1 CITY OF WACO Purchasing Services Post Office Box 2570 Waco, Texas Phone: Fax: Date: 09/10/2018 RFB No: Commodity: Greenleaf and Park Lake Sewer Lift Stations Control Panels Rehabilitation Project Purchasing Agent: Mr. Tim Cubos Closing Time: 2:00 P.M. CST, Friday, September 14, 2018 Opening Time: 2:01 P.M. CST, Friday, September 14, 2018 RFB Opening Location: Operations Center, Purchasing Services Office, 1415 N. 4 th St., Waco, TX Addendum No: 1 The above-mentioned RFB invitation has been changed in the following manner. Sign and return addendum to the Purchasing Office by the closing time and date with your RFB response. Returning this page signed by your authorized agent will serve to acknowledge this change. All other requirements of the invitation remain unchanged. If you have any questions, please call or stop by the Purchasing Office at the above address. 1. The following page includes clarifications and amendments to the RFB. Please review and note the changes. This includes using the revised Bid Sheet that is attached. This revised Bid Sheet must be used in your bid proposals. Not using the revised Bid Sheet will be cause to disqualify your bid. Firm: Address Signature of Person Authorized to Sign Bid: Signor's Name and Title (print or type): Address: Date: Telephone: Fax:

2 CITY OF WACO OFFICIAL BID SHEET BID INVITATION NO: RFB Greenleaf and Park Lake Sewer Lift Stations Control Panels Rehabilitation Project DATE: BIDDER: AUTHORIZED SIGNATURE: I. Refer to "Standard Instructions for all Bids" before completing Bid Sheet. a. Price: Includes all labor, materials, and equipment to complete project. b. Completion time to be 150 calendar days after Notice to Proceed. c. Retainage shall be withheld in the percentage per the Standard Specifications until final completion of the project including turf establishment and receipt of as-built plans and other closeout documents. II. In submitting this bid, I certify: a. Items bid are in exact accordance with specifications, unless noted in bid. b. That prices in this bid have been arrived at independently, without consultation or agreement with any competitor for the purpose of restricting competition PRICING INFORMATION NOTE: Depending on unit prices, requirements and approved budgeted funds, quantities may be reduced or increased during the contract period. Item Est. Unit Unit Item No. Description Qty. Meas. Price Amount MOBILIZATION, BONDS AND INSURANCE, NOT-TO-EXCEED 5% OF THE 1 TOTAL BID AMOUNT 1 LS FURNISH AND INSTALL ALL CONDUIT & WIRING FOR GREEN LEAF LIFT 2 STATION COMPLETE AND IN PLACE 1 LS MODIFY CITY PRE-PURCHASED PUMP CONTROL PANEL AND INSTALL PUMP CONTROL PANEL AND FLOATS FOR GREEN LEAF LIFT STATION 3 COMPLETE AND IN PLACE 1 LS MODIFY CITY PRE-PURCHASED SCADA (PLC) CONTROL PANEL AND INSTALL SCADA(PLC) CONTROL PANEL FOR GREEN LEAF LIFT STATION 4 COMPLETE AND IN PLACE 1 LS FURNISH AND INSTALL ALL CONDUIT AND WIRING FOR PARK LAKE LIFT 5 STATION COMPLETE AND IN PLACE 1 LS MODIFY CITY PRE-PURCHASED PUMP CONTROL PANEL AND INSTALL PUMP CONTROL PANEL AND FLOATS FOR PARK LAKE LIFT STATION 6 COMPLETE AND IN PLACE 1 LS

3 Item Est. Unit Unit Item No. Description Qty. Meas. Price Amount MODIFY CITY PRE-PURCHASED SCADA (PLC) CONTROL PANEL AND INSTALL SCADA (PLC) CONTROL PANEL FOR PARK LAKE LIFT STATION 7 COMPLETE AND IN PLACE 1 LS FURNISH AND INSTALL RACK AND MISCELLANEOUS MODIFICATIONS TO 8 GREEN LEAF LIFT STATION COMPLETE AND IN PLACE 1 LS FURNISH AND INSTALL RACK, LIGHTING, AND MISCELLANEOUS 9 MODIFICATIONS TO PARK LAKE LIFT STATION COMPLETE AND IN PLACE 1 LS PAY ONCOR FOR CHANGING OUT 45 KVA POLE MOUNTED 10 TRANSFORMER BANK AT PARK LAKE LIFT STATION 1 LS $3, $3, PROVIDE PROJECT RECORD DRAWINGS (AS BUILTS) 1 LS 12 PAINT (CAMOFLAQUE PATTERN) ALL METAL CABINETS, PIPIING, RACK AND SUPPORTS (GREENLEAF SEWER LIFT STATION ONLY) LS TOTAL AMOUNT OF BASE BID TOTAL AMOUNT OF MATERIALS TOTAL AMOUNT OF LABOR & EQUIPMENT Early Payment Terms: a) Bidder may offer an early payment discount by filling in the blanks in section b below. City may accept an early payment discount, but in doing so, City does not waive any of its rights under Texas Government Code Section 2251 (Prompt Payment Act). b) Payment is due thirty (30) DAYS after acceptance of order and receipt of an original invoice, but a percent early payment discount is offered for full payment made within ( ) DAYS after acceptance of order and receipt of an original invoice. COMPLETED FORM MUST BE RETURNED WITH BID

4 Questions and Answers from the pre-bid meeting: 1. Is there an error on Page E-03 of the plans? Reference Drawing E-08 PARK LAKE ONE LINE DIAGRAM - EXISTING. Clarification: The feeder from the ATS to the Lift Station is a 2"C not a 3"C. The cables are 3 # 4/0 no ground. Demo cable, reuse conduit as before. 2. Will the required PVC pipe be supplied by the City of Waco? No, the City will not be supplying PVC piping for this project. The four control panels is all that the City will be providing. All other items will be provided by the contractor. 3. What panels are being supplied by the City of Waco? The City will be providing the Pump Control Panels and the SCADA (PLC) Control Panels for both the Greenleaf and Park Lake Sewer Lift Stations. 4. What other instrumentation companies can be used besides Control Panels USA? The instrumentation company used must be Control Panels USA as noted in the RFB (Request for Bids). There will be no approved equals. 5. What size is the current electrical conduit at the Park Lake Sewer Lift Station from the generator to the lift station (on Page E-08 of the plans)? Is this the correct size for all the future cabling? Reference Drawing E-08 PARK LAKE ONE LINE DIAGRAM - REVISED. Change the New feeder from the ATS to the Lift Station to "3 #4/0, #4/0G. 2"C". 6. Does the City of Waco want a rack to hang ball float cables on in the wet well of the Park Lake Sewer Lift Station? Yes. Please provide a rack to hang the ball float cables on for the Park Lake Sewer Lift Station. It is noted in the plans. 7. Are plans for the Park Lake Lift Station sewer force main available for review? Yes. See the attached documentation of the sewer force mains for the Park Lake and Greenleaf Sewer Lift Stations. 8. The schematic drawings on page E-16 of the plans are labeled Duplex Pump Control Panels. Is this correct? No. The drawings on page E-16 of the plans should read SCADA (PLC) Control Panel, for each lift station.