1 ADDENDUM Addendum # Date Issued Project Name Job # Minot Municipal Auditorium Flooring Replacement Bid Date Time Thursday, June, 08 :00 AM THIS ADDENDUM AMENDS AND BECOMES PART OF THE CONTRACT DOCUMENTS FOR EAPC PROJECT MINOT MUNICIPAL AUDITORIUM FLOORING REPLACEMENT, DATED 05/30/08, RESPECTIVELY. EACH BIDDER SHALL ACKNOWLEDGE RECEIPT OF THIS ADDENDUM BY MARKING THE ADDENDUM NUMBER AND DATE ON THE BID FORM. ******************************************************************************************************************** NOTE BID DATE CHANGE TO JUNE ST AT :00 AM ******************************************************************************************************************** SPECIFICATIONS CHANGE Bid Close Date to June st at :00 AM. CHANGE Bid Place to the Auditorium Community Room CHANGE: Paragraph 5. LIQUIDATED DAMAGES as follows: ADD: There are Liquidated Damages for this Project, according Article 3.0 of The Supplementary Conditions, see spec section ADD paragraph: 6. BID SELECTION CRITERIA The Contractor shall provide the following information relative to the flooring with his bid: ) Flooring Selection Data (attached form) from the flooring material/manufacturer/distributor, ) Flooring Warranty Coverage, 3) Three References and 4) a list of at least 3 similar projects in size, scope and age of the building in the states of North Dakota, Minnesota, South Dakota and Montana with a brief description of the project. The Owner will select a product by evaluating these factors. EAPC Project Addendum No.

2 ADDENDUM continued F. There is an event scheduled in the Auditorium on August st. Contractors will need to have either the existing floor in place for this event or the new floor in place, cured and ready to be used ADD Specification Section to the Specification Book ADD: DRAWINGS B. Alternate No.. Base Bid: Provide labor and materials to install Robbins Pulastic Classic 90 ECO Polyurethane Floor System as specified in Section Alternate: ADD to the Base Bid the cost to install Robbins Pulastic Classic 40 SP instead of the specified product. C. Alternate No.3. Base Bid: Provide labor and materials to install Robbins Pulastic Classic 90 ECO Polyurethane Floor System as specified in Section Alternate: ADD to the Base Bid the cost to install Dynamic Sports Construction, DynaForce instead of the specified product. D. Alternate No.4. Base Bid: Provide labor and materials to install Robbins Pulastic Classic 90 ECO Polyurethane Floor System as specified in Section Alternate: ADD to the Base Bid the cost to install Champion Flooring, Monoflex HD instead of the specified product. A0 A03 A04 REPLACE sheet with attached sheet REPLACE sheet with attached sheet: one volley ball court is added. DELETE pickle ball court in the center of the floor, there will be only pickle ball court remaining. EAPC Project Addendum No.

3 ADDENDUM continued PRIOR APPROVALS Section Item Equal Product Fluid Applied Athletic Flooring Dynamic Sports Construction, Inc. DynaForce Champion Flooring Monoflex HD ATTACHMENTS Plan Holders List Prebid Walk through attendees list Flooring Selection Data Bid Form 0 00 Multiple Contract Summary A0 A03 END OF ADDENDUM NO. EAPC Project Addendum No. 3

4 6/3/08 9:06 AM EAPC Architects Engineers of PLAN HOLDERS LIST Minot Municipal Auditorium Flooring Replacement Minot, ND 5870 EAPC Project: # BID DATE: June, 08 BID TIME: :00 AM CST PLAN HOLDER CONTACT PERSON ADDRESS CITY STATE ZIP PHONE FAX City of Minot Scott Collins 40 3rd Ave SW Minot ND 5870 EAPC Laura Reuer 300 3rd Avenue SW, Suite A Minot ND laura.reuer@eapc.net BUILDERS EXCHANGES Aberdeen Builders Exchange 30 N. Jackson Street Aberdeen SD dakotabuild@midconetwork.com Billings Builders Exchange 050 Broadwater Avenue Billings MT bbx@billingsplanroom.com Bismarck-Mandan Builders Exchange P. O. Box 550 Mandan ND bis_manbe@midconetwork.com CMD (Construction Market Data) Suite 500 Norcross GA Construction Industry Center Box 7 Rapid City SD cic@constructionindustrycenter.com or chrissy@constructionindustrycenter.com Construction Plans Exchange 5 Airport Road Bismarck ND cpeinc@midconetwork.com Dickinson Builders Exchange Drawer C Dickinson ND team@dickinsonchamber.org Duluth Builders Exchange 80 Garfield Avenue Duluth MN 5860 info@duluthbx.com Fargo-Moorhead Bldrs. Exchange P. O. Box 0076 Fargo ND upload Grand Forks Builders Exchange S. Washington St. Ste D Grand Forks ND planroom@bntgf.com McGraw Hill Const./Dodge Plan Rm. 40 Glenwood Avenue No. Minneapolis MN Minnesota Builders Exchange 3 Glenwood Avenue Minneapolis MN new project: jb@mbex.org addendums: addenda@mbex.org Minot Builders Exchange 44 Burdick Expy East Minot ND mbe@srt.com Plains Builders Exchange 0 N. Kiwanis Ave. Sioux Falls SD info@plainsbuilders.com QuestC.com # St. Cloud Builders Exchange 0 6th Ave S / P.O. Box 746 St. Cloud MN admin@stcloudbx.com Sioux Falls Builders Exchange 48 "C" Avenue Sioux Falls SD info@sfbx.com Williston Builders Exchange 08-4th Ave. West Williston ND willistonbuildersexchange@gmail.com CONTRACTOR/SUBCONTRACTOR/SUPPLIER Rolac Contracting Inc Jason Sanders PO Box 87 Minot ND info@rolac-nd.com Mattson Construction Terry Mattson PO Box 37 Minot ND tm@projectdelivery.com Tollefson's Contract Flooring Corwin Enns 00 S Broadway Minot ND corwin.enns@contractflooringnd.com Craft Builders Pat Graner PO Box 86 Minot ND cbigc@srt.com Dynamic Sports Construction, Inc. Melissa Lowdermilk 30 Sonny Dr. Leander TX melissa@dynamicsportsconstruction.com

5

6 Flooring Selection Data Minot Municipal Auditorium Flooring Replacement Minot, ND EAPC Project Criteria Basis of Design (Y/N) Polyurethane Flooring Specialist (Y/N) Mfg & Installer (Y/N) ISO Certified on INSTALL & Mfg (Y/N) System Type Resurfaceable (Y/N) Adhesive type Shock Pad (in mm) Pad Sealer type Polyurethane Resin type Resin Match to the Topcoat (Y/N) Coating type Game Line Paint type Warranty in years* Response time for site visit in case of problems (days/hours) Distance from project location (in miles) Performance Data Friction (%) Ball Rebound (%) Shock Absorption (DIN) (%) Surface Hardness Tensile Strength (psi) Elongation at Break (%) Tear Strength (pli) Static Loads Impact Resistance Rolling Loads VOC Compliant Standard number of colors Color Fastness 00% Made in the USA (Y/N) Flammability *Provide on a separate sheet warranty coverage information EAPC Architects Engineers

7 BID FORM PROJECT: Minot Municipal Auditorium Flooring Replacement BID OPENING DATE. June, 08 BID OPENING TIME. BID OPENING PLACE. TO THE OWNER: :00AM Minot Municipal Auditorium Community Room 40 3 rd Ave SW Minot, ND 5870 City of Minot 55 nd Avenue SW Minot, ND 5870 I have received the Drawings and Specifications for the Contract for EAPC Project No , Minot Municipal Auditorium Flooring Replacement, to be erected at Minot, ND. I have also received Addenda Nos. and have included their provisions in my Bid. I have examined both the documents and the site and submit the following Bid: I will do the Construction work for the lump sum price of dollars ($ ). ALTERNATIVES. I will include the following alternates as specified additions to the above Base Bid, for changes in dollars and time listed: Alternate No., Robbins Pulastic Classic 0 ECO Alternate No., Robbins Pulastic Classic 40 SP $ Add Calendar Days. $ Add Calendar Days. Alternate No. 3, Dynamic Sport Construction, DynaForce $ Add Calendar Days. EAPC Project BID FORM_Addendum

8 Alternate No. 4, Champion Flooring, MonoFlex HD In submitting this Bid, I agree: $ Add Calendar Days.. To hold my bid open for 30 calendar days after its' opening.. To accept the provisions of the Instructions to Bidders regarding disposition of Bid Security. 3. To enter into and execute a Contract, if awarded on the basis of this bid, and to furnish Guarantee Bonds in accord with the Instructions to Bidders. 4. To accomplish the work in accord with the Contract Documents. 5. To include a) Flooring Selection Data from the flooring material/manufacturer/distributor, on the form included in the Project Manual, b) Flooring Warranty Coverage, c) Three References d) A list of at least Three similar projects in size, scope and age of the building in the states of North Dakota, Minnesota, South Dakota and Montana 6. To include a $7,500 Allowance per Specification Section To substantially complete the Work in the Base Bid according to the following schedule: (See Supplementary Conditions for Liquidated Damages.) To substantially complete the Work in the Base Bid by September th, 08. I have attached the required Bid Security. Official Address: firm name signed by title EAPC Project BID FORM_Addendum

9 SECTION MULTIPLE CONTRACT SUMMARY PART - GENERAL. RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 0 Specification Sections, apply to this Section.. SUMMARY A. Section includes a summary of each contract, including responsibilities for coordination and temporary facilities and controls. B. Specific requirements for Work of each contract are also indicated in individual Specification Sections and on Drawings. C. Related Requirements:. Section "Summary" for the Work covered by the Contract Documents, restrictions on use of Project site, coordination with occupants, and work restrictions.. Section "Project Management and Coordination" for general coordination requirements..3 PROJECT COORDINATOR A. Project coordinator shall be responsible for coordination between the General Construction Contract and the Flooring Contractor.. The project coordinator is the General Contractor..4 PROJECT COORDINATOR RESPONSIBILITIES A. Project coordinator shall perform Project coordination activities for the multiple contracts, including, but not limited to, the following:. Provide typical overall coordination of the Work.. Coordinate shared access to workspaces. 3. Coordinate product selections for compatibility. 4. Provide overall coordination of temporary facilities and controls. 5. Coordinate, schedule, and approve interruptions of permanent and temporary utilities, including those necessary to make connections for temporary services. 6. Coordinate construction and operations of the Work with work performed by each Contract. 7. Coordinate sequencing and scheduling of the Work. Include the following: EAPC Project MULTIPLE CONTRACT SUMMARY ADDENDUM NO

10 a. Initial Coordination Meeting: At earliest possible date, arrange and conduct a meeting with contractors for sequencing and coordinating the Work; negotiate reasonable adjustments to schedules. b. Prepare combined Contractors' Construction Schedule for entire Project. Base schedule on preliminary construction schedule. Secure time commitments for performing critical construction activities from contractors. Show activities of each contract on a separate sheet. Prepare a simplified summary sheet indicating combined construction activities of contracts. ) Submit schedules for approval. ) Distribute copies of approved schedules to contractors. 8. Provide photographic documentation. 9. Provide quality-assurance and quality-control services specified in Section "Quality Requirements." 0. Coordinate sequence of activities to accommodate tests and inspections, and coordinate schedule of tests and inspections.. Locate existing permanent benchmarks, control points, and similar reference points, and establish permanent benchmarks on Project site.. Provide progress cleaning of common areas and coordinate progress cleaning of areas or pieces of equipment where more than one contractor has worked. 3. Coordinate cutting and patching. 4. Coordinate protection of the Work. 5. Coordinate completion of interrelated punch list items. 6. Coordinate preparation of Project Record Documents if information from more than one contractor is to be integrated with information from other contractors to form one combined record. 7. Print and submit Record Documents if installations by more than one contractor are indicated on the same Contract Drawing or Shop Drawing. 8. Collect record Specification Sections from contractors, collate Sections into numeric order, and submit complete set. 9. Coordinate preparation of operation and maintenance manuals if information from more than one contractor is to be integrated with information from other contractors to form one combined record. B. Responsibilities of Project coordinator for temporary facilities and controls include, but are not limited to, the following:. Provide common-use field office for use by all personnel engaged in construction activities..5 GENERAL CONSTRUCTION CONTRACT A. Extent of Contract: Unless the Agreement contains a more specific description of the Work of each Contract, requirements indicated on Drawings and in Specification Sections determine which contract includes a specific element of Project.. Contractors' Startup Construction Schedule: Within five working days after startup horizontal bar-chart-type construction schedule submittal has been received from Project EAPC Project MULTIPLE CONTRACT SUMMARY ADDENDUM NO

11 coordinator, submit a matching startup horizontal bar-chart schedule showing construction operations sequenced and coordinated with overall construction.. Removal of existing floor and floor adhesive including disposal. The contractor is expected to leave the floor clean and ready for the flooring contractor to prep the concrete. 3. Move of existing bleachers as necessary to remove existing floor and install new flooring. 4. Installation of plywood under the location of the bleachers. 5. Installation of Vinyl Base. B. Substitutions: Each contractor shall cooperate with other contractors involved to coordinate approved substitutions with remainder of the work.. Project coordinator shall coordinate substitutions. C. Temporary facilities and controls in the General Construction Contract include, but are not limited to, the following:. Project identification and temporary signs.. General waste disposal facilities. 3. Pest control. 4. Site enclosure fence. 5. Security enclosure and lockup. 6. Environmental protection. 7. Maintenance and restoration of Owner's existing facilities used as temporary facilities..6 FLOORING CONTRACT A. Work of the Flooring Contract includes, but is not limited to, the following:. Preparation of the concrete for the new floor, includes work under allowance specification section New flooring installation. 3. Striping on the new flooring. PART - PRODUCTS (Not Used) PART 3 - EXECUTION (Not Used) END OF SECTION 0 00 EAPC Project MULTIPLE CONTRACT SUMMARY ADDENDUM NO

12 TELE FAX rd Avenue SW, Suite A, Minot ND 5870 Grand Forks ND Williston ND Bemidji MN St. Paul MN Fargo ND Minot ND Buenos Aires ARG Bismarck ND Norwich VT Sioux Falls SD PLAN NOTES 3 NEW STEEL TRANSITION STRIP WITH VCT NEW STEEL THRESHOLD REINSTALL EX BLEACHER, SEE NOTE ON A0 ALSO LEGENDS BASKETBALL COURT PICKLE BALL COURT VOLLEYBALL COURT SEE A0 EXISTING BLEACHERS File Location:W:\08\ MINOT Auditorium Floor Replacement\Drawings\ A0.dwg Plot Date:-Jun-8 UP A0 FLOOR PLAN /8" = '-0" FIELD VERIFY FIELD VERIFY 3 3 FIELD VERIFY UP UP UP UP CLIENT CITY OF MINOT PROJECT DESCRIPTION MINOT MUNICIPAL AUDITORIUM FLOORING REPLACEMENT CITY STATE ISSUE DATES DD DESIGN DEVELOPMENT MARK DESCRIPTION DRAWN BY: CHECKED BY: COPYRIGHT: All plans, specifications, computer files, field data, notes and other documents and instruments prepared by EAPC as instruments of service shall remain the property of EAPC. EAPC shall retain all common law, statutory and other reserved rights, including the copyright thereto. DRAWING TITLE FLOOR PLAN A0 MINOT ND ADDENDUM - COURTS LINES DATE PROJECT NO: BP GL

13 TELE FAX rd Avenue SW, Suite A, Minot ND 5870 Grand Forks ND Williston ND Bemidji MN St. Paul MN Fargo ND Minot ND Buenos Aires ARG Bismarck ND Norwich VT Sioux Falls SD LEGENDS VOLLEYBALL COURT = NAVY BLUE LINES SEE A0 EXISTING BLEACHERS (STACKED) File Location:W:\08\ MINOT Auditorium Floor Replacement\Drawings\ A03.dwg Plot Date:-Jun-8 UP A0 0'-0" 30'-0" 0'-8 /" 30'-0" 0'-8 /" 30'-0" 0'-0" COURT LINE FLOOR PLAN /8" = '-0" 3'-6" 60'-0" 3'-6" 8'-6" 30'-0" 8'-6" 55'-8 /" 60'-0" 55'-8 /" 3'-6" 60'-0" 3'-6" 3'-6" 60'-0" 3'-6" UP UP UP UP CLIENT CITY OF MINOT PROJECT DESCRIPTION MINOT MUNICIPAL AUDITORIUM FLOORING REPLACEMENT CITY STATE ISSUE DATES DD DESIGN DEVELOPMENT MARK DESCRIPTION DRAWN BY: CHECKED BY: COPYRIGHT: All plans, specifications, computer files, field data, notes and other documents and instruments prepared by EAPC as instruments of service shall remain the property of EAPC. EAPC shall retain all common law, statutory and other reserved rights, including the copyright thereto. DRAWING TITLE VOLLEYBALL COURTS A03 MINOT ND ADDENDUM - COURT LINES DATE PROJECT NO: BP GL