Hays CISD IH 35 Kyle, Texas ext August 2018

Size: px
Start display at page:

Download "Hays CISD IH 35 Kyle, Texas ext August 2018"

Transcription

1 Hays CISD IH 35 Kyle, Texas ext August 2018 Date: August 14, 2018 ADDENDUM 1 Bid#: VL Lehman HS Roof Replacements Opening Date: August 21, 2:00 P.M. Clarifications: Addendum #1 contains the REVISED Bid Form, Impact main building aerial photo and the DC Minute Thermal & Ignition Barrier on Spray Polyurethane Foam Technical Data Application Guide. Valerie Littrell Buyer In the submission of the response, vendor must acknowledge receipt of this addendum. Otherwise this offer may not be given consideration. Vendor may acknowledge receipt on face of response or by returning one copy of this notice. Signature of Bidder Printed Name Company Name 1

2 ROOFING AND RELATED WORK BID# VL HAYS CISD Hays CISD, Three year contract to replace shingle roof assemblies on two standard portable classrooms within the district as requested by district. Lehman High School Weight Room re-roofing as described in the specifications and shown on the drawings. Beacon Hill Maintenance Facility installation of insulated steel metal roof assembly on the Carpentry Shop and Grounds Building. Installation of spray foam insulation on walls and bottom of the roof deck on Carpentry Building, Bus Shop, District Warehouse, District Warehouse Storage and the Plumbing/Electric Warehouse, Paint Storage and Bus Shop. ADDENDUM NO August 2018 NOTICE TO ALL BIDDERS: This addendum forms a part of the Contract Documents and modifies the original Bidding Documents. Where provisions of the following Addendum differ from the original specifications, the Addendum shall govern and take precedence. Acknowledge receipt of this addendum in THE PROPOSAL FORM. Failure to do so may subject the bidder to disqualification. ITEM NO. 1 All buildings specified to have spray foam insulation installed will require an ignition barrier coating (International Fireproof Technology Inc., DC 315 (or approved equal) to meet or exceed code requirements for exposed closed cell foam insulations. All walls and bottom of the roof deck that will receive the foam insulation will need to be cleaned as required by the closed cell foam manufacturer s recommendations. Several of the buildings have old coatings/paint on the walls that will need to be removed as required to meet manufacturer s recommendations. All items within the buildings will be moved by the Owner prior to the contractor manning the job. It is understood that closed cell applications are temperature sensitive and cooler temperatures require longer curing times. Spray foam cannot be installed in temperatures below 45 degrees. The foam insulation is to encapsulate the purlins. All fixtures, heaters, etc will remain in place and will need to be protected prior to the foam application. Structures within the buildings that block wall areas or doors will not be insulated. The foam application will provide R-20 below the roof deck and R-16 at all walls. Fiberglass skylights are to be covered with new 22 gauge metal panel to match existing profile prior to foam application below roof deck. The carpentry shop and the grounds storage building currently have fiberglass skylights that will have to be replaced with metal panels. ITEM NO 2 Grounds Storage Building and Carpentry Shop will have 24 gauge pre-painted gutters and down spouts replaced as part of the roof replacement with an insulated steel roof assembly. Gutters will be 6 x 6 and down spouts will be 5 x 5. Gutter and down spouts will be provided in areas that they currently exist only. ITEM NO. 3 Design Professional Fee of $6,800 will be included in Base Proposal Item #3, Lehman High School Weight Room roof replacement. ITEM NO. 4 New Bid Form Provided with addendum #1 ITEM NO. 5 Aerial picture of IMPACT Center is provided to identify building to be insulation on the IMPACT Campus. ITEM NO. 6 IFTI, DC315 Ignition Barrier coating Data Sheet ITEM NO.7 Bid time and date remain unchanged. END ADDENDUM NO. 1, PAGE 1

3 SECTION BID PROPOSAL FORM (Addendum #1) Date: 13 August 2018 To: Ms. Valerie Littrell Hays CISD IH 35 Kyle, Texas From: (Contractor) (Address) (City, State, Zip) Subject: Hays CISD, Three year contract to replace shingle roof assemblies on two standard portable classrooms within the district. Lehman High School Weight Room re-roofing as described in the specifications and shown on the drawings. Beacon Hill Maintenance Facility installation of insulated steel metal roof assembly on the Carpentry Shop and Grounds Building. Installation of spray foam insulation on walls and bottom of roof deck on Carpentry Building, Bus Shop. District Warehouse, District Warehouse Storage and the Plumbing/Electric Warehouse, Paint Storage and Bus Shop. Dear Ms. Littrell: The undersigned having carefully inspected the site and studied all conditions affecting the cost of the proposed work, and having carefully studied these documents, including Instructions to Bidders, Supplemental Instructions to Bidders, General Conditions, Specifications and Drawings; hereby propose to perform everything required under this proposal and to furnish all the labor, materials, necessary tools, equipment, and all utility and transportation services necessary to perform and complete in a workman like manner, in the time hereafter specified, all the work as specified and described in these specifications for the following sum: BASE PROPOSAL ITEM # 1: Replace the shingle roofing assembly on one (1) Typical Portable (approximately 2500 sq ft) located within the district boundaries as described in the specifications and shown on the drawings. which shall be identified as Base Proposal Item #1. All applicable permits and P&P Bonds are included in this Pricing to be honored through , and school years and total contract is not to exceed $100,000. BASE PROPOSAL ITEM # 2: Replace the shingle roofing assembly on one (1) Typical Portable (approximately 2100 sq ft) located within the district boundaries as described in the specifications and shown on the drawings. which shall be identified as Base Proposal Item #2. All applicable permits and P&P Bonds are included in this Contractor Pricing to be honored through , and school years and total contract is not to exceed $100,000. BID # VL BID FORM

4 BASE PROPOSAL ITEM # 3: Replace the roofing on the Weight Room at Lehman High School as described in the specifications and shown on the drawings. which shall be identified as Base Proposal Item #3. All applicable permits, $6,800 design professional fee and P&P Bonds are included in this BASE PROPOSAL ITEM # 4: Replace the roofing on the Carpentry Building at the Beacon Hill Maintenance Facility with an insulated steel metal roof as described in the specifications and shown on the drawings. which shall be identified as Base Proposal Item #4. All applicable permits, P&P Bonds are included in this BASE PROPOSAL ITEM # 5: Replace the roofing on the Grounds Storage Building at the Beacon Hill Maintenance Facility with an insulated steel metal roof as described in the specifications and shown on the drawings. which shall be identified as Base Proposal Item #5. All applicable permits and P&P Bonds are included in this BASE PROPOSAL ITEM # 6: Install R-38 blown-in fiberglass insulation into Main Building of IMPACT Center attic space as described in the specifications and shown on the drawings. which shall be identified as Base Proposal Item #6. All applicable permits and P&P Bonds are included in this ALTERNATE # 1: Install R-20 closed cell foam insulation to the bottom of the roof deck on the Carpentry Building with an ignition barrier coating as described in the specifications and shown on the drawings. which shall be identified as Alternate #1. All applicable permits and P&P Bonds are included in this ALTERNATE #1A: Install R-16 closed cell foam insulation to the inside walls of the Carpentry Building with an ignition barrier coating as described in the specifications and shown on the drawings. which shall be identified as Alternate #1A. All applicable permits and P&P Bonds are included in this ALTERNATE # 2: Install R-20 closed cell foam insulation to the bottom of the roof deck in the Grounds Storage Building with an ignition barrier coating as described in the specifications and shown on the drawings. which shall be identified as Alternate #2. All applicable permits and P&P Bonds are included in this BID # VL BID FORM

5 ALTERNATE # 2A: Install R-16 closed cell foam insulation to the inside walls of the Grounds Storage Building with an ignition barrier coating as described in the specifications and shown on the drawings. which shall be identified as Alternate #2A. All applicable permits and P&P Bonds are included in this ALTERNATE # 3: Install R-20 closed cell foam insulation to the bottom of the roof deck on the Bus Shop Building with an ignition barrier coating as described in the specifications and shown on the drawings. which shall be identified as Alternate #3. All applicable permits and P&P Bonds are included in this ALTERNATE # 3A: Install R-16 closed cell foam insulation to the inside walls on the Bus Shop Building with an ignition barrier coating as described in the specifications and shown on the drawings. which shall be identified as Alternate #3A. All applicable permits and P&P Bonds are included in this ALTERNATE # 4: Install -20 closed cell foam insulation to the bottom of the roof deck on the District Warehouse with an ignition barrier coating as described in the specifications and shown on the drawings. which shall be identified as Alternate #4. All applicable permits and P&P Bonds are included in this ALTERNATE # 4A: Install R-16 closed cell foam insulation to the inside walls on the District Warehouse with an ignition barrier coating as described in the specifications and shown on the drawings. which shall be identified as Alternate #4A. All applicable permits and P&P Bonds are included in this ALTERNATE # 5: Install R-20 closed cell foam insulation to the bottom of the roof deck on the District Warehouse Storage Building with an ignition barrier coating as described in the specifications and shown on the drawings. which shall be identified as Alternate #5. All applicable permits and P&P Bonds are included in this ALTERNATE # 5A: Install R-16 closed cell foam insulation to the inside walls of the District Warehouse Storage Building with an ignition barrier coating as described in the specifications and shown on the drawings. which shall be identified as Alternate #5A. All applicable permits and P&P Bonds are included in this BID # VL BID FORM

6 ALTERNATE # 6: Install R-20 closed cell foam insulation to the bottom of the roof deck on the Plumbing/Electrical Warehouse with an ignition barrier coating as described in the specifications and shown on the drawings. which shall be identified as Alternate #6. All applicable permits and P&P Bonds are included in this ALTERNATE # 6A: Install R-16 closed cell foam insulation to the inside walls of the Plumbing/Electrical Warehouse with an ignition barrier coating as described in the specifications and shown on the drawings. which shall be identified as Alternate #6A. All applicable permits and P&P Bonds are included in this ALTERNATE # 7: Install R-20 closed cell foam insulation to the bottom of the roof deck on the Paint Warehouse with an ignition barrier coating as described in the specifications and shown on the drawings. which shall be identified as Alternate #7. All applicable permits and P&P Bonds are included in this ALTERNATE # 7A: Install R-16 closed cell foam insulation to the inside walls of the Paint Warehouse with an ignition barrier coating as described in the specifications and shown on the drawings. which shall be identified as Alternate #7A. All applicable permits and P&P Bonds are included in this UNIT PRICES UP-1 UP-2 UP-3 UP-4 UP-5 UP-6 Replace Shingle Roofing on Typical Portable Classroom (approx sq ft) $ per portable (same as Base proposal Item #1). Replace Shingle Roofing on Typical Portable Classroom (approx sq ft) $ per portable. (same as Base proposal Item #2). Replace 9/16 CDX plywood decking $ per square foot. Replace 1X wood fascia on portable classrooms $ per linear foot. Replace deteriorated metal decking at Lehman High School Weight Room $ per square foot. Replace deteriorated 2X wood nailers on parapet walls $ per square foot. The sum quoted in the proposal is guaranteed for ninety (90) consecutive days from the date hereof, and includes all applicable permit fees, performance bonds, payment bonds, etc. If authorized to proceed within that period, the undersigned agrees to complete the work covered by this proposal for the quoted sum. The bidder agrees to the following: (Bidder to Complete) A. To start work calendar days after notice to proceed. BID # VL BID FORM

7 B. To complete specified work on Base Proposal Item #1 in calendar days. C. To complete specified work on Base Proposal Item #2 in calendar days. D. To complete specified work on Base Proposal Item #3 in calendar days. E. To complete specified work on Base Proposal Item #4 in calendar days. F. To complete specified work on Base Proposal Item #5 in calendar days. G. To complete specified work on Base Proposal Item #6 in calendar days. H. To complete specified work on Alternate Item #1 in calendar days. I. To complete specified work on Alternate Item #1A in calendar days. J. To complete specified work on Alternate Item #2 in calendar days. K. To complete specified work on Alternate Item #2A in calendar days. L. To complete specified work on Alternate Item #3 in calendar days. M. To complete specified work on Alternate Item #3A in calendar days. N. To complete specified work on Alternate Item #4 in calendar days. O. To complete specified work on Alternate Item #4A in calendar days. P. To complete specified work on Alternate Item #5 in calendar days. Q. To complete specified work on Alternate Item #5A in calendar days. R. To complete specified work on Alternate Item #6 in calendar days. S. To complete specified work on Alternate Item #6A in calendar days. T. To complete specified work on Alternate Item #7 in calendar days. U. To complete specified work on Alternate Item #7A in calendar days. V. To work calendar days per week. By submitting this Bid, the Bidder certifies that he has visited the project sites, is aware of existing conditions which affect the work, and has reviewed the Contract Documents, including the following Addenda: BID # VL BID FORM

8 It is understood that the right is reserved by the Owner to reject any or all bids, or waive any formalities in bidding. Respectfully Submitted, By: (signature) (company) (title) Seal, if bidder is a corporation 13 August 2018 BID # VL BID FORM

9 Hays CISD, IMPACT Center, Main Building, Install R-38 Blown in Fiberglass insulation in the attic space. Existing to remain. MAIN BLDG feet meters