1 Promptly sign and date on the line below, then IT BACK TO KDOT, EVEN IF NOT BIDDING. Or you may still FAX IT TO the Estimating Section at (785) Any instructions not followed will result in your bid being declared irregular. If these changes affect any of your subcontractors or suppliers, IT IS YOUR RESPONSIBILITY to inform them. These changes are part of the contract for this project(s). Please contact me at (785) , if there are questions. Thank you for your cooperation. 1BTo: 2BFrom: 4BKansas Department of Transportation 3Bureau of Construction and Maintenance 0BEstimating Section Prime Contractor Bid Holders Shane Houser, P.E. - Estimating Engineer 5BDate: December 11, 2018 Proposal/Contract No.: Subject: Project Notice for the December 12, 2018 Letting KA WASHINGTON COUNTY GRADING, BRIDGE & SURFACING The quantity for item 32 RIPRAP (LIGHT STONE) (100 LB) has changed. Revised plans will be sent out after the letting. This revised the Unit Prices List. To view this project s documents, choose Addendum #1 from KDOT s website: You must update your EBSX file by going to the Bid Express website: choose the correct Letting, locate and select the Proposal number to download 12dec X. The Contractor is responsible for ensuring the EBSX file that the Contractor uses to prepare its Proposal and submits to KDOT contains any amendments. We also recommend that you check the Bid Express Questions and Answers ( to review any questions that may have been posted for this project. (Company Name) (Signature) (Date) C: District 2 & Junction City Office KA3086.doc

2 Line Number Item Number Quantity Unit Unit Price Extension Price Section 01 COMMON ITEMS LS CONTRACTOR CONSTRUCTION STAKING EACH FIELD OFFICE AND LABORATORY (TYPE C) LS MOBILIZATION LS MOBILIZATION (DBE) LS $4, $4, MAINTENANCE AND RESTORATION OF HAUL ROADS (SET PRICE) LS REMOVAL OF EXISTING STRUCTURES CUYD $ $40.00 FOUNDATION STABILIZATION (SET PRICE) CUYD $ $ CONCRETE FOR SEAL COURSE (SET PRICE) LS CURING ENVIRONMENT HOUR $ $25.00 FLAGGER (SET PRICE) Section 01 Total $4, Section 02 ROAD ITEMS LS CLEARING AND GRUBBING LS TRANSPORTING SALVAGEABLE MATERIAL CUYD COMMON EXCAVATION (RURAL SMALL) CUYD COMMON EXCAVATION (CONTRACTOR FURNISHED) CUYD ROCK EXCAVATION CUYD COMPACTION OF EARTHWORK (TYPE A) (MR-5-5) CUYD COMPACTION OF EARTHWORK (TYPE AA) (MR-5-5) MGAL $ $35.00 WATER (GRADING) (SET PRICE) SQYD SALVAGED TOPSOIL CUYD $ $35.00 TEMPORARY SURFACING MATERIAL (AGGREGATE) (SET PRICE) PMPS MOWING Contractor: Page 13 Check: 7E7555F92C

3 EACH RIGHT-OF-WAY SURVEY MONUMENT EACH MONUMENT BOX LNFT CROSS ROAD PIPE ( 48") (RCP) LNFT ENTRANCE PIPE ( 36") (RCP) EACH END SECTION ( 48") (RC) EACH END SECTION ( 36") (RC) LNFT GUARDRAIL, STEEL PLATE (MGS) LNFT SLOPE DRAIN (STONE) EACH FLUME INLET (CONCRETE) TON AGGREGATE DITCH LINING ( 6") SQYD RIPRAP (LIGHT STONE) (100 LB) Section 02 Total $70.00 Section 03 GUARDRAIL END TERMINAL ALT (MGS-SRT) EACH GUARDRAIL END TERMINAL (MGS-SRT) Section 03 Total Section 04 GUARDRAIL END TERMINAL ALT (MGS-FLEAT) EACH GUARDRAIL END TERMINAL (MGS-FLEAT) Section 04 Total Section 05 TEMP PRJ WTR POL CTL-SOIL EROSION LBS. TEMPORARY FERTILIZER ( ) LBS. TEMPORARY SEED (CANADA WILDRYE) LBS. TEMPORARY SEED (GRAIN OATS) LBS. TEMPORARY SEED (STERILE WHEATGRASS) Contractor: Page 14 Check: 7E7555F92C

4 LBS. SOIL EROSION MIX SQYD EROSION CONTROL (CLASS 1) (TYPE D) SQYD EROSION CONTROL (CLASS 2) (TYPE F) CUYD $ $35.00 SEDIMENT REMOVAL (SET PRICE) LNFT $1.000 $1.00 TEMPORARY BERM (SET PRICE) LNFT BIODEGRADABLE LOG ( 9") LNFT BIODEGRADABLE LOG (12") LNFT BIODEGRADABLE LOG (20") LNFT FILTER SOCK (12") LNFT FILTER SOCK (18") SQYD GEOTEXTILE (EROSION CONTROL) LNFT SILT FENCE LS SWPPP DESIGN EACH SWPPP INSPECTION EACH WATER POLLUTION CONTROL MANAGER LBS. MULCHING TACKING SLURRY TON MULCHING MGAL $ $35.00 WATER (EROSION CONTROL) (SET PRICE) Section 05 Total $71.00 Section 06 BR NO (053) CUYD CLASS I EXCAVATION CUYD CONCRETE (GRADE 4.0) (AE) (SA) CUYD CONCRETE (GRADE 4.0) (AE) LBS. REINFORCING STEEL (GRADE 60) (EPOXY COATED) Contractor: Page 15 Check: 7E7555F92C

5 LBS. REINFORCING STEEL (GRADE 60) LBS. STRUCTURAL STEEL (M270) (GR 50WT3) LBS. STRUCTURAL STEEL (A709) (GR 50W) LBS. STRUCTURAL STEEL (A709) (GR 50) LNFT PILES (STEEL) (HP10X42) EACH CAST STEEL PILE POINTS EACH BEARING (STEEL REINFORCED ELASTOMERIC) EACH WELDED STUD SHEAR CONNECTORS LNFT DRILLED SHAFT ( 48") (CASED) LNFT CORE HOLE (INVESTIGATIVE) EACH $1, $1, SONIC TEST (DRILLED SHAFT) (SET PRICE) CUYD ABUTMENT AGGREGATE DRAIN SQYD BRIDGE BACKWALL PROTECTION SYSTEM CUYD SLOPE PROTECTION (RIPRAP STONE) LS TEMPORARY SHORING SQYD BRIDGE DECK GROOVING Section 06 Total $1, Section 07 CONCRETE SURFACING ITEMS SQYD CONCRETE PAVEMENT (11" UNIFORM) (AE) (BR APP) CUYD BRIDGE APPROACH SLAB FOOTING Section 07 Total Section 08 ASPHALT SURFACING ITEMS TON HMA-COMMERCIAL GRADE (CLASS A) TON Contractor: Page 16 Check: 7E7555F92C

6 PAVEMENT EDGE WEDGE (ROCK) MGAL $ $35.00 WATER (EARTHWORK COMPACTION) (SET PRICE) TON SURFACING MATERIAL (AB-3) SQYD AGGREGATE SHOULDER (AS-1) ( 6") TON MILLING EACH FIELD OFFICE AND LABORATORY (TYPE A) TON TRANSPORTING SALVAGEABLE MATERIAL (0-2.5MI) Section 08 Total $35.00 Section 09 SIGNING ITEMS SQFT SIGN (FLAT SHEET) (HIGH PERFORMANCE) LNFT SIGN POST (4" X 6" WOOD) (FLAT SHEET SIGN) LNFT SIGN POST (2 LB/FT "U" STEEL) EACH SIGNING OBJECT MARKER (TYPE 2) EACH SIGNING DELINEATOR (TYPE B) (WHITE RIGID "U" POST) Section 09 Total Section 10 PAVEMENT MARKING ITEMS LNFT PAVEMENT MARKING (THERMOPLASTIC) (WHITE) ( 6") LNFT PAVEMENT MARKING (THERMOPLASTIC) (YELLOW) ( 4") Section 10 Total Section 11 SEEDING ITEMS LBS. FERTILIZER ( ) LBS. FERTILIZER ( ) LBS. SEED (BIG BLUESTEM GRASS) (KAW) LBS. Contractor: Page 17 Check: 7E7555F92C

7 SEED (BLUE GRAMA GRASS) (LOVINGTON) LBS. SEED (BUFFALO GRASS) (TREATED) LBS. SEED (CANADA WILD-RYE) LBS. SEED (INDIANGRASS) (OSAGE) LBS. SEED (LITTLE BLUESTEM GRASS) (ALDOUS) LBS. SEED (RYEGRASS) (PERENNIAL) LBS. SEED (PRAIRIE JUNE GRASS) LBS. SEED (SIDE OATS GRAMA) (EL RENO) LBS. SEED (STERILE WHEATGRASS) LBS. SEED (SWITCHGRASS) (BLACKWELL) LBS. SEED (TALL DROP) LBS. SEED (FESCUE) (TALL) (ENDOPHYTE-FREE) LBS. SEED (WESTERN WHEATGRASS) (BARTON) LBS. SEED (NATIVE WILDFLOWER MIX 1) Section 11 Total Section 12 TRAFFIC CONTROL ITEMS EADA WORK ZONE SIGNS ( 0 TO 9.25 SQ.FT.) EADA WORK ZONE SIGNS ( 9.26 TO SQ.FT.) EADA WORK ZONE BARRICADES (TYPE 3-4 TO 12 LIN. FT.) EADA CHANNELIZER (FIXED) EADA CHANNELIZER (PORTABLE) EADA WORK ZONE WARNING LIGHT (TYPE "A" LOW INTENSITY) EADA WORK ZONE WARNING LIGHT (RED TYPE "B" HIGH INTENSITY) EADA ARROW DISPLAY STAL Contractor: Page 18 Check: 7E7555F92C

8 PAVEMENT MARKING (TEMP) 4" SOLID (TYPE I) STAL PAVEMENT MARKING (TEMP) 4" SOLID (TYPE II) EACH PAVEMENT MARKING (TEMP) (SYMBOL) (TYPE II) LNFT PAVEMENT MARKING REMOVAL EACH RIGID RAISED PAVEMENT MARKER (TYPE I) LS TRAFFIC SIGNAL INSTALLATION (TEMPORARY) LS TRAFFIC CONTROL (INITIAL SETUP) LNFT CONCRETE SAFETY BARRIER (TYPE F3) (TEMPORARY) LNFT CONCRETE SAFETY BARRIER (TYPE F3) (TEMPORARY - RELOCATE) EACH INERTIAL BARRIER SYSTEM (TL-3) EACH REPLACEMENT MODULES (IBS) Section 12 Total Item Total $6, Contractor: Page 19 Check: 7E7555F92C