1 Letting: Letting Dt: March 02, :30 A.M. State Proj.: Contract ID: Contract Description: Contract Location: Recommendation: STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS District(s): M Route: Start Dt: 04/03/17 Comp. Dt: 10/06/17 Counties: Bridge Span: RAMSEY No Contract Time: Min: Max: (TH 51=125), (TH 51=125), and SAP STPF 6217 (131) In Ramsey County on TH 51 from Como Avenue to TH 36 in St Paul, Falcon Heights, and Roseville Bituminous and Concrete Surfacing, Concrete Pavement Rehabilitation, ADA Improvements, Signals, Lighting, and TMS 2.32 Miles LOCATED ON T.H. 51 FROM COMO AVE. TO T.H. 36. Award To Low Bidder I, the undersigned certify that this abstract is a correct tabulation of all bids received on this (these) Project(s), and that the legal requirements have been complied with relating to competitive bidding. Approved: Rick Beckes Elisa Bottos Digitally signed by Rick Beckes DN: cn=rick Beckes Date: :31:32-05'00' Digitally signed by Elisa Bottos DN: cn=elisa Bottos Date: :29:46-05'00' Construction Engineer Contract Administration Engineer Award Date: 03/17/2017 Rank Vendor ID Vendor Name Total Bid % Over Low Bid % Over Estimate 0 -EST- Engineer's Estimate $8,553, % 100% PCiRoads, LLC $7,103, % 83.05% INTERSTATE IMPROVEMENT, $7,263, % 84.92%

2 / , , , , , , VIBRATION MONITORING / , , , , , , AS BUILT / , , , , , , MOBILIZATION / MAINT AND RESTORATION OF HAUL ROADS / , , , CLEARING TREE / , , , GRUBBING TREE / , , , , PAVEMENT MARKING REMOVAL / PAVEMENT MARKING REMOVAL / , , , REMOVE PIPE SEWERS / , , , REMOVE INTEGRANT CURB / , , , , REMOVE CURB AND GUTTER / , , , REMOVE RETAINING WALL

3 / , , , REMOVE GUARDRAIL-PLATE BEAM / , , , , REMOVE CONCRETE WALK / , , , , REMOVE CONCRETE DRIVEWAY PAVEMENT / , , , , REMOVE CONCRETE PAVEMENT / , , , REMOVE CASTING / , , , REMOVE DRAINAGE STRUCTURE / REMOVE DELINEATOR / REMOVE MARKER / , , , REMOVE SIGN TYPE C / , , , REMOVE SIGN TYPE D / , , , , , , REMOVE SIGN TYPE OH / REMOVE SIGN PANEL TYPE C

4 / REMOVE SIGN PANEL TYPE D / , REMOVE SIGN PANEL TYPE OH / , , , , SAWING CONCRETE PAVEMENT (FULL DEPTH) / SALVAGE IMPACT ATTENUATOR / SALVAGE ENERGY ABSORBING TERMINAL / SALVAGE SIGN TYPE C / SALVAGE SIGN PANEL TYPE C / SALVAGE SIGN PANEL TYPE SPECIAL / ABANDON MISCELLANEOUS STRUCTURE / , , , REMOVE AND REPLACE BITUMINOUS PAVEMENT / , , , , , , DEWATERING / , , , DITCH CLEANING

5 / , , , , EXCAVATION - COMMON / , , , EXCAVATION - SUBGRADE / , , , SELECT GRANULAR EMBANKMENT (CV) / , , , COMMON EMBANKMENT (CV) / , , , STREET SWEEPER (WITH PICKUP BROOM) HOUR / , , , , AGGREGATE BASE (CV) CLASS / , , BITUMINOUS PATCHING MIXTURE TON / , , , , MILL BITUMINOUS SURFACE (2.0") S Y / , , , , PLACE CONCRETE PAVEMENT 8" S Y / , , , STRUCTURAL CONCRETE / , , , , DOWEL BAR / , , , DRILL AND GROUT DOWEL BAR (EPOXY COATED)

6 / DRILL AND GROUT REINFORCEMENT BAR (EPOXY COATED) , , , / , , , , DOWEL BAR / , , , , JOINT AND CRACK REPAIR (TYPE B3) / , ,178, ,347, ,528, FULL DEPTH REPAIR (TYPE CD-HV) / , , , , CONCRETE GRINDING S Y / , ,756, , ,134, PAVEMENT REPLACEMENT (TYPE CX) S Y / , , , , PARTIAL DEPTH REPAIR (TYPE BA) / , , , PARTIAL DEPTH REPAIR SPECIAL (TYPE BE) / , , , TYPE SP 12.5 WEARING COURSE MIXTURE (4,E) TON / , , , EXPANSION JOINTS, DESIGN E8H / , , , " RC PIPE SEWER / , , , " RC PIPE SEWER

7 / , , " RC PIPE SEWER / , , , , , CONNECT TO EXISTING STORM SEWER / , , , , CLEAN AND VIDEO TAPE PIPE SEWER / , , , CONSTRUCT DRAINAGE STRUCTURE DESIGN F / , , , CONSTRUCT DRAINAGE STRUCTURE DESIGN SD / CONSTRUCT DRAINAGE STRUCTURE DESIGN , , , / CONSTRUCT DRAINAGE STRUCTURE DESIGN , , , , , , / , , , CASTING ASSEMBLY / CASTING ASSEMBLY SPECIAL / CONNECT INTO EXISTING DRAINAGE STRUCTURE / , , , , CONCRETE WALK / , , , CONCRETE CURB AND GUTTER DESIGN B612

8 / , , , , CONCRETE CURB AND GUTTER DESIGN B / , , , CONCRETE CURB AND GUTTER DESIGN B / , , , " CONCRETE DRIVEWAY PAVEMENT S Y / , , , " CONCRETE DRIVEWAY PAVEMENT S Y / , CONCRETE CURB DESIGN V / , , , TRUNCATED DOMES / , PORTABLE PRECAST CONCRETE BARRIER DESIGN , , , / , RELOCATE PORTABLE PRECAST CONCRETE BARRIER DESIGN , , , / , , , , , , LIGHTING SYSTEM / , , , , , , LIGHTING SYSTEM "A" / , , , , , , LOOP DETECTOR DESIGN SAWCUT / , , , TRAFFIC BARRIER DESIGN SPECIAL

9 / , , , TRAFFIC BARRIER DESIGN BULLNOSE / , , , TRAFFIC BARRIER DESIGN B / ANCHORAGE ASSEMBLY - PLATE BEAM / , , , , , , END TREATMENT-TANGENT TERMINAL / T-BARRIER BRIDGE CONN DES / , , , , , , IMPACT ATTENUATOR AMBY / , , , , , , IMPACT ATTENUATOR NO 1 AMBY / , , , RELOCATE IMPACT ATTENUATOR AMBY / , , , , , , TRAFFIC CONTROL / , , , , , , ALTERNATE PEDESTRIAN ROUTE / RAISED PAVEMENT MARKER TEMPORARY / , , , MEDIAN BARRIER DELINEATOR

10 / , , , PORTABLE CHANGEABLE MESSAGE SIGN UDAY / , , , , , , CONCRETE FOOTINGS (TYPE OH SHAFT) / , STRUCTURAL STEEL-POSTOR OH SIGNS (DESIGN B) LB , , , / , STRUCTURAL STEEL-TRUSSEOR OH SIGNS (DESIGN B) LB , , , / STR STEEL-PANEL MOUNTING POSTOR OH SIGNS (DESIGN B) LB / , , , , SIGN PANE TYPE C / , , , SIGN PANE TYPE D / SIGN PANE TYPE OVERLAY / , , , SIGN PANE TYPE OH / INSTALL SIGN PANEL TYPE C / INSTALL SIGN PANEL TYPE SPECIAL / INSTALL SIGN TYPE C

11 / OVERHEAD SIGN IDENTIFICATION PLATE / , DELINEATOR TYPE X / , , , DELINEATOR TYPE X / REFERENCE LOCATION SIGN / OBJECT MARKER TYPE X / OBJECT MARKER TYPE X / , , , , , , REVISE SIGNAL SYSTEM A SYS / , , , , , , REVISE SIGNAL SYSTEM B SYS / , , , , , , REVISE SIGNAL SYSTEM C SYS / , , , STORM DRAIN INLET PROTECTION / , , , , SEDIMENT CONTROL LOG TYPE COMPOST / FERTILIZER TYPE 1 LB

12 / SUBSOILING ACRE / , SOIL BED PREPARATION ACRE / SEED MIXTURE LB / SEED MIXTURE LB / , , , MULCH MATERIAL TYPE / , , , , EROSION CONTROL BLANKETS CATEGORY 0 S Y / , , , WATER MGAL / WEED SPRAYING ACRE / , , , SITE RESTORATION / , REMOVABLE PREFORMED PAVEMENT MARKING TAPE , , , / , , , , REMOVABLE PREFORMED PLASTIC MASK (BLACK) / , PAVEMENT MESSAGE PREFORM THERMOPLASTIC ENHANCED SKIDRESISTANCE GROUND IN CONTRAST , , ,235.50

13 / , , , , " SOLID LINE EPOXY GROUND IN (WR) / , , , " SOLID LINE EPOXY GROUND IN (WR) / , " SOLID LINE PREFORM TAPE GROUND IN CONTRAST , , , / , " BROKEN LINE PREFORM TAPE GROUND IN CONTRAST , , , / " DOTTED LINE PREFORM TAPE GROUND IN CONTRAST , / " DOTTED LINE PREFORM TAPE GROUND IN CONTRAST / " DOUBLE SOLID LINE PREFORM TAPE GROUND IN CONTRAST 3, , , , / , , , " SOLID LINE PREFORM THERMO GROUND IN / , , " DOTTED LINE PREFORM THERMO GROUND IN / , CROSSWALK PREFORM THERMOPLASTIC ENHANCED SKIDRESISTANCE GROUND IN CONTRAST , , , / , MOBILE RETROREFLECTOMETER MEASUREMENTS Section Totals: $8,553, $7,103, $7,263, Life Cycle Costs:

14 Contract Item Totals Contract Time Totals Contract Life Cycle Costs Totals $8,553, $7,103, $7,263, $0.00 $0.00 $0.00 $0.00 Contract Grand Totals $8,553, $7,103, $7,263, ( ) indicates item is bid as Lump Sum