1 Company Name Total Bid Amount Wyman & Simpson Inc. - Richmond, ME $3,379, Scott Construction Corporation - Portland, ME $3,572, CPM Constructors - Freeport, ME $3,732, Page 1 of 16

2 Wyman & Simpson Inc. Richmond, ME 2 0 C o B r Removing Existing Superstructure - Property of Contractor Removing Existing Structural Concrete (Dutton Hill Removing Existing Structural Concrete (Weymouth LS $225, LS $50, LS $40, Removing Pavement Surface SY $25, Pavement Butt Joints SY $19, Common Excavation CY $38, Rock Excavation CY $42, Common Borrow CY $29, Granular Borrow CY $4, Aggregate Subbase Course - Gravel CY $68, Hot Mix Asphalt, 12.5 mm Nominal Maximum Size TON $17, Hot Mix Asphalt, 9.5 mm Nominal Maximum Size (sidewalks, drives, islands & incidentals) TON $1, Hot Mix Asphalt, 9.5 mm Nominal Maximum Size TON $181, Hot Mix Asphalt, 12.5 mm Nominal Maximum Size (Base and Intermediate Base Course) TON $123, Bituminous Tack Coat - Applied GAL $1, Untreated Aggregate Surface Course, Truck Measure CY $ Sawing Bituminous Pavement LF $11, Structural Concrete, Abutments and Retaining Walls CY $79, Structural Concrete Piers CY $26, Structural Concrete Roadway and Sidewalk Slab on Steel Bridges (Dutton Hill Structural Concrete Roadway and Sidewalk Slab on Steel Bridges (Weymouth Structural Concrete Curbs and Sidewalks (Dutton Hill Structural Concrete Curbs and Sidewalks (Weymouth LS $175, LS $25, LS $25, LS $3, Bridge Drain Grate Modification EA $8, Page 2 of 16

3 Bridge Drain Grate Modification (Running Hill EA $1, Sealing Deck Construction Joints LF $1, Reinforcing Steel, Fabricated and Delivered LB $ Reinforcing Steel, Placing LB $3, Epoxy-Coated Reinforcing Steel, Fabricated and Delivered LB $41, Epoxy-Coated Reinforcing Steel, Placing LB $46, Structural Steel Fabricated and Delivered (Dutton Hill Structural Steel Fabricated and Delivered (Weymouth LS $275, LS $25, Structural Steel Erection (Dutton Hill LS $30, Structural Steel Erection (Weymouth LS $15, Shear Connectors LS $15, Zinc Rich Coating System (Shop Applied) LS $12, Zinc Rich Coating System (Field Applied) LS $35, Steel Bridge Railing, 3 Bar LS $75, Aluminum Bridge Rail - 3 Bar Post Remove and Reset EA $1, Aluminum Bridge Railing - Splice Retrofit EA $ High Performance Waterproofing Membrane (Running Hill High Performance Waterproofing Membrane (Blackstrap High Performance Waterproofing Membrane (Dutton Hill High Performance Waterproofing Membrane (Weymouth LS $22, LS $20, LS $15, LS $12, Membrane Waterproofing (Dutton Hill LS $2, Membrane Waterproofing (Weymouth LS $2, Culvert Sliplining LF $40, Curing Box for Concrete Cylinders EA $2, Pigmented Protective Coating for Concrete Surfaces SY $31, Clear Protective Coating for Concrete Surfaces SY $14, Abutment Repairs SF $28, Pier Repairs SF $72, Page 3 of 16

4 Repairing Granite Curb Joint and Bedding Mortar LF $7, Epoxy Injection Crack Repair LF $4, Partial Depth Concrete Deck Repairs SF $53, Expansion Joint Modification EA $54, Asphaltic Plug Joint LF $21, Expansion Device - Silicone Coated and Precompressed Seal Bridge Joint Replacement - Silicone Coated and Precompressed Seal LF $4, LF $6, Reset Steel Bearings EA $4, Bearing Installation EA $18, Bearing Removal EA $12, Laminated Elastomeric Bearings, Expansion EA $30, PTFE Elastomeric Bearings, Expansion EA $49, Protective Shielding - Steel Girders SY $31, Jacking Existing Superstructure (Blackstrap LS $35, Jacking Existing Superstructure (Weymouth LS $65, Temporary Concrete Barrier, Type I - Supplied by Authority LS $20, Permanent Concrete Transition Barrier EA $18, Work Zone Crash Cushions - TL-3 UNIT $15, inch Culvert Pipe Option III LF $2, inch Culvert Pipe Option III LF $13, Bridge Transition - Type I EA $6, W-Beam to 3-Bar Bridge Rail Transition EA $6, Guardrail Type 3d - 15 ft. Radius and Less LF $1, Guardrail Type 3d - over 15 feet Radius LF $4, Guardrail Type 3d - Single Rail, 7 foot Posts LF $43, Terminal End - Single Rail - Galvanized Steel EA $ Terminal End - Anchored End EA $ Reflectorized Flexible Guardrail Marker EA $ Low Volume Guardrail End - Type 3 EA $1, Guardrail 350 Flared Terminal EA $12, Page 4 of 16

5 Tangent Guardrail Terminal Energy Absorbing EA $2, Chain Link Fence - 6 Foot LF $23, Chain Link Fence Gate EA $5, Pipe Entry Gate EA $6, Bracing Assembly Type I - Metal Posts EA $9, Bracing Assembly Type II - Metal Posts EA $5, Snow Fence LF $7, Vertical Curb Type 1 LF $10, Plain Riprap CY $16, Stone Ditch Protection CY $6, Erosion Control Blanket SY $15, Loam CY $41, Seeding Method Number 2, Plan Quantity UNIT $2, Mulch - Plan Quantity UNIT $2, Temporary Mulch (Dutton Hill LS $3, Temporary Mulch (Weymouth LS $3, Erosion Control Geotextile SY $1, Cellular Confinement System SY $17, White or Yellow Pavement Marking Line LF $2, Temporary Pavement Marking Line, White or Yellow LF $ Hand Labor, Straight Time HR $7, All Purpose Excavator (Including Operator) HR $11, Truck - Small (Including Operator) HR $8, Foreman HR $6, Temporary Traffic Signal LS $15, Regulatory, Warning and Bridge Number Signs, Type I - Supplied by the Authority EA $3, Flashing Arrow EA $12, Type III Barricades EA $1, Drum EA $23, Cone EA $2, Page 5 of 16

6 Construction Signs SF $52, Maintenance of Traffic Control Devices LS $40, Flaggers HR $4, Portable - Changeable Message Sign EA $24, Truck Mounted Attenuator CD $12, Automated Trailer Mounted Speed Limit Sign UNIT $4, Temporary Portable Rumble Strip CD $13, Baled Hay, in place EA $ inch Temporary Silt Fence LF $9, Temporary Soil Erosion and Water Pollution Control (Running Hill Temporary Soil Erosion and Water Pollution Control (Blackstrap LS $1, LS $1, Mobilization LS $337, Total Bid $3,379, Page 6 of 16

7 Scott Construction Corporation Portland, ME 2 0 C o B r Removing Existing Superstructure - Property of Contractor Removing Existing Structural Concrete (Dutton Hill Removing Existing Structural Concrete (Weymouth LS $175, LS $25, LS $20, Removing Pavement Surface SY $63, Pavement Butt Joints SY $21, Common Excavation CY $41, Rock Excavation CY $78, Common Borrow CY $29, Granular Borrow CY $6, Aggregate Subbase Course - Gravel CY $74, Hot Mix Asphalt, 12.5 mm Nominal Maximum Size TON $13, Hot Mix Asphalt, 9.5 mm Nominal Maximum Size (sidewalks, drives, islands & incidentals) TON $1, Hot Mix Asphalt, 9.5 mm Nominal Maximum Size TON $121, Hot Mix Asphalt, 12.5 mm Nominal Maximum Size (Base and Intermediate Base Course) TON $87, Bituminous Tack Coat - Applied GAL $8, Untreated Aggregate Surface Course, Truck Measure CY $ Sawing Bituminous Pavement LF $5, Structural Concrete, Abutments and Retaining Walls CY $90, Structural Concrete Piers CY $33, Structural Concrete Roadway and Sidewalk Slab on Steel Bridges (Dutton Hill Structural Concrete Roadway and Sidewalk Slab on Steel Bridges (Weymouth Structural Concrete Curbs and Sidewalks (Dutton Hill Structural Concrete Curbs and Sidewalks (Weymouth LS $275, LS $20, LS $30, LS $2, Bridge Drain Grate Modification EA $14, Page 7 of 16

8 Bridge Drain Grate Modification (Running Hill EA $2, Sealing Deck Construction Joints LF $1, Reinforcing Steel, Fabricated and Delivered LB $ Reinforcing Steel, Placing LB $ Epoxy-Coated Reinforcing Steel, Fabricated and Delivered LB $ Epoxy-Coated Reinforcing Steel, Placing LB $ Structural Steel Fabricated and Delivered (Dutton Hill Structural Steel Fabricated and Delivered (Weymouth LS $275, LS $23, Structural Steel Erection (Dutton Hill LS $45, Structural Steel Erection (Weymouth LS $25, Shear Connectors LS $13, Zinc Rich Coating System (Shop Applied) LS $12, Zinc Rich Coating System (Field Applied) LS $52, Steel Bridge Railing, 3 Bar LS $75, Aluminum Bridge Rail - 3 Bar Post Remove and Reset EA $ Aluminum Bridge Railing - Splice Retrofit EA $ High Performance Waterproofing Membrane (Running Hill High Performance Waterproofing Membrane (Blackstrap High Performance Waterproofing Membrane (Dutton Hill High Performance Waterproofing Membrane (Weymouth LS $23, LS $19, LS $14, LS $12, Membrane Waterproofing (Dutton Hill LS $1, Membrane Waterproofing (Weymouth LS $1, Culvert Sliplining LF $20, Curing Box for Concrete Cylinders EA $3, Pigmented Protective Coating for Concrete Surfaces SY $33, Clear Protective Coating for Concrete Surfaces SY $18, Abutment Repairs SF $57, Pier Repairs SF $145, Page 8 of 16

9 Repairing Granite Curb Joint and Bedding Mortar LF $7, Epoxy Injection Crack Repair LF $6, Partial Depth Concrete Deck Repairs SF $85, Expansion Joint Modification EA $50, Asphaltic Plug Joint LF $20, Expansion Device - Silicone Coated and Precompressed Seal Bridge Joint Replacement - Silicone Coated and Precompressed Seal LF $4, LF $9, Reset Steel Bearings EA $4, Bearing Installation EA $45, Bearing Removal EA $20, Laminated Elastomeric Bearings, Expansion EA $8, PTFE Elastomeric Bearings, Expansion EA $15, Protective Shielding - Steel Girders SY $34, Jacking Existing Superstructure (Blackstrap LS $15, Jacking Existing Superstructure (Weymouth LS $60, Temporary Concrete Barrier, Type I - Supplied by Authority LS $30, Permanent Concrete Transition Barrier EA $35, Work Zone Crash Cushions - TL-3 UNIT $21, inch Culvert Pipe Option III LF $4, inch Culvert Pipe Option III LF $8, Bridge Transition - Type I EA $7, W-Beam to 3-Bar Bridge Rail Transition EA $6, Guardrail Type 3d - 15 ft. Radius and Less LF $1, Guardrail Type 3d - over 15 feet Radius LF $4, Guardrail Type 3d - Single Rail, 7 foot Posts LF $43, Terminal End - Single Rail - Galvanized Steel EA $ Terminal End - Anchored End EA $ Reflectorized Flexible Guardrail Marker EA $ Low Volume Guardrail End - Type 3 EA $1, Guardrail 350 Flared Terminal EA $13, Page 9 of 16

10 Tangent Guardrail Terminal Energy Absorbing EA $2, Chain Link Fence - 6 Foot LF $24, Chain Link Fence Gate EA $5, Pipe Entry Gate EA $5, Bracing Assembly Type I - Metal Posts EA $10, Bracing Assembly Type II - Metal Posts EA $5, Snow Fence LF $7, Vertical Curb Type 1 LF $11, Plain Riprap CY $16, Stone Ditch Protection CY $7, Erosion Control Blanket SY $18, Loam CY $44, Seeding Method Number 2, Plan Quantity UNIT $6, Mulch - Plan Quantity UNIT $1, Temporary Mulch (Dutton Hill LS $1, Temporary Mulch (Weymouth LS $1, Erosion Control Geotextile SY $ Cellular Confinement System SY $13, White or Yellow Pavement Marking Line LF $2, Temporary Pavement Marking Line, White or Yellow LF $ Hand Labor, Straight Time HR $7, All Purpose Excavator (Including Operator) HR $10, Truck - Small (Including Operator) HR $6, Foreman HR $6, Temporary Traffic Signal LS $20, Regulatory, Warning and Bridge Number Signs, Type I - Supplied by the Authority EA $2, Flashing Arrow EA $5, Type III Barricades EA $ Drum EA $35, Cone EA $3, Page 10 of 16

11 Construction Signs SF $69, Maintenance of Traffic Control Devices LS $100, Flaggers HR $4, Portable - Changeable Message Sign EA $30, Truck Mounted Attenuator CD $12, Automated Trailer Mounted Speed Limit Sign UNIT $4, Temporary Portable Rumble Strip CD $13, Baled Hay, in place EA $ inch Temporary Silt Fence LF $15, Temporary Soil Erosion and Water Pollution Control (Running Hill Temporary Soil Erosion and Water Pollution Control (Blackstrap LS $1, LS $1, Mobilization LS $356, Total Bid $3,572, Page 11 of 16

12 CPM Constructors Freeport, ME 2 0 C o B r Removing Existing Superstructure - Property of Contractor Removing Existing Structural Concrete (Dutton Hill Removing Existing Structural Concrete (Weymouth LS $190, LS $75, LS $50, Removing Pavement Surface SY $45, Pavement Butt Joints SY $21, Common Excavation CY $43, Rock Excavation CY $85, Common Borrow CY $30, Granular Borrow CY $6, Aggregate Subbase Course - Gravel CY $76, Hot Mix Asphalt, 12.5 mm Nominal Maximum Size TON $13, Hot Mix Asphalt, 9.5 mm Nominal Maximum Size (sidewalks, drives, islands & incidentals) TON $1, Hot Mix Asphalt, 9.5 mm Nominal Maximum Size TON $112, Hot Mix Asphalt, 12.5 mm Nominal Maximum Size (Base and Intermediate Base Course) TON $81, Bituminous Tack Coat - Applied GAL $8, Untreated Aggregate Surface Course, Truck Measure CY $ Sawing Bituminous Pavement LF $6, Structural Concrete, Abutments and Retaining Walls CY $64, Structural Concrete Piers CY $32, Structural Concrete Roadway and Sidewalk Slab on Steel Bridges (Dutton Hill Structural Concrete Roadway and Sidewalk Slab on Steel Bridges (Weymouth Structural Concrete Curbs and Sidewalks (Dutton Hill Structural Concrete Curbs and Sidewalks (Weymouth LS $185, LS $28, LS $17, LS $3, Bridge Drain Grate Modification EA $8, Page 12 of 16

13 Bridge Drain Grate Modification (Running Hill EA $1, Sealing Deck Construction Joints LF $ Reinforcing Steel, Fabricated and Delivered LB $ Reinforcing Steel, Placing LB $7, Epoxy-Coated Reinforcing Steel, Fabricated and Delivered LB $58, Epoxy-Coated Reinforcing Steel, Placing LB $38, Structural Steel Fabricated and Delivered (Dutton Hill Structural Steel Fabricated and Delivered (Weymouth LS $286, LS $38, Structural Steel Erection (Dutton Hill LS $40, Structural Steel Erection (Weymouth LS $20, Shear Connectors LS $15, Zinc Rich Coating System (Shop Applied) LS $6, Zinc Rich Coating System (Field Applied) LS $54, Steel Bridge Railing, 3 Bar LS $82, Aluminum Bridge Rail - 3 Bar Post Remove and Reset EA $ Aluminum Bridge Railing - Splice Retrofit EA $ High Performance Waterproofing Membrane (Running Hill High Performance Waterproofing Membrane (Blackstrap High Performance Waterproofing Membrane (Dutton Hill High Performance Waterproofing Membrane (Weymouth LS $30, LS $25, LS $14, LS $12, Membrane Waterproofing (Dutton Hill LS $1, Membrane Waterproofing (Weymouth LS $1, Culvert Sliplining LF $22, Curing Box for Concrete Cylinders EA $1, Pigmented Protective Coating for Concrete Surfaces SY $44, Clear Protective Coating for Concrete Surfaces SY $18, Abutment Repairs SF $65, Pier Repairs SF $112, Page 13 of 16

14 Repairing Granite Curb Joint and Bedding Mortar LF $7, Epoxy Injection Crack Repair LF $7, Partial Depth Concrete Deck Repairs SF $99, Expansion Joint Modification EA $60, Asphaltic Plug Joint LF $24, Expansion Device - Silicone Coated and Precompressed Seal Bridge Joint Replacement - Silicone Coated and Precompressed Seal LF $2, LF $6, Reset Steel Bearings EA $8, Bearing Installation EA $26, Bearing Removal EA $3, Laminated Elastomeric Bearings, Expansion EA $15, PTFE Elastomeric Bearings, Expansion EA $21, Protective Shielding - Steel Girders SY $33, Jacking Existing Superstructure (Blackstrap LS $75, Jacking Existing Superstructure (Weymouth LS $144, Temporary Concrete Barrier, Type I - Supplied by Authority LS $25, Permanent Concrete Transition Barrier EA $14, Work Zone Crash Cushions - TL-3 UNIT $14, inch Culvert Pipe Option III LF $4, inch Culvert Pipe Option III LF $9, Bridge Transition - Type I EA $7, W-Beam to 3-Bar Bridge Rail Transition EA $6, Guardrail Type 3d - 15 ft. Radius and Less LF $1, Guardrail Type 3d - over 15 feet Radius LF $4, Guardrail Type 3d - Single Rail, 7 foot Posts LF $46, Terminal End - Single Rail - Galvanized Steel EA $ Terminal End - Anchored End EA $ Reflectorized Flexible Guardrail Marker EA $ Low Volume Guardrail End - Type 3 EA $1, Guardrail 350 Flared Terminal EA $13, Page 14 of 16

15 Tangent Guardrail Terminal Energy Absorbing EA $2, Chain Link Fence - 6 Foot LF $24, Chain Link Fence Gate EA $5, Pipe Entry Gate EA $5, Bracing Assembly Type I - Metal Posts EA $10, Bracing Assembly Type II - Metal Posts EA $6, Snow Fence LF $7, Vertical Curb Type 1 LF $10, Plain Riprap CY $16, Stone Ditch Protection CY $8, Erosion Control Blanket SY $18, Loam CY $45, Seeding Method Number 2, Plan Quantity UNIT $7, Mulch - Plan Quantity UNIT $1, Temporary Mulch (Dutton Hill LS $1, Temporary Mulch (Weymouth LS $1, Erosion Control Geotextile SY $ Cellular Confinement System SY $12, White or Yellow Pavement Marking Line LF $2, Temporary Pavement Marking Line, White or Yellow LF $ Hand Labor, Straight Time HR $7, All Purpose Excavator (Including Operator) HR $11, Truck - Small (Including Operator) HR $6, Foreman HR $6, Temporary Traffic Signal LS $18, Regulatory, Warning and Bridge Number Signs, Type I - Supplied by the Authority EA $3, Flashing Arrow EA $16, Type III Barricades EA $ Drum EA $35, Cone EA $3, Page 15 of 16

16 Construction Signs SF $71, Maintenance of Traffic Control Devices LS $40, Flaggers HR $4, Portable - Changeable Message Sign EA $23, Truck Mounted Attenuator CD $12, Automated Trailer Mounted Speed Limit Sign UNIT $4, Temporary Portable Rumble Strip CD $13, Baled Hay, in place EA $ inch Temporary Silt Fence LF $17, Temporary Soil Erosion and Water Pollution Control (Running Hill Temporary Soil Erosion and Water Pollution Control (Blackstrap LS $1, LS $1, Mobilization LS $370, Total Bid $3,732, Page 16 of 16