Transcription

1 Sr. No. Application Base Material Benefits Fastener 1 Concrete Fast operation X-DNI Fixing of dry wall tracks 2 Concrete Fast operation X-DNI Fixing of junction box, conduits 3 Fast operation Marking characters Marking from a distance with pole tool marking upto 10 characters at a time marking on steel upto 800 C no electricity required Hot Marking on steel

2 4 Fast operation Marking characters marking upto 10 characters at a time no electricity required Cold Marking on Metal / 5 Concrete, masonry Fast operation X-SW no damage to insulating material no electricity required Fixing of Insulation panels 6 Concrete Fast operation X-FB conduit clip Concrete X-DNI Fixing of flexible pipes

3 7 Concrete Fast operation X-DNI Fixing of temporary wooden panels 8 Concrete Fast operation X-HS hanger Fixing of overhead pipes, cable trays, ventilation ducts 9 Concrete Fast operation X-ECH bunched cable holder Even cable trays can be eliminated clear job cables can be added/removed cable clips eliminated Fixing of Bunched Cables

4 10 Concrete Fast operation X-EKB cable clasp Even cable trays can be eliminated clear job cables can be added/removed cable clips eliminated Fixing of bunched cables 11 Concrete Fast operation X-EFC flexible conduit clip Fixing of Conduits 12 Concrete Fast operation X-FB conduit clip Fixing of Conduits

5 13 Concrete Fast operation X-DNI masonry X-DNI soft concrete X-ZF no wleding to steel Fixing metal brackets to concrete / masonary 14 Concrete Fast operation X-CC ceiling clip Securing supports for false ceiling Fast operation 15 Concrete X-DNI Soft concrete X-ZF Concrete forming, shuttering etc. DAK

6 16 Concrete Fast operation X-DNI Soft concrete X-ZF Fixing of Braces, temporary fences DAK 17 Fast operation Concrete X-DNI Soft concrete X-ZF Fixing of barriers DAK 18 Concrete Fast operation X-DNI Soft concrete X-ZF 3000 fixings in half a day DAK Connections between columns and brick walls

7 19 Fast operation Concrete X-DNI 3000 fixings in half a day Fixing of Ladders 20 No welding welding equipment need'nt be taken to heights Threaded connection EM6/EW6, EM7/EW7 EM8/EW8, EM10/EW10 100% stainless steel nail X-CR Fixing of Brackets, clips, fixtures for mechanical trades 100% stainless steel stud X-CRM 21 Concrete X-CC DNI Old/High strength concrete X-C AL-H Old/High strength concrete minimise surface disruptions X-CC DNH37 single point design X-CC EDNI All above base materials Nails required for use with clip, strap X-DNI DS Fast operation NK X-AL-H False ceiling with wires, straps, adjustable rods

8 22 Concrete X-HS DNI Old/High strength concrete X-HS AL-H Old/High strength concrete minimise surface disruptions X-HS DKH 48 single point design X-HS EDNI 100% stainless steel fastener X-HSR All above base materials External threading required X-M/W/F X-EM/W X-CRM X-M6H, M8H False Ceiling with threaded rods, threaded couplings 23 Concrete & Fast operation X-DNI, X-DNI_MX, _MX X-ZF, X-ZF_MX Old/High strength concrete X-AL-H Wooden battens for ceiling & wall panelling, ceiling and wall insulation, flooring 24 Walls (concrete, steel, Fast operation X-IE masonary) X-IR Roofs (concrete) Variable insulation thickness

9 Fixing of insulation like composite thermal insulation, curtain wall, moisture barriers, drainage plates, expansion joints

10 25 Concrete, masonary Fast operation X-SW no damage to insulating material no electricity required Fixing of thin or easily damaged materials like drainage plates, thin insulation, nets, fabric, paper, plastic corrugated plate 26 Concrete, masonry, steel Fast operation X-DNI X-ZF DS NK Old/High strength concrete X-AL-H Above plus aluminium and stainless steel Fastening of wood or metal for sill plates, concrete forming X-CR 27 Concrete, masonry No damage to plastic X-ET minimal placing failures, concrete disruption Fast operation Fastening of plastic electrical trunking

11 28 Fast operation X-FCM 120 fixings per hour simple and easy operation X-EM8 Floor grating 29 Concrete Fast operation X-DNI X-ZF e.g a buiding with 200 flats 200 flats x 10 doors x 6 nails fixings = 20 hrs job = 2 working days DAK Fixing of door and window frames