REHABILITATION OF DOLOW ADMINISTRATION AND COMMUNITY CENTRE

Size: px
Start display at page:

Download "REHABILITATION OF DOLOW ADMINISTRATION AND COMMUNITY CENTRE"

Transcription

1 REHABILITATION OF DOLOW ADMINISTRATION AND COMMUNITY CENTRE Reintegration and Durable Solutions

2 Sheet No. Content G-01 Index Sheet A-01 A-02 A-03 A-04 A-05 A-06 A-07 A-08 A-09 A-10 3D-01 3D-02 3D-03 3D-04 3D-05 Existing Site Plan Proposed Site Plan Proposed 2 Offices Block Plan Proposed 2 Offices Block Elevations Proposed 2 Offices Block Roof Plan & Section Proposed Masonry Fence New Openings' Schedule Rehabilitation Notes 01 Rehabilitation Notes 02 Existing Site Photos 3D Projection 01 3D Projection 02 3D Projection 03 3D Projection 04 3D Projection 05 INDEX SHEET G-01 N/A

3 Existing building Provide new gate Existing building Get rid off the chainlink fence wall and provide a new perimeter block wall Adjacent Building Existing building Out of scope (leave as it is) Get rid off the chainlink fence wall and provide a new perimeter block wall Out of scope (leave as it is) Existing building Out of scope (leave as it is) Get rid off the chainlink fence wall and provide a new perimeter block wall Garden Out of scope (leave as it is) Inside compound of (District administration offices) Inside compound of (Police station center) Existing underground water tank, demolish and remove this water tank and build two new offices behind it Garden Existing flag statue This line splits the two building, but actually there is no barrier existing here Out of scope (leave as it is) Propose two new offices for somewhere here. inside of district administration office This gate is existing Get rid off the chainlink fence wall and provide a new perimeter block wall Get rid off the chainlink fence wall and provide a new perimeter block wall EXISTING SITE PLAN A-01 1:300

4 EXISTING BUILDING EXISTING BUILDING EXISTING TREE GARDEN - extended to the perimeter wall EXISTING BUILDING DISTRICT ADMINISTRATION OFFICES EXISTING BUILDING EXISTING FLAGPOST POLICE STATION COMPOUND LANDSCAPING EXISTING BUILDING NEW 2 NO. OFFICES BLOCK NEW CAR PARK ACCESS ROAD NEW MASONRY FENCE - REPLACES EXISTING CHAINLINK FENCE - HEIGHT = 2000MM X 300 MM 4000MM CENTRES NEW CAR PARK NEW CAR PARK LANDSCAPING ACCESS ROAD PROJECT DETAILS Project : Tittle: PROPOSED SITE PLAN Checked & Approved by: Drawn by: Drawing Tittle: Sheet No. A-02 Scale: 1:300

5 E A B C 600 3,600 1,220 3,500 1,170 1,500 1,500 1,220 PV PV 600 1,500 1,500 1,220 3,500 1,170 3,600 1,220 E-01 S-01 7,100 3,500 3,500 OFFICE X 300 CERAMIC TILES OFFICE X 300 CERAMIC TILES E-02 E-04 PV PV PV PV CORRIDOR FLOOR SCREED 500 1, , ,500 3,500 S-01 7,100 PROPOSED 2 OFFICES BLOCK FLOOR PLAN A-03 1:45

6 Highest Point 4, A B C Highest Point 4,182 Roof Level Lintel Level 3,000 2,700 PV PV PV PV Roof Level Lintel Level 3,000 2,700 PV Window Sill Level 1,200 Window Sill Level 1,200 Floor Level G.L. 300 Floor Level G.L. 300 ELEVATION E-01 3,500 3,500 3,500 1,170 ELEVATION E-02 Highest Point 4, Highest Point 4,182 C B A Roof Level Lintel Level 3,000 2,700 Roof Level Lintel Level 3,000 2,700 PV Window Sill Level 1,200 Window Sill Level 1,200 Floor Level G.L. 300 Floor Level G.L. 300 ELEVATION E-03 3,500 3,500 1,170 ELEVATION E-04 3,500 PROPOSED 2 OFFICES BLOCK ELEVATIONS A-04 1:50

7 8,320 8, mm (H) x 200mm R.C. Ring beam to S.E. details 12mm chipboard ceiling nailed on wooden A B C framework 28 Gauge G.I. Sheet roofing on 100 x 50mm sawn timber trusses. Roof incline angle = 25 deg. 6,020 C B A 0 Highest Point 4,182 FALL FALL Roof Level Lintel Level 3,000 2,700 PV Window Sill Level 1 1,200 Floor Level G.L. 300 FALL FALL 1,170 3, mm x 1500mm M.S. Casement window to Schedule 2 200mm thick Masonry Walls 6, mm (H) x 900mm M,S. Swing door to Schedule PROPOSED 2 OFFICES BLOCK ROOF PLAN & SECTION A-05 1:50

8 3,700 3,000 3,300 10,000 33,000 2,200 2,000 60, ,000 17, mm Precast Concrete Copping 400mm x 400mm 300mm x 300mm R.C. Column cast insitu. 2200mm in Height 2000mm (H) x 200mm Thick Quary Stone Masonry Wall 4,000 15,500 3,000 44,000 25,500 55,000 PROPOSED MASONRY FENCE A-06 1:40/1:260

9 2, ,500 2,400 OPENING IMAGE NAME QTY WIDTH HEIGHT DESCRIPTION 900 D M.S. Panel Swing Door with lockable door latch amd 3 welded hinges 1,500 W M.S. Casement Window with Louvred main sash and side hung side sashes and a top hung transom above the touvres 300 3, G M.S. Panel Double Swing Gate bolted to 300mm x300mm R.C. Columns on either side OPENINGS SCHEDULE A-07 1:50

10 BEFORE Replace the Existing Police Station Gate With a new M.S. Panel double Swing Gate as per opening schedule AFTER Clear Bushes and dirt around the gates, level and introduce new parking spaces outside the two gates as per drawing provided REHABILITATION NOTES 01 Demolish tank. existing undergound Cart away debri, level and compact ground ready for new foundation for the proposed new 2 Offices Block Construct a 2 Offices block where the underground tank used to be as per the drawings provided. AFTER PROJECT DETAILS BEFORE Project : Tittle: REHABILITATION NOTES 01 Checked & Approved by: Drawn by: Drawing Tittle: Sheet No. A-08 Scale: N/A

11 BEFORE Replace the Existing Chain link fence with quary stone masonry wall 2000mm high as per the proposed drawings with 300mm x 300mm R.C. Columns at 4000mm centres AFTER Clear Bushes and dirt around the gates, level and introduce new parking spaces outside the two gates as per drawing provided REHABILITATION NOTES 02 Clear the site of all unwanted dirt, bushes and debri. Level the site to architects aprooval. Introduce defined Parking inside the police station. Introduce proper tree gardens / landscaped areas as per proposed drawings AFTER PROJECT DETAILS BEFORE Project : Tittle: REHABILITATION NOTES 01 Checked & Approved by: Drawn by: Drawing Tittle: Sheet No. A-09 Scale: N/A

12 EXISTING PHOTOS PROJECT DETAILS Project : Tittle: Checked & Approved by: Drawn by: Drawing Tittle: Sheet No. Scale:

13 EXISTING PHOTOS A-10 N/A