1 Facilities Modernization Program Funded by Measure B Project Report April 2015

2 Learning Resource Center- B100 Learning Resource Center Architect: Construction Manager: Contractor: Steinberg Architects Swinerton Management & Consulting, Inc. W.A. Thomas The project involves the remodel of the first floor of Building 100. Project will include a voluntary seismic upgrade, interior renovations for computer labs, renovations to the library, and The Learning Connection. The contractor was issued a Notice to Proceed in early October. Abatement, footing excavation and light renovations to the library are complete. Seismic upgrade and IT improvements are underway on the 1 st floor. Installation of piping to connect B100 to the central plant underway. 10/2012- Complete 06/ Complete 10/ Complete 08/2015

3 Hesperian Landscape Project Before After Architect: David Gates Associates Contractor: Empire Landscaping The goal of this landscape improvement project is to create a unique, vandal-resistant and sustainable entry statement that sets a visual character appropriate for the stature of the campus while also addressing site lines and practicality of maintenance and water conservation Construction started in late December. Selective tree removal has been completed and wall footings are complete. Masonry block wall has been built and is awaiting delivery of granite cladding. Clearing and grubbing are complete and installation of the irrigation system has commenced. : Complete : 06/ Complete : 12/ Complete : 06/2015

4 Building 1700 Architect: Steinberg Architects Contractor: BHM Construction The project modernizes inefficient classrooms and instructional spaces in the building and provides expanded technical and media services. The scope of work includes the installation of all new finishes, AV equipment, HVAC Systems, telecommunication, electrical system upgrades, and voluntary seismic upgrade. This project includes Landscaping upgrades and building exterior improvements. The building is substantially complete and occupied. 05/2008- Complete 04/2011- Complete 04/ Complete 08/ Complete

5 Building 1800 Architect: Steinberg Architects Contractor: DL Falk The project modernizes inefficient classrooms and instructional spaces in the building and provides expanded technical and media services. The scope of work includes the installation of all new finishes, AV equipment, HVAC Systems, telecommunication, electrical system upgrades. This project includes landscaping upgrades and building exterior improvements. The building is substantially complete and occupied. Closeout with Division of State Architect is underway. 05/ Complete 04/ Complete 10/ Complete 01/ Complete

6 Building 2100 Cadaver Room Remodel Architect: HMC Architects Construction Manager: Parsons Brinckerhoff Contractor: Southland Industries, Inc. Remodel rooms 2102B & 2102C to accommodate New Cadaver room. Replace existing mechanical system, provide new sink, cabinetry, refrigerator, and CCTV system for teacher monitoring of students inside cadaver room and in classroom. Remodel existing cadaver room into new computer room. All new computer tables, chairs, and cabinetry for student and faculty use. Project completed in January Punch list is completed. : : : : 06/ Complete 09/ Complete 01/ Complete

7 Security in Lots F, G, H, J Lot G with Photovoltaic Architect: tbp/ Architects Contractor: Rodan Builders This project includes the addition of security devices in Parking Lots F, G, H and J. It also includes an electronic reader board in parking lot G at the corner of Hesperian and Depot roads. The project is complete and nearly closed out. 11/2011 Complete 10/ Complete 12/2013 Complete 08/ Complete

8 Physical Education Complex Buildings Architect: Stafford King Wiese Contractor: Jeff Luchetti Construction The physical education complex project consists of renovations to buildings 2500, 2600, 2700, 2800, and A portion of B2800 has been allocated to house the new central plant equipment. An innovative phasing plan has been developed to allow classes and athletic competitions to continue during the entire construction process. The project is complete and is now occupied. Punch list is complete. Project closeout has began. 06/ Complete 02/ Phase II- Complete 07/2011 to 05/2013-Phased -Complete 08/2011 to 01/2014-Phased -Complete

9 Building BMW Architect: Charles Ham Associates Contractor: BHM Construction Renovate the former print shop to accommodate the BMW Autotech Training Program. Work includes installing 4 new roll-up doors, seismic strengthening, new roofing, vehicle lifts and alignment rack, along with upgraded electrical and mechanical systems. Construction began March 2013, and the building is now occupied. Contractor achieved substantial completion 11 weeks ahead of schedule. The project closeout is nearly complete. : 10/2011 Complete : 11/2012 Complete : 03/2013 Complete : 08/2013 Complete

10 Performing Arts Center/ B1200 Architect: IBI Group Contractor: West Bay Builders, Inc. The Performing Arts Center B1200 project consists of major renovations to building 1200 and 1300 as well as a new addition to B1200 for a recording studio. The project also includes a music technology classroom and modifications to the adjacent plaza to include an outdoor stage. The project is substantially complete and occupied. Contractor is working on punchlist and close out activities. 04/2010- Complete 05/2011- Complete 10/2011- Complete 01/2013- Complete

11 Strength & Fitness Building Architect: Stafford King Wiese Contractor: Rodan The new 16,560s.f. strength and fitness building will house the strength center on the first floor and the fitness center on the second floor. The landscaped promenade surrounding the building will be the new grand entry to the college s athletic facilities. The building is complete and occupied. DSA certification is nearing completion. 06/ Complete 11/ Complete 06/ Complete 01/ Complete