To, The Intending Tenderers

Size: px
Start display at page:

Download "To, The Intending Tenderers"

Transcription

1 PUBLIC WORKS DEPARTMENT Executive Engineer, National Highway Division,Solapur Tel : NHD/AB/Tender/Camp-Mumbai/4 Date :- 14/05/2012 To, The Intending Tenderers SUB:- Improvement to Riding Quality from km 10/000 to 20/000 of Solapur Vijapur Road Section of N.H.13 in the State of Maharashtra System Tender.21 REF:- Pre bid meeting held in the office Chief Engineer, National Highway (P.W.) Konkan Bhavan, Navi Mumbai on Dated at hrs. Please find enclosed herewith Addendum of the pre bid meeting held in the office of Chief Engineer, National Highway (P.W.) Konkan Bhavan, Navi Mumbai on in pursuant to the clause 7.3 of Volume I of the bidding document for the above mentioned work. 1. The Addendum issued herewith shall be part of the bidding document & the bidders are requested to submit the Addendum on line along with the bidding document. 2. any other changes in terms & condition of Bid document except that are mentioned in Addendum 3. The Bidders are requested to submit their offer considering the Addendum and that offers shall be unconditional. The conditional offers are liable for rejection. D.A.:- Addendum Sd/- Executive Engineer, National Highway Division Solapur.

2 ADDENDUM. Line. Provisions 1 4 IFB Table.. 4 &5 Approximate value of work ( Rs. ) Bid Security 4 5 7,06,83, lakhs ( Rs.)* Approximate value of work ( Rs. ) Bid Security 4 5 5,92,60, lakhs ( Rs.)* 2 69 Contract Data..4 The defects liability period is Three years form the date of completion The defects liability period is One year (365 days) form the date of completion

3 2. Line Contract Data..9 (A) (A) Road Works. Provisions Site clearance, setting out and layout Improvement of Riding Quality Programme of the existing road by providing BUSG, the bituminous layer of bituminous macadam and Semidence bituminous concrete with profile correction, construction of road side shoulders, providing road safety / guiding measures like Thermoplastic road marking paint, Sign and caution boards and rectification of defects in the completed works during the Defect Liability Period, submission of As built drawings / laying charts and any other related documents and other item of work as may be required to be carried out for completing the works in accordance with the drawings and provisions of the contract to ensure safety. (A) Road Works. Scarifying and providing 75 mm BUSG in selected stretches. Providing 75 mm thick B.M. with 3.30% bitumen of VG-30 grade and 10% for profile correction. (in km. 10/00 to 13/500) & 50 mm thick B.M. with 3.30% bitumen of VG-30 grade and 10% for profile correction. (in km. 14/00 to 16/00, Km.16/500 to 18/00, Km.18/500 to 20/00) Providing 25mm thick S.D.B.C. with 5.00% bitumen of VG- 30 grade as wearing surface. Hard Murum side shoulders on either side. Sign Board. Thermoplastic paint for center and edge line.

4 4 118 Section 7 Bill of Quantitie s..3. Description of Item ( With brief specification and reference to book of specification) 3 Providing and laying hot mix laid bituminous macadam 75 milli compacted thickness with 3.30 % bitumen content by weight of total mix on prepared surface with specified graded crushed aggregate for the base/binding course including loading of aggregate with front edge loader, heating of stone aggregate and bitumen and mixing in modern drum type of hot mix plant, transporting the mixed material from tipper to paver and laying the mixed material with sensor paver finisher to the required grade, level and camber, rolling by power roller and vibratory roller to achieve the desired density ( with a bitumen of VG-30 grade) and including tack coat by mechanical sprayer with 3 kilogramme per 10 square. (Reference to MORT&H Specification for Road & Bridge Work (Fourth Revision) 2001: Specification.101 to 121 /. 3 to 31, Sp / Pg to 155, Sp..503 / Pg..157 to 160, Sp / Pg to 164, Sp / Pg to 343.) Quantity may be more or less Unit One. Description of Item ( With brief specification and reference to book of specification) 3 Providing and laying hot mix laid bituminous macadam of prescribed compacted thickness with 3.30 % bitumen content by weight of total mix on prepared surface with specified graded crushed aggregate for the base/binding course including loading of aggregate with front edge loader, heating of stone aggregate and bitumen and mixing in modern drum type of hot mix plant, transporting the mixed material from tipper to paver and laying the mixed material with sensor paver finisher to the required grade, level and camber, rolling by power roller and vibratory roller to achieve the desired density ( with a bitumen of VG-30 grade) and including tack coat by mechanical sprayer with 3 kilogramme per 10 square. Quantity may be more or less Unit (A) 75mm Thickness - (Km.10/00 to 13/500) One (B) 50mm Thickness (Km. 14/00 to 16/00, Km.16/500 to 18/00, Km.18/500 to 20/00) One (Reference to MORT&H Specification for Road & Bridge Work (Fourth Revision) 2001: Specification.101 to 121 /. 3 to 31, Sp / Pg to 155, Sp..503 / Pg..157 to 160, Sp / Pg to 164, Sp / Pg to 343.)

5 O.C. Approved by C.E. 4. Line Section 7 Specifica tion of Bill of Quantities..3 Provisions Providing & laying hot mix hot laid bituminous macadam 50 milli compacted thickness with 3.30% of VG-30 grade bitumen content by weight of total mix on prepared surface with specified graded crush aggregates for the base / binding course including loading of stone aggregates with front edge loader & heating of stone aggregates & bitumen & mixing in modern drum type hot mix plant transporting the mixed materials to the site in tipper to paver and laying the mixed material with sensor paver finisher to the required level,grade & camber, rolling by vibratory and power roller to achieve the desired density, including brooming by mechanical broom and tack coat of bitumen and spraying with mechanical sprayer at 3.00 Killogramme per10 Square metre including all leads and lifts etc. complete. Providing & laying hot mix hot laid bituminous macadam 50/75 milli compacted thickness with 3.30% of VG-30 grade bitumen content by weight of total mix on prepared surface with specified graded crush aggregates for the base / binding course including loading of stone aggregates with front edge loader & heating of stone aggregates & bitumen & mixing in modern drum type hot mix plant transporting the mixed materials to the site in tipper to paver and laying the mixed material with sensor paver finisher to the required level, grade & camber, rolling by vibratory and power roller to achieve the desired density, including brooming by mechanical broom and tack coat of bitumen and spraying with mechanical sprayer at 3.00 Killogramme per10 Square metre including all leads and lifts etc. complete.