TABLE OF CONTENTS. Chapter 3 - WATER MAIN, VALVES, HYDRANTS AND APPURTENANCES. Chapter 4 - SANITARY SEWER. Chapter 5 - STORM SEWER

Size: px
Start display at page:

Download "TABLE OF CONTENTS. Chapter 3 - WATER MAIN, VALVES, HYDRANTS AND APPURTENANCES. Chapter 4 - SANITARY SEWER. Chapter 5 - STORM SEWER"

Transcription

1 Chapter 3 - WATER MAIN, VALVES, HYDRANTS AND APPURTENANCES Chapter 4 - SANITARY SEWER Chapter 5 - STORM SEWER Chapter 6 - EXCAVATION, TRENCING, BACKFILLING, AND BEDDING Chapter 11 - CONCRETE CURBS, CURB AND GUTTERS, CONCRETE SURFACING, SIDEWALKS, DRIVEWAYS AND BIKEWAYS Chapter 12 - PORTLAND CEMENT CONCRETE PAVEMENT Chapter 33 - SEEDING AND SODDING Chapter 37 - CONSTRUCTION EROSION CONTROL Standard Details

2 Chapter 3 - WATER MAIN, VALVES, HYDRANTS AND APPURTENANCES 3.00 SCOPE 3.10 GENERAL 3.20 MATERIALS 3.21 WATER MAIN MATERIAL A. DUCTILE IRON PIPE B. FITTINGS C. FIRE HYDRANTS D. VALVES E. GATE VALVES F. VALVE BOXES G. TAPPING TEES, CROSSES AND VALVES H. COUPLINGS 3.22 WATER SERVICES A. COPPER TUBING B. CORPORATION STOPS C. TAPPING SADDLES D. CURB STOPS AND BOXES 3.23 FIRE SERVICE LINES A. DUCTILE IRON PIPE B. DOMESTIC WATER SERVICES 3.30 CONSTRUCTION METHODS 3.31 EXCATION, TRENCHING, BEDDING AND BACKFILLING 3.32 WATER MAIN INSTALLATION A. LOWERING OF WATER MAIN INTO TRENCH B. INSPECTION BEFORE INSTALLATION C. CLEANING OF PIPE AND FITTINGS D. PLACEMENT OF PIPE E. CUTTING OF PIPE F. BELL ENDS TO FACE DIRECTION OF LAYING G. UNSUITABLE CONDITIONS FOR LAYING PIPE H. BRIDGING OF PIPE I. INSULATION BETWEEN DIFFERENT METALIC PIPE MATERIALS 3.33 GENERAL REQUIREMENTS OF PIPE JOINTING A. MECHANICAL JOINTS B. PUSH-ON JOINTS C. RESTRAINED JOINTS 3.34 CONNECTIONS WITH EXISTING PIPE LINES A. CONNECTION B. PRESSURE CONNECTION 3.35 RELATION OF WATER MAINS TO SEWERS A. PARRALLEL INSTALATION B. CROSSING 3.40 WATER MAIN APPURTENANCES 3.41 SETTING OF VALVE AND FITTINGS 3.42 SETTING OF FIRE HYDRANTS 3.43 INSTALLATION OF BRACING, SUPPORTING AND ANCHORING A. ANCHORAGE FOR FIRE HYDRANTS B. ANCHORAGE FOR PLUGS, CAPS, TEES, TAPS AND BENDS

3 C. FORMING FOR CONCRETE THRUST BLOCKS AND ANCHORS 3.50 SERVICE CONNECTIONS A. WATER SERVICES B. SANITARY SEWER SERVICES 3.70 QUALITY ASSURANCE A. DISINFECTION B. METHOD C. TESTING D. PRESSURE AND LEAKAGE TESTS E. TEST EQUIPMENT AND FACILITIES F. PRESSURE TEST G. LEAKAGE TEST 3.80 SUBMITTALS A. Certification by Manufacturer B. Quality Control Testing C. Shop Drawings 3.90 MEASUREMENT AND PAYMENT A. Measurement and payment B. Water Mains C. Pipeline Specials D. Fire Hydrants E. Connections F. Pressure Connections G. Water and Sewer Crossings H. Service Lines I. Service Reconnections for Water and Sewer Chapter 4 - SANITARY SEWER 4.00 SCOPE 4.10 GENERAL 4.20 MATERIALS 4.21 GRAVITY SEWERS A. VITRIFIED CLAY SEWER PIPE B. DUCTILE IRON PIPE 4.22 PRESSURE SEWERS A. DUCTILE IRON PIPE AND FITTINGS B. GATE VALVES C. PLUG VALVE D. VALVE BOXES 4.30 CONTRUCTION METHODS A. EXCAVATION, TRENCHING AND BACKFILLING B. PIPE INSTALLATION C. PLUGGING OF PIPE DURING INSTALLATION D. DEWATERING IN PIPE INSTALLATION 4.40 SEWER APPURTENANCES A. MANHOLES B. WYE BRANCHES AND TEES C. SERVICE CONNECTIONS D. ANCHORAGE FOR PLUGS, CAPS, WYES, TEES AND BENDS E. RELATION OF WATERMAINS TO SEWERS

4 F. ADAPTOR COUPLINGS 4.70 QUALITY ASSURANCE 4.71 TESTING GRAVITY SEWERS A. FIELD QUALITY CONTROL B. LIGHT TEST C. INFILTRATION AND AIR TEST D. AIR TEST E. TELEVISION INSPECTION 4.72 TESTING PRESSURE SEWERS A. HYDROSTATIC TEST B. PRESSURE AND LEAKAGE TESTS C. TEST EQUIPMENT AND FACILITIES D. PRESSURE TEST E. LEAKAGE TESTS 4.90 MEASUREMENT AND PAYMENT A. MEASUREMENT AND PAYMENT B. SEWER PIPE C. STANDARD MANHOLES D. DROP MANHOLES E. WYE BRANCHES AND TEES F. CLEANOUTS G. SERVICE CONNECTIONS H. SPECIAL FOUNDATIONS I. CONNECTIONS TO EXISTING MANHOLE J. SERVICE RECONNECTIONS FOR WATER AND SEWER K. WATER AND SEWER CROSSING L. ADAPTOR COUPLINGS M. FORCEMAIN CLEANOUT Chapter 5 - STORM SEWER 5.00 SCOPE OF WORK 5.20 STORM SEWER MATERIALS A. REINFORCED CONCRETE PIPE B. REINFORCED CONCRETE LOW-HEAD PRESSURE PIPE C. REINFORCED CONCRETE ARCH CULVERT D. REINFORCED CONCRETE ELLIPTICAL CULVERT E. STORM SEWER INLET FRAMES AND GRATES F. GRADE RINGS G. MANHOLE RINGS AND COVER H. GROUT I. CONCRETE J. REINFORCING STEEL K. REINFORCING BARS L. JOINT MATERIALS M. BITUMINOUS JOINT FILLER N. GASKET TYPE JOINTS O. LIFT HOLE 5.30 CONSTRUCTION METHODS A. PROTECTION OF EXISTING UTILITIES B. STRUCTURE SUBGRADE PREPARATION

5 C. PIPE LAYING AND JOINTING D. PLACEMENT OF PIPE E. CUTTING OF PIPE F. PIPE BEDDING G. HORIZONTAL AND VERTICAL PIPE SEPARATION H. MANHOLES I. STORM SEWER INLETS J. EXCAVATION TRENCHING, BEDDING AND BACKFILLING K. FLOWABLE BACKFILL L. EXPOSURE OF SANITARY PIPE OR MANHOLES 5.40 DRAINAGE STRUCTURE CONSTRUCTION A. CONCRETE WORK B. FORM WORK C. FORM REMOVAL D. CONCRETE PLACEMENT E. FINISHING F. CONSTRUCTION JOINTS G. PROTECTION AND CURING H. WATERPROOFING I. CLEANING 5.70 QUALITY ASSURANCE A. TESTING B. LIGHT TEST C. AIR TEST. D. TELEVISION INSPECTION E. UNUSUAL CONDITIONS F. GENERAL OF CONCRETE PIPE H. EVALUATION OF BACKFILL 5.71 ACCEPTANCE A. ACCEPTANCE 5.80 SUBMITTALS A. SUBMITTALS Chapter 6 - EXCAVATION, TRENCING, BACKFILLING, AND BEDDING 6.00 SCOPE 6.10 GENERAL 6.30 CONSTRUCTION METHODS 6.31 TRENCH EXCAVATION A. COMMON EXCAVATION B. UNCLASSIFIED EXCAVATION C. GENERAL PREPARATION OF SUB-GRADE D. TRENCH WIDTH E. DEWATERING 6.32 BEDDING A. CLASSES OF BEDDING B. CONCRETE CRADLE BEDDING, CLASS A C. FIRST CLASS BEDDING, CLASS B D. ORDINARY BEDDING, CLASS C E. SPECIAL BEDDING, CLASS D

6 6.33 TRENCH BACKFILL A. BACKFILLING B. COMMON TRENCH BACKFILL C. BACKFILL AROUND STRUCTURES AND APPURTENANCES D. BACKFILL MATERIAL E. BACKFILL MOISTURE CONTROL F. BACKFILL GRAVEL G. FREEZING WEATHER H. DISPOSAL OF SURPLUS MATERIAL 6.34 MISCELLANEOUS A. PROTECTION OF EXISTING UTILITIES AND PROPERTIES B. ABANDONMENT OF UTILITIES C. SURVEY REFERENCE PROTECTION D. CONSTRUCTION RIGHT-OF-WAY E. PROTECTION F. SETTLEMENT 6.35 CLEANUP A. PROJECT CLEAN-UP 6.70 QUALITY CONTROL 6.71 TESTING A. SOILS TESTING B. GEOTECHNICAL LABORATORY TESTING 6.72 EROSION CONTROL A. SOIL EROSION AND SEDIMENTATION CONTROL 6.90 MEASUREMENT AND PAYMENT A. MEASUREMENT AND PAYMENT B. REMOVAL AND REPLACEMENT OF EXISTING PAVEMENTS C. UNCLASSIFIED EXCAVATION D. DISPOSAL OF SURPLUS MATERIAL E. UNSUITABLE MATERIALS Chapter 11 - CONCRETE CURBS, CURB AND GUTTERS, CONCRETE SURFACING, SIDEWALKS, DRIVEWAYS AND BIKEWAYS SCOPE GENERAL MATERIALS A. CONCRETE B. PORTLAND CEMENT C. GRADATION LIMITS- FINE AGGREGATE D. GRADATION LIMITS- COURSE AGGREGATE E. WATER F. SLUMP G. WORKABILITY H. MIXING I. ADMIXTURES J. FLY ASH K. WATER REDUCING, SET CONTROLLING ADMIXTURE L. REINFORCING STEEL M. REINFORCING BARS N. DOWEL BARS

7 O. EXPANSION JOINTS P. JOINT SEALING MATERIAL: CONSTRUCTION METHODS A. PREPARATION OF SUBGRADE FORMS A. RIGID FORMS B. SLIP FORMS CONCRETE PLACEMENT A. VIBRATING B. FINISHING C. CURING D. PROTECTION CURBS, CURB AND GUTTERS AND VALLEY GUTTERS MEDIAN SURFACING STAMPED AND COLORED BRICK PATTERN CONCRETE SURFACING SIDEWALKS DRIVEWAYS ACCESS RAMPS CONSTRUCCTION APPURTENANCES PLACING REINFORCING STEEL JOINTS A. CONTRACTION JOINTS B. EXPANSION JOINTS C. JOINT SEALING COLD WEATHER CONCRETING A. COLD WEATHER CONCRETING HOT WEATHER CONCRETING A. HOT WEATHER CONCRETING MEASURMETN AND PAYMENT A. MEASUREMENT AND PAYMENT B. CURBS AND GUTTERS C. VALLEY GUTTERS D. SIDEWALKS E. DRIVEWAYS F. DETECTABLE TRUNCATED SURFACEING Chapter 12 - PORTLAND CEMENT CONCRETE PAVEMENT SCOPE GENERAL PAVEMENT MATERIALS A. CONCRETE B. PORTLAND CEMENT C. GRADATION LIMITS- FINE AGGREGATE D. GRADATION LIMITS- COURSE AGGREGATE E. WATER F. SLUMP G. WORKABILITY H. MIXING I. ADMIXTURES

8 J. FLY ASH K. WATER REDUCING, SET CONTROLLING ADMIXTURE L. REINFORCING STEEL M. REINFORCING BARS N. DOWEL BARS O. EXPANSION JOINTS P. JOINT SEALING MATERIAL Q. METAL SUPPORTS R. EXPANSION TUBES CONSTRUCTION METHODS EARTHWORK A. CLEARING AND GRUBBING B. SITE PREPARATION C. EXCAVATION D. EMBANKMENT E. BORROW F. SURPLUS MATERIAL SUB-GRADE A. SUB-GRADE B. SUB-GRADE PREPARATION C. FAULTY FOUNDATION D. GRANULAR FOUNDATION COURSE PAVEMENT A. BLOCK OUTS B. CONCRETE PLACEMENT REQUIREMENTS D. MACHINE PLACEMENT E. FORMED METHOD G. FORM REMOVAL H. PLACING REINFORCING STEEL I. FLOATING AND SCRAPING J. EDGING K. FINAL SURFACE FINISH L. INTEGRAL CURBS M. INTEGRAL CURB JOINTS N. PROTECTION O. CURING JOINT APPLICATIONS A. CONTRACTION JOINTS B. PLANNED CONSTRUCTION JOINTS C. EMERGENCY CONSTRUCTION JOINTS D. LONGITUDINAL JOINTS E. EXPANSION JOINTS ADJUSTMENTS A. ADJUSTMENT OF MANHOLES AND STORM SEWER INLETS B. ADJUSTMENT OF VALVE BOXES BACKFILLING A. BACKFILLING B. FINAL GRADING AND TOPSOILING OPENING TO TRAFFIC A. OPENING TO TRAFFIC CLEANUP

9 A. CLEANUP B. COATING FOR CAST IRON CASTINGS OTHER PAVEMENT OPERATIONS COLD WEATHER CONCRETING A. COLD WEATHER CONCRETING HOT WEATHER CONCRETING A. HOT WEATHER CONCRETING PAVEMENT PATCHING, REMOVAL AND REPLACEMENT A. PAVEMENT PATCHING, REMOVAL AND REPLACEMENT QUALITY ASSURANCE A. CONCRETE TESTING SERVICE B. MIX DESIGN C. QUALITY CONTROL THICKNESS A. REQUIREMENTS FOR THICKNESS B. LENGTH AND WIDTH OF UNITS C. CORES D. DETERMINATION OF THICKNESS E. THICKNESS - THICKNESS DEFICIENT MORE THAN 8.0% SUBMITTALS A. SUBMITTALS MEASUREMENT AND PAYMENT A. MEASUREMENT AND PAYMENT B. CLEARING AND GRUBBING C. PREPARATION D. COMMON EXCAVATION E. EMBANKMENT F. BORROW G. SUB-GRADE PREPARATION. H. GRANULAR FOUNDATION COURSE I. ADJUSTING MANHOLES, INLETS AND VALVE BOXES J. PORTLAND CEMENT CONCRETE PAVEMENT K. INTEGRAL CURB L. HEADERS M. TRANSVERSE EXPANSION AND MISCELLANEOUS JOINTS N. MISCELLANEOUS O. CONCRETE TESTING Chapter 33 - SEEDING AND SODDING SCOPE GENERAL MATERIALS A. GENERAL PLANT MATERIALS REQUIREMENT - B. SEED (GENERAL) - C. APPROVED VARIETIES INCLUDE: TYPE A TYPE B TYPE C TYPE D TYPE E TYPE F

10 TYPE G TYPE H TYPE I D. SOD (GENERAL) - E. FERTILIZER F. TOPSOIL G. COMPOST H. MULCH I. LIMESTONE J. WATER CONSTRUCTION METHODS A. EXAMINATION B. UNDERGROUND FACILITIES C. PREPARATION OF SOIL E. FERTILIZING F. SITE CLEAN-UP COVER CROP (Temporary Seeding) A. EARLY SEASON (SPRING COVER CROP) B. MID-SEASON (LATE SUMMER/FALL COVER CROP) C. LATE SEASON (WINTER COVER CROP) SEEDING A. GENERAL B. TOPSOIL C. SEED D. MULCHING E. SEEDING METHOD - 1. FESCUE/BLUEGRASS SEEDING 2. NATIVE SEEDING F. WATERING SODDING A. GENERAL B. TOPSOIL. C. CARE AND HANDLING D. INSTALLATION. G. MAINTENANCE J. WATERING CONSTRUCTION APPURTENANCES PLANTING SEASON ACCEPTANCE AND ESTABLISHMENT PERIOD A. INSPECTION B. ESTABLISHMENT C. FINAL INSPECTION REPLACEMENT OF MATERIAL AND GUARANTEE PERIOD QUALITY ASSURANCE A. SOD B. SEED C. COMPLIANCE D. INSPECTION SOURCE QUALITY CONTROL A. CERTIFICATES OF INSPECTION

11 B. SUBSTATUTIONS C. CERTIFIED ANALYSIS SUBMITTALS MEASUREMENT AND PAYMENT A. GENERAL Chapter 37 - CONSTRUCTION EROSION CONTROL SCOPE OF WORK GENERAL MATERIALS CONSTRUCTION METHODS STORM WATER POLLUTION PREVENTION PLAN (SWPPP) AND NDEQ PERMITTING: A. STORM WATER POLLUTION PREVENTION PLAN (SWPPP) B. RESPONSIBILITIES AND DUTIES LOCATION OF STORM WATER POLLUTION PREVENTION PLAN (SWPPP) STABILIZATION PRACTICES FOR DISTURBED LAND STOCKPILES, SIDE CASTING, AND STORAGE OF CONSTRUCTION MATERIALS STABILIZATION PRACTICES SEEDING AND SODDING: STRUCTURAL PRACTICES A. SILT FENCE B. CONSTRUCTION SPECIFICATIONS C. SILT FENCE MAINTENANCE D. REMOVAL OF SILT FENCE E. TEMPORARY SEDIMENT TRAP F. ROLLED EROSION CONTROL PRODUCTS (RECP) S G. STORM DRAIN INLET PROTECTION H. OFF- SITE VEHICLE TRACKING I. WASHING J. ENTRANCE/EXIT MAINTENANCE. K. CONCRETE WASHOUT L. EROSION CONTROL MAINTENANCE M. GENERAL BMP MAINTENANCE OTHER CONTROLS A. WASTE DISPOSAL B. PORTABLE SANITARY FACILITIES TIMING OF CONTROLS/MEASURES MAINTENANCE AND INSPECTION PROCEDURES A. EROSION AND SEDIMENT CONTROL INSPECTION AND MAINTENANCE PRACTICES B. ALLOWABLE NON- STORM WATER DISCHARGES TIMELY REPAIRS BY CONTRACTOR SPILL PREVENTION: A. MATERIAL MANAGEMENT PRACTICES B. INVENTORY FOR POLLUTION PREVENTION PLAN C. SPILL PREVENTION CONTROL PRACTICES MEASUREMENT AND PAYMENT A. MEASUREMENT AND PAYMENT

12 B SILT FENCE, TEMPORARY BERMS, TEMPORARY DIVERSIONS, AND TEMPORARY CULVERT PIPE C. EROSION CONTROL BALES AND CHECK D. SEDIMENT TRAPS AND SEDIMENT BASINS E. ROLLED EROSION CONTROL PRODUCTS F. TIME OF PAYMENT FOR EROSION CONTROL ITEMS G. FAILURE TO PERFORM STANDARD DETAILS PAVEMENT DETAILS 3 SHEETS DRIVEWAY DETAILS CURB INLET DETAILS INLET DETAILS JUNCTION MANHOLE AND MISC. DETAILS SEDIMENT CONTROL DETAILS SIDEWALK DETAILS WATER DETAILS SANITARY SEWER DETAILS