GrowSpan Series 2000 Steel End Frame Kits

Size: px
Start display at page:

Download "GrowSpan Series 2000 Steel End Frame Kits"

Transcription

1 GrowSpan Series 2000 Steel End Frame Kits 20' Wide 2017 Farmek All Rights Reserved. Reproduction is prohibited without permission. SK# GK2EW22120B GK2EW22120G 20' Wide (Base Plates) 20' Wide (No Base Plates)

2 Important Information READ HIS DOCUMEN BEFORE YOU BEGIN hank you for purchasing this GrowSpan Series 2000 Steel End Frame Kit. When properly assembled and maintained, this product will provide years of reliable service. hese instructions include helpful hints and important information needed to safely assemble and properly maintain the end frame. Please read these instructions before you begin. If you have any questions during the assembly, contact Customer Service for assistance. END FRAME KI: HOW O USE HIS GUIDE After assembling building main frame, attach steel end frame. Read this section to learn how best to use this guide. Not all pages apply to your end wall frame. he phrase Ground Post Option used in this guide refers to end frames that do not include base plates. (B) Base Plate Diagrams: Used when end wall frame includes vertical supports and base plates that will be anchored to a concrete slab or concrete piers. (G) Without Base Plate Diagrams: Used when end wall frame includes vertical supports that will be set below grade and anchored in place using customer-supplied concrete. ROUGH DOOR OPENING: Materials are included to frame an opening for a pedestrian door. If a door will not be installed in the end wall, C-channel material is not used. Always confirm rough opening dimensions by reading the documentation included with door and by measuring the actual door before anchoring any framing in concrete. AENION: Customer/contractor is responsible for installing end framing to install door. Consult a qualified contractor to assist in framing an opening and to complete door installation if needed. Additional purchase required for doors and end wall cladding kits. Consult documentation with those items for additional details. SAFEY PRECAUIONS Wear eye, hand, and head protection. Use a portable GFCI (Ground Fault Circuit Interrupter) when working with power tools and cords. Do not climb on framing during or after construction. Do not occupy the shelter during high winds, tornadoes, or hurricanes. Provide adequate ventilation if the structure is enclosed. Do not store hazardous materials in the shelter. Provide proper ingress and egress to prevent entrapment. REQUIRED OOLS he following list identifies the main tools needed to assemble end frame. Additional tools and supports may be needed depending on the structure, location, and application. ape measure or measuring device Marker to mark the location on tubing. Variable speed drill and impact driver (cordless with extra batteries works best) Metal file and metal-cutting saw Wrenches and impact socket set Hammers, gloves, and eye protection Adjustable pliers and self-locking pliers Ladders, work platforms, and other machinery for lifting designed to work safely at building and end frame height. AENION: Consult the services of a qualified, professional contractor if you are not familiar with constructing similar frame structures. he individuals assembling this end frame are responsible for designing and furnishing all temporary bracing, shoring and support needed during the assembly process. For safety reasons, those who are not familiar with recognized construction methods and techniques must seek the help of a qualified contractor. 2 GK2EW22120B_G

3 Important Information UNPACK AND IDENIFY PARS he following steps help ensure you have all parts before you begin. 1. Unpack shipment and place where you can easily inventory parts. Refer to Bill of Materials/Spec Sheets. 2. Verify all parts listed on Bill of Materials/Spec Sheets are present. If anything is missing or you have questions, consult all diagrams for clarification, or contact Customer Service. NOE: At this time, you do not need to open the plastic bags containing smaller parts such as fasteners and clamps. CUSOMER-SUPPLIED MAERIALS Concrete is required to anchor end wall vertical columns. Concrete is not supplied and can be purchased locally. Anchor base plates to concrete slab or piers; end wall supports without base plates are set below grade and anchored to site using concrete. WARNING: he individuals assembling this end frame are responsible for designing and furnishing all temporary bracing, shoring and support needed during the assembly process. For safety reasons, those who are not familiar with recognized construction methods and techniques must seek the help of a qualified contractor. ASSEMBLY PROCEDURE Following these instructions helps ensure proper assembly of your end frame. Steps outlining assembly are as follows: 1. Verify all parts are included in shipment. Notify Customer Service for questions or concerns. 2. Read these instructions and all additional documentation included with shipment before you begin. 3. Gather the tools, bracing, ladders (and lifts), and assistants needed to assemble end frame. 4. Check weather before you install end frame cladding (additional purchase required). Do not install cladding on a windy or stormy day. 5. Assemble end frame. 6. Read care and maintenance information (below). 7. Complete and return all warranty information as instructed (if present). CARE AND MAINENANCE Proper care and maintenance is important. Check these items periodically: Inspect all components regularly and frequently. Check connections and all fasteners to verify they remain tight and in good repair. Do not climb or stand on shelter or end frame. Remove debris and objects that may accumulate on the shelter. Use tools that will not damage the cover (if equipped) when removing debris. Remove snow to prevent excess accumulation. Use tools that will not damage the cover (if equipped) when removing snow. Never allow snow to accumulate on the cover or along sides and end panels after removing snow. Replace all worn or damaged parts promptly. GK2EW22120B_G 3

4 End Frame Base Plate Layout (B) 5 1/2" 1 1/4" 6" 3" 7/8" YP. 8" DEAIL (OPIONAL) A NOE: USE PLAE CENERS FOR GROUND POS APPLICAION. A PLAE CENERS: ANCHOR HOLE CENERS: PLAE EDGE PLAE EDGE 1 1/2" 4 1/2" 7 1/2" 5'-10 1/2" 5'-7 3/4" 6'-1 1/4" 14'-10 1/2" 14'-7 3/4" 15'-1 1/4" 20'-1 1/2" 20'-4 1/2" PLAE EDGE 20'-7 1/2" 4 GK2EW22120B_G

5 End Frame Solid (B) 1'-7 5/8" 1'-4 3/8" OP OF POS 4'-0" 4'-0" GROUND LEVEL B B 5'-6" 9'-0" 5'-6" 20'-0" NOES: ALL DIMENSIONS ARE FROM CENER O CENER UNLESS OHERWISE NOED. GIRS/FRAMING CHANNEL MAY REQUIRE FIELD CUING O FI. ENDWALL COLUMNS: PG2X2E4L15000(2" x 2" 14 GA 1-PLY SQUARE UBE) GIR/DOOR FRAME GR2X2G16L (14 GA PROFILE) (16 GA PROFILE) COLUMN OP CONNECION PLAE: PGBRKAAS01 (CONNECION PLAE) COLUMN BOOM BASE PLAE: B (BASE PLAE) LAERAL BRACING BRACKE: QH1070 (PIPE SRAP) GK2EW22120B_G 5

6 End Frame Diagram: Door Frame (B) 1'-7 5/8" 1'-4 3/8" OP OF POS H1 J1 VERIFY DOOR ROUGH OPENING J1 4'-0" 4'-0" GROUND LEVEL B DB DB B 5'-6" 9'-0" 5'-6" 20'-0" NOES: ALL DIMENSIONS ARE FROM CENER O CENER UNLESS OHERWISE NOED. SEE DOOR KI INSRUCIONS FOR ADDIIONAL INSALLAION INFORMAION (IF APPLICABLE). GIRS/FRAMING CHANNEL MAY REQUIRE FIELD CUING O FI. ENDWALL COLUMNS: PG2X2E4L15000(2" x 2" 14 GA 1-PLY SQUARE UBE) GIR/DOOR FRAME COLUMN OP CONNECION PLAE: GR2X2G16L (14 GA PROFILE) (16 GA PROFILE) PGBRKAAS01 (CONNECION PLAE) H (2" C-CHANNEL) COLUMN BOOM BASE PLAE: J (2" C-CHANNEL) B (BASE PLAE) DB QH1330 (FRAME BRACKE) LAERAL BRACING BRACKE: QH1070 (PIPE SRAP) 6 GK2EW22120B_G

7 Vent End Frame Diagram (B) 1'-2" OP OF POS 2'-10" 4'-3" GROUND LEVEL 2'-3 3/8" B B 5'-6" 9'-0" 5'-6" 20'-0" NOES: ALL DIMENSIONS ARE FROM CENER O CENER UNLESS OHERWISE NOED. GIRS/FRAMING CHANNEL MAY REQUIRE FIELD CUING O FI. ENDWALL COLUMNS: PG2X2E4L15000 (2" x 2" 14 GA 1-PLY SQUARE UBE) GIR/DOOR FRAME GR2X2G16L (14 GA PROFILE) (16 GA PROFILE) COLUMN OP CONNECION PLAE: PGBRKAAS01 (CONNECION PLAE) COLUMN BOOM BASE PLAE: B (BASE PLAE) LAERAL BRACING BRACKE: QH1070 (PIPE SRAP) GK2EW22120B_G 7

8 End Frame (G): Vertical Supports Layout A Ground Level Concrete to anchor vertical supports (required). 5'-6" 9'-0" 5'-6" 20'-0" 8 GK2EW22120B_G

9 End Frame Solid (G) AENION: See End Frame Connections Details 1-4 showing how to anchor vertical end wall columns in concrete. 1'-7 5/8" 1'-4 3/8" OP OF POS 4'-0" 5/8" FROM GROUND LEVEL O BOOM OF COLUMN 4'-0" GROUND LEVEL 2'-0" EMBEDMEN 20'-0" 5'-6" 9'-0" 5'-6" NOES: ALL DIMENSIONS ARE FROM CENER O CENER UNLESS OHERWISE NOED. GIRS/FRAMING CHANNEL MAY REQUIRE FIELD CUING O FI. ENDWALL COLUMNS: PG2X2E4L17500 (2" x 2" 14 GA 1-PLY SQUARE UBE) GIR/DOOR FRAME GR2X2G16L144 (14 GA PROFILE) (16 GA PROFILE) COLUMN OP CONNECION PLAE: PGBRKAAS01 (CONNECION PLAE) COLUMN BOOM GROUND POS INSER: B (GROUND POS INSER) LAERAL BRACING BRACKE: QH1070 (PIPE SRAP) GK2EW22120B_G 9

10 End Frame Diagram: Door Frame (G) 1'-7 5/8" 1'-4 3/8" OP OF POS H1 J1 J1 4'-0" 5/8" FROM GROUND LEVEL O BOOM OF COLUMN 4'-0" GROUND LEVEL 2'-0" EMBEDMEN 20'-0" 5'-6" 9'-0" 5'-6" NOES: ALL DIMENSIONS ARE FROM CENER O CENER UNLESS OHERWISE NOED. SEE DOOR KI INSRUCIONS FOR ADDIIONAL INSALLAION INFORMAION (IF APPLICABLE). GIRS/FRAMING CHANNEL MAY REQUIRE FIELD CUING O FI. ENDWALL COLUMNS: PG2X2E4L17500 (2" x 2" 14 GA 1-PLY SQUARE UBE) GIR/DOOR FRAME COLUMN OP CONNECION PLAE: GR2X2G16L (14 GA PROFILE) (16 GA PROFILE) PGBRKAAS01 (CONNECION PLAE) H (2" C-CHANNEL) COLUMN BOOM GROUND POS INSER: J (2" C-CHANNEL) B (GROUND POS INSER) LAERAL BRACING BRACKE: QH1070 (PIPE SRAP) 10 GK2EW22120B_G

11 Vent End Frame Diagram (G) AENION: See End Frame Connections Details 1-4 showing how to anchor vertical end wall columns in concrete. 1'-2" OP OF POS 2'-10" 4'-3" 5/8" FROM GROUND LEVEL O BOOM OF COLUMN GROUND LEVEL 2'-3 3/8" 2'-0" EMBEDMEN 20'-0" 5'-6" 9'-0" 5'-6" NOES: ALL DIMENSIONS ARE FROM CENER O CENER UNLESS OHERWISE NOED. GIRS/FRAMING CHANNEL MAY REQUIRE FIELD CUING O FI. ENDWALL COLUMNS: PG2X2E4L17500 (2" x 2" 14 GA 1-PLY SQUARE UBE) GIR/DOOR FRAME GR2X2G16L (14 GA PROFILE) (16 GA PROFILE) COLUMN OP CONNECION PLAE: PGBRKAAS01 (CONNECION PLAE) COLUMN BOOM GROUND POS INSER: B (GROUND POS INSER) LAERAL BRACING BRACKE: QH1070 (PIPE SRAP) GK2EW22120B_G 11

12 End Frame Connections (B & G) VIEW 2 - COLUMN O OP CHORD VIEW 3 - COLUMN O GIR (NON-SPLICE) VIEW 1 - COLUMN O BASE PLAE/GIR (BASE PLAE OPION) VIEW 1A - COLUMN O GIR (GROUND POS OPION) VIEW 4 - LAERAL BRACE O COLUMN 12 GK2EW22120B_G

13 End Frame Connections Details 1-4 (B & G) ENDWALL GIR ENDWALL COLUMN ENDWALL GIR ENDWALL COLUMN ENDWALL GIR ENDWALL GIR -(4X) #14 X 1" EK SCREW -(4X) #14 X 1" EK SCREW -(1X) BASE PLAE ( ) -(1X) 1/2" X 3-1/2" HEX BOL (A325) -(2X) 1/2" WASHER (SRUCURAL) -(1X) 1/2" NU (SRUCURAL) CONCREE PIER VIEW 1 COLUMN O BASE PLAE/GIR (BASE PLAE OPION) VIEW 1A COLUMN O GIR (GROUND POS OPION) OP CHORD ENDWALL COLUMN ENDWALL COLUMN LAERAL BRACE -(1X) BRACKE (QH1070) -(3X) #14 X 1" EK SCREW -(2X) CONNECION PLAE (PGBRKAAS01) -(2X) 1/2" X 3" HEX BOL (A325) -(4X) 1/2" WASHER (SRUCURAL) -(2X) 1/2" NU (SRUCURAL) ENDWALL GIR ENDWALL COLUMN -(2X) #14 X 1" EK SCREW VIEW 2 COLUMN O OP CHORD VIEW 3 COLUMN O GIR (NON-SPLICE) VIEW 4 LAERAL BRACE O COLUMN GK2EW22120B_G 13

14 End Frame Connections Door Option (B & G) VIEW 5 - DOOR JAMB O GIR (ONLY APPLIES O DOOR ENDWALL OPION) VIEW 6 - DOOR HEADER O JAMB (ONLY APPLIES O DOOR ENDWALL OPION) VIEW 7 - DOOR JAMB ANCHOR/GIR (BASE PLAE OPION) (ONLY APPLIES O DOOR ENDWALL OPION) 14 GK2EW22120B_G

15 End Frame Connections Details 5-7 Door Option (B & G) ENDWALL GIR DOOR JAMB ("C" CHANNEL) - (2X) WAFER HEAD SCREW #10 X 3/4 - (2X) WAFER HEAD SCREW #10 X 3/4 - (2X) WAFER HEAD SCREW #10 X 3/4 - (1X) #14 X 1" EK SCREW - (1X) #14 X 1" EK SCREW DOOR JAMB ("C" CHANNEL) NOE: HIS PAR O BE CU IN FIELD O FI DOOR HEADER ("C" CHANNEL) NOE: HIS PAR O BE CU IN FIELD O FI VIEW 5 DOOR JAMB O GIR (ONLY APPLIES O DOOR ENDWALL OPION) VIEW 6 DOOR HEADER O JAMB (ONLY APPLIES O DOOR ENDWALL OPION) DOOR JAMB ("C" CHANNEL) ENDWALL GIR - (2X) WAFER HEAD SCREW #10 X 3/4 -(1X) BRACKE ( QH1330) -(2X) #14 X 1" EK SCREW VIEW 7 DOOR JAMB ANCHOR/GIR (ONLY APPLIES O DOOR ENDWALL OPION) AENION: Actual position of QH1330 bracket may differ and depends on how purchased door is secured to door frame. GK2EW22120B_G 15

16 Aluminum Angle Installation Option Base Plates Only (B) IN SOME INSANCES, ALUMINUM ANGLE IS REPLACED WIH ALUMINUM UBING. SEE NEX PAGE. AENION: INSALL BOOM RUN OF GIR AFER INSALLING HE ALUMINUM ANGLE. PRE-DRILL MOUNING HOLES IN ALUMINUM; SPACE A 12"-16" ON CENER. APPLY SEALAN (112263) UNDER ALUMINUM HEN SECURE O CONCREE USING CONCREE FASENERS INCLUDED WIH KI. O PREVEN LEAKS A HIS CONNECION, INSALL PC PANEL OVER GIR AND ALUMINUM. A DO NO INSALL BEHIND ALUMINUM. ALUMINUM ANGLE O BE FIELD CU O FI (BASED ON ENDWALL OPION) A ALUMINUM ANGLE [XR2535] - (2X) #14 X 1" EK SCREW PANEL ENDWALL COLUMN ENDWALL COLUMN APPLY SEALAN UNDER AND ALONG ALUMINUM. BASE PLAE (OPION) GIR NOE: INSALL ALUMINUM UBE PRIOR O AACHING BOOM RUN OF ENDWALL GIRS. NOE: ALUMINUM ANGLE SHALL BE FLUSH O HE GIR FACE AND FIELD CU O FI. AACH PANEL O OUSIDE OF GIR AND ALUMINUM. ENDWALL GIR ENDWALL COLUMN BASE PLAE ALUMINUM ANGLE [XR2535] ALUMINUM ANGLE [XR2535] - (1X) 1 3/4" APCON SCREW [FA7150] ALUMINUM ANGLE DEAIL A COLUMN BASE PLAE SIDE VIEW 16 GK2EW22120B_G

17 Aluminum Square ube Istallation Option Base Plates Only (B) AENION: INSALL BOOM RUN OF GIR AFER INSALLING HE ALUMINUM UBING. PRE-DRILL MOUNING HOLES IN ALUMINUM; SPACE A 12"-16" ON CENER. APPLY SEALAN (112263) UNDER ALUMINUM HEN SECURE O CONCREE USING CONCREE FASENERS INCLUDED WIH KI. O PREVEN LEAKS A HIS CONNECION, INSALL PC PANEL OVER GIR AND ALUMINUM. B A DO NO INSALL BEHIND ALUMINUM. A ALUMINUM UBE O BE FIELD CU O FI (BASED ON ENDWALL OPION) ALUMINUM UBE [113301] - (1X) 3 1/4" APCON SCREW [FA7165] (SPACE A MAX. 12" O.C.) COLUMN GLAZING LINE BASE PLAE (OPION) ENDWALL COLUMN PANEL NOE: ALUMINUM ANGLE ONLY O BE USED WHEN AACHING POLYCARBONAE PANELS O CONCREE PAD. NOE: POLYUREHANE SEALAN O BE BASE OF ALUMINUM UBE GIR NOE: INSALL ALUMINUM UBE PRIOR O AACHING BOOM RUN OF ENDWALL GIRS. NOE: ALUMINUM UBE SHALL BE FLUSH O HE GIR FACE AND FIELD CU O FI. ENDWALL GIR 1" X 1 1/2" ALUMINUM UBE [113301] FOR USE WIH BASE PLAE OPION ONLY APPLY SEALAN UNDER AND ALONG ALUMINUM. AACH PANEL O OUSIDE OF GIR AND ALUMINUM. ALUMINUM UBE [113301] ENDWALL COLUMN BASE PLAE ALUMINUM UBE DEAIL A COLUMN BASE PLAE DEAIL "B" SECION "A-A" GK2EW22120B_G 17