ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS

Size: px
Start display at page:

Download "ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS"

Transcription

1 ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS CONTRACT # TRACS No. Project No. County District Gross Length Net Length Prepared By: 0000 SC SSC SH53301C SSC-0-(205)T LOCAL SANTA CRUZ SOUTHCENT 5.5 Patwary Mohammed Highway Termini Location Work Description SANTA CRUZ COUNTY Pendl Dr - via Calie to Circ C RIO RICO & PENDLETON DR INT, SANTA CRUZ, TUCSON

2 Printed: 11/20/2018 Page 1 of 12 BID RESULTS FOR Bid Opening Date : 10/5/2018, Prequalification Required, Engineer Specialist : Patwary Mohammed Completion Date: 230 Calendar Days The proposed work is located in Santa Cruz County on Pendleton Drive from Via Caliente to Circulo Cerro and at the intersection of Pendleton Drive and Ruby Road. The work consists of widening Pendleton Drive, constructing left and right turn lanes, signing and pavement marking and other miscellaneous work. Bid Rank Department Estimate Bid Amount Contractor Extended Sum of s +% $2,334, DEPARTMENT ESTIMATE $2,334, % $2,932, % $3,208, % $3,330, K E & G CONSTRUCTION, INC Paseo San Luis Suite 202 Sierra Vista, AZ GRANITE CONSTRUCTION COMPANY 4115 E ILLINOIS ST TUCSON, AZ HUNTER CONTRACTING COMPANY 701 N COOPER ROAD GILBERT, AZ Winning Bidder is 25.6% Over Department Estimate (Difference = $597,528.50) $2,932, $3,208, $3,330,685.33

3 Printed: 11/20/2018 Page 2 of ACRE CLEARING AND GRUBBING Bid Rank Department Estimate $2, $35, K E & G CONSTRUCTION, INC. $5, $81, % 2 GRANITE CONSTRUCTION COMPANY $10, $140, % 3 HUNTER CONTRACTING COMPANY $3, $50, % L.FT. REMOVAL OF CONCRETE CURB Bid Rank Department Estimate $8.000 $1, K E & G CONSTRUCTION, INC. $6.650 $1, % 2 GRANITE CONSTRUCTION COMPANY $2.250 $ % 3 HUNTER CONTRACTING COMPANY $4.600 $ % L.FT. REMOVAL OF CONCRETE CURB AND GUTTER Bid Rank Department Estimate $ $5, K E & G CONSTRUCTION, INC. $5.450 $2, % 2 GRANITE CONSTRUCTION COMPANY $9.250 $4, % 3 HUNTER CONTRACTING COMPANY $4.840 $2, % SQ.FT. REMOVAL OF CONCRETE SIDEWALKS, DRIVEWAYS AND SLABS Bid Rank Department Estimate 4, $4.000 $18, K E & G CONSTRUCTION, INC. $1.200 $5, % 2 GRANITE CONSTRUCTION COMPANY $2.800 $13, % 3 HUNTER CONTRACTING COMPANY $2.750 $12, % SQ.YD. REMOVAL OF ASPHALTIC CONCRETE PAVEMENT Bid Rank Department Estimate 7, $3.000 $22, K E & G CONSTRUCTION, INC. $9.150 $68, % 2 GRANITE CONSTRUCTION COMPANY $7.600 $57, % 3 HUNTER CONTRACTING COMPANY $7.530 $56, % CU.YD. REMOVAL OF RIPRAP Bid Rank Department Estimate $ $1, K E & G CONSTRUCTION, INC. $ $2, % 2 GRANITE CONSTRUCTION COMPANY $ $2, % 3 HUNTER CONTRACTING COMPANY $ $2, % L.FT. REMOVE (METAL HANDRAIL) Bid Rank Department Estimate $ $5, K E & G CONSTRUCTION, INC. $3.100 $1, % 2 GRANITE CONSTRUCTION COMPANY $2.600 $1, % 3 HUNTER CONTRACTING COMPANY $2.880 $1, % EACH REMOVE (SIGNS) Bid Rank Department Estimate $ $11, K E & G CONSTRUCTION, INC. $ $5, %

4 Printed: 11/20/2018 Page 3 of EACH REMOVE (SIGNS) Bid Rank Department Estimate $ $11, GRANITE CONSTRUCTION COMPANY $ $8, % 3 HUNTER CONTRACTING COMPANY $ $9, % L.FT. REMOVE GUARD RAIL Bid Rank Department Estimate $4.000 $ K E & G CONSTRUCTION, INC. $ $1, % 2 GRANITE CONSTRUCTION COMPANY $2.900 $ % 3 HUNTER CONTRACTING COMPANY $3.160 $ % L.FT. REMOVE (CONCRETE FORD WALL) Bid Rank Department Estimate $ $2, K E & G CONSTRUCTION, INC. $ $14, % 2 GRANITE CONSTRUCTION COMPANY $ $11, % 3 HUNTER CONTRACTING COMPANY $ $17, % SQ.YD. REMOVE (CONCRETE PAVEMENT) (MILLING 3") Bid Rank Department Estimate $ $ K E & G CONSTRUCTION, INC. $ $1, % 2 GRANITE CONSTRUCTION COMPANY $ $2, % 3 HUNTER CONTRACTING COMPANY $ $4, % CU.YD. ROADWAY EXCAVATION Bid Rank Department Estimate 12, $8.000 $100, K E & G CONSTRUCTION, INC. $6.100 $76, % 2 GRANITE CONSTRUCTION COMPANY $ $326, % 3 HUNTER CONTRACTING COMPANY $ $253, % CU.YD. AGGREGATE BASE, CLASS 2 Bid Rank Department Estimate 8, $ $341, K E & G CONSTRUCTION, INC. $ $524, % 2 GRANITE CONSTRUCTION COMPANY $ $264, % 3 HUNTER CONTRACTING COMPANY $ $561, % TON FOG COAT Bid Rank Department Estimate $ $5, K E & G CONSTRUCTION, INC. $ $9, % 2 GRANITE CONSTRUCTION COMPANY $1, $16, % 3 HUNTER CONTRACTING COMPANY $ $10, % TON BLOTTER MATERIAL Bid Rank Department Estimate $ $1, K E & G CONSTRUCTION, INC. $ $3, % 2 GRANITE CONSTRUCTION COMPANY $ $5, %

5 Printed: 11/20/2018 Page 4 of TON BLOTTER MATERIAL Bid Rank Department Estimate $ $1, HUNTER CONTRACTING COMPANY $ $10, % TON ASPHALTIC CONCRETE (MISCELLANEOUS STRUCTURAL) Bid Rank Department Estimate 6, $ $618, K E & G CONSTRUCTION, INC. $ $756, % 2 GRANITE CONSTRUCTION COMPANY $ $866, % 3 HUNTER CONTRACTING COMPANY $ $794, % L.FT. PIPE, CORRUGATED METAL, 30" Bid Rank Department Estimate $ $4, K E & G CONSTRUCTION, INC. $ $4, % 2 GRANITE CONSTRUCTION COMPANY $ $5, % 3 HUNTER CONTRACTING COMPANY $ $6, % EACH FLARED END SECTION, 30" (C-13.25) Bid Rank Department Estimate $1, $1, K E & G CONSTRUCTION, INC. $1, $1, % 2 GRANITE CONSTRUCTION COMPANY $1, $1, % 3 HUNTER CONTRACTING COMPANY $ $ % EACH SLIP BASE ( Bid Rank Department Estimate $ $2, K E & G CONSTRUCTION, INC. $ $5, % 2 GRANITE CONSTRUCTION COMPANY $ $5, % 3 HUNTER CONTRACTING COMPANY $ $4, % L.FT. SIGN POST (PERFORATED) (2 S) Bid Rank Department Estimate $ $6, K E & G CONSTRUCTION, INC. $6.400 $3, % 2 GRANITE CONSTRUCTION COMPANY $5.800 $3, % 3 HUNTER CONTRACTING COMPANY $7.290 $4, % L.FT. SIGN POST (PERFORATED) (2 1/2 S) Bid Rank Department Estimate $ $10, K E & G CONSTRUCTION, INC. $9.600 $6, % 2 GRANITE CONSTRUCTION COMPANY $8.750 $6, % 3 HUNTER CONTRACTING COMPANY $8.200 $5, % L.FT. SIGN POST (PERFORATED) (2 1/2 T) Bid Rank Department Estimate $ $3, K E & G CONSTRUCTION, INC. $ $2, % 2 GRANITE CONSTRUCTION COMPANY $ $1, % 3 HUNTER CONTRACTING COMPANY $ $3, %

6 Printed: 11/20/2018 Page 5 of EACH FOUNDATION FOR SIGN POST (CONCRETE) Bid Rank Department Estimate $ $29, K E & G CONSTRUCTION, INC. $ $24, % 2 GRANITE CONSTRUCTION COMPANY $ $23, % 3 HUNTER CONTRACTING COMPANY $ $7, % SQ.FT. WARNING, MARKER, OR REGULATORY SIGN PANEL Bid Rank Department Estimate 1, $ $26, K E & G CONSTRUCTION, INC. $ $19, % 2 GRANITE CONSTRUCTION COMPANY $ $17, % 3 HUNTER CONTRACTING COMPANY $ $19, % EACH SIGN (RELOCATE) Bid Rank Department Estimate $ $1, K E & G CONSTRUCTION, INC. $ $1, % 2 GRANITE CONSTRUCTION COMPANY $ $2, % 3 HUNTER CONTRACTING COMPANY $ $1, % L.FT. METAL HANDRAIL (MAG STD 145) Bid Rank Department Estimate $ $31, K E & G CONSTRUCTION, INC. $ $22, % 2 GRANITE CONSTRUCTION COMPANY $ $14, % 3 HUNTER CONTRACTING COMPANY $ $16, % L.FT. TEMPORARY CONCRETE BARRIER (INSTALLATION AND REMOVAL) Bid Rank Department Estimate 1, $ $27, K E & G CONSTRUCTION, INC. $ $48, % 2 GRANITE CONSTRUCTION COMPANY $ $90, % 3 HUNTER CONTRACTING COMPANY $ $45, % EACH TEMPORARY IMPACT ATTENUATORS (INSTALLATION AND REMOVAL) Bid Rank Department Estimate $1, $6, K E & G CONSTRUCTION, INC. $3, $12, % 2 GRANITE CONSTRUCTION COMPANY $3, $15, % 3 HUNTER CONTRACTING COMPANY $3, $12, % L.FT. TEMPORARY PAINTED MARKING (STRIPE) Bid Rank Department Estimate 38, $0.150 $5, K E & G CONSTRUCTION, INC. $0.260 $10, % 2 GRANITE CONSTRUCTION COMPANY $0.240 $9, % 3 HUNTER CONTRACTING COMPANY $0.240 $9, % L.FT. OBLITERATE PAVEMENT MARKING (STRIPE) Bid Rank Department Estimate 77, $0.300 $23, K E & G CONSTRUCTION, INC. $0.260 $20, %

7 Printed: 11/20/2018 Page 6 of L.FT. OBLITERATE PAVEMENT MARKING (STRIPE) Bid Rank Department Estimate 77, $0.300 $23, GRANITE CONSTRUCTION COMPANY $0.200 $15, % 3 HUNTER CONTRACTING COMPANY $0.240 $18, % L.FT./DAY TEMPORARY CONCRETE BARRIER (IN USE) Bid Rank Department Estimate 16, $0.050 $ K E & G CONSTRUCTION, INC. $0.130 $2, % 2 GRANITE CONSTRUCTION COMPANY $0.100 $1, % 3 HUNTER CONTRACTING COMPANY $0.120 $1, % EACH-DAY TEMPORARY IMPACT ATTENUATORS (IN USE) Bid Rank Department Estimate $ $1, K E & G CONSTRUCTION, INC. $ $1, % 2 GRANITE CONSTRUCTION COMPANY $ $1, % 3 HUNTER CONTRACTING COMPANY $ $1, % EACH-DAY BARRICADE (TYPE II, VERT.PANEL, TUBULAR MARKER) Bid Rank Department Estimate 13, $0.250 $3, K E & G CONSTRUCTION, INC. $0.100 $1, % 2 GRANITE CONSTRUCTION COMPANY $0.090 $1, % 3 HUNTER CONTRACTING COMPANY $0.110 $1, % EACH-DAY BARRICADE (TYPE III, HIGH LEVEL FLAG TREES) Bid Rank Department Estimate $0.500 $ K E & G CONSTRUCTION, INC. $0.320 $ % 2 GRANITE CONSTRUCTION COMPANY $0.250 $ % 3 HUNTER CONTRACTING COMPANY $0.330 $ % EACH-DAY PORTABLE SIGN STANDS (RIGID) Bid Rank Department Estimate $0.500 $ K E & G CONSTRUCTION, INC. $0.190 $ % 2 GRANITE CONSTRUCTION COMPANY $0.150 $ % 3 HUNTER CONTRACTING COMPANY $0.200 $ % EACH-DAY WARNING LIGHTS (TYPE A) Bid Rank Department Estimate 8, $0.200 $1, K E & G CONSTRUCTION, INC. $0.130 $1, % 2 GRANITE CONSTRUCTION COMPANY $0.100 $ % 3 HUNTER CONTRACTING COMPANY $0.130 $1, % EACH-DAY WARNING LIGHTS (TYPE C) Bid Rank Department Estimate 13, $0.200 $2, K E & G CONSTRUCTION, INC. $0.130 $1, % 2 GRANITE CONSTRUCTION COMPANY $0.100 $1, %

8 Printed: 11/20/2018 Page 7 of EACH-DAY WARNING LIGHTS (TYPE C) Bid Rank Department Estimate 13, $0.200 $2, HUNTER CONTRACTING COMPANY $0.130 $1, % EACH-DAY EMBEDDED SIGN POST Bid Rank Department Estimate 6, $0.200 $1, K E & G CONSTRUCTION, INC. $0.060 $ % 2 GRANITE CONSTRUCTION COMPANY $0.050 $ % 3 HUNTER CONTRACTING COMPANY $0.070 $ % EACH-DAY TEMPORARY SIGN (LESS THAN 10 S.F.) Bid Rank Department Estimate 8, $0.500 $4, K E & G CONSTRUCTION, INC. $0.260 $2, % 2 GRANITE CONSTRUCTION COMPANY $0.200 $1, % 3 HUNTER CONTRACTING COMPANY $0.260 $2, % EACH-DAY FLASHING ARROW PANEL Bid Rank Department Estimate $ $5, K E & G CONSTRUCTION, INC. $ $2, % 2 GRANITE CONSTRUCTION COMPANY $ $2, % 3 HUNTER CONTRACTING COMPANY $ $2, % EACH-DAY CHANGEABLE MESSAGE BOARD (CONTRACTOR FURNISHED) Bid Rank Department Estimate $ $7, K E & G CONSTRUCTION, INC. $ $5, % 2 GRANITE CONSTRUCTION COMPANY $ $7, % 3 HUNTER CONTRACTING COMPANY $ $5, % HOUR FLAGGING SERVICES (CIVILIAN) Bid Rank Department Estimate 5, $ $194, K E & G CONSTRUCTION, INC. $ $134, % 2 GRANITE CONSTRUCTION COMPANY $ $263, % 3 HUNTER CONTRACTING COMPANY $ $137, % HOUR FLAGGING SERVICES (LOCAL ENFORCEMENT OFFICER) Bid Rank Department Estimate $ $1, K E & G CONSTRUCTION, INC. $ $1, % 2 GRANITE CONSTRUCTION COMPANY $ $1, % 3 HUNTER CONTRACTING COMPANY $ $1, % EACH OBJECT MARKER (M-23) (TYPE 3(1)) Bid Rank Department Estimate $ $ K E & G CONSTRUCTION, INC. $ $ % 2 GRANITE CONSTRUCTION COMPANY $ $ % 3 HUNTER CONTRACTING COMPANY $1, $6, %

9 Printed: 11/20/2018 Page 8 of EACH OBJECT MARKER (M-23) (TYPE 2) Bid Rank Department Estimate $ $ K E & G CONSTRUCTION, INC. $ $ % 2 GRANITE CONSTRUCTION COMPANY $ $ % 3 HUNTER CONTRACTING COMPANY $1, $3, % EACH OBJECT MARKER (M-23) (TYPE 1 OR 4) Bid Rank Department Estimate $ $ K E & G CONSTRUCTION, INC. $ $ % 2 GRANITE CONSTRUCTION COMPANY $ $ % 3 HUNTER CONTRACTING COMPANY $1, $1, % L.FT. PAVEMENT MARKING (WHITE EXTRUDED THERMOPLASTIC) (0.090") Bid Rank Department Estimate 50, $0.400 $20, K E & G CONSTRUCTION, INC. $0.490 $24, % 2 GRANITE CONSTRUCTION COMPANY $0.500 $25, % 3 HUNTER CONTRACTING COMPANY $0.460 $23, % L.FT. PAVEMENT MARKING (YELLOW EXTRUDED THERMOPLASTIC) (0.090") Bid Rank Department Estimate 51, $0.400 $20, K E & G CONSTRUCTION, INC. $0.490 $25, % 2 GRANITE CONSTRUCTION COMPANY $0.500 $25, % 3 HUNTER CONTRACTING COMPANY $0.460 $23, % L.FT. PAVEMENT MARKING (TRANSVERSE) (THERMOPLASTIC) (ALKYD) (0.090") Bid Rank Department Estimate $3.000 $2, K E & G CONSTRUCTION, INC. $0.720 $ % 2 GRANITE CONSTRUCTION COMPANY $0.650 $ % 3 HUNTER CONTRACTING COMPANY $0.680 $ % EACH PAVEMENT MARKING, PREFORMED, TYPE I, SINGLE ARROW Bid Rank Department Estimate $ $2, K E & G CONSTRUCTION, INC. $ $1, % 2 GRANITE CONSTRUCTION COMPANY $ $1, % 3 HUNTER CONTRACTING COMPANY $ $1, % EACH PAVEMENT MARKING, PREFORMED, TYPE I, LEGEND (ONLY) Bid Rank Department Estimate $ $ K E & G CONSTRUCTION, INC. $ $1, % 2 GRANITE CONSTRUCTION COMPANY $ $ % 3 HUNTER CONTRACTING COMPANY $ $ % EACH PAVEMENT MARKER, RAISED, TYPE D Bid Rank Department Estimate $5.000 $3, K E & G CONSTRUCTION, INC. $2.900 $1, %

10 Printed: 11/20/2018 Page 9 of EACH PAVEMENT MARKER, RAISED, TYPE D Bid Rank Department Estimate $5.000 $3, GRANITE CONSTRUCTION COMPANY $2.550 $1, % 3 HUNTER CONTRACTING COMPANY $2.730 $1, % L.FT. PERMANENT PAVEMENT MARKING (PAINTED) (WHITE) Bid Rank Department Estimate 52, $0.150 $7, K E & G CONSTRUCTION, INC. $0.080 $4, % 2 GRANITE CONSTRUCTION COMPANY $0.080 $4, % 3 HUNTER CONTRACTING COMPANY $0.080 $4, % L.FT. PERMANENT PAVEMENT MARKING (PAINTED) (YELLOW) Bid Rank Department Estimate 51, $0.150 $7, K E & G CONSTRUCTION, INC. $0.080 $4, % 2 GRANITE CONSTRUCTION COMPANY $0.080 $4, % 3 HUNTER CONTRACTING COMPANY $0.080 $4, % EACH REMOVE AND SALVAGE EXISTING LIGHTING POLES Bid Rank Department Estimate $1, $2, K E & G CONSTRUCTION, INC. $1, $2, % 2 GRANITE CONSTRUCTION COMPANY $2, $4, % 3 HUNTER CONTRACTING COMPANY $1, $2, % EACH BOULDER RELOCATION Bid Rank Department Estimate $ $ K E & G CONSTRUCTION, INC. $ $ % 2 GRANITE CONSTRUCTION COMPANY $ $ % 3 HUNTER CONTRACTING COMPANY $ $ % ACRE SEEDING (CLASS II) Bid Rank Department Estimate $3, $24, K E & G CONSTRUCTION, INC. $4, $29, % 2 GRANITE CONSTRUCTION COMPANY $3, $26, % 3 HUNTER CONTRACTING COMPANY $4, $30, % L.FT. EROSION CONTROL (SILT FENCE ) Bid Rank Department Estimate 1, $8.000 $8, K E & G CONSTRUCTION, INC. $4.600 $4, % 2 GRANITE CONSTRUCTION COMPANY $6.000 $6, % 3 HUNTER CONTRACTING COMPANY $4.430 $4, % L.FT. EROSION CONTROL (WATTLES) (9") Bid Rank Department Estimate 26, $3.000 $79, K E & G CONSTRUCTION, INC. $2.300 $60, % 2 GRANITE CONSTRUCTION COMPANY $3.500 $92, %

11 Printed: 11/20/2018 Page 10 of L.FT. EROSION CONTROL (WATTLES) (9") Bid Rank Department Estimate 26, $3.000 $79, HUNTER CONTRACTING COMPANY $2.020 $53, % CU.YD. EROSION CONTROL (ROCK MULCH) (MODIFIED GRADATION C) Bid Rank Department Estimate $ $13, K E & G CONSTRUCTION, INC. $ $13, % 2 GRANITE CONSTRUCTION COMPANY $ $19, % 3 HUNTER CONTRACTING COMPANY $ $17, % L.SUM MOBILIZATION Bid Rank Department Estimate $234, $234, K E & G CONSTRUCTION, INC. $321, $321, % 2 GRANITE CONSTRUCTION COMPANY $266, $266, % 3 HUNTER CONTRACTING COMPANY $463, $463, % L.FT. GUARD RAIL, W-BEAM, SINGLE FACE, SHOP CURVED Bid Rank Department Estimate $ $1, K E & G CONSTRUCTION, INC. $ $3, % 2 GRANITE CONSTRUCTION COMPANY $ $1, % 3 HUNTER CONTRACTING COMPANY $ $2, % L.FT. GUARD RAIL, W-BEAM, SINGLE FACE (MASH) Bid Rank Department Estimate $ $7, K E & G CONSTRUCTION, INC. $ $9, % 2 GRANITE CONSTRUCTION COMPANY $ $9, % 3 HUNTER CONTRACTING COMPANY $ $8, % EACH GUARD RAIL TERMINAL (MASH) Bid Rank Department Estimate $4, $4, K E & G CONSTRUCTION, INC. $4, $4, % 2 GRANITE CONSTRUCTION COMPANY $4, $4, % 3 HUNTER CONTRACTING COMPANY $4, $4, % EACH GUARD RAIL, ANCHOR ASSEMBLY Bid Rank Department Estimate $1, $1, K E & G CONSTRUCTION, INC. $2, $2, % 2 GRANITE CONSTRUCTION COMPANY $2, $2, % 3 HUNTER CONTRACTING COMPANY $3, $3, % L.FT. CONCRETE CURB (DETAIL B) Bid Rank Department Estimate $ $4, K E & G CONSTRUCTION, INC. $ $4, % 2 GRANITE CONSTRUCTION COMPANY $ $6, % 3 HUNTER CONTRACTING COMPANY $ $6, %

12 Printed: 11/20/2018 Page 11 of L.FT. CONCRETE CURB AND GUTTER (TYPE D) Bid Rank Department Estimate $ $12, K E & G CONSTRUCTION, INC. $ $14, % 2 GRANITE CONSTRUCTION COMPANY $ $25, % 3 HUNTER CONTRACTING COMPANY $ $22, % SQ.FT. CONCRETE (ROADWAY) Bid Rank Department Estimate 6, $8.000 $48, K E & G CONSTRUCTION, INC. $ $61, % 2 GRANITE CONSTRUCTION COMPANY $ $64, % 3 HUNTER CONTRACTING COMPANY $9.480 $57, % SQ.FT. CONCRETE DRIVEWAY (T=9") Bid Rank Department Estimate 2, $ $35, K E & G CONSTRUCTION, INC. $8.300 $19, % 2 GRANITE CONSTRUCTION COMPANY $ $27, % 3 HUNTER CONTRACTING COMPANY $ $29, % L.FT. CONCRETE FORD WALL Bid Rank Department Estimate $ $28, K E & G CONSTRUCTION, INC. $ $39, % 2 GRANITE CONSTRUCTION COMPANY $ $46, % 3 HUNTER CONTRACTING COMPANY $ $78, % EACH RESET FRAME AND COVER FOR VALVE BOX (MAG DETAIL 391-1, TYPE B) Bid Rank Department Estimate $ $4, K E & G CONSTRUCTION, INC. $ $3, % 2 GRANITE CONSTRUCTION COMPANY $ $5, % 3 HUNTER CONTRACTING COMPANY $ $4, % SQ.FT. RETAINING WALL (MASONRY CANTILEVER) Bid Rank Department Estimate 2, $ $120, K E & G CONSTRUCTION, INC. $ $224, % 2 GRANITE CONSTRUCTION COMPANY $ $172, % 3 HUNTER CONTRACTING COMPANY $ $188, % HOUR CONTRACTOR BASED ON-THE-JOB TRAINING Bid Rank Department Estimate $3.000 $1, K E & G CONSTRUCTION, INC. $3.000 $1, % 2 GRANITE CONSTRUCTION COMPANY $3.000 $1, % 3 HUNTER CONTRACTING COMPANY $3.000 $1, % L.SUM FORCE ACCOUNT WORK (BIOLOGIST) Bid Rank Department Estimate $5, $5, K E & G CONSTRUCTION, INC. $5, $5, %

13 Printed: 11/20/2018 Page 12 of L.SUM FORCE ACCOUNT WORK (BIOLOGIST) Bid Rank Department Estimate $5, $5, GRANITE CONSTRUCTION COMPANY $5, $5, % 3 HUNTER CONTRACTING COMPANY $5, $5, % L.SUM FORCE ACCOUNT (ADDITIONAL MONITORING, SAMPLING, AND TESTING OF IMPAIRED WATER) Bid Rank Department Estimate $5, $5, K E & G CONSTRUCTION, INC. $5, $5, % 2 GRANITE CONSTRUCTION COMPANY $5, $5, % 3 HUNTER CONTRACTING COMPANY $5, $5, % L.SUM CONTRACTOR QUALITY CONTROL Bid Rank Department Estimate $10, $10, K E & G CONSTRUCTION, INC. $27, $27, % 2 GRANITE CONSTRUCTION COMPANY $30, $30, % 3 HUNTER CONTRACTING COMPANY $41, $41, % SQ.YD. MISCELLANEOUS WORK (CONTROL OF NOXIOUS PLANTS) (MANUAL / MECHANICAL METHODS) Bid Rank Department Estimate 27, $0.550 $14, K E & G CONSTRUCTION, INC. $0.700 $19, % 2 GRANITE CONSTRUCTION COMPANY $0.350 $9, % 3 HUNTER CONTRACTING COMPANY $0.670 $18, % SQ.YD. MISCELLANEOUS WORK (CONTROL OF NOXIOUS PLANTS) (HERBICIDE) Bid Rank Department Estimate 33, $0.450 $14, K E & G CONSTRUCTION, INC. $0.240 $7, % 2 GRANITE CONSTRUCTION COMPANY $0.300 $9, % 3 HUNTER CONTRACTING COMPANY $0.230 $7, % L.SUM CONSTRUCTION SURVEYING AND LAYOUT Bid Rank Department Estimate $10, $10, K E & G CONSTRUCTION, INC. $88, $88, % 2 GRANITE CONSTRUCTION COMPANY $85, $85, % 3 HUNTER CONTRACTING COMPANY $101, $101, %