Kaysville Parks and Recreation Department Request For Bids Pioneer Park Phase I RFB 10-17

Size: px
Start display at page:

Download "Kaysville Parks and Recreation Department Request For Bids Pioneer Park Phase I RFB 10-17"

Transcription

1 The total construction s shall be broken down into the categories indicated below to provide the Owner with a comparable analysis of each proposal submitted and a method for determining value engineering items as necessary. Every numbered item, subtotal and total shall have a dollar amount entered. A line item entry that says included meaning included in the total is not acceptable. All pricing shall include all work, materials, labor, fees, etc. to fully complete the work per the plans and specifications whether specifically listed as a bid item on this form or not. This includes all necessary surveying/staking to accomplish the work. BID SCHEDULE Item Description Quantity 1. Demolition (including all disposal of material) a. Asphalt Sawcut & Removal b. Curb & Gutter Removal lin. ft. c. Sidewalk Removal d. Clear and Grub Site, Stockpile Topsoil e. Other Sub Total Demolition 2. Utilities (including all trenching, backfilling, etc.) Quantity a. 2 Culinary Connection, Meter & Water Line lin. ft. b. 4 Sanitary Sewer Connection, Line & Cleanouts lin. ft. c. 15 RCP lin. ft. d. 12 RCP lin. ft. e. 15 HDPE lin. ft. 5

2 f. 12 HDPE lin. ft. g. SDCB-Curb each h. 3 x3 YD each i. 2 x2 YD each j. Secondary Water Connection & Line (10 behind back of walk) lump k. 6 PVC Playground Connection lin. ft. l. 4 Wrapped Perforated Pipe in Playground lin. ft. m. Other Sub Total Utilities 3. Electrical and Lighting Quantity a. Electrical service, panel, conduit, controls and switches for park and restroom lump b. Street Lights on Angel Street (K-3) each c. Parking Lot Lights (PK-3) each d. Bollard Lights (OB-1) each e. Landscape Uplights (SP-3) each f. Barn Lights (BR-1) each g. Downlights (DL410) Each 6

3 h. Pendant Lights (FC-1) each i. LED Uplights (SA-1) each j. Electrical Outlets each k. Junction Boxes each l. Other Sub Total Electrical 4. Site Grading and Excavation Quantity a. Rough Grading Parking Lot cu. yd. b. Rough Grading Walkways/Concrete cu. yd. c. Rough Grading Playground cu. yd. d. Rough Grading Landscape Areas cu. yd. e. Clean Import cu. yd. f. Export and Dispose cu. yd. g. Misc. Grading cu. yd. h. Erosion Control/SWPPP lump Sub Total Site Grading and Excavation 5. Roadway and Parking (including all subgrade material) Quantity 7

4 a. Asphalt (Angel Street) b. Asphalt (Parking Lot) c. Curb and Gutter (Angel Street) lin. ft. d. Curb and Gutter (Parking Lot) lin. ft. e. Waterways lin. ft. f. Traffic/Parking Signage lump g. Crosswalk Striping lump h. Parking Lot Striping lump i. Other Sub Total Roadway and Parking 6. Concrete Walks and Hardscape (including all subgrade material) Quantity a. 5 Concrete Walk b. 6 Concrete Walk c. 8 Concrete Walk d. 10 Concrete Walk e. Concrete Plaza/Hardscape (at Large Pavilion/Restroom) f. Specialty Concrete/Hardscape (Integrally Colored & Sawcut) 8

5 g. ADA Ramps each h. Bench Pads i. Picnic Table Pads j. Trash Receptacle Pads k. Bollard Light Apron l. Play Area Thickened Edge lin. ft. m. Playground Ramp each n. 12 x6 Concrete Mowstrip/Edger lin. ft. o. 12 x14 Concrete Playground Edger lin. ft. p. Other Sub Total Concrete Walks and Hardscape 7. Restroom/Large Pavilion Quantity a. Restroom/Large Pavilion Structure (including footings, posts, walls, siding, roof structure, masonry, etc.) lump b. Restroom Electrical lump c. Restroom Lighting lump d. Restroom Mechanical lump e. Restroom Plumbing lump 9

6 f. Barn Doors lump g. Whitewash Pioneer Park Letters lump h. Ornamental Fly Wheel lump i. Chain Downspouts and River Rock each j. Manufactured Stone Clad Benches lin. ft. k. Concrete Table lump l. Drinking Fountains each m. Other Sub Total Restroom/Large Pavilion 8. Miscellaneous Quantity a. Specimen Boulders above Playground each b. Hammock Posts each c. Stepped Flagstone Path d. Playground Boulder Retaining Wall e. Landscape Boulder Retaining Wall f. Linear Sandstone Bench lin. ft. g. Bike Racks each 10

7 h. Rope and Post Fence lin. ft. i. Three Rail Fence lin. ft. j. Two Rail Fence lin. ft. k. Other Sub Total Miscellaneous TOTAL BASE BID The following Optional Items are provided here as Bid Alternates available to the City as described on Sheet SP1.1 of the Construction Drawings. The inclusion of the Bid Alternates is dependent upon the City s overall budget and may be selected individually at the discretion of the City. BID ALTERNATES 1A. Additive Bid Alternate Quantity 1A.1 Concrete walks and furniture pads in designated area as shown on SP1.1 1A.2 Landscape Boulder Retaining wall in designated area as shown on SP1.1 1A.3 Electrical and Bollard Lights in designated area as shown on SP1.1 and ES1.1 each Sub Total Additive Bid Alternate 1A : 1B. Additive Bid Alternate Quantity 1B.1 Concrete walk in designated area as shown on SP1.1 11

8 1B.2 Electrical and Bollard Lights in designated area as shown on SP1.1 and ES1.1 each 1B.3 Demo and Remove Existing Sidewalk on Angel Street Sub Total Additive Bid Alternate 1B : 1C. Additive Bid Alternate Quantity 1C.1 Concrete walk in designated area as shown on SP1.1 1C.2 Demo and Remove existing sod, Repair sod and irrigation in designated area as shown on SP1.1 Sub Total Additive Bid Alternate 1C : 2. Additive Bid Alternate Quantity 2.1 Install Backstop and Dugout Fencing including footings lin. ft. 2.2 Install Concrete Pads and Concrete Edger 2.3 Install Shock Attenuating Rubber Belt on Backstop lin. ft. 2.4 Provide and Install Player s Benches each Sub Total Additive Bid Alternate 2 : 3A. Additive Bid Alternate Quantity 3A Install Specialty Concrete as Integrally Colored Concrete with Light Exposed Aggregate ( Sandscape ) Finish in designated area as shown on SP1.1 12

9 Sub Total Additive Bid Alternate 3A: 3B. Additive Bid Alternate Quantity 3B Install Specialty Concrete as Integrally Colored Concrete with Wood Plank Stamp Pattern and Color Hardener in designated area as shown on SP1.1 Sub Total Additive Bid Alternate 3B: 4. Deductive Bid Alternate Quantity 4 Remove concrete and specialty concrete from designated area as shown on SP1.1 Sub Total Deductive Bid Alternate 4: 5. Deductive Bid Alternate Quantity 5 Remove concrete bench, manufactured stone veneer, and cast in place concrete cap from designated areas as shown on SP1.1 Sub Total Deductive Bid Alternate 5: 6A. Deductive Bid Alternate Quantity 6A Remove stepped flagstone path from area above playground Sub Total Deductive Bid Alternate 6A: 13

10 6B. Deductive Bid Alternate Quantity 6B.1 Remove specimen boulders from area above playground each 6B.2 Remove linear sandstone benches from area above playground lin. ft. Sub Total Deductive Bid Alternate 6B: 7. Deductive Bid Alternate Quantity 7 Remove concrete walk from designated area as shown on SP1.1 Sub Total Deductive Bid Alternate 7: Information Required for Submittal of a Request for Bid Taxpayer ID # Utah Contractors License # Representative Name Title Company Name Address City State Zip Code Phone number Cell number address Submitted by: Date (Signature) My signature attests that: I have carefully reviewed all the contract documents, drawings, specifications and additional requirements and instructions that have been issued concerning the above project. I understand the scope of work and requirements of the project. The total construction is the fee to be compensated to the Subcontractor for fully completing all requirements contained in the contract documents and providing a complete and fully operating system. Subcontractor will provide all equipment, labor, and materials required to fully complete the project. 14