1 CURRICULUM VITAE Name: Designation: Nationality: BHUSHAN JADHAV Sr. Mechanical Engineer (Static Equipment) INDIAN Date of birth: 13 March 1986 Education: Bachelor of Engineering (Production Engg) ( ) Pune University, Maharashtra, INDIA Certification: 1) Project Management Professional [PMI] 2) Design of Static Equipment and Pressure Vessel (ASME Code) at Code Tech Engineering Years of Experience: 6+ Years of experience in EPC, Oil & Gas an Petrochemical Industry. Contact details :- 1. Mobile :- UAE : India : / id:- bhushanjadhav31@yahoo.co.in CAREER SUMMARY: Innovative Environmental Technologies Pvt Ltd. Pune India As a Design Engineer/ Static Equipments. I am also handling additional role as an Operations & commissioning Manager- Biochemical Sulfur Recovery Units & Project Coordinator. Independently handling the Spare parts and preparation of Patented chemical. Dembla Valves Pvt Ltd Mumbai India As an Design Engineer for Design and development of Butterfly valve, Gate Valve. Software Skills: PV Elite Autocad Pro- E MS office Page 1 of 6

2 CAREER HISTORY: Innovative Environmental Technologies Pvt Ltd. (Feb 2013-to date) Designation: Senior Mechanical Engineer (Static Equipment) Responsibility and achievements Participate in review contract requirements for project execution, preparation of the Technical Document Register (TDR) Deliverable List, identify technical requirements, scope of work; review Project specifications, Process Data Sheets (PDS), prepare Mechanical Data Sheets (MDS), review Piping & Instrumentation Diagrams (P&ID s), Plot plans, Equipment Layout Drawings, Review Project Philosophies. Preparing and checking of Mechanical Data sheets for vertical Pressure vessels, and Columns from Process Data Sheets as per ASME SEC VIII Div.1, ASME SEC VIII Div.2, project specification by using PV-Elite. Preparing and checking of Material/ Purchase Requisition, Technical Specification for Static Equipment from client project specifications. Preparing Design calculations for vertical Pressure vessels, Horizontal Pressure vessels and Columns by using PV-Elite from Mechanical Data sheets, customer specifications and Codes and Standards for Oil and gas, IOCL Refinery. P&ID development / review vendor P&ID. HAZOP/design review participation. Well versed with scrubber plant as per P & ID, plot plan & PFD Drawings. (Review & approval). Preparation of company HSE philosophy, HSE incident reporting, Lesson learnt report, Hazardous Area Classification Drawing, Risk assessment and Job safety assessment, Work environment Audit report, Preparation of Material Safety Data Sheet for handling hazardous chemicals Hands-on experience in handling Pre-commissioning & Commissioning of Biochemical sulphur recovery units. Operations Head and control H 2 S scrubber plant installed at distilleries, Sewage Treatment Plants and Starch industries. As-Built drawing for Petrofac International, ADCO in UAE Responsible for smooth operating and preventive maintenance of H 2 S removal plant. Lab analysis of process liquid for Thiobacillus bacterial growth Involved in manufacture of companies patented nutrient. Trained 13 Graduate Trainee Engineers of Petrofac (Mumbai) by conducting Industrial Site Visit at Biogas to Power generating unit. A team player with exceptional time management and problem solving skills. Page 2 of 6

3 Project 1- Lukoil-Well Engineering services Petrofac Iraq (July 2018 to date) ENGINEERING & SERVICES AND FEED ENDORSEMENT & COST ESTIMATION Well Pad development, including oil wells hook-up, closed drain system, interconnecting piping, transformers, pig launcher Key elements of the Projects Design calculation of pressure vessel (Close Drain Sump) by PV Elite. Design Calculation for Pig Launcher and Pig receiver. Prepare Mechanical Requisition. Project 2- ADGAS FEED for Utilities Training Plant For Petrofac International Ltd. (Oct 2017) a) POWER GENERATION b) GAS ENGINE GENERATOR c) FUEL HANDLING SYSTEM (DIESEL & PROPANE) d) STEAM GENERATION e) DEMINERALIZED WATER PACKAGE f) BOILER PACKAGE g) CONDENSER & DEAERATOR h) WASTE HEAT RECOVERY Key elements of the Projects Preparation of Mechanical Design Basis, Mechanical Data Sheet, Specification of equipment Provided inputs for Generation of 3D model using PDMS software. Development of modularized packages with state of the art Integrated Control & Safety System (ICSS). Documentation / data requirements as per ADGAS Engineering Records Procedure. Preparation of Material Safety Data Sheet for emulsifier, Demulsified, corrosion inhibitor, chlorination, Brine, Muddy Water Study & review Design reviews (I & II) 3D model review HSE Study Page 3 of 6

4 Project 3- Front End Engineering Design (FEED) Project for K C Valley Sewage Treatment plant for Ecolog Poland (May 2017) Conducted Conceptual design and Design basis for Biogas generation, H2S Scrubber, Gas Genset, Sludge thickening and removal system. Directed mechanical equipment purchases as required. Prepared Plant Layout, PNID, Process Flow Diagram Carrying out vendor offer review Technical Query TQ and Technical Bid Evaluation TBE report preparation. Checking and reviewing of Vendor Documents like Bill of material Assembly and fabrication drawings Calculation Reports. Develop project data sheets, specifications & tender documents of mechanical equipment. Conducted preventive maintenance on mechanical as well as electrical systems. Reviewed single-line diagrams for electrical specification documentation Project 4- Front End Engineering Design (FEED) PDO Oman Tayseer for Petrofac International (Jan 2017) 50 ton /day Sulphur removal Plant Design of storage tank Bioreactor. Preparation of mechanical datasheet for scrubber column. Prepared Plant Layout, PNID, Process Flow Diagram Checking and reviewing of Cost estimation under guidance of project manager Project 5- V A Tech Wabag Delhi, India (May 2016 to date) Gas Cleaning (Sulphur removal plant) to power generation system Details of project :- Gas flow = 900 m3/hr Inlet H2S = 2000 ppm Outlet H2S = 4 ppm Key elements of the Projects Perform & verify basic & detailed engineering design & calculation of Process Equipments (i-e Pressure Vessels, Columns & Tanks) as per Codes (ASME), Standards (TEMA), client specifications and Standard Industry practices. Support and Guide drafting team to prepare equipment General Arrangement Drawings of Static Equipment like Pressure Vessels Columns Heat Exchangers Storage Tanks etc. Conducted PNID, Process Flow Diagram, design evaluation for Process liquid flow pattern. Directed mechanical equipment purchases as required. Page 4 of 6

5 Ensured that all performed work adhered to factory and local safety codes. Presented project scope proposals and contracts to appropriate vendors. Oversaw mechanical facility designs for layout plant utilities and equipment arrangement. Reviewed all project scope and budget documents for submission to management. Conducted Erection and commissioning activities at site Project 6- Initiating planning execution of H2S scrubber at Dhampur Sugar mill Asmoli Unit, Utter Pradesh India (May 2015) Gas Cleaning (Sulphur removal plant) to power generation system Details of project :- Gas flow = 1600 m3/hr Inlet H2S = ppm Outlet H2S = 15 ppm Manage 4-person engineering team, including hiring employees and consultants. Report directly to CEO. Responsible for financial, scheduling, and technical requirements in compliance with company, industry, and regulatory standards. Site Erection and commissioning of 2 ton sulphur load plant Project 7 -Erection of H2S scrubber at Dhampur suger mill, Dhampur Bijnor Unit, Utter Pradesh, India (March 2015) Gas Cleaning (Sulphur removal plant) to power generation system Details of project: - Gas flow 2200 m3/hr H2S = 3.5 % Outlet = 15 ppm Design calculation for Scrubber column as per ASME Develop and monitor engineering budgets for product line. Conduct design reviews and tests. Liaise with Program Manager, Design Director, and Production Manager to transition products from design and prototype through production and completion. Advise on integration of all technical aspects for product line, including hardware, software, mechanical, and electrical disciplines Page 5 of 6

6 Project 8- Green Future Innovation Philippines (July 2015) Details of project: - Gas flow = 700 m3/hr Inlet H2S = ppm /Outlet H2S = 50 ppm Recommissioning of H2S scrubber plant. Provided support during installation and start-up of projects, ensuring multidiscipline engineering and design efforts were completed in accordance with project scope, schedule, and costs. Checked construction and Piping engineering contractors performance against specifications, codes, and drawings. Verified construction work was performed safely per company, industry, and regulatory standards. Managed schedule to make sure projects were completed per estimates. Prepared and presented project status and progress reports. Project 9- Maze Product Gujarat India (Nov 2014) Assisted with project technical supervision, cost estimating, materials selection, quality assurance, transition planning, approval procurement, and project closeout documentation. Helped develop and execute engineering and construction projects with focus on integrating design and construction of facilities and building systems in Manhattan. Aided in scheduling of draftspersons, engineering aides, and other engineers Project 10- ADCO/ Petrofac - As built drawings (Mar 2013) deliverables for as built drawing. Guided team of 9 draftsmen for AutoCAD drawing Coordination with project team in Abu Dhabi DEMBLA Valves Pvt Ltd, Mumbai, India from July 2012 to Feb 2013 Designation: Design Engineer Responsibility and achievements Design and development of Butterfly valve, Gate Valve Involved in the design discussions and reviewing the data. Coordinate with production department for valve manufacture Butterfly valve pressure and leak test Development of solid model of valve with the help Pro-E Minimum material consumption reporting Maintaining the data & Records Page 6 of 6