1 COCO PALMS SITE SAFETY PRACTICES WORK AT HEIGHT SAFETY

2 Project Brief: Project Scale : 12 blocks / 12 to 16 storeys building with 2 basement car parks Total Units Site Area : 944 Units, 6 Ancillary Commercial Units : 41,514 sqm (or approximate 446,857 sqft) Contract Commencement Date : 10 th July 2014 Contract Completion Date Phase 1 Contract Completion Date Phase 2 : 09 th Oct 2017 (39 months) : 09 th Jan 2018 (42 months)

3 Project Team: Developer/Owner Project Manager Architect / QP For Building Plan Structural Engineer Quantity Surveyor M&E Interior Designer Landscape Consultant Builder : Hong Realty (Private) Limited : CDL Management Services Pte Ltd : Axis Architects Planners Pte Ltd : Parsons Brinckerhoff Pte Ltd : Langdon & Seah Singapore Pte Ltd : Meinhardt (Singapore) Pte Ltd : Axis ID Pte Ltd : Tinderbox Pte Ltd : Woh Hup (Private) Limited

4 CCP WSHE ORGANIZATION CHART Roy Chia Construction Manager Tan Ee Pong Site Manager Tang Chun Keat Site Manager Mohd Fadzli WSHEO Blk 3-4 Padmanaban Scaffold Team Scaffold Sup Sekar Scaffold Erector 16 Lifting Team Lifting Sup Dinesh Sig/Rig - 18 Blk 9-10 Tan Siang Weng Blk 1-2 Paulo Blk 5-6 Shanmugam Blk 7-8 Ganesh Blk Suresh

5 WH s Safety Awards Achieved For The Past 3 Years

6 WOH HUP 2015 EHS ACHIEVEMENTS RoSPA Gold Award RoSPA Guardian Angel Award 2015 RoSPA Ocupational Safety Award Winner of the Housebuilding & Property Development Sector SCAL WSH Innovation Convention Silver WSHE Team Bronze Corals At Keppel bay MOM WSH SHARP Award MOM WSH Award For Supervisor Happy Toilet 5 Star Award

7 COCO PALMS EHS ACHIEVEMENTS RoSPA Gold Award 2014 RoSPA Gold Award 2015 MOM SHARP Award 2014 MOM SHARP Award 2015 Happy Toilet 5 Star Award 2014 Happy Toilet 5 Star Award 2015 CDL 5 STAR AWARDS

8 WH Management s Top-Down Driven Safety Culture WH s Internal Monthly Housekeeping Audits External Safety Audits on site s safety standards CDL quarterly 5 Stars Audits

9

10 TOPICS FOR THE DAY WORK AT HEIGHT SAFETY WORK AT HEIGHT SAFETY

11 WORK AT HEIGHT (WAH) SAFETY

12 WAH SAFETY Fall Prevention Plan

13 WAH SAFETY Fall Prevention Plan Structural Stage Formwork Edge Railings External Gap Covering Detachable Barricade External scaffold Rigid Barricade Floor Opening Cover External Safety Screen Lift Shaft Jump Form Access to Construction Floor Formwork Edge Railings

14 WAH SAFETY Fall Prevention Plan Finishing Stage Drop Down Lifeline External Gap Covering Rigid Barricade External scaffold Lift Shaft Fencing Staircase Railings External Safety Screen Catch Screen Opening Cover Bay Window Barricade

15 IDENTIFICATION OF TOP 5 CRITICAL HIGH RISK ACTIVITIES

16 Installation of MLP 1 Dropdown lifeline pre installed for user to anchor on during the shifting of MLP. 2 Dropdown lifeline pre installed for user to anchor on during the shifting of MLP.

17 Installation of MLP 3 MLP door hinge is provided with a knob to prevent it from dislodge during operation or lifting. 4 MLP door hinge is provided with a knob to prevent it from dislodge during operation or lifting.

18 Installation of MLP 3 Safe working load (SWP) to be displayed for user awareness. 4 Lifting point for MLP

19 AC ledge Installation of barricade Legend: Drop down lifeline 2.5m GI pipe 1m GI pipe Base plate AC Ledge Vertical GI pipe Horizontal GI pipe Toeboard Steps: 1)Drill 10mm hole to the ac ledge. 2) Insert 10mm wall plug into the hole. 3)Install the GI column pipe and screw in with 10mm bolt. 4) Complete with 5 layer horizontal guardrail and toeboard

20 Planter box Installation of barricade 1.5m GI pipe 1m GI pipe 0.5m GI pipe Vertical GI pipe Horizontal GI pipe Steps: 1)Drill 10mm hole to the planter box. 2) Insert 10mm wall plug into the hole. 3)Install the GI column pipe plate and screw in with 10mm bolt. 4) Complete with 3 layer horizontal guardrail without toeboard. Base plate Planter Legend: Drop down lifeline

21 Staircase Installation of barricade 1.5m GI pipe 1m GI pipe 0.5m GI pipe Base plate Vertical GI pipe Horizontal GI pipe Toeboard Staircase mid landing 200mm Steps: 1)Drill 10mm hole to the staircase midlanding and 200mm away from the edge. 2) Insert 10mm wall plug into the hole. 3)Install the GI column pipe plate and screw in with 10mm bolt. 4) Complete with 3 layer horizontal guardrail with toeboard. Legend: Drop down lifeline

22 INSTALLATION OF WINDOW FRAME 1 Rope will be used to secure the window frame and the other end to the safety barricade. 2 Worker will hook his harness to the safety barricade or the dropdown lifeline when slotting the window frame into its position. 3 4 Using an explosive powered tools, worker will then secured the window frame to the concrete surface. Once window frame installed, barricades will be transferred to the window frame itself.

23 Installation of precast finwall Precast Finwall Installation sequence 4 5 High detachable barricade in placed prior precast Finwall is installed. Lifting gear released after tie back is installed and secured.

24 Layering AAC block or installing Acotec panel at the edge of the building A B 1. Brickcage to be installed at the exterior façade of the work area 1. Brickcage will be shifted up to the next level for the following level (Common staircase area)

25 Layering AAC block or install Acotec panel at the edge of the building C 1. Brickcage to be installed at the exterior façade of the work area (Planter area)

26 Tower Crane Operator Access Typical erection of tower crane access

27 Tower Crane Operator Access Typical erected of tower crane access

28 Passenger Hoist Location of passenger hoist

29 Site Access Perimeter access Site perimeter access to be clean. Any deviation in the height of the walkway needs to be mark with a visible sign.

30 Site Access Access to higher slab Steps access provided for personnel to cross higher slab area

31 Site Access Access to formwork areas Access provided to formwork areas.

32 Internal In House Training Joint training between Woh Hup & Subcontractors - Classroom

33 Internal In House Training Joint training between Woh Hup & Subcontractors On Site Training

34 WAH SAFETY Competency of WAH Worker Supervisor WAH Assessor Manager

35 WAH SAFETY Emergency Response Rescue Kits

36 SITE WALK

37 Site Office SITE WALK ROUTE G2

38 THANK YOU