1 Specialists in Earthworks and Excavation Services

2 COMPANY PROFILE John C Beaumont Earthmoving (JCB) was established at Willowbank in The company now has over 50 employees and more than 28 years experience delivering a range of earthmoving and excavation services across South East Queensland. John Beaumont and his team are considered leaders in their field and are sought by industry professionals for advice on challenging projects where practical knowhow and innovative thinking are required to resolve complex site issues. JCB maintain specialist equipment to tackle any size project and offer highly skilled operators with current industry accreditations to drive productivity and deliver commercial results. As John says, We pride ourselves on being able to deliver exactly what our clients request - on time and on budget. JCB operate primarily in the South East Queensland, Darling Downs and Maranoa/Warrego regions. The company s head office and workshop are located at Muirlea, near Ipswich. They also maintain a depot at Jondaryan and have mobile mechanics and refuelling services available. JCB s clients include mining companies, government utilities, local councils and private landholders. The range of work JCB provides include: Environmental land clearing, contouring and landscaping Mine excavation and site access roads built Building and stockpile pads constructed Referrable dam and levee construction Flood mitigation and remediation works Maintenance of tailings dams and sedimentation ponds Road repair and verge maintenance Onsite quarrying, crushing and screening of gravels and road base Site rehabilitation including defusing sponcom stockpiles Development of parklands and sporting grounds Plant and operator hire 2

3 OUR SERVICES Utilising our extensive range of equipment and specialist operators JCB provide a range of earthmoving and excavation services to support the following projects: Environmental Land Clearing Earthworks Mining Quarrying Road Construction Dam Construction Flood Remediation Site Rehabilitation Parklands Plant Hire EQUIPMENT JCB maintain specialist equipment to tackle any size project and have the capacity to supply specific project requirements. Accounts with multiple hire firms means that JCB also have access to back up equipment if required. Our fleet of low loaders ensures quick delivery of machinery to site so that no time is wasted. JCB s range of equipment includes: Scrapers Dozers Swamp Dozers Excavators Loaders Compactors Graders Impact Crushers Screening Plants Water Tankers and Trucks Bobcats Mini Excavators Small Rollers Small Pavers Tractors and Slashers Front Deck Mowers Body Tipper Trucks Trucks & Dogs Low Loaders Timber Grinder 3

4 SPECIALIST CAPABILITIES With over 28 years experience JCB have developed specialised skills and knowledge which enable them to assist clients with complex and challenging construction projects, such as: Pre stripping and box cut for mine establishment Construction of large scale referrable dams and levees for mine operations Rehabilitation of coal mines and associated infrastructure Defusing sponcom stockpiles on mine sites Safe removal of asbestos materials Remediation of public infrastructure after flooding events Environmentally sensitive land clearing for development areas There are a number of advantages in working with JCB which include: Access to knowledge developed through working on major projects with leading industry specialists Experience gained over 28 years working on major construction projects Flexibility to provide the equipment and personnel required at each project stage Reliability that ensures deadlines are met and projects are delivered on time Convenience of having the right equipment and materials delivered to site when needed Affordability to ensure the delivery of quality services within budget limits 4

5 PROJECT MANAGEMENT For JCB good project management is about clearly understanding the client s requirements from the outset and implementing processes to ensure those standards are met. The process begins with an initial client meeting after which a work schedule is prepared to identify all of the required resources. A mobilisation plan is then developed for all staff and contractors to outline the required specifications and timeframes. Managers and supervisors then monitor progress and timeframes to ensure key milestones are achieved. Regular consultations are held with the client to provide progress reports in an agreed format. This ensures any issues are detected early and can be quickly rectified. This process allows for a degree of flexibility if required by the client. With a computer system able to track projects through to completion and the ability to work effectively with all trades and contractors, JCB really do stake their reputation on delivering projects on time and on budget. 5

6 KEY PERSONELL 01 JOHN BEAUMONT Managing Director John Beaumont has extensive industry experience which equips him with the practical skills to ensure onsite works are constructed to exact specifications and meet stringent quality assurance targets. With over 28 years on the job John also has the capacity to perform the higher level planning and oversight required to manage multiple projects through to a successful completion for clients. John maintains the following qualifications and accreditations: Certificate IV in Horticulture Certificate IV in Training & Assessment Training & Assessing for Dozer, Scraper & Grader Level 2 Escort Pilot 02 ANDREW TEECE Project Engineer Andrew Teece has been in Construction for over thirty years and has a degree in Civil Engineering. Has been involved in every level of civil works including concept, planning, design, construction and finalisation of projects. He has previously held various roles within Local Government ranging from Senior Planning and Investigations Engineer through to Construction Manager of large Civil Projects. 03 BRETT ROBINSON Finance Manager Brett Robinson is a Certified Practising Accountant (CPA) who manages JCB s finance and accounting systems. He previously held a number of high level accounting roles with major construction corporations. Brett s unique business insights and rigorous attention to detail ensure JCB meet their contractual obligations and maintain high levels of compliance with relevant legislation. 6

7 04 KAY BEAUMONT Office Manager Kay Beaumont oversees JCB s day to day operations and supports the various project teams to achieve their daily targets and overall goals. She is responsible for the administration, planning and human resources functions of the company. Kay s ability to efficiently manage the operations of the business and provide a high level of support to staff and clients ensures JCB maintains an excellent reputation for reliability and quality service provision. PROJECT PERSONNEL JCB brings together teams of highly skilled and industry accredited personnel to work on specific projects as required. Team members are chosen for their ability to work collaboratively with other professionals and contractors to achieve project milestones. Industry accreditations and site inductions are managed by JCB to ensure project staff are able to commence working safely and efficiently. The project personnel JCB can supply includes: Contract Managers Construction Managers Site Supervisors Plant Operators Environmental Health and Safety Officers Workshop Managers Site Maintenance Managers Workshop Tradespeople CERTIFICATIONS JCB maintain relevant industry accreditations including: BSA Contractor License Structural Landscaping (Trade) BSA Contractors Ticket in Structural Landscaping Fire Ant Certification ARMP 0934 Mine Operator Senior Site Executive (SSE) Mining and Quarrying 7

8 CERTIFICATIONS JCB personnel maintain the following industry accreditations as required for their roles: Construction Safety Cards Coal Surface Generics Coal Board Medicals QMS 123 Qualifications Wide Load Pilots Level 2 MUTCD Tickets ACDC Tickets Chainsaw Operation Tickets Operator Tickets First Aid JCB crews have also completed industry inductions with: SEQ Water New Hope Coal Queensland Urban Utilities Road Tek Investa Land Development General Site Inductions QUALITY ASSURANCE JCB is investing significantly in the implementation of a quality framework which meets the standards of AS/NZ ISO 9001:2008. Regular monitoring and auditing of projects ensures JCB maintain a rigorous adherence to this standard. All personnel are taken through the policies and procedures relating to the quality assurance framework and their performance is routinely assessed to ensure compliance at the highest level. 8

9 ENVIRONMENTAL HEALTH AND SAFETY JCB maintains a positive commitment to safety and environmental management and has site safety planning and implementation procedures in place across all of its operations. Operational areas such as waste and run off control are managed through the implementation of relevant policies and procedures. All staff are inducted to these standards and have access to Safety and Environment Manuals to guide their work practices. These documents are currently being adapted to become accredited under AS/NZS In the interim JCB crews complete the following safety training as required: Company and Site Inductions Work Method Statements Risk Assessments Tool Box Meetings Safe Machinery Start Up Procedure INSURANCE DETAILS JCB manage risk by implementing relevant policies and procedures and maintaining the following insurance cover: Public Liability $20M Plant and Equipment Marine Cargo Work Cover Audit 9

10 MAJOR CLIENTS JCB have forged a reputation over the past 28 years for getting the job done on time and on budget. Clients keep coming back to JCB because they deliver exactly what is required at an affordable price. Major clients who have maintained long term working relationships with JCB include: New Hope Coal Australia Investa Land Development Sibelco Australia RoadTek SEQ Water Queensland Urban Utilities Brisbane City Council Ipswich City Council Toowoomba Regional Council Lockyer Valley Regional Council Somerset Regional Council Scenic Rim Regional Council PROJECT EXPERIENCE JCB s solid reputation has been forged on major projects working with highly regarded industry specialists including geologists, engineers and surveyors. John Beaumont and his team have amassed considerable know-how over the past 28 years and bring that expertise to bear on each project. Their demonstrated ability to meet project deadlines and deliver quality services on a consistent basis is evidenced in the following example projects and case study. 10

11 PROJECT EXPERIENCE 01 NEW ACLAND COAL MINE STAGES 1 & 2 02 Client New Acland Coal Mine Description Contracted to build infrastructure for a new production coal mine. 1.3million BCM Rom pad Box cut Raw water dam Environmental dams and levees Sedimentation dams Tailings dams with associated drains & rock spillways QUARRY PRODUCTION Client Toowoomba Regional Council Description 03 FLOOD REMEDIATION Client Ipswich City Council Description Clear and mulch flood debris from Colleges Crossing after 2011 flood event. Excavators, grinder, bobcat and trucks used to gather and sort flood waste for mulching or disposal. Stockpile sand heaps for rejuvenation of areas. Snip, mulch & stockpile all green waste for the park area. 04 Win, crush and blend road base for road repairs. Successful supplier on the Quarrying and Mining Act Regulations. Generic Inductions, QMS 1,2&3, mine medical, First Aid as required to become an SSE. Establish access and production/ stockpiling pads at various pits. Establishment of dams, drains and dust control to EPA requirements. Process material to various required standards. SITE REHABILITATION SWANBANK ENTERPRISE PARK Client Investa Land Development Description Convert mine lease from coal mining legislation to an approved industrial park development. Became an approved coal mine operator to work with the EPA to surrender a mining lease. Remove old workshop and infrastructure containing asbestos. Remove stockpile of coal stone on fire which created a Sponcom event. Cleared area of vegetation, snipped and mulched the green waste. 11

12 CASE STUDY Major project successfully completed for New Hope Coal Acland Stage 1 involving the construction of various referable dams, with Parsons Brinckerhoff as consulting engineers. Environmental Dam 1 Environmental Dam 2 Raw Water Dam 1 Tailings Dam 1 470,000m³ of embankment Sedimentation Dam Associated drains and rock spillways Long term erosion and sediment controls Various flood levees Construction of an industrial level crossing, including boom gates, involved bridging over Moonie Pipeline by removing the railway line and embankment and replacing with 3.5m deep road base pavement. Associated culverts, pipe work, head walls, rock work and drainage were also completed. Acland Stage 2 Parsons Brinckerhoff consulting engineers. Tailings Dam embankment and spillway. Raw Water Dam 2, including diversion channel to inlet, sediment trap to inlet and inlet headwall structure. South Pit Flood Levee Parsons Brinckerhoff consulting engineers, Opus International for inspections and certifications. 2.5km long referable flood levee drain, including 2 referable settlement dams of approximately 65 megalitres each. Associated spillway and rock lined inlets & outlets. Environmental Dam 4 SKM consulting engineers, Opus International for certifications and inspections. Referable dam of approximately 110 megalitres Gabion basket inlet Diversion drains Construction of new coal pads and maintenance of existing pads Pre-strip and box cut as required to assist production rates for the mine Ongoing rehabilitation of completed mine areas Profiling, top soiling, contour drains, rock lined drains and seeding 12

13 Head Office 456 Pine Mountain Road Muirlea QLD 4306 Postal address PO Box 2 Amberley Qld 4306 Phone: Fax: John Beaumont - Managing Director Mobile: admin@jcbeaumont.com.au Web: ABN: