1 PROJECT MANUAL IOWA STATE FAIR CARNIVAL RESTROOMS AND GATE 15 FOOTINGS AND FOUNDATIONS DES MOINES, IOWA K/O Project No KEFFER/OVERTON ASSOCIATES, INC. ARCHITECTS 650 SOUTH PRAIRIE VIEW DRIVE, STUDIO 103, WEST DES MOINES, IA 50266

2 PART 1 GENERAL 1.01 PROJECT IDENTIFICATION SECTION PROJECT INFORMATION A. Project Name: Carnival Restrooms and Gate 15 - Footings and Foundations, located at: Iowa State Fairgrounds, Des Moines, Iowa. B. Architects Project Number: C. The Owner, hereinafter referred to as Owner: Iowa State Fair Board of Directors 1.02 DESIGN PROFESSIONALS A. Architect: K/O Architects. 1. Address: 650 S. Prairie View Dr., Studio City, State, Zip: West Des Moines, Iowa Phone/Fax: Contact: Chip Overton 5. chip@k-o.com. B. Structural Engineer: Korpela Engineering. 1. Address: rd Street, Studio C. 2. City, State, Zip: Windsor Heights, Iowa Phone/Fax: Contact: Tim Korpela 5. tim@korpelaengineering.com. END OF SECTION K/O PROJECT INFORMATION

3 SECTION TABLE OF CONTENTS PROCUREMENT AND CONTRACTING REQUIREMENTS DIVISION PROCUREMENT AND CONTRACTING REQUIREMENTS Project Information Table of Contents List of Drawing Sheets Notice to Bidders Instructions to Bidders Bid Form Contracting Forms and Supplements SPECIFICATIONS DIVISION GENERAL REQUIREMENTS Summary Price and Payment Procedures Alternates Administrative Requirements Quality Requirements Temporary Facilities and Controls Product Requirements Execution and Closeout Requirements Closeout Submittals DIVISION CONCRETE Cast-in-Place Concrete DIVISION EARTHWORK Earthwork END OF SECTION K/O TABLE OF CONTENTS

4 SECTION LIST OF DRAWING SHEETS GATE 15 SHEET DESCRIPTION COVER SHEET CONCRETE FOOTING PLAN CONCRETE WALL PLAN CONCRETE DETAILS AND SECTIONS CONCRETE DEATILS AND SECTIONS CONCRETE DEATILS AND SECTIONS CONCRETE DEATILS AND SECTIONS SHEET NUMBERS S000 S101 S102 S501 S502 S503 S504 CARNIVAL RESTROOMS SHEET DESRIPTION COVER SHEET FTG. & FND. PLAN & FLOOR PLAN ROOF FRAMING PLAN 7 REFLECTED CEILING PLAN EXTERIOR ELEVATIONS AND SECTIONS DETAILS AND DOOR SCHEDULE SHEET NUMBERS A000 A101 A102 A301 A501 END OF SECTION K/O LIST OF DRAWING SHEETS

5 SECTION NOTICE TO BIDDERS THE IOWA STATE FAIR BOARD OF DIRECTORS (OWNER) WILL RECEIVE BIDS TO PERFORM SPECIFIC PORTIONS OF THE WORK FOR THE FOLLOWING NEW STRUCTURES LOCATED ON THE IOWA STATE FAIRGROUNDS, DES MOINES, IOWA: CARNIVAL RESTROOM AND GATE 15. THE INTENT OF THIS NOTICE IS TO OBTAIN OFFERS TO FURNISH LABOR, EQUIPMENT AND MATERIALS TO COMPLETE THE CONCRETE FOOTINGS, FOUNDATIONS, WALLS AND COLUMNS FOR THE ABOVE STATED BUILDINGS. BIDS WILL BE RECEIVED BY THE OWNER AT THE IOWA STATE FAIR ADMINISTRATION BUILDING, IOWA STATE FAIRGROUNDS, DES MOINES, IOWA, ON OR BEFORE 10:00 A.M., LOCAL TIME, THURSDAY, DECEMBER 15, INTERESTED BIDDERS MAY OBTAIN A SET OF BIDDING DOCUMENTS BY CONTACTING IOWA REPROGRAPHICS INC., 3 COLLEGE AVE., DES MOINES, IOWA, PHONE: A DOCUMENT DEPOSIT OF $ OR CURRENT BUILDERS ASSOCIATION PLAN DEPOSIT CARD IS REQUIRED. A PRE-BID MEETING FOR PROSPECTIVE BIDDERS WILL BE HELD AT THE MAINTENANCE SHOP, IOWA STATE FAIRGROUNDS, DES MOINES, IOWA, AT 10:00 A.M. LOCAL TIME, THURSDAY, DECEMBER 8, THE PURPOSE OF THIS MEETING IS TO ANSWER QUESTIONS AND DISCUSS MATTERS PERTAINING TO THE PROJECT. EACH PROPOSAL SHALL BE MADE ON THE FORMS (BID FORM AND REQUIRED SUPPLEMENTS) BOUND IN THE PROJECT MANUAL, AND NO BIDDER MAY WITHDRAW HIS PROPOSAL FOR A PERIOD OF THIRTY (30) DAYS FROM AND AFTER THE DATE SET FOR OPENING OF BIDS. EACH PROPOSAL MUST BE ACCOMPANIED BY A CERTIFIED OR CASHIER'S CHECK DRAWN ON AN IOWA BANK OR A BANK CHARTERED UNDER THE LAWS OF THE UNITED STATES, OR A CERTIFIED SHARE DRAFT ON A CREDIT UNION IN IOWA OR CHARTERED UNDER THE LAWS OF THE UNITED STATES, IN AN AMOUNT EQUAL TO FIVE PERCENT (5%) OF THE BID PRICE, MADE PAYABLE TO THE OWNER, OR A BID BOND ON THE FORM APPROVED BY THE OWNER FOR A LIKE AMOUNT, WHICH SHALL BE CONSIDERED AS LIQUIDATED DAMAGES AND SHALL BE FORFEITED TO THE OWNER IF SAID BID IS ACCEPTED AND THE BIDDER FAILS TO EXECUTE THE CONTRACT AND FILE THE REQUIRED PERFORMANCE BOND AND LABOR AND MATERIAL PAYMENT BOND AS REQUIRED IN THE CONTRACT DOCUMENTS. BY VIRTUE OF STATUTORY AUTHORITY, A PREFERENCE WILL BE GIVEN TO PRODUCTS AND PROVISIONS GROWN AND COAL PRODUCED WITHIN THE STATE OF IOWA, AND TO IOWA DOMESTIC LABOR. THE OWNER RESERVES THE RIGHT TO REJECT ANY OR ALL BIDS OR TO WAIVE ANY IRREGULARITIES IN THE BIDDING. BIDS MAY BE HELD BY THE IOWA STATE FAIR BOARD OF DIRECTORS, DES MOINES, IOWA FOR A PERIOD NOT TO EXCEED THIRTY (30) DAYS OF THE DATE OF THE OPENING OF BIDS FOR THE PURPOSE OF REVIEWING THE BIDS AND INVESTIGATING THE QUALIFICATIONS OF BIDDERS, PRIOR TO AWARDING THE CONTRACT. END OF SECTION K/O NOTICE TO BIDDERS

6 SUMMARY 1.01 DOCUMENT INCLUDES SECTION INSTRUCTIONS TO BIDDERS A. Invitation 1. Bid Submission 2. Intent 3. Work Identified in the Contract Documents 4. Contract Time B. Bid Documents and Contract Documents 1. Definitions 2. Contract Documents Identification C. Site Assessment 1. Site Examination 2. Prebid Conference D. Qualifications 1. Qualifications E. Bid Submission 1. Submission Procedure 1.02 RELATED DOCUMENTS A. Document Summary. B. Document Bid Form. INVITATION 2.01 BID SUBMISSION A. BIDS WILL BE RECEIVED BY THE OWNER AT THE IOWA STATE FAIR ADMINISTRATION BUILDING, IOWA STATE FAIRGROUNDS, DES MOINES, IOWA, ON OR BEFORE 10:00 A.M., LOCAL TIME, THURSDAY, DECEMBER 15, B. Offers submitted after the above time shall be returned to the bidder unopened. C. Owner requests that for budgeting purposes bid sum amount shall be portioned into Part A and Part B as shown in Section Bid Form and as defined below. 1. Part A includes all work associated with the Carnival Restoroms portion of the work. 2. Part B includes all work associated with the Gate 15 portion of the work INTENT A. The intent of this Bid request is to obtain an offer to perform work to complete the Carnival Restrooms and Gate 15 - Footings and Foundations located at The Iowa State Fairgrounds for a Stipulated Sum contract, in accordance with the Contract Documents WORK IDENTIFIED IN THE CONTRACT DOCUMENTS A. Work of this proposed Contract comprises General Construction Work, including Earthwork and Concrete Work CONTRACT TIME A. Perform the Work within the time stated in Section Summary. BID DOCUMENTS AND CONTRACT DOCUMENTS 3.01 DEFINITIONS A. Bid Documents: Contract Documents supplemented with Invitation To Bid, Instructions to Bidders, Information Available to Bidders, Bid Form Supplements To Bid Forms and Appendices identified. K/O INSTRUCTIONS TO BIDDERS

7 3.02 CONTRACT DOCUMENTS IDENTIFICATION A. The Contract Documents are identified as Project Number , as prepared by the Architect and Engineers, and with contents as identified in the Table of Contents AVAILABILITY A. Bid documents may be obtained at Iowa Reprographics Inc., 3 College Ave., Des Moines, Iowa, Phone: A document deposit of $ or current builders association plan deposit card is required. B. Deposit will be refunded if Bid Documents are returned complete, undamaged, unmarked and reusable, within 7 days of bid submission. Failure to comply will result in forfeiture of deposit. C. Bid Documents are made available only for the purpose of obtaining offers for this project. Their use does not grant a license for other purposes EXAMINATION A. Bid Documents may be viewed at the office of Architect. B. Upon receipt of Bid Documents verify that documents are complete. Notify Architect should the documents be incomplete. C. Immediately notify Architect upon finding discrepancies or omissions in the Bid Documents INQUIRIES/ADDENDA A. Addenda may be issued during the bidding period. All Addenda become part of the Contract Documents. Include resultant costs in the Bid Amount. B. Verbal answers are not binding on any party. C. Clarifications requested by bidders must be in writing not less than 7 days before date set for receipt of bids. The reply will be in the form of an Addendum, a copy of which will be forwarded to known recipients PRODUCT/ASSEMBLY/SYSTEM SUBSTITUTIONS A. Substitute products will be considered if submitted as an attachment to the Bid Form. Approval to submit substitutions prior to submission of bids is not required. B. In submission of substitutions to products specified, bidders shall include in their bid all changes required in the Work and changes to Contract Time and Contract Sum to accommodate such substitutions. A later claim by the bidder for an addition to the Contract Time or Contract Sum because of changes in work necessitated by use of substitutions shall not be considered. C. The submission shall provide sufficient information to determine acceptability of such products. D. Provide complete information on required revisions to other work to accommodate each proposed substitution. E. Provide products as specified unless substitutions are submitted in this manner and accepted. F. See Section Product Requirements for additional requirements. SITE ASSESSMENT 4.01 SITE EXAMINATION A. Examine the project site before submitting a bid PREBID CONFERENCE A. A PRE-BID MEETING FOR PROSPECTIVE BIDDERS WILL BE HELD AT THE MAINTENANCE SHOP, IOWA STATE FAIRGROUNDS, DES MOINES, IOWA, AT 10:00 A.M. LOCAL TIME, THURSDAY, DECEMBER 8, The purpose of this meeting is to answer questions and discuss matters pertaining to the Project. B. All general contract bidders and suppliers are invited. K/O INSTRUCTIONS TO BIDDERS

8 C. Representatives of Architect and Engineers will be in attendance. D. Information relevant to the Bid Documents will be recorded in an Addendum, issued to Bid Document recipients. QUALIFICATIONS 5.01 EVIDENCE OF QUALIFICATIONS A. To demonstrate qualification for performing the Work of this Contract, bidders may be requested to submit AIA A SUBCONTRACTORS/SUPPLIERS/OTHERS A. Owner reserves the right to reject a proposed subcontractor for reasonable cause. B. Refer to General Conditions. BID SUBMISSION 6.01 SUBMISSION PROCEDURE A. Bidders shall be solely responsible for the delivery of their bids in the manner and time prescribed. B. Double Envelope: Insert the closed and sealed Bid Form envelope plus requested security deposit,in a large opaque envelope and label this envelope as noted above. C. Improperly completed information, irregularities in security deposit, may be cause not to open the Bid Form envelope and declare the bid invalid or informal. D. An abstract summary of submitted bids will be made available to all bidders following bid opening BID INELIGIBILITY A. Bids that are unsigned, improperly signed or sealed, conditional, illegible, obscure, contain arithmetical errors, erasures, alterations, or irregularities of any kind, may at the discretion of the Owner, be declared unacceptable. B. Bid Forms, Appendices, and enclosures that are improperly prepared may, at the discretion of Owner, be declared unacceptable. C. Failure to provide security deposit, bonding or insurance requirements may, at the discretion of Owner, be waived. BID ENCLOSURES/REQUIREMENTS 7.01 SECURITY DEPOSIT A. Bids shall be accompanied by a security deposit as follows: 1. Each proposal must be accompanied by a certified or cashier's check drawn on an Iowa bank or a bank chartered under the laws of the United States, or a certified share draft on a credit union in Iowa or chartered under the laws of the United States, in an amount equal to five percent (5%) of the Bid Price, made payable to the Owner, or on AIA A310 Bid Bond form or form approved by the Owner for a like amount, which shall be considered as liquidated damages and shall be forfeited to the Owner if said bid is accepted and the bidder fails to execute the contract and file the required Performance Bond and Labor and Material Payment Bond as required in the Contract Documents. B. The security deposit will be returned after delivery to the Owner of the required Performance and Payment Bond(s) by the accepted bidder. C. Include the cost of bid security in the Bid Amount. D. If no contract is awarded, all security deposits will be returned PERFORMANCE ASSURANCE A. Accepted Bidder: Provide a Performance bond as described in Contracting Forms and Supplements. K/O INSTRUCTIONS TO BIDDERS

9 7.03 INSURANCE A. Provide an executed "Undertaking of Insurance" on a standard form provided by the insurance company stating their intention to provide insurance to the bidder in accordance with the insurance requirements of the Contract Documents BID FORM REQUIREMENTS A. Complete all requested information in the Bid Form and Appendices SALES AND USE TAXES A. All sales and use taxes are included in the bid amount FEES FOR CHANGES IN THE WORK A. Include in the Bid Form, the overhead and profit fees on own Work and Work by subcontractors, applicable for Changes in the Work, whether additions to or deductions from the Work on which the Bid Amount is based BID FORM SIGNATURE A. The Bid Form shall be signed by the bidder, as follows: 1. Sole Proprietorship: Signature of sole proprietor in the presence of a witness who will also sign. Insert the words "Sole Proprietor" under the signature. Affix seal. 2. Partnership: Signature of all partners in the presence of a witness who will also sign. Insert the word "Partner" under each signature. Affix seal to each signature. 3. Corporation: Signature of a duly authorized signing officer(s) in their normal signatures. Insert the officer's capacity in which the signing officer acts, under each signature. Affix the corporate seal. If the bid is signed by officials other than the president and secretary of the company, or the president/secretary/treasurer of the company, a copy of the by-law resolution of their board of directors authorizing them to do so, must also be submitted with the Bid Form in the bid envelope. 4. Joint Venture: Each party of the joint venture shall execute the Bid Form under their respective seals in a manner appropriate to such party as described above, similar to the requirements of a Partnership SELECTION AND AWARD OF ALTERNATES A. Indicate variation of bid price for Alternates listed on the Bid Form. Unless otherwise indicated, indicate a fixed amount as a difference in bid price by adding to or deducting from the base bid price. B. Bids will be evaluated on the total of the base bid price and all of the Alternates. After determination of the successful bidder, consideration will be given to which Alternates will be included in the Work. OFFER ACCEPTANCE/REJECTION 8.01 DURATION OF OFFER A. Bids shall remain open to acceptance and shall be irrevocable for a period of thirty (30) days after the bid closing date ACCEPTANCE OF OFFER A. Owner reserves the right to accept or reject any or all offers. B. After acceptance by Owner, Architect on behalf of Owner, will issue to the successful bidder, a written Bid Acceptance. END OF SECTION K/O INSTRUCTIONS TO BIDDERS

10 THE PROJECT AND THE PARTIES 1.01 TO: A. Owner 1. Iowa State Fair Board of Directors 2. Iowa State Fairgrounds 3. Des Moines, Iowa 1.02 FOR: SECTION BID FORM A. Project: Carnival Restrooms and Gate 15 - Footings and Foundations B. Project Number: DATE: (BIDDER TO ENTER DATE) 1.04 SUBMITTED BY: (BIDDER TO ENTER NAME AND ADDRESS) A. Bidder's Full Name 1. Address 2. City, State, Zip 1.05 OFFER A. Base Bid: Having examined the Place of The Work and all matters referred to in the Instructions to Bidders and the Contract Documents prepared by the Architect and Engineers for the above mentioned project, we, the undersigned, hereby offer to enter into a Contract to perform the Work described in the Documents for the Sum of: B. dollars ($ ), in lawful money of the United States of America. C. Altenate No. 1: Include cost difference to delete the Salem #313 form liner from Architectural Polymers from the Base Bid. Replace with smooth form panels full height of wall in widths no less than 4'-0". Contractor shall work with Architect and Engineers to redesign the building wall to accomodate thickness difference of new panel system. Having examined the Place of The Work and all matters referred to in the Instructions to Bidders and the Contract Documents prepared by the Architect and Engineers for the above mentioned work, we, the undersigned, hereby offer to enter into a Contract to perform the Work described as Alternate No 1. as a deduct to the Base Bid for the Sum of: D. dollars ($ ), in lawful money of the United States of America. E. Part A: Portion of Bid Amount assigned to Carnival Restrooms work as defined in Section Summary $ F. Part B: Portion of Bid Amount assigned to Gate 15 work as defined in Section Summary $ G. We have included the required security deposit as required by the Instruction to Bidders. H. All applicable federal, state and local taxes are included in the Bid Sum. I. The bid Sum has been divided according to that to be undertaken in Part A and Part B as described in Section Summary. For budget allocation the Iowa State Fair must have the Bid Sum divided into work complete for both portions of Work. K/O BID FORM

11 1.06 ACCEPTANCE A. This offer shall be open to acceptance and is irrevocable for thirty days from the bid closing date. B. If this bid is accepted by Owner within the time period stated above, we will: 1. Execute the Agreement within seven days of receipt of Notice of Award. 2. Furnish the required bonds within seven days of receipt of Notice of Award. 3. Commence work within seven days after written Notice to Proceed of this bid. C. If this bid is accepted within the time stated, and we fail to commence the Work or we fail to provide the required Bond(s), the security deposit shall be forfeited as damages to Owner by reason of our failure, limited in amount to the lesser of the face value of the security deposit or the difference between this bid and the bid upon which a Contract is signed. D. In the event our bid is not accepted within the time stated above, the required security deposit shall be returned to the undersigned, in accordance with the provisions of the Instructions to Bidders; unless a mutually satisfactory arrangement is made for its retention and validity for an extended period of time CONTRACT TIME A. If this Bid is accepted, we will: B. Complete all work on the project by March 1, CHANGES TO THE WORK A. When Architect establishes that the method of valuation for Changes in the Work will be net cost plus a percentage fee in accordance with General Conditions, our percentage fee will be: 1. percent overhead and profit on the net cost of our own Work; 2. percent on the cost of work done by any Subcontractor. B. On work deleted from the Contract, our credit to Owner shall be Architect-approved net cost plus of the overhead and profit percentage noted above ADDENDA A. The following Addenda have been received. The modifications to the Bid Documents noted below have been considered and all costs are included in the Bid Sum. 1. Addendum # Dated. 2. Addendum # Dated. 3. Addendum # Dated. 4. Addendum # Dated BID FORM SUPPLEMENTS 1.11 BID FORM SIGNATURE(S) A. The Corporate Seal of B. C. (Bidder - print the full name of your firm) D. was hereunto affixed in the presence of: E. F. (Authorized signing officer, Title) 1.12 IF THE BID IS A JOINT VENTURE OR PARTNERSHIP, ADD ADDITIONAL FORMS OF EXECUTION FOR EACH MEMBER OF THE JOINT VENTURE IN THE APPROPRIATE FORM OR FORMS AS ABOVE. END OF BID FORM K/O BID FORM

12 PART 1 GENERAL SECTION CONTRACTING FORMS AND SUPPLEMENTS 1.01 CONTRACTOR IS RESPONSIBLE FOR OBTAINING A VALID LICENSE TO USE ALL COPYRIGHTED DOCUMENTS SPECIFIED BUT NOT INCLUDED IN THE PROJECT MANUAL AGREEMENT AND CONDITIONS OF THE CONTRACT A. The Agreement is based on AIA A101. B. The General Conditions are based on AIA A FORMS A. Use the following forms for the specified purposes unless otherwise indicated elsewhere in the Contract Documents. B. Bond Forms: 1. Performance and Payment Bond Form: AIA A312. C. Post-Award Certificates and Other Forms: 1. Application for Payment Forms: AIA G702 with AIA G703 (for Contractors). D. Clarification and Modification Forms: 1. Architect's Supplemental Instructions Form: AIA G Construction Change Directive Form: AIA G Change Order Form: AIA G701. E. Closeout Forms: 1. Certificate of Substantial Completion Form: AIA G REFERENCE STANDARDS A. AIA A101 - Standard Form of Agreement Between Owner and Contractor where the basis of Payment is a Stipulated Sum; B. AIA A201 - General Conditions of the Contract for Construction; C. AIA A312 - Performance Bond and Payment Bond; D. AIA G701 - Change Order; E. AIA G702 - Application and Certificate for Payment; F. AIA G703 - Continuation Sheet; G. AIA G704 - Certificate of Substantial Completion; H. AIA G710 - Architect's Supplemental Instructions; I. AIA G714 - Construction Change Directive; PART 2 PRODUCTS - NOT USED PART 3 EXECUTION - NOT USED END OF SECTION K/O CONTRACTING FORMS AND SUPPLEMENTS

13 PART 1 GENERAL 1.01 PROJECT SECTION SUMMARY A. Project Name: Carnival Restrooms and Gate 15 - Footings and Foundations B. Owner's Name: Iowa State Fair Board of Directors. C. Architect's Name: K/O Architects. D. The Project includes, but is not limited to: Material and Labors for excavation, backfill and grading to complete the concrete footings, foundations, walls and columns for the above stated project CONTRACT DESCRIPTION A. Contract Type: A single prime contract based on a Stipulated Price as described in Document Contracting Forms and Supplements WORK BY OWNER A. The Owner will terminate water, sanitary sewer, storm sewer, gas and electrical to the site. Contractor will be responsible for removal of abandoned systems to the limits of accessibility within the limits of the site and as part of the general demolition defined on the Drawings. Materials to be salvaged will be removed by the Owner prior to the commencement of demolition OWNER OCCUPANCY A. Owner intends to continue to occupy adjacent buildings and grounds during the entire construction period. B. Cooperate with Owner to minimize conflict and to facilitate Owner's operations. C. Schedule the Work to accommodate Owner occupancy of adjacent properties. D. Owner intends to occupy the Project site prior to and upon completion of each phase or stage of work. Contractor shall only work in one phase area of the project at a time. E. Cooperate with Owner to minimize conflict and to facilitate Owner's operations. F. Schedule the Work to accommodate Owner occupancy CONTRACTOR USE OF SITE AND PREMISES A. Construction Operations: Limited to areas noted on Drawings. B. Arrange use of site and premises to allow: 1. Owner occupancy. 2. Work by Others. 3. Work by Owner. 4. Use of site and premises by the public. C. Provide access to and from site as required by law and by Owner: 1. Emergency Building Exits During Construction: Keep all exits required by code open during construction period; provide temporary exit signs if exit routes are temporarily altered. 2. Do not obstruct roadways, sidewalks, or other public ways without permit CONSTRUCTION SCHEDULE A. Contractors are required to work within the time constraints to achieve completion as follows: 1. The Work shall commence after Notice to Proceed. The contractor shall complete all work by March 1, END OF SECTION K/O SUMMARY

14 PART 1 GENERAL 1.01 SECTION INCLUDES SECTION PRICE AND PAYMENT PROCEDURES A. Procedures for preparation and submittal of applications for progress payments RELATED REQUIREMENTS A. Section Contracting Forms and Supplements: Forms to be used. B. Section Unit Prices: Monetary values of unit prices, payment and modification procedures relating to unit prices SCHEDULE OF VALUES A. Electronic media printout including equivalent information will be considered in lieu of standard form specified; submit draft to Architect for approval. B. Forms filled out by hand will not be accepted. C. Submit Schedule of Values in duplicate within 15 days after date of Owner-Contractor Agreement. D. Include separately from each line item, a direct proportional amount of Contractor's overhead and profit APPLICATIONS FOR PROGRESS PAYMENTS A. Payment Period: Submit at intervals stipulated in the Agreement. B. Electronic media printout including equivalent information will be considered in lieu of standard form specified; submit sample to Architect for approval. C. Forms filled out by hand will not be accepted. D. For each item, provide a column for listing each of the following: 1. Item Number. 2. Description of work. 3. Scheduled Values. 4. Previous Applications. 5. Work in Place and Stored Materials under this Application. 6. Authorized Change Orders. 7. Total Completed and Stored to Date of Application. 8. Percentage of Completion. 9. Balance to Finish. 10. Retainage. E. Execute certification by signature of authorized officer. F. Use data from approved Schedule of Values. Provide dollar value in each column for each line item for portion of work performed and for stored products. G. List each authorized Change Order as a separate line item, listing Change Order number and dollar amount as for an original item of Work. H. Submit two copies of each Application for Payment. I. Include the following with the application: 1. Construction progress schedule, revised and current as specified in Section Current construction photographs specified in Section Partial release of liens from major Subcontractors and vendors. 4. Project record documents as specified in Section , for review by Owner which will be returned to the Contractor. K/O PRICE AND PAYMENT PROCEDURES

15 J. When Architect requires substantiating information, submit data justifying dollar amounts in question. Provide one copy of data with cover letter for each copy of submittal. Show application number and date, and line item by number and description MODIFICATION PROCEDURES A. For minor changes not involving an adjustment to the Contract Sum or Contract Time, Architect will issue instructions directly to Contractor. B. For other required changes, Architect will issue a document signed by Owner instructing Contractor to proceed with the change, for subsequent inclusion in a Change Order. 1. The document will describe the required changes and will designate method of determining any change in Contract Sum or Contract Time. 2. Promptly execute the change. C. For changes for which advance pricing is desired, Architect will issue a document that includes a detailed description of a proposed change with supplementary or revised drawings and specifications, a change in Contract Time for executing the change with a stipulation of any overtime work required and the period of time during which the requested price will be considered valid. Contractor shall prepare and submit a fixed price quotation within 10 days. D. Contractor may propose a change by submitting a request for change to Architect, describing the proposed change and its full effect on the Work, with a statement describing the reason for the change, and the effect on the Contract Sum and Contract Time with full documentation and a statement describing the effect on Work by separate or other contractors. Document any requested substitutions in accordance with Section E. Computation of Change in Contract Amount: As specified in the Agreement and Conditions of the Contract. 1. For change requested by Architect for work falling under a fixed price contract, the amount will be based on Contractor's price quotation. 2. For change requested by Contractor, the amount will be based on the Contractor's request for a Change Order as approved by Architect. 3. For pre-determined unit prices and quantities, the amount will based on the fixed unit prices. 4. For change ordered by Architect without a quotation from Contractor, the amount will be determined by Architect based on the Contractor's substantiation of costs as specified for Time and Material work. F. Substantiation of Costs: Provide full information required for evaluation. 1. On request, provide the following data: a. Quantities of products, labor, and equipment. b. Taxes, insurance, and bonds. c. Overhead and profit. d. Justification for any change in Contract Time. e. Credit for deletions from Contract, similarly documented. 2. Support each claim for additional costs with additional information: a. Origin and date of claim. b. Dates and times work was performed, and by whom. c. Time records and wage rates paid. d. Invoices and receipts for products, equipment, and subcontracts, similarly documented. 3. For Time and Material work, submit itemized account and supporting data after completion of change, within time limits indicated in the Conditions of the Contract. G. Execution of Change Orders: Architect will issue Change Orders for signatures of parties as provided in the Conditions of the Contract. K/O PRICE AND PAYMENT PROCEDURES

16 H. After execution of Change Order, promptly revise Schedule of Values and Application for Payment forms to record each authorized Change Order as a separate line item and adjust the Contract Sum. I. Promptly revise progress schedules to reflect any change in Contract Time, revise sub-schedules to adjust times for other items of work affected by the change, and resubmit. J. Promptly enter changes in Project Record Documents APPLICATION FOR FINAL PAYMENT A. Prepare Application for Final Payment as specified for progress payments, identifying total adjusted Contract Sum, previous payments, and sum remaining due. B. Application for Final Payment will not be considered until the following have been accomplished: 1. All closeout procedures specified in Section PART 2 PRODUCTS - NOT USED PART 3 EXECUTION - NOT USED END OF SECTION K/O PRICE AND PAYMENT PROCEDURES

17 PART 1 GENERAL 1.01 SECTION INCLUDES A. Description of Alternates. B. Procedures for pricing Alternates. SECTION ALTERNATES C. Documentation of changes to Contract Price and Contract Time RELATED REQUIREMENTS A. Document Instructions to Bidders: Instructions for preparation of pricing for Alternates ACCEPTANCE OF ALTERNATES A. Alternates quoted on Bid Forms will be reviewed and accepted or rejected at Owner's option. Accepted Alternates will be identified in the Owner-Contractor Agreement. B. Coordinate related work and modify surrounding work to integrate the Work of each Alternate SCHEDULE OF ALTERNATES A. Alternate No. 1 - Substitute Concrete Form Liner 1. Altenate No. 1: Include cost difference to delete the Salem #313 form liner from Architectural Polymers from the Base Bid. Replace with smooth form panels full height of wall in widths no less than 4'-0". Contractor shall work with Architect and Engineers to redesign the building wall to accomodate thickness difference of new panel system. PART 2 PRODUCTS - NOT USED PART 3 EXECUTION - NOT USED END OF SECTION K/O ALTERNATES

18 PART 1 GENERAL 1.01 SECTION INCLUDES A. Preconstruction meeting. B. Site mobilization meeting. C. Progress meetings. D. Construction progress schedule. E. Progress photographs. F. Coordination drawings. G. Submittal procedures RELATED REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS A. Section Execution and Closeout Requirements: Additional coordination requirements. B. Section Closeout Submittals: Project record documents. PART 2 PRODUCTS - NOT USED PART 3 EXECUTION 3.01 PRECONSTRUCTION MEETING A. Architect will schedule a meeting after Notice of Award. B. Attendance Required: 1. Owner. 2. Architect. 3. Contractor. C. Agenda: 1. Execution of Owner-Contractor Agreement. 2. Submission of executed bonds and insurance certificates. 3. Distribution of Contract Documents. 4. Submission of list of Subcontractors, list of Products, schedule of values, and progress schedule. 5. Designation of personnel representing the parties to Contract, Owner and Architect. 6. Procedures and processing of field decisions, submittals, substitutions, applications for payments, proposal request, Change Orders, and Contract closeout procedures. 7. Scheduling. D. Record minutes and distribute copies within two days after meeting to participants, with two copies to Architect, Owner, participants, and those affected by decisions made SITE MOBILIZATION MEETING A. Architect will schedule meeting at the Project site prior to Contractor occupancy. B. Attendance Required: 1. Contractor. 2. Owner. 3. Architect. 4. Contractor's Superintendent. 5. Major Subcontractors. C. Agenda: 1. Use of premises by Owner and Contractor. 2. Owner's requirements and occupancy prior to completion. K/O ADMINISTRATIVE REQUIREMENTS

19 3. Construction facilities and controls provided by Owner. 4. Temporary utilities provided by Owner. 5. Survey and building layout. 6. Security and housekeeping procedures. 7. Schedules. 8. Application for payment procedures. 9. Procedures for testing. 10. Procedures for maintaining record documents. 11. Requirements for start-up of equipment. 12. Inspection and acceptance of equipment put into service during construction period. D. Record minutes and distribute copies within two days after meeting to participants, with two copies to Architect, Owner, participants, and those affected by decisions made PROGRESS MEETINGS A. Make arrangements for meetings, prepare agenda with copies for participants, preside at meetings. B. Attendance Required: 1. Contractor. 2. Owner. 3. Architect. 4. Contractor's Superintendent. 5. Major Subcontractors. C. Agenda: 1. Review minutes of previous meetings. 2. Review of Work progress. 3. Field observations, problems, and decisions. 4. Identification of problems that impede, or will impede, planned progress. 5. Review of submittals schedule and status of submittals. 6. Maintenance of progress schedule. 7. Corrective measures to regain projected schedules. 8. Planned progress during succeeding work period. 9. Maintenance of quality and work standards. 10. Effect of proposed changes on progress schedule and coordination. 11. Other business relating to Work. D. Record minutes and distribute copies within two days after meeting to participants, with two copies to Architect, Owner, participants, and those affected by decisions made CONSTRUCTION PROGRESS SCHEDULE A. Within 10 days after date of the Agreement, submit preliminary schedule defining planned operations for the first 60 days of Work, with a general outline for remainder of Work. B. If preliminary schedule requires revision after review, submit revised schedule within 10 days. C. Within 20 days after review of preliminary schedule, submit draft of proposed complete schedule for review. 1. Include written certification that major contractors have reviewed and accepted proposed schedule. D. Within 10 days after joint review, submit complete schedule. E. Submit updated schedule with each Application for Payment PROGRESS PHOTOGRAPHS A. Submit photographs with each application for payment, taken not more than 3 days prior to submission of application for payment. B. Photography Type: Digital; electronic files. K/O ADMINISTRATIVE REQUIREMENTS

20 C. Provide photographs of site and construction throughout progress of Work produced by an experienced photographer, acceptable to Architect. D. In addition to periodic, recurring views, take photographs of each of the following events: 1. Final completion, minimum of ten (10) photos. E. Take photographs as evidence of existing project conditions as follows: 1. Photos shall be representative of all work progress as indicated on Schedule of Values as provided with Pay Application.. F. Views: 1. Provide non-aerial photographs from four cardinal views at each specified time, until Date of Substantial Completion. 2. Consult with Architect for instructions on views required. 3. Provide factual presentation. 4. Provide correct exposure and focus, high resolution and sharpness, maximum depth of field, and minimum distortion. G. Digital Photographs: 24 bit color, minimum resolution of 1024 by 768, in JPG format; provide files unaltered by photo editing software. 1. Delivery Medium: Via File Naming: Include project identification, date and time of view, and view identification COORDINATION DRAWINGS A. Provide information required by Project Coordinator for preparation of coordination drawings. B. Review drawings prior to submission to Architect. END OF SECTION K/O ADMINISTRATIVE REQUIREMENTS

21 PART 1 GENERAL 1.01 SECTION INCLUDES A. Submittals. B. References and standards. SECTION QUALITY REQUIREMENTS C. Testing and inspection agencies and services. D. Control of installation. E. Mock-ups. F. Tolerances. G. Defect Assessment RELATED REQUIREMENTS A. Section Administrative Requirements: Submittal procedures. B. Section Product Requirements: Requirements for material and product quality SUBMITTALS A. See Section Administrative Requirements, for submittal procedures. B. Design Data: Submit for Architect's knowledge as contract administrator for the limited purpose of assessing conformance with information given and the design concept expressed in the contract documents, or for Owner's information. C. Test Reports: After each test/inspection, promptly submit two copies of report to Architect and to Contractor. 1. Include: a. Date issued. b. Project title and number. c. Name of inspector. d. Date and time of sampling or inspection. e. Identification of product and specifications section. f. Location in the Project. g. Type of test/inspection. h. Date of test/inspection. i. Results of test/inspection. j. Conformance with Contract Documents. k. When requested by Architect, provide interpretation of results. 2. Test report submittals are for Architect's knowledge as contract administrator for the limited purpose of assessing conformance with information given and the design concept expressed in the contract documents, or for Owner's information. D. Manufacturer's Instructions: When specified in individual specification sections, submit printed instructions for delivery, storage, assembly, installation, start-up, adjusting, and finishing, for the Owner's information. Indicate special procedures, perimeter conditions requiring special attention, and special environmental criteria required for application or installation REFERENCES AND STANDARDS A. For products and workmanship specified by reference to a document or documents not included in the Project Manual, also referred to as reference standards, comply with requirements of the standard, except when more rigid requirements are specified or are required by applicable codes. B. Conform to reference standard of date of issue current on date of Contract Documents, except where a specific date is established by applicable code. K/O QUALITY REQUIREMENTS

22 C. Obtain copies of standards where required by product specification sections. D. Maintain copy at project site during submittals, planning, and progress of the specific work, until Substantial Completion. E. Should specified reference standards conflict with Contract Documents, request clarification from Architect before proceeding. F. Neither the contractual relationships, duties, or responsibilities of the parties in Contract nor those of Architect shall be altered from the Contract Documents by mention or inference otherwise in any reference document TESTING AND INSPECTION AGENCIES AND SERVICES A. Owner will employ and pay for services of an independent testing agency to perform other specified testing. B. Employment of agency in no way relieves Contractor of obligation to perform Work in accordance with requirements of Contract Documents. PART 2 PRODUCTS - NOT USED PART 3 EXECUTION 3.01 CONTROL OF INSTALLATION A. Monitor quality control over suppliers, manufacturers, products, services, site conditions, and workmanship, to produce Work of specified quality. B. Comply with manufacturers' instructions, including each step in sequence. C. Should manufacturers' instructions conflict with Contract Documents, request clarification from Architect before proceeding. D. Comply with specified standards as minimum quality for the Work except where more stringent tolerances, codes, or specified requirements indicate higher standards or more precise workmanship. E. Have Work performed by persons qualified to produce required and specified quality. F. Verify that field measurements are as indicated on shop drawings or as instructed by the manufacturer. G. Secure products in place with positive anchorage devices designed and sized to withstand stresses, vibration, physical distortion, and disfigurement MOCK-UPS A. Tests shall be performed under provisions identified in this section and identified in the respective product specification sections. B. Assemble and erect specified items with specified attachment and anchorage devices, flashings, seals, and finishes. C. Accepted mock-ups shall be a comparison standard for the remaining Work. D. Where mock-up has been accepted by Architect and is specified in product specification sections to be removed, protect mock-up throughout construction, remove mock-up and clear area when directed to do so by Architect TOLERANCES A. Monitor fabrication and installation tolerance control of products to produce acceptable Work. Do not permit tolerances to accumulate. B. Comply with manufacturers' tolerances. Should manufacturers' tolerances conflict with Contract Documents, request clarification from Architect before proceeding. C. Adjust products to appropriate dimensions; position before securing products in place. K/O QUALITY REQUIREMENTS

23 3.04 TESTING AND INSPECTION A. Testing Agency Duties: 1. Provide qualified personnel at site. Cooperate with Architect and Contractor in performance of services. 2. Perform specified sampling and testing of products in accordance with specified standards. 3. Ascertain compliance of materials and mixes with requirements of Contract Documents. 4. Promptly notify Architect and Contractor of observed irregularities or non-conformance of Work or products. 5. Perform additional tests and inspections required by Architect. 6. Submit reports of all tests/inspections specified. B. Limits on Testing/Inspection Agency Authority: 1. Agency may not release, revoke, alter, or enlarge on requirements of Contract Documents. 2. Agency may not approve or accept any portion of the Work. 3. Agency may not assume any duties of Contractor. 4. Agency has no authority to stop the Work. C. Contractor Responsibilities: 1. Deliver to agency at designated location, adequate samples of materials proposed to be used that require testing, along with proposed mix designs. 2. Cooperate with laboratory personnel, and provide access to the Work and to manufacturers' facilities. 3. Provide incidental labor and facilities: a. To provide access to Work to be tested/inspected. b. To obtain and handle samples at the site or at source of Products to be tested/inspected. c. To facilitate tests/inspections. d. To provide storage and curing of test samples. 4. Notify Architect and laboratory 24 hours prior to expected time for operations requiring testing/inspection services. 5. Employ services of an independent qualified testing laboratory and pay for additional samples, tests, and inspections required by Contractor beyond specified requirements. 6. Arrange with Owner's agency and pay for additional samples, tests, and inspections required by Contractor beyond specified requirements. D. Re-testing required because of non-conformance to specified requirements shall be performed by the same agency on instructions by Architect. E. Re-testing required because of non-conformance to specified requirements shall be paid for by Contractor DEFECT ASSESSMENT A. Replace Work or portions of the Work not conforming to specified requirements. END OF SECTION K/O QUALITY REQUIREMENTS

24 PART 1 GENERAL 1.01 SECTION INCLUDES A. Temporary telecommunications services. B. Temporary sanitary facilities. C. Waste removal facilities and services TEMPORARY UTILITIES SECTION TEMPORARY FACILITIES AND CONTROLS A. Owner will provide the following: 1. Electrical power, consisting of connection to existing facilities. 2. Water supply, consisting of connection to existing facilities. B. Connect to existing power service in coordination with the Owner s staff. Power consumption shall not disrupt Owner s need for continuous service. Owner to pay for power consumed. C. The electrical contractor shall provide temporary power distribution from Owners power source and maintain for the duration of construction until permanent systems are operational. Temporary power shall be supplied and maintained in accordance with OSHA standards. D. Use trigger-operated nozzles for water hoses, to avoid waste of water. E. Connect to existing water source for construction operations. Contractor accepts the water system in it s current condition, and will bear the cost of any improvements required for the functional operation of the same. F. Protect water filled piping from freezing TELECOMMUNICATIONS SERVICES A. Provide, maintain, and pay for telecommunications services to field office at time of project mobilization. B. Telecommunications services shall include: 1. Account/address reserved for project use. 2. The contractor will provide continuous on site cellular phone service for contacting the job superintendent TEMPORARY SANITARY FACILITIES A. Provide and maintain portable facilities and enclosures. Provide at time of project mobilization. B. Contractors will be allowed to use the Owners existing facilities. C. Maintain existing facilities daily in a clean and sanitary condition BARRIERS A. Provide barriers to prevent unauthorized entry to construction areas, to prevent access to areas that could be hazardous to workers or the public, to allow for owner's use of site and to protect existing facilities and adjacent properties from damage from construction operations and demolition. B. Provide barricades and covered walkways required by governing authorities for public rights-of-way and for public access to existing building. C. Provide protection for plants designated to remain. Replace damaged plants. D. Protect non-owned vehicular traffic, stored materials, site, and structures from damage. E. Protect with barriers required code egress path from adjacent buildings throughout the duration of construction. K/O TEMPORARY FACILITIES AND CONTROLS

25 1.06 FENCING A. Construction: Provide fencing to protect the site from unauthorized public access. Plastic snow fence is acceptable. Fencing shall be installed and removed as work progresses through each phase of the project as defined in Summary SECURITY A. Provide security and facilities to protect Work, existing facilities, and Owner's operations from unauthorized entry, vandalism, or theft. B. Coordinate with Owner's security program VEHICULAR ACCESS AND PARKING A. Coordinate access and haul routes with governing authorities and Owner. B. Provide and maintain access to fire hydrants, free of obstructions. C. Provide means of removing mud from vehicle wheels before entering streets. D. Arrange for temporary parking areas to accommodate construction personnel in accordance with the direction from the Owner WASTE REMOVAL A. Provide waste removal facilities and services as required to maintain the site in clean and orderly condition. Site shall be free of waste materials, debris, and rubbish. B. Provide containers with lids. Remove trash and demolition materials from site periodically. C. If materials to be recycled or re-used on the project must be stored on-site, provide suitable non-combustible containers; locate containers holding flammable material outside the structure unless otherwise approved by the authorities having jurisdiction. D. Disposal of demolished concrete and masonry scrap and granular fill material at no charge is allowed on nearby Owner property. Loading and hauling of materials are the contractor s responsibility. E. All other items and demolition materials except as noted above shall be disposed of at contractor's expense in an approved demolition landfill located off-site FIELD OFFICES A. Office: At contractors discretion. No special accommodations will be provided by Owner. Locate in accordance with Owner direction. B. Material staging and storage will occur at a location adjacent to the site as directed by Owner REMOVAL OF UTILITIES, FACILITIES, AND CONTROLS A. Remove temporary utilities, equipment, facilities, materials, prior to Date of Substantial Completion inspection. B. Remove all existing utilities vacated as part of the project. C. Clean and repair damage caused by installation or use of temporary work. D. Restore existing facilities used during construction to original condition. E. Restore new permanent facilities used during construction to specified condition. PART 2 PRODUCTS - NOT USED PART 3 EXECUTION - NOT USED END OF SECTION K/O TEMPORARY FACILITIES AND CONTROLS

26 PART 1 GENERAL 1.01 SECTION INCLUDES A. General product requirements. SECTION PRODUCT REQUIREMENTS B. Transportation, handling, storage and protection. C. Product option requirements. D. Substitution limitations and procedures. E. Maintenance materials, including extra materials, spare parts, tools, and software RELATED REQUIREMENTS A. Section Volatile Organic Compound (VOC) Content Restrictions: Requirements for VOC-restricted product categories SUBMITTALS A. Product Data Submittals: Submit manufacturer's standard published data. Mark each copy to identify applicable products, models, options, and other data. Supplement manufacturers' standard data to provide information specific to this Project. B. Shop Drawing Submittals: Prepared specifically for this Project; indicate utility and electrical characteristics, utility connection requirements, and location of utility outlets for service for functional equipment and appliances. C. Sample Submittals: Illustrate functional and aesthetic characteristics of the product, with integral parts and attachment devices. Coordinate sample submittals for interfacing work. 1. For selection from standard finishes, submit samples of the full range of the manufacturer's standard colors, textures, and patterns. PART 2 PRODUCTS 2.01 NEW PRODUCTS A. Provide new products unless specifically required or permitted by the Contract Documents. B. DO NOT USE products having any of the following characteristics: 1. Made using or containing CFC's or HCFC's. C. Where all other criteria are met, Contractor shall give preference to products that: 1. If used on interior, have lower emissions, as defined in Section If wet-applied, have lower VOC content, as defined in Section Are extracted, harvested, and/or manufactured closer to the location of the project. 4. Have longer documented life span under normal use. 5. Result in less construction waste. 6. Are made of vegetable materials that are rapidly renewable. 7. Have a published GreenScreen Chemical Hazard Analysis PRODUCT OPTIONS A. Products Specified by Reference Standards or by Description Only: Use any product meeting those standards or description. B. Products Specified by Naming One or More Manufacturers: Use a product of one of the manufacturers named and meeting specifications, no options or substitutions allowed. C. Products Specified by Naming One or More Manufacturers with a Provision for Substitutions: Submit a request for substitution for any manufacturer not named MAINTENANCE MATERIALS A. Furnish extra materials, spare parts, tools, and software of types and in quantities specified in individual specification sections. K/O PRODUCT REQUIREMENTS

27 B. Deliver to Project site; obtain receipt prior to final payment. PART 3 EXECUTION 3.01 SUBSTITUTION PROCEDURES A. Instructions to Bidders specify time restrictions for submitting requests for substitutions during the bidding period. Comply with requirements specified in this section and complete Form Request for Substitution included after this Section. B. Document each request with complete data substantiating compliance of proposed substitution with Contract Documents. C. A request for substitution constitutes a representation that the submitter: 1. Has investigated proposed product and determined that it meets or exceeds the quality level of the specified product. 2. Agrees to provide the same warranty for the substitution as for the specified product. 3. Agrees to coordinate installation and make changes to other Work that may be required for the Work to be complete with no additional cost to Owner. 4. Waives claims for additional costs or time extension that may subsequently become apparent. D. Substitutions will not be considered when they are indicated or implied on shop drawing or product data submittals, without separate written request, or when acceptance will require revision to the Contract Documents TRANSPORTATION AND HANDLING A. Package products for shipment in manner to prevent damage; for equipment, package to avoid loss of factory calibration. B. If special precautions are required, attach instructions prominently and legibly on outside of packaging. C. Coordinate schedule of product delivery to designated prepared areas in order to minimize site storage time and potential damage to stored materials. D. Transport and handle products in accordance with manufacturer's instructions. E. Transport materials in covered trucks to prevent contamination of product and littering of surrounding areas. F. Promptly inspect shipments to ensure that products comply with requirements, quantities are correct, and products are undamaged. G. Provide equipment and personnel to handle products by methods to prevent soiling, disfigurement, or damage, and to minimize handling. H. Arrange for the return of packing materials, such as wood pallets, where economically feasible STORAGE AND PROTECTION A. Designate receiving/storage areas for incoming products so that they are delivered according to installation schedule and placed convenient to work area in order to minimize waste due to excessive materials handling and misapplication. B. Store and protect products in accordance with manufacturers' instructions. C. Store with seals and labels intact and legible. D. Store sensitive products in weather tight, climate controlled, enclosures in an environment favorable to product. E. For exterior storage of fabricated products, place on sloped supports above ground. F. Protect products from damage or deterioration due to construction operations, weather, precipitation, humidity, temperature, sunlight and ultraviolet light, dirt, dust, and other contaminants. G. Comply with manufacturer's warranty conditions, if any. K/O PRODUCT REQUIREMENTS

28 H. Cover products subject to deterioration with impervious sheet covering. Provide ventilation to prevent condensation and degradation of products. I. Prevent contact with material that may cause corrosion, discoloration, or staining. J. Provide equipment and personnel to store products by methods to prevent soiling, disfigurement, or damage. K. Arrange storage of products to permit access for inspection. Periodically inspect to verify products are undamaged and are maintained in acceptable condition. END OF SECTION K/O PRODUCT REQUIREMENTS

29 PART 1 GENERAL FORM TO: SECTION REQUEST FOR SUBSTITUTION Keffer/Overton Associates Inc., Architects 650 South Prairie View Drive, Studio 103, West Des Moines, IA Phone: design@k-o.com PROJECT: RUAN PLAZA - PHASE 1, DES MOINES, IOWA SPECIFIED ITEM: Section Page Paragraph Description THE UNDERSIGNED REQUESTS CONSIDERATION OF THE FOLLOWING: PROPOSED SUBSTITUTION: REASON FOR SUBSTITUTION: ATTACHED DATA INCLUDES PRODUCT DESCRIPTION, SPECIFICATIONS, DRAWINGS, PHOTOGRAPHS, PERFORMANCE AND TEST DATA ADEQUATE FOR EVALUATION OF THE REQUEST: APPLICABLE PORTIONS ARE CLEARLY IDENTIFIED. ATTACHED DATA ALSO INCLUDES DESCRIPTION OF CHANGES TO CONTRACT DOCUMENTS WHICH PROPOSED SUBSTITUTION WILL REQUIRE FOR ITS PROPER INSTALLATION. THE UNDERSIGNED STATES THAT THE FOLLOWING PARAGRAPHS, UNLESS MODIFIED ON ATTACHMENTS, ARE CORRECT. The proposed substitution does not affect dimensions shown on Drawings. The undersigned will pay for changes to the building design, including engineering design, detailing, and construction costs caused by the requested substitution. The proposed substitution will have no adverse affect on other trades, the construction schedule, or specified warranty requirements. The product, material or method proposed for substitution meets or exceeds the current specifications. Maintenance and service will be locally available for the proposed substitution. K/O REQUEST FOR SUBSTITUTION

30 THE UNDERSIGNED STATES THAT THE FUNCTION, APPEARANCE, QUALITY, AND PERFORMANCE OF THE PROPOSED SUBSTITUTION ARE EQUIVALENT OR SUPERIOR TO THE SPECIFIED ITEM. SUBMITTED BY: ACTION BY ARCHITECT: SIGNATURE: ACCEPTED NOT ACCEPTED FIRM: ADDRESS: BY: DATE: DATE: TELEPHONE: PART 2 PRODUCTS (NOT USED) PART 3 EXECUTION (NOT USED) END OF FORM REMARKS: K/O REQUEST FOR SUBSTITUTION

31 PART 1 GENERAL 1.01 SECTION INCLUDES SECTION EXECUTION AND CLOSEOUT REQUIREMENTS A. Examination, preparation, and general installation procedures. B. Requirements for alterations work, including selective demolition, except removal, disposal, and/or remediation of hazardous materials and toxic substances. C. Pre-installation meetings. D. Cutting and patching. E. Surveying for laying out the work. F. Cleaning and protection. G. Closeout procedures, including Contractor's Correction Punch List, except payment procedures RELATED REQUIREMENTS A. Section Summary: Limitations on working in existing building; continued occupancy; work sequence; identification of salvaged and relocated materials. B. Section Administrative Requirements: Submittals procedures, Electronic document submittal service. C. Section Quality Requirements: Testing and inspection procedures. D. Section Closeout Submittals: Project record documents, operation and maintenance data, warranties and bonds. E. Individual Product Specification Sections: 1.03 REFERENCE STANDARDS A. NFPA Standard for Safeguarding Construction, Alteration, and Demolition Operations; SUBMITTALS A. See Section Administrative Requirements, for submittal procedures. B. Survey work: Submit name, address, and telephone number of Surveyor before starting survey work. 1. On request, submit documentation verifying accuracy of survey work. 2. Submit a copy of site drawing signed by the Land Surveyor, that the elevations and locations of the work are in conformance with Contract Documents. 3. Submit surveys and survey logs for the project record. C. Demolition Plan: Submit demolition plan as specified by OSHA and local authorities. 1. Indicate extent of demolition, removal sequence, bracing and shoring, and location and construction of barricades and fences. Include design drawings and calculations for bracing and shoring. 2. Identify demolition firm and submit qualifications. 3. Include a summary of safety procedures. D. Cutting and Patching: Submit written request in advance of cutting or alteration that affects: 1. Structural integrity of any element of Project. 2. Integrity of weather exposed or moisture resistant element. 3. Efficiency, maintenance, or safety of any operational element. 4. Visual qualities of sight exposed elements. 5. Work of Owner or separate Contractor. K/O EXECUTION AND CLOSEOUT REQUIREMENTS

32 1.05 QUALIFICATIONS A. For demolition work, employ a firm specializing in the type of work required. B. For survey work, employ a land surveyor registered in Iowa and acceptable to Architect. Submit evidence of Surveyor's Errors and Omissions insurance coverage in the form of an Insurance Certificate. C. For field engineering, employ a professional engineer of the discipline required for specific service on Project, licensed in Iowa. D. For design of temporary shoring and bracing, employ a Professional Engineer experienced in design of this type of work and licensed in Iowa PROJECT CONDITIONS A. Grade site to drain. Maintain excavations free of water. Provide, operate, and maintain pumping equipment. B. Protect site from puddling or running water. Provide water barriers as required to protect site from soil erosion. C. Ventilate enclosed areas to assist cure of materials, to dissipate humidity, and to prevent accumulation of dust, fumes, vapors, or gases. D. Dust Control: Execute work by methods to minimize raising dust from construction operations. Provide positive means to prevent air-borne dust from dispersing into atmosphere and over adjacent property. E. Noise Control: Provide methods, means, and facilities to minimize noise produced by construction operations. 1. Outdoors: Limit conduct of especially noisy exterior work to the hours of 8 am to 5 pm. F. Rodent Control: Provide methods, means, and facilities to prevent rodents from accessing or invading premises. G. Pollution Control: Provide methods, means, and facilities to prevent contamination of soil, water, and atmosphere from discharge of noxious, toxic substances, and pollutants produced by construction operations. Comply with federal, state, and local regulations COORDINATION A. Coordinate scheduling, submittals, and work of the various sections of the Project Manual to ensure efficient and orderly sequence of installation of interdependent construction elements, with provisions for accommodating items installed later. B. Notify affected utility companies and comply with their requirements. C. Verify that utility requirements and characteristics of new operating equipment are compatible with building utilities. Coordinate work of various sections having interdependent responsibilities for installing, connecting to, and placing in service, such equipment. D. Coordinate space requirements, supports, and installation of mechanical and electrical work that are indicated diagrammatically on Drawings. Follow routing shown for pipes, ducts, and conduit, as closely as practicable; place runs parallel with lines of building. Utilize spaces efficiently to maximize accessibility for other installations, for maintenance, and for repairs. E. In finished areas except as otherwise indicated, conceal pipes, ducts, and wiring within the construction. Coordinate locations of fixtures and outlets with finish elements. F. Coordinate completion and clean-up of work of separate sections. G. After Owner occupancy of premises, coordinate access to site for correction of defective work and work not in accordance with Contract Documents, to minimize disruption of Owner's activities. K/O EXECUTION AND CLOSEOUT REQUIREMENTS

33 PART 2 PRODUCTS 2.01 PATCHING MATERIALS A. New Materials: As specified in product sections; match existing products and work for patching and extending work. B. Type and Quality of Existing Products: Determine by inspecting and testing products where necessary, referring to existing work as a standard. C. Product Substitution: For any proposed change in materials, submit request for substitution described in Section Product Requirements. PART 3 EXECUTION 3.01 EXAMINATION A. Verify that existing site conditions and substrate surfaces are acceptable for subsequent work. Start of work means acceptance of existing conditions. B. Verify that existing substrate is capable of structural support or attachment of new work being applied or attached. C. Examine and verify specific conditions described in individual specification sections. D. Take field measurements before confirming product orders or beginning fabrication, to minimize waste due to over-ordering or misfabrication. E. Verify that utility services are available, of the correct characteristics, and in the correct locations. F. Prior to Cutting: Examine existing conditions prior to commencing work, including elements subject to damage or movement during cutting and patching. After uncovering existing work, assess conditions affecting performance of work. Beginning of cutting or patching means acceptance of existing conditions PREPARATION A. Clean substrate surfaces prior to applying next material or substance. B. Seal cracks or openings of substrate prior to applying next material or substance. C. Apply manufacturer required or recommended substrate primer, sealer, or conditioner prior to applying any new material or substance in contact or bond PREINSTALLATION MEETINGS A. When required in individual specification sections, convene a preinstallation meeting at the site prior to commencing work of the section. B. Require attendance of parties directly affecting, or affected by, work of the specific section. C. Notify Architect 2 days in advance of meeting date. D. Prepare agenda and preside at meeting: 1. Review conditions of examination, preparation and installation procedures. 2. Review coordination with related work. E. Record minutes and distribute copies within two days after meeting to participants, with two copies to Architect, Owner, participants, and those affected by decisions made LAYING OUT THE WORK A. Verify locations of survey control points prior to starting work. B. Promptly notify Architect of any discrepancies discovered. C. Protect survey control points prior to starting site work; preserve permanent reference points during construction. D. Promptly report to Architect the loss or destruction of any reference point or relocation required because of changes in grades or other reasons. K/O EXECUTION AND CLOSEOUT REQUIREMENTS

34 E. Replace dislocated survey control points based on original survey control. Make no changes without prior written notice to Architect. F. Utilize recognized engineering survey practices. G. Establish elevations, lines and levels. Locate and lay out by instrumentation and similar appropriate means: 1. Site improvements including pavements; stakes for grading, fill and topsoil placement; utility locations, slopes, and invert elevations. 2. Grid or axis for structures. H. Periodically verify layouts by same means. I. Maintain a complete and accurate log of control and survey work as it progresses GENERAL INSTALLATION REQUIREMENTS A. Install products as specified in individual sections, in accordance with manufacturer's instructions and recommendations, and so as to avoid waste due to necessity for replacement. B. Make vertical elements plumb and horizontal elements level, unless otherwise indicated. C. Install equipment and fittings plumb and level, neatly aligned with adjacent vertical and horizontal lines, unless otherwise indicated. D. Make consistent texture on surfaces, with seamless transitions, unless otherwise indicated. E. Make neat transitions between different surfaces, maintaining texture and appearance ALTERATIONS A. Drawings showing existing construction and utilities are based on casual field observation and existing record documents only. 1. Verify that construction and utility arrangements are as shown. 2. Report discrepancies to Architect before disturbing existing installation. 3. Beginning of alterations work constitutes acceptance of existing conditions. B. Remove existing work as indicated and as required to accomplish new work. 1. Remove items indicated on drawings. 2. Relocate items indicated on drawings. 3. Where new surface finishes are to be applied to existing work, perform removals, patch, and prepare existing surfaces as required to receive new finish; remove existing finish if necessary for successful application of new finish. 4. Where new surface finishes are not specified or indicated, patch holes and damaged surfaces to match adjacent finished surfaces as closely as possible. C. Services (Including but not limited to Electrical, Telecommunications, and Water/Sewer): Remove, relocate, and extend existing systems to accommodate new construction. 1. Maintain existing active systems that are to remain in operation; maintain access to equipment and operational components; if necessary, modify installation to allow access or provide access panel. 2. Where existing systems or equipment are not active and Contract Documents require reactivation, put back into operational condition; repair supply, distribution, and equipment as required. 3. Where existing active systems serve occupied facilities but are to be replaced with new services, maintain existing systems in service until new systems are complete and ready for service. a. Disable existing systems only to make switchovers and connections; minimize duration of outages. b. Provide temporary connections as required to maintain existing systems in service. 4. Verify that abandoned services serve only abandoned facilities. 5. Remove abandoned pipe, ducts, conduits, and equipment, including those above accessible ceilings; remove back to source of supply where possible, otherwise cap stub K/O EXECUTION AND CLOSEOUT REQUIREMENTS

35 and tag with identification; patch holes left by removal using materials specified for new construction. D. Protect existing work to remain. 1. Prevent movement of structure; provide shoring and bracing if necessary. 2. Perform cutting to accomplish removals neatly and as specified for cutting new work. 3. Repair adjacent construction and finishes damaged during removal work. E. Adapt existing work to fit new work: Make as neat and smooth transition as possible. F. Patching: Where the existing surface is not indicated to be refinished, patch to match the surface finish that existed prior to cutting. Where the surface is indicated to be refinished, patch so that the substrate is ready for the new finish. G. Remove demolition debris and abandoned items from alterations areas and dispose of off-site; do not burn or bury. H. Do not begin new construction in alterations areas before demolition is complete. I. Comply with all other applicable requirements of this section CUTTING AND PATCHING A. Whenever possible, execute the work by methods that avoid cutting or patching. B. See Alterations article above for additional requirements. C. Perform whatever cutting and patching is necessary to: 1. Complete the work. 2. Fit products together to integrate with other work. 3. Provide openings for penetration of mechanical, electrical, and other services. 4. Match work that has been cut to adjacent work. 5. Repair areas adjacent to cuts to required condition. 6. Repair new work damaged by subsequent work. 7. Remove samples of installed work for testing when requested. 8. Remove and replace defective and non-conforming work. D. Execute work by methods that avoid damage to other work and that will provide appropriate surfaces to receive patching and finishing. In existing work, minimize damage and restore to original condition. E. Employ original installer to perform cutting for weather exposed and moisture resistant elements, and sight exposed surfaces. F. Cut rigid materials using masonry saw or core drill. Pneumatic tools not allowed without prior approval. G. Restore work with new products in accordance with requirements of Contract Documents. H. Fit work air tight to pipes, sleeves, ducts, conduit, and other penetrations through surfaces. I. Patching: 1. Finish patched surfaces to match finish that existed prior to patching. On continuous surfaces, refinish to nearest intersection or natural break. For an assembly, refinish entire unit. 2. Match color, texture, and appearance. 3. Repair patched surfaces that are damaged, lifted, discolored, or showing other imperfections due to patching work. If defects are due to condition of substrate, repair substrate prior to repairing finish PROGRESS CLEANING A. Maintain areas free of waste materials, debris, and rubbish. Maintain site in a clean and orderly condition. B. Remove debris and rubbish from hand hold boxes, conduits, and other closed or remote spaces, prior to enclosing the space. K/O EXECUTION AND CLOSEOUT REQUIREMENTS

36 C. Broom and vacuum clean interior areas prior to start of surface finishing, and continue cleaning to eliminate dust. D. Collect and remove waste materials, debris, and trash/rubbish from site periodically and dispose off-site; do not burn or bury PROTECTION OF INSTALLED WORK A. Protect installed work from damage by construction operations. B. Provide special protection where specified in individual specification sections. C. Provide temporary and removable protection for installed products. Control activity in immediate work area to prevent damage. D. Prohibit traffic from landscaped areas. E. Remove protective coverings when no longer needed; reuse or recycle coverings if possible ADJUSTING A. Adjust operating products and equipment to ensure smooth and unhindered operation FINAL CLEANING A. Use cleaning materials that are nonhazardous. B. Remove all labels that are not permanent. Do not paint or otherwise cover fire test labels or nameplates on mechanical and electrical equipment. C. Clean equipment and fixtures to a sanitary condition with cleaning materials appropriate to the surface and material being cleaned. D. Clean site; sweep paved areas, rake clean landscaped surfaces. E. Remove waste, surplus materials, trash/rubbish, and construction facilities from the site; dispose of in legal manner; do not burn or bury CLOSEOUT PROCEDURES A. Make submittals that are required by governing or other authorities. 1. Provide copies to Architect and Owner. B. Accompany Project Coordinator on preliminary inspection to determine items to be listed for completion or correction in the Contractor's Correction Punch List for Contractor's Notice of Substantial Completion. C. Notify Architect when work is considered ready for Architect's Substantial Completion inspection. D. Submit written certification containing Contractor's Correction Punch List, that Contract Documents have been reviewed, work has been inspected, and that work is complete in accordance with Contract Documents and ready for Architect's Substantial Completion inspection. E. Conduct Substantial Completion inspection and create Final Correction Punch List containing Architect's and Contractor's comprehensive list of items identified to be completed or corrected and submit to Architect. F. Correct items of work listed in Final Correction Punch List and comply with requirements for access to Owner-occupied areas. G. Notify Architect when work is considered finally complete and ready for Architect's Substantial Completion final inspection. H. Complete items of work determined by Architect listed in executed Certificate of Substantial Completion. END OF SECTION K/O EXECUTION AND CLOSEOUT REQUIREMENTS

37 PART 1 GENERAL 1.01 SECTION INCLUDES A. Project Record Documents. B. Operation and Maintenance Data. C. Warranties and bonds RELATED REQUIREMENTS SECTION CLOSEOUT SUBMITTALS A. Section Administrative Requirements: Submittals procedures, shop drawings, product data, and samples. B. Section Execution and Closeout Requirements: Contract closeout procedures. C. Individual Product Sections: Specific requirements for operation and maintenance data. D. Individual Product Sections: Warranties required for specific products or Work SUBMITTALS A. Project Record Documents: Submit documents to Architect with claim for final Application for Payment. B. Operation and Maintenance Data: 1. Submit two copies of preliminary draft or proposed formats and outlines of contents before start of Work. Architect will review draft and return one copy with comments. 2. For equipment, or component parts of equipment put into service during construction and operated by Owner, submit completed documents within ten days after acceptance. 3. Submit one copy of completed documents 15 days prior to final inspection. This copy will be reviewed and returned after final inspection, with Architect comments. Revise content of all document sets as required prior to final submission. 4. Submit two sets of revised final documents in final form within 10 days after final inspection. C. Warranties and Bonds: 1. For equipment or component parts of equipment put into service during construction with Owner's permission, submit documents within 10 days after acceptance. 2. Make other submittals within 10 days after Date of Substantial Completion, prior to final Application for Payment. 3. For items of Work for which acceptance is delayed beyond Date of Substantial Completion, submit within 10 days after acceptance, listing the date of acceptance as the beginning of the warranty period. PART 2 PRODUCTS - NOT USED PART 3 EXECUTION 3.01 PROJECT RECORD DOCUMENTS A. Maintain on site one set of the following record documents; record actual revisions to the Work: 1. Drawings. 2. Addenda. 3. Change Orders and other modifications to the Contract. B. Ensure entries are complete and accurate, enabling future reference by Owner. C. Store record documents separate from documents used for construction. D. Record information concurrent with construction progress. E. Record Drawings : Legibly mark each item to record actual construction including: K/O CLOSEOUT SUBMITTALS

38 1. Measured depths of foundations in relation to finish first floor datum. 2. Measured horizontal and vertical locations of underground utilities and appurtenances, referenced to permanent surface improvements. 3. Measured locations of internal utilities and appurtenances concealed in construction, referenced to visible and accessible features of the Work. 4. Field changes of dimension and detail. 5. Details not on original Contract drawings OPERATION AND MAINTENANCE DATA A. Source Data: For each product or system, list names, addresses and telephone numbers of Subcontractors and suppliers, including local source of supplies and replacement parts. B. Product Data: Mark each sheet to clearly identify specific products and component parts, and data applicable to installation. Delete inapplicable information. C. Drawings: Supplement product data to illustrate relations of component parts of equipment and systems, to show control and flow diagrams. Do not use Project Record Documents as maintenance drawings. D. Typed Text: As required to supplement product data. Provide logical sequence of instructions for each procedure, incorporating manufacturer's instructions OPERATION AND MAINTENANCE DATA FOR MATERIALS AND FINISHES A. For Each Product, Applied Material, and Finish: B. Instructions for Care and Maintenance: Manufacturer's recommendations for cleaning agents and methods, precautions against detrimental cleaning agents and methods, and recommended schedule for cleaning and maintenance. C. Where additional instructions are required, beyond the manufacturer's standard printed instructions, have instructions prepared by personnel experienced in the operation and maintenance of the specific products OPERATION AND MAINTENANCE DATA FOR EQUIPMENT AND SYSTEMS A. For Each Item of Equipment and Each System: 1. Description of unit or system, and component parts. 2. Identify function, normal operating characteristics, and limiting conditions. 3. Include performance curves, with engineering data and tests. 4. Complete nomenclature and model number of replaceable parts. B. Where additional instructions are required, beyond the manufacturer's standard printed instructions, have instructions prepared by personnel experienced in the operation and maintenance of the specific products. C. Panelboard Circuit Directories: Provide electrical service characteristics, controls, and communications; typed. D. Include color coded wiring diagrams as installed. E. Operating Procedures: Include start-up, break-in, and routine normal operating instructions and sequences. Include regulation, control, stopping, shut-down, and emergency instructions. Include summer, winter, and any special operating instructions. F. Include manufacturer's printed operation and maintenance instructions. G. Provide original manufacturer's parts list, illustrations, assembly drawings, and diagrams required for maintenance. H. Additional Requirements: As specified in individual product specification sections ASSEMBLY OF OPERATION AND MAINTENANCE MANUALS A. Assemble operation and maintenance data into durable manuals for Owner's personnel use, with data arranged in the same sequence as, and identified by, the specification sections. K/O CLOSEOUT SUBMITTALS

39 B. Where systems involve more than one specification section, provide separate tabbed divider for each system. C. Binders: Commercial quality, 8-1/2 by 11 inch (216 by 280 mm) three D side ring binders with durable plastic covers; 2 inch (50 mm) maximum ring size. When multiple binders are used, correlate data into related consistent groupings. D. Cover: Identify each binder with typed or printed title OPERATION AND MAINTENANCE INSTRUCTIONS; identify title of Project; identify subject matter of contents. E. Project Directory: Title and address of Project; names, addresses, and telephone numbers of Architect, Consultants, Contractor and subcontractors, with names of responsible parties. F. Tables of Contents: List every item separated by a divider, using the same identification as on the divider tab; where multiple volumes are required, include all volumes Tables of Contents in each volume, with the current volume clearly identified. G. Dividers: Provide tabbed dividers for each separate product and system; identify the contents on the divider tab; immediately following the divider tab include a description of product and major component parts of equipment. H. Text: Manufacturer's printed data, or typewritten data on 20 pound paper. I. Drawings: Provide with reinforced punched binder tab. Bind in with text; fold larger drawings to size of text pages. J. Arrangement of Contents: Organize each volume in parts as follows: 1. Project Directory. 2. Table of Contents, of all volumes, and of this volume. 3. Operation and Maintenance Data: Arranged by system, then by product category. a. Source data. b. Product data, shop drawings, and other submittals. c. Operation and maintenance data. d. Field quality control data. e. Photocopies of warranties and bonds WARRANTIES AND BONDS A. Obtain warranties and bonds, executed in duplicate by responsible Subcontractors, suppliers, and manufacturers, within 10 days after completion of the applicable item of work. Except for items put into use with Owner's permission, leave date of beginning of time of warranty until Date of Substantial completion is determined. B. Verify that documents are in proper form, contain full information, and are notarized. C. Co-execute submittals when required. D. Retain warranties and bonds until time specified for submittal. E. Manual: Bind in commercial quality 8-1/2 by 11 inch (216 by 279 mm) three D side ring binders with durable plastic covers. F. Cover: Identify each binder with typed or printed title WARRANTIES AND BONDS, with title of Project; name, address and telephone number of Contractor and equipment supplier; and name of responsible company principal. G. Table of Contents: Neatly typed, in the sequence of the Table of Contents of the Project Manual, with each item identified with the number and title of the specification section in which specified, and the name of product or work item. H. Separate each warranty or bond with index tab sheets keyed to the Table of Contents listing. Provide full information, using separate typed sheets as necessary. List Subcontractor, supplier, and manufacturer, with name, address, and telephone number of responsible principal. END OF SECTION K/O CLOSEOUT SUBMITTALS

40 SECTION EARTHWORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS: Drawings and General Provisions of Contract, including General and Supplementary conditions and Division 1 Specification Sections, apply to work specified in this Section. 1.2 DESCRIPTION OF WORK: A. Extent of Earthwork is indicated on Drawings. B. Work includes: 1. Excavation. 2. Fill. 3. Compaction. 4. Preparation of subgrade for walls, parking and drives, and steps and walks. 5. Grading. 6. Topsoil placement. 7. Finish grading. 8. Erosion control. 1.3 QUALITY ASSURANCE: A. Codes and Standards: 1. Perform excavation work in compliance with applicable requirements of governing authorities having jurisdiction. 2. The entire installation shall fully comply with all local and state laws and ordinances, and with all established codes applicable thereto. B. Testing and Inspection Service: 1.4 SUBMITTALS: 1. Cost of field and laboratory testing will be borne by the Owner. Testing by laboratory approved by the Owner. Lab reports shall be simultaneously forwarded to the Owner, Contractor and Landscape Architect. 2. Contractor will cooperate with testing laboratory and geotechnical Engineer in coordinating compaction testing, installation and protection of settlement monitoring devices. Testing Reports - Excavating: Submit the following reports directly to the Owner from the testing services, with copies to the Contractor and the Landscape Architect. A. Test reports on borrow material/lab analysis of fill materials. GR GATE 15 EARTHWORK

41 B. Verification of each footing subgrade (material and unconfined compressive strength). C. Field density test reports. D. One optimum moisture-maximum density curve for each type of soil encountered. E. Report of actual unconfined compressive strength and/or results of bearing tests of each strata tested. 1.5 JOB CONDITIONS: A. Soil Borings: 1. Soil borings have not been been made for this site. 2. Test borings and other exploratory operations may be made by Contractor at no cost to Owner. B. Existing Utilities: 1. Locate existing underground utilities in areas of work. If utilities are to remain in place, provide adequate means of support and protection during earthwork operations. 2. Underground utilities shown on the drawings have been taken from existing public records, Owner's records and available as-built drawings and are correct to the best of our knowledge and provided for information only. 3. Should uncharted, or incorrectly charted, piping or other utilities be encountered during excavation, consult Owner immediately for directions. Cooperate with Owner and utility companies in keeping respective services and facilities in operation. Repair damaged utilities caused by Contractor's negligence to the satisfaction of utility owner at no cost to the Project Owner. 4. Do not interrupt existing utilities serving facilities occupied and used by Owner or others, during occupied hours, except when permitted in writing by Owner and then only after acceptable temporary utility services have been provided. 5. Provide minimum of 48-hour notice to Owner and receive written notice to proceed before interrupting any utility. 6. Demolish and completely remove from site existing underground utilities indicated to be removed. Coordinate with Owner for shut-off of services if lines are active. C. Protection of Persons and Property: 1. Barricade open excavations occurring as part of this work and post with warning lights. 2. Operate warning lights as recommended by authorities having jurisdiction. GR GATE 15 EARTHWORK

42 PART 2 - PRODUCTS 3. Protect structures, utilities, sidewalks, pavements, and other facilities from damage caused by settlement, lateral movement, undermining, washout and other hazards created by earthwork operations. 4. Perform excavation within drip-line of large trees to remain by hand, and protect the root system from damage or dryout to the greatest extent possible. Maintain moist condition for root system and cover exposed roots with burlap. Paint root cuts of 1" diameter and larger with emulsified asphalt tree paint. 2.1 SOIL MATERIALS/DEFINITIONS: A. Satisfactory soil materials are defined as those complying with ASTM D2487 soil classification groups CL, GC, GW, CP, GM, ML, SC, SM, SW, and SP. B. Unsatisfactory soil materials are defined as those complying with ASTM D2487 soil classification groups MG, DH, OL, OH, PT and any bedrock material. C. Subbase material (granular fill): Naturally or artificially graded mixture of natural or crushed gravel, crushed stone, crushed slag, natural or crushed sand. D. Fill materials: 1. The fill material type shall be cohesive, non-expansive soil having a "CL" or "CL-ML" classification in accordance with the Unified Soil Classification System and shall have a maximum laboratory dry density (100%) of 100 pounds per cubic foot or more as determined by ASTM D698 (Standard Proctor). 2. No organic dark colored soils or plastic and potentially expansive soils, such as clay shale, are considered suitable engineered fill materials. Topsoils should be sorted and stockpiled for landscaping purposes. 3. When fill material includes rock, the maximum rock size acceptable shall be three inches (3"). No large rocks shall be allowed to nest and all voids must be carefully filled with small stones or earth, properly compacted. No large rocks will be permitted within twelve inches (12") of the finished grade. E. Topsoil: Secure and stockpile from naturally well drained areas during stripping operations; use satisfactory soil materials free of admixture of subsoil, reasonably free from clay lumps, stone or other debris a greater than 1-1/2" in diameter. F. Erosion Fence: Three (3) foot wide, 10 mil., 100 percent spunbonded nylon reinforced silt fence fabric with a maximum vertical water flow of 500 gallons per minute per square foot. Posts shall be steel T posts, minimum length 5 foot. G. Straw Bales: Bound, rectangular, straw bales and suitable stakes. Straw bales to be in good condition. Loose, broken or deteriorated bales will not be accepted. GR GATE 15 EARTHWORK

43 PART 3 - EXECUTION 3.1 EXCAVATION: A. Excavation is unclassified, and includes excavation to subgrade elevations indicated, regardless of character of materials and obstructions encountered. B. Unauthorized Excavation: 1. Consists of removal of materials beyond indicated subgrade elevations or dimensions without specific direction of Geotechnical Engineer. 2. Unauthorized excavation, as well as remedial work directed by Geotechnical Engineer shall be at Contractor's expense. 3. Backfill and compact unauthorized excavations as specified for authorized excavations of same classification, unless otherwise directed by Geotechnical Engineer. C. Additional Excavation: 1. When excavation has reached required subgrade elevations, notify Soils Engineer (hired by Owner) who will make an inspection of conditions. Soils Engineer shall evaluate and advise if bearing material is suitable and shall provide unconfined compressive strength tests. 2. If unsuitable bearing materials are encountered at required elevations, carry excavations deeper and replace excavated material with engineered compacted backfill as directed by Engineer. 3. Unsuitable soil shall be removed 2'-0" minimum from beneath the footing level and shall be reinstalled at a width 2.5 times the footing width as indicated on the drawings. This area shall be refilled with compacted crushed stone to 98 percent standard proctor D698 (70 percent relative density D2049). 4. Removal or reworking of unsuitable material and its replacement as directed will be paid on basis of contract conditions relative to changes in work. D. Stability of Excavations: 1. Slope sides of excavations to comply with local codes and ordinances having jurisdiction. 2. Shore and brace where sloping is not possible because of space restrictions or stability of material excavated. 3. Maintain sides and slopes of excavations in safe condition until completion of backfilling. E. Dewatering: 1. Prevent surface water and subsurface or ground water from flowing into excavations and from flooding project site and surrounding area. 2. Do not allow water to accumulate in excavations. 3. Remove water to prevent softening of foundation bottoms, undercutting footings, and soil changes detrimental to stability of subgrades and foundations. GR GATE 15 EARTHWORK

44 4. Provide and maintain pumps, well points, sumps, suction and discharge lines, and other dewatering system components necessary to convey water away from excavations. 5. Establish and maintain temporary drainage ditches and other diversions outside excavation limits to convey rain water and water removed from excavations to collecting or run-off areas. 6. Do not use trench excavations as temporary drainage ditches. F. Material Storage: 3.2 COMPACTION: 1. Stockpile satisfactory excavated materials where directed, until required for backfill or fill. 2. Place, grade and shape stockpiles for proper drainage. 3. Locate and retain soil materials away from edge of excavations. 4. Do not store within drip line of trees indicated to remain. 5. Dispose of excess soil material and waste materials as herein specified. A. General: Control soil compaction during construction providing minimum percentage of density specified for each area classification indicated below. B. Compaction Requirements: Compact top 12" of subgrade and each layer of backfill or fill material to not less than the following percentages of maximum density: Standard Proctor *Rel. Density ASTM D698 (ASTM D2049) Construction Cohesive Cohesionless Cohesionless Type Soils Soils Soils Building, foundation, 95% 98% 70% walls, roadway, parking lot and critical backfill area beneath same; e.g. trenches *Use relative density technique (ASTM D2049) where standard proctor technique (ASTM D698) does not result in a definable maximum dry density and optimum moisture content. C. Moisture Control and Content: 1. When subgrade or layer of soil material must be moisture conditioned before compaction, uniformly apply water to surface of subgrade, or layer of soil material, to prevent free water appearing on surface during or subsequent to compaction operations. 2. Remove and replace, or scarify and air dry, soil material that is too wet to permit compaction to specified density. 3. Soil material that has been removed because it is too wet to permit compaction may be stockpiled or spread and allowed to dry. Assist GR GATE 15 EARTHWORK

45 drying by discing, harrowing or pulverizing until moisture content is reduced to a satisfactory value. 4. The fill material shall be compacted at a moisture content typically within a range of minus two percent to plus four percent (-2% to +4%) of optimum moisture content as determined by ASTM D698 (Standard Proctor). Other acceptable moisture content ranges determined by the Geotechnical Engineer may be necessary to produce desirable results with specific soils. 3.3 BACKFILL AND FILL: A. General: Place acceptable soil material in layers to required subgrade elevations, for each area classification listed below. 1. In excavations and within the building footprint, use satisfactory excavated or borrow material. 2. Under grassed areas, use satisfactory excavated or borrow material. 3. Under walks and pavements, use subbase material, or satisfactory excavated or borrow material, or combination of both. 4. Under steps, use subbase material. 5. Under piping and conduit, use subbase material where subbase is indicated under piping or conduit; shape to fit bottom 90 degrees of cylinder. 6. Utilize loess soil for fill only in the lower portion of deep fill sections or below frost depth under pavement/structures. B. Ground Surface Preparation: 1. Clearing area to be filled: All timber, logs, trees, brush and rubbish shall be removed, piled or burned or otherwise acceptably disposed of. 2. Scarifying area to be filled a minimum of 12": a. All vegetable matter and dark colored organic soil shall be removed from the surface upon which the fill is to be placed, and the surface shall then be plowed or scarified to a depth of at least six inches and until the surface is free from ruts, hummocks or other uneven features which would tend to prevent uniform compaction by the equipment to be used. b. Where fills are made on hillsides or slopes, the slope of the original ground upon which the fill is to be placed shall be plowed or scarified deeply or where the slope ratio of the original ground is steeper than 5 horizontal to 1 vertical, the bank shall be stepped or benched. Ground slopes which are flatter than 5 to 1 shall be benched when considered necessary by the Geotechnical Engineer. 3. Compaction area to be filled: After the fill area has been cleared and plowed or scarified, it shall be disced or bladed until it is uniform and free from large clods, brought to within the specified moisture content range and compacted to not less than ninety-five percent (95%) of maximum dry density in accordance with current ASTM D698 (Standard Proctor). 4. Proof roll the prepared subgrade prior to delineate zones of soft soils, and correct prior to placing any fill materials. GR GATE 15 EARTHWORK

46 C. Placement and Compaction: 3.4 GRADING: 1. Depth and Mixing of Fill Layers: The selected fill material shall be placed in level, uniform layers which, when compacted, shall have a density conforming to a minimum of ninety-five percent (95%) of maximum dry density in accordance with ASTM D698 (Standard Proctor). Each layer shall be thoroughly blade mixed during the spreading to insure uniformity of material in each layer. Compacted layer thickness will be compatible with the demonstrated compatibility of the compaction equipment being used, with a compacted layer thickness of 6" considered typical. 2. Amount of Compaction: After each layer (lift) has been placed, mixed and spread evenly, it shall be thoroughly compacted to a minimum of ninety-five percent (95%) of the material's maximum dry density as determined by ASTM D698 (Standard Proctor) for areas supporting building foundations and floor slabs. Grassed areas or areas not supporting buildings or slabs-on-grade should be compacted to a minimum of eighty-five percent (85%). 3. Compaction of Fill Layer: Compaction equipment shall be of such design to be able to compact the fill to the specified density. Compaction shall be accomplished while the fill material is within the specified moisture content range. Compaction of each layer shall be continuous over its entire area and the compaction equipment shall make sufficient trips to insure that the required density has been obtained. 4. Compaction of Slopes: Fill slopes shall be compacted. Compacting operations shall be continued until the slopes are stable but not too dense for planting on the slopes. Compacting of the slopes may be done progressively in increments of three to five feet (3' to 5') in fill height or after the fill is brought to its total height. 5. Do not place backfill or fill material on surfaces that are muddy, frozen, or contain frost or ice. A. General: 1. Uniformly grade areas within limits of grading under this Section, including adjacent transition areas. 2. Smooth finished surface within specified tolerances, compact with uniform levels or slopes between points where elevations are indicated, or between such points and existing grades. B. Grading Outside Paving Lines: 1. Grade areas to adjacent to paving lines to drain away from structures and to prevent ponding. 2. Finish surfaces free from irregular surface changes, and as follows: a. Lawn or Unpaved Areas: Finish areas to receive topsoil to within not more than 0.10' above or below required subgrade elevations. GR GATE 15 EARTHWORK

47 b. Walks: Shape surface of areas under walks to line, grade and cross-section, with finish surface not more than 0.10' above or below required subgrade elevation. C. Grading Surface of Fill Under Paving: Reference notes on Drawings 1. Grade smooth and even, free of voids, compacted as specified, and to required elevation. 2. Provide final grades within a tolerance of 1/2" when tested with a 10' straightedge. D. Compaction: After grading, compact subgrade surfaces to the depth and indicated percentage of maximum or relative density for each area classification. 3.5 EMBANKMENTS: A. General: Prepare site, place and compact excavated materials to required elevation and cross section. B. Construction: 1. Construct embankment in horizontal layers not more than 6" in loose thickness. 2. Deposit each layer over full width of embankment as separate and distinct operation. 3. After layer is deposited, smooth to uniform depth by means of suitable motor patrol or bulldozer. 4. Compact layer by rolling with tamping type roller until full weight of roller is supported by tamping feet, but with not less than one pass per inch of loose thickness of layer. 5. Roller will be considered to be supported entirely on its tamping feet when feet do not penetrate more than 3" into material being compacted. 6. If soil is wet so that it will not sufficiently compact by one passing of roller per inch of loose thickness, provide one discing per 2" of loose thickness. a. Cut and stir full depth of layer. b. Allow interval of not longer than two hours between successive discings, or as directed by Geotechnical Engineer. c. After discing is completed compact layer by specified rolling. 7. If soil is dry so that it will not satisfactorily compact by rolling, moisten material before compaction; manipulate material to secure proper distribution of moisture before compaction. 8. Whenever operations are suspended during periods rain is likely to occur, smooth and compact surface to shed water readily. 9. Compact to not less than 95% maximum density with moisture content not more than three percentage points above or below optimum; maximum density determined by ASTM D TOPSOIL SPREADING: A. Do not place finish topsoil until after clean-up and removal of construction debris, trash, surplus materials and equipment from project site. GR GATE 15 EARTHWORK

48 B. Loosen surface of subgrade to minimum 2" depth to insure a positive bond between subgrade and topsoil. C. In areas to be sodded, spread and compact topsoil to uniform 4" depth, bring grade to 1" - 1-1/2" below finish grade shown on Plans. D. Where topsoil is spread, use a cultipacker, pulverizer or similar tool to pulverize the soil and eliminate all lumps. E. All lawn areas shall be free of clods, ruts, stones and other debris. 3.7 FINISH GRADING: A. Prepare finished grade for sodding or seeding with only light raking or scarifying required by the Landscape Contractor. B. Round finished surfaces at abrupt changes in slope. C. Should spot elevations for finished grades conflict with finished contours, the spot elevations shall govern. D. Finish grades to uniform levels or slopes between points where levels are given or between such points and existing grades. E. Positively drain all lawn areas to designated surface water collection points, streets and/or waterways. F. Repair irregularities in lawn surface drainage at no cost to Owner. G. Protect paving, sidewalks, utilities and plants during finish grading; repair or replace any items damaged by construction operations at no cost to Owner. H. After placement, maintain surfaces to indicated finished grades; deposit whatever additional topsoil may be required to take care of any settlement or erosion up to date of final acceptance. Scarify surfaces upon which additional topsoil is to be deposited, or otherwise satisfactorily prepare to ensure proper bond. 3.8 MAINTENANCE: A. Protection of Graded Areas: 1. Protect newly graded areas from traffic and erosion. Keep free of trash and debris. 2. Repair and re-establish grades in settled, eroded, and rutted areas to specified tolerances. 3. Keep public streets clean from soil, soil tracking and debris at all times. B. Reconditioning Compacted Areas: Where completed graded areas are disturbed by subsequent construction operations, erosion or adverse weather, scarify surface, re-shape and compact to required density prior to further construction. GR GATE 15 EARTHWORK

49 C. Settling: Where settling is measurable or observable at excavated areas during general project warranty period, remove surface (pavement, lawn or other finish), add backfill material, compact, and replace surface treatment. Restore appearance, quality, and condition of surface or finish to match adjacent work, and eliminate evidence of restoration to greatest extent possible. 3.9 EROSION PROTECTION: A. The Contractor shall comply with soil erosion control requirements of the Iowa Code, and the local ordinances. The Contractor shall take all necessary measurements to protect against erosion and dust pollution on this project site and all off-site borrow or deposit areas, during performance or as a result of performance. B. The Contractor shall take all steps necessary to protect adjoining property, including public sanitary and storm drainage systems and streets, from any damage resulting from the movement of earth or other debris thereto from the site; and such steps as are necessary to prevent the accumulation of earth or debris on adjoining public or private property from the construction site. The Contractor shall take into consideration all factors which might cause the movement of earth or debris from the construction site onto any adjoining public or private property. C. The Contractor shall take immediate corrective action should damage occur to adjoining public or private property (including sanitary or storm drainage systems and streets). The Contractor shall take immediate corrective action to remove any debris should any earth or other debris move from the construction site to adjoining public or private property. Further, the Contractor shall take steps required to prevent the repetition of any instance where dirt or other debris moves from the construction site to adjoining public or private property. D. The Contractor will hold the Owner harmless from any and all claims of any type whatsoever resulting from damages to adjoining public or private property, including reasonable attorney's fees incurred to Owner. Further, if the Contractor fails to take necessary steps to promptly remove earth or debris which comes onto adjoining public or private property, the Owner may, but need not, remove such debris and deduct the cost thereof from amounts due the Contractor. E. The Contractor shall maintain storm sewer systems throughout construction and provide erosion control measures acceptable to protect against siltation and erosion or any adverse conditions resulting from storm water. Use silt fence, filter socks and other means at all intakes and outfall structures and at all locations where erosion or siltation is anticipated or occurring; including drainage courses and swales. F. Silt fences shall be installed as required by local ordinace, and as required by the Storm Water Pollution Prevention Plan. 1. Drive T-posts 5' O.C. in drainage swales, 8' O.C. for slope control, to a minimum depth of 2 1/2'. Attach fabric to posts with continuous cord or wire. Bury 12" of fabric in continuous trench in front of posts. GR GATE 15 EARTHWORK

50 2. Contractor to routinely inspect condition of fences and repair and clean, as necessary to maintain them in good working order. 3. After vegetative cover is established, silt fences will be removed by Contractor and disposed of off site. G. In lieu of silt fences, filter socks may be installed at the option of the Contractor. Contractor shall furnish a detail of the dike for approval to the Landscape Architect. Contractor shall routinely inspect the conditions of the filter socks and replace damaged filter socks as necessary. Periodic cleaning of sediment and removal of filter socks shall conform to similar requirements for silt fences FIELD QUALITY CONTROL: Quality Control Testing During Construction: A. Allow testing service to inspect and approve subgrades and fill layers before further construction work is performed. B. Perform field density tests in accordance with ASTM D1556 (sand cone method), ASTM D2167 (rubber balloon method), or nuclear method, as applicable. C. Footing Subgrade: For each strata of soil on which footings will be placed, conduct at least one test every 50 lineal feet to verify required design bearing capacities. Subsequent verification and approval of each footing subgrade may be based on a visual comparison of each subgrade with related tested strata, when acceptable to Geotechnical Engineer. D. Paved Areas and Building Slab Subgrade: Make at least one field density test of subgrade for every 2000 sq. ft. of paved area, but in no case less than 3 tests. In each compacted fill layer, make one field density test for every 2000 sq. ft. of overlaying building slab or paved area, but in no case less than 3 tests. E. If, in opinion of Geotechnical Engineer, based on testing service reports and inspection, subgrade or fills which have been placed are below specified density, provide additional compaction and testing at no additional expense NATURAL AND ARTIFICIAL DRAINAGE: A. If necessary during the progress of the work to interrupt the natural drainage of the surface water, Contractor shall provide approved temporary drainage facilities. B. If necessary to interrupt any field tile drains that might be encountered in this work, the Contractor shall restore or extend drains as necessary. Payment for this work will be on the basis of contract conditions relative to changes in work DISPOSAL OF EXCESS AND WASTE MATERIALS: A. Removal from Project Site: Remove waste materials, including unacceptable excavated material, trash and debris from site to a location approved by Owner. GR GATE 15 EARTHWORK

51 B. All excess excavation shall be spread on the site in areas to be designated by the Owner. END OF SECTION GR GATE 15 EARTHWORK

52 SECTION CAST-IN-PLACE CONCRETE PART 1 GENERAL 1.01 SECTION INCLUDES A. Concrete formwork. B. Concrete building frame members. C. Concrete Form Liner Panels D. Concrete Column Forms E. Concrete reinforcement. E. Concrete curing REFERENCES A. ACI Standard Practice for Selecting Proportions for Normal, Heavyweight, and Mass Concrete; American Concrete Institute International; 1991 (Reapproved 2006). B. ACI Specifications for Structural Concrete for Buildings; American Concrete Institute International; C. ACI 302.1R - Guide for Concrete Floor and Slab Construction; American Concrete Institute International; D. ACI 304R - Guide for Measuring, Mixing, Transporting, and Placing Concrete; American Concrete Institute International; E. ACI 305R - Hot Weather Concreting; American Concrete Institute International; F. ACI 306R - Cold Weather Concreting; American Concrete Institute International; 1988 (Reapproved 2002). G. ACI 308R Guide to Curing Concrete; American Concrete Institute International; 2001 H. ACI Building Code Requirements for Reinforced Concrete and Commentary; American Concrete Institute International; I. ASTM A 185/A 185M - Standard Specifications for Steel Welded Wire Fabric, Plain, for Concrete Reinforcement; J. ASTM A 615/A 615M - Standard Specifications for Deformed and Plain Billet-Steel Bars for Concrete Reinforcement; GR GATE 15 CAST-IN-PLACE CONCRETE

53 K. ASTM C 33 - Standard Specification for Concrete Aggregates; L. ASTM C 39/C 39M - Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens; M. ASTM C 94/C 94M - Standard Specification for Ready-Mixed Concrete; N. ASTM C Standard Specification for Portland Cement; O. ASTM C Standard Specification for Sheet Materials for Curing Concrete; P. ASTM C Standard Specification for Air-Entraining Admixtures for Concrete; Q. ASTM C Standard Specification for Coal Fly Ash and Raw or Calcined Natural Pozzolan for use in Concrete; R. ASTM C 685/C 685M Standard Specification for Concrete Made by Volumetirc Batching and Continuous Mixing; S. ASTM C 1107/C 1107M - Standard Specification for Packaged Dry, Hydraulic-Cement Grout (Nonshrink); 2007a. T. ASTM C Standard Specification for Preformed Expansion Joint Filler for Concrete Paving and Structural Construction (Nonextruding and Resilient Bituminous Types); SUBMITTALS A. See Section Basic Requirements, for submittal procedures. B. Product Data: Submit manufacturer s data on manufactured products. C. Concrete Mix Design. D. Forming bracing and design details. E. Tie hole spacing showing all walls in elevation with tie hole location, details of ties and tie hole finishing. F. Manufacturer s Installation Instructions: Indicate installation procedures and interface required with adjacent construction for concrete accessories. G. Project Record Documents: Accurately record actual locations of embedded utilities and components that will be concealed from view upon completion of concrete work. GR GATE 15 CAST-IN-PLACE CONCRETE

54 1.05 QUALITY ASSURANCE A. Perform work of this section in accordance with ACI 301 and ACI 318. B. Acquire cement from same source and aggregate from same source for entire project. C. Follow recommendations of ACI 305R when concreting during hot weather. D. Follow recommendations of ACI 306R when concreting during cold weather. H. Full Scale mock-up panel: 1. Provide full scale mock-up panel as detailed on the drawings to test placement rates, form pressures, specific concrete mix, slump, joint sealing, vibrating and stripping practices. The mock-up must duplicate the materials, methods, placement rates, form pressures and workmanship that will be used on the job. 2. The mock-up panel to be constructed on the Iowa State Fairgrounds at a location determined by the owner. 3. The mock-up panel is to be completely separate from the final wall construction and with not be accepted as part of the final construction. 4. Remove after construction complete or as directed by owner. PART 2 PRODUCTS 2.01 FORMWORK A. Form Materials: Sufficient strength to withstand hydrostatic head without distortion in excess of permitted tolerances. 1. CONCRETE WALLS WITH SMOOTH FINISH: Form material for all Exposed Finish Concrete: Olympic Panel Classic HDO Concrete Form, ¾ minimum thickness. Architectural Finish semi-gloss. 2. CONCRETE WALLS WITH FORM LINER FINISH: Form material to be Premium grade elastomeric form liner for 15+ uses, factory mounted on ¾ plywood. Architectural Polymers polymers.com a. Follow manufactures recommendations in the attached appendix 03300A Specification Data and Job site guide. 3. CONCRETE COLUMNS WITH SMOOTH FINISH: SONOTUBE round FINISH FREE forms, SONOCO a. Concrete Column Forms: Sonotube Finish Free Concrete Forms with Duraglas Coating. b. Description: Multiple layers of 100 percent recycled paperboard, spirally wound, and laminated with adhesive. c. Interior Surface: Duraglas coating. Smooth with no spiral seams or form markings. d. Exterior Surface: Moisture barrier outer label. e. Forms shall not impart visible seams or form marks on concrete columns. f. 1-piece, 1-time-use forms. g. Inside Diameter: 24 inches. 4. Form Coating: Architectural Polymers 2550 Form Oil for form liners GR GATE 15 CAST-IN-PLACE CONCRETE

55 4. Form Ties: SuperTie fiberglass form tie system RJD Industries a. Follow manufacturers recommendations in the attached appendix 03300B Specifications Data Technical Information for SuperTies by RJD Industries. b. Ties to be equally and uniformly spaced provide owner review submittal. 5. Rustication and Chamfer Strips: Dressed wood (no knots, checks, splits) with sides beveled and back kerfed; nonstaining; in longest practicable lengths REINFORCEMENT A. Design: As shown on drawings. B. Reinforcing Steel: ASTM A 615/A 615M Grade 60 (420). 1. Deformed billet-steel bars. 2. Epoxy Coated C. Welded Steel Wire Fabric: ASTM A 185, plain type. 1. Flat Sheets. 2. Mesh Size: 6 x Wire Gage: 10x10. D. Reinforcement Accessories: 1. Tie Wire: Annealed, minimum 16 gage. 2. Chairs, Bolsters, Bar Supports, Spacers: Sized and shaped for adequate support of reinforcement during concrete placement. All plastic tipped. a. No chairs against form liner material. 3. Provide stainless steel or galvanized components for placement within 1-1/2 inches of weathering surfaces CONCRETE MATERIALS A. Cement: ASTM C 150, Type I - Normal Portland type. B. Normal-Weight Aggregates: ASTM C 33, Class 3S coarse aggregate or better, graded. Provide aggregates from a single source with documented service record data of at least 10 years' satisfactory service in similar applications and service conditions using similar aggregates and cementitious materials. 1. Maximum course aggregate size ¾ nominal. C. Fly Ash: ASTM C 618, Class C. D. Calcined Pozzolan: ASTM C 618, Class N. E. Silica Fume: ACI F. Water: Clean and not detrimental to concrete ADMIXTURES A. Air Entrainment Admixture: ASTM C 260. GR GATE 15 CAST-IN-PLACE CONCRETE

56 B. Chemical Admixtures: ASTM C 494, Type A - Water Reducing, Type C - Accelerating, and Type G - Water Reducing, High Range and Retarding. 1. Do not use chemicals that will result in soluble chloride ions in excess of 0.08 percent by weight of cement. C. High Range Water reducer BASF MasterRheobuild CONCRETE ACCESSORIES A. Bonding Agent: ASTM C 1059, Type II acrylic non-redispersable type. B. Non-Shrink Grout: ASTM C 1107; premixed compound consisting of non-metallic aggregate, cement, water reducing and plasticizing agents. 1. Minimum Compressive Strength at 28 Days: 7,000 psi. C. Moisture-Retaining Cover: ASTM C 171; regular curing paper, white curing paper, clear polyethylene, white polyethylene, or white burlap-polyethylene sheet CONCRETE MIX DESIGN A. Proportioning Normal Weight Concrete: Comply with ACI recommendations. B. Concrete Strength: Establish required average strength for each type of concrete on the basis of field experience or trial mixtures, as specified in ACI For trial mixtures method, employ independent testing agency acceptable to Architect for preparing and reporting proposed mix designs. C. Admixtures: Add acceptable admixtures as recommended in ACI and at rates recommended by manufacturer. D. Normal Weight Concrete: 1. Compressive Strength, per ASTM C 39 at 28 days: 4000 psi. 2. Fly Ash Content: Maximum 15 percent of cementitious materials by weight. 3. Water-Cement Ratio: Maximum 44 percent by weight. 4. Total Air Content: 2 percent, ASTM C Minimum Slump 4 inches 6. Maximum Slump: 6 inches 7. Limit small aggregate (sand) content to reduce bug holes MIXING A. Transit Mixers: Comply with ASTM C 94. PART 3 EXECUTION 3.01 EXAMINATION GR GATE 15 CAST-IN-PLACE CONCRETE

57 A. Verify lines, levels and dimensions before proceeding with work of this section. B. Patching and placement procedures as shown on the Drawings PREPARATION A. Formwork: Comply with requirements of ACI 301, do not exceed. Design and fabricate forms to support all applied loads until concrete is cured, and for easy removal without damage to concrete. In addition to ACI limits on form-facing panel deflection, limit cast-in-place architectural concrete surface irregularities, designated by ACI 347 as abrupt or gradual, Class B ¼. B. Verify that forms are clean and free of rust before applying release agent. C. Install form liners in accordance with manufacturer s recommendations. D. Coordinate placement of joint devices with erection of concrete formwork, chamfer stripes, and placement of form accessories. E. Prepare previously placed concrete by cleaning with steel brush and applying bonding agent in accordance with manufacturer s instructions. F. Column Forms: 1. Place and brace column forms in accordance with manufacturer's instructions. At a minimum forms must be secured at the base, mid point, and at the top of the form. 2. Do not use forms that are out-of-round, deformed, damaged, or contain defects that could impair concrete surface 3. Protect forms from rain and snow if work is delayed and forms have been positioned for placing concrete. Place waterproof sheeting over top of forms to prevent damage to interior surface. 4. Do not allow forms to stand in water or snow before placing concrete. G. Elastomeric Forms: 1. Form liners will shrink when the temperature drops, and expand when the temperature rises. The liner will typically change 1/16 in 10ft. with a 10 F change in temperature. Form liner movement can be minimized with proper fastening. The form liner may expand with a large increase in temperature. Spray a fine mist of water on the liner before placement to shrink the liner to its original size. If possible the liner should be fastened at the warmest time of the day. 2. The form liner material will lose impact strength and become more rigid at temperatures below 25 F. Exercise extra care under these conditions. 3. Adverse effects will occur when concrete temperatures exceed 140 F INSTALLING REINFORCEMENT A. Comply with requirements of ACI 301. Clean reinforcement of loose rust and mill scale, and accurately position, support, and secure in place to achieve not less than minimum concrete coverage required for protection. GR GATE 15 CAST-IN-PLACE CONCRETE

58 B. Install wire fabric in maximum possible lengths, and offset end laps in both directions. Splice laps with tie wire. C. Verify that anchors, seats, plates, reinforcement and other items to be cast into concrete are accurately placed, positioned securely, and will not interfere with concrete placement PLACING CONCRETE A. Do not add water to the concrete mix at the job site. B. Place concrete in accordance with ACI 304R. B. Place concrete for floor slabs in accordance with ACI 302.1R. C. Notify Architect not less than 24 hours prior to commencement of placement operations. D. Ensure reinforcement, inserts, and formed construction joint devices will not be disturbed during concrete placement. E. Concrete Columns - Place concrete at pour rate in accordance with manufacturer's instructions. Sonotube Finish Free is sold in standard lengths of 12 feet and can be poured to this full height without pour rate restrictions, as indicated on the product label. For lengths in excess of this, do not exceed 1800 pounds per square foot form pressure. D. Apply form release coating to interior surface. E. Do not touch interior surface of forms with vibrator. F. Do not vibrate concrete from exterior of forms. J. Maintain records of concrete placement. Record date, location, quantity, air temperature, and test samples taken. L. Do not interrupt successive placement; do not permit cold joints to occur CONCRETE FINISHING A. Repair surface defects, including tie holes, immediately after removing formwork. Do not apply rubbed finish to smooth formed finish. B. Unexposed Form Finish: Rub down or chip off fins or other raised areas 1/4 inch or more in height. C. Grind fiberglass ties off flush to the surface of the concrete smooth and uniform without damaging the concrete surface. GR GATE 15 CAST-IN-PLACE CONCRETE

59 3.06 CURING AND PROTECTION A. Comply with requirements of ACI 308. Immediately after placement, protect concrete from premature drying, excessively hot or cold temperatures, and mechanical injury. B. Maintain concrete with minimal moisture loss at relatively constant temperature for period necessary for hydration of cement and hardening of concrete. 1. Normal concrete: Not less than 7 days. 2. High early strength concrete: Not less than 4 days. C. Formed Surfaces: Cure by moist curing with forms in place for full curing period. D. Surfaces Not in Contact with Forms: 1. Start initial curing as soon as free water has disappeared and before surface is dry. Keep continuously moist for not less than three days by water ponding, watersaturated sand, water-fog spray, or saturated burlap. 2. Begin final curing after initial curing but before surface is dry. a. Moisture-retaining cover: Seal in place with waterproof tape or adhesive FIELD QUALITY CONTROL A. An independent testing agency will perform field quality control tests, as specified in Section B. Provide free access to concrete operations at project site and cooperate with appointed firm. C. Submit proposed mix design of each class of concrete to inspection and testing firm for review prior to commencement of concrete operations. D. Tests of concrete and concrete materials may be performed at any time to ensure conformance with specified requirements. E. Compressive Strength Tests: ASTM C 39. For each test, mold and cure three concrete test cylinders. Obtain test samples for every 25 cu yd or less of each class of concrete placed. F. Take one additional test cylinder during cold weather concreting, cured on job site under same conditions as concrete it represents. G. Perform one slump test for each set of test cylinders taken DEFECTIVE CONCRETE A. Test Results: The testing agency shall report test results in writing to Architect and Contractor within 24 hours of test. B. Defective Concrete: Concrete not conforming to required lines, details, dimensions, tolerances or specified requirements. GR GATE 15 CAST-IN-PLACE CONCRETE

60 C. Repair or replacement of defective concrete will be determined by the Architect. The cost of additional testing shall be borne by Contractor when defective concrete is identified. D. Do not patch, fill, touch-up, repair, or replace exposed concrete except upon express direction of Architect for each individual area. END OF SECTION GR GATE 15 CAST-IN-PLACE CONCRETE

61 Architectural Concrete Form Liners Specification Data and Job Site Guide Architectural Polymers form liners are used to create texture to cast-in-place, tilt-up, and precast concrete. Simply attach the panels of form liner to the formwork or casting bed before placing the concrete. After allowing concrete to properly cure, strip the formwork and liner to reveal the textured concrete surface. Architectural Polymers manufactures form liners in four use ranges: 1. Premium elastomeric form liner for 15+ uses 2. Lightweight elastomeric form liner for 5-15 uses 3. ABS vacuum thermoformed polymer alloy for 2-5 uses.090 mil. 4. HIPS single use vacuum thermoformed polymer alloy 070 mil. More than 75 elastomeric form liner textures that can be customized for any project. Standard patterns are available in ABS and HIPS. Architectural Polymers ABS and HIPS vacuum thermoformed form liners are trimmed straight and square to 4 x 10 (see brochure for actual dimensions). All Architectural Polymers vacuum formed liners have a solid void free surface which are easy to strip, and repel moisture and discoloration. Form liner size cannot exceed 4 x 10 and significant undercuts are not possible. Form pressure of more than 1000 PSF may deform some deeper patterns. Contact Architectural Polymers for specific recommendations. Typical Applications Include: Residential/commercial buildings Water/waste water treatment plants Highway Structures Commercial Landscaping Federal, State and Local Infrastructure Improvements Bridges Retaining walls Sound walls INSTALLATION GUIDELINES GENERAL Architectural Polymers recommends a fullscale pre-construction mock-up to test placement rates, form pressures, specific concrete mix, slump, joint sealing, vibrating and stripping practices. The mock-up must duplicate the materials, methods, placement rates, form pressures and workmanship that will be used on the job. Form liners are shipped on 4 x 10 skids, covered and banded. Architectural Polymers recommends covering form liners if stored outside for long periods of time. The form liner material will lose impact strength and become more rigid at temperatures below 25 F. Exercise extra care under these conditions. Adverse affects will occur when concrete temperatures exceed 140 F. Architectural Polymers does not recommend utilizing form liners in these conditions. TRIMMING Form liners may need to be custom trimmed to fit the formwork on many jobs. Build a sturdy work table with an edge guide running the 10 direction and a rip fence or adjustable saw guide. A circular handsaw with a fine tooth panel blade and a rip fence or saw guide is recommended. Use a fine tooth panel blade with minimum set or a carbide tipped blade with 40 or more teeth. For lighter gage liners, a sharp utility knife works well for trimming; score the liner and snap off the excess. Miter the edge of the liner on the same angle if a liner butts against a chamfer or reveal strip to ensure a proper fit. MOUNTING Keep vertical joints plumb and on the same line. Keep horizontal joints level and in line at the same elevation. Reveal strips or rustication are recommended where liner joints do not blend with the pattern. A properly sized rustication will enhance and compliment the pattern and overall appearance of the structure. When mounting the form liner, make sure the correct side goes toward the formwork.

62 Architectural Concrete Form Liners Specification Data and Job Site Guide MOUNTING (continued) Form liners will shrink when the temperature drops, and expand when the temperature rises. The liner will typically change 1/16 in 10ft. with a 10 F change in temperature Form liner movement can be minimized with proper fastening. The form liner may expand with a large increase in temperature. Spray a fine mist of water on the liner before placement to shrink the liner to its original size. If possible the liner should be fastened at the warmest time of the day. Nails or screws should be placed on 12 to 24 centers that are distributed evenly over the sheet. Place outer fasteners within 2 of the liner edge. Attachment points should be randomly placed to avoid a consistent pattern that may appear obvious in the finished concrete. Screwing through the valley of the liner will help hide fastener marks. Nailing through the peak of the form liner, although not generally recommended, will also help hide fastener marks. Patterns with deeper relief and more texture require more fasteners. Less screws are required than nails since screws have more holding power. Use the least amount of fasteners as possible to keep HIPS form liners positioned. Screws: Have the best holding power, are easy to use and can be easily removed. The minimum size recommended is #8-18 x 1 bugle head self-drilling and taping screws. For steel or wood forms, self-drill and tap the flat head flush with the liner. A screw gun with an adjustable torque setting can also be used. Nails: Nails have good holding power and are easy to install. 7D or larger cement coated or ring shanked nails installed with a pneumatic nailer and pressure regulator are recommended. Staples: Small staples used with a pnematic stapler and pressure regulator are easy to use and hide in the pattern They have much less holding power and should be used on 6 to 12 centers. Pop Rivets: Require more work than self drilling screws, but have good holding power on metal forms. Wooden Dowels: Screw or nail the liner to the 1 2 wooden dowels inserted in the concrete where the liner is attached to the concrete casting bed on tilt-up or precast jobs. The dowels easily drill out and patch upon completion of the job. Construction Adhesive: Construction adhesive can be used on tilt-up jobs to adhere ABS/HIPS form liner to concrete slabs. The form liner and concrete must remain clean and dry during installation. Keep the concrete surface dry after initial installation, as moisture between the liner and concrete can break the adhesive bond. To help maintain the bond, place sealer at the form liner joints. Double-Sided Carpet Tape: Double-sided carpet tape provides an easy way to secure the form liner to the casting bed on tilt-up jobs. The tape should be centered on the form liner seams for most patterns. 1/32 1/16 carpet tape is recommended. The form liner and concrete must be clean and dry. Backup Strips: Backup strips should be installed on patterns with ribs wider than 1 1 2, or a depth of or greater to prevent deflection from the pressure of the concrete. Confirm the need for backup strips on the mock up pour. Use wood or styrene foam insulation board between the liner and formwork. SEALING To prevent localized water loss and subsequent discoloration of the concrete all form liner joints and tie holes should be sealed. Grout leakage will make stripping more difficult and may cause damage to the liner. Neutral cure silicone sealant, once cured, is flexible, has good adhesion and will not discolor or stick to the concrete. It is recommended for cast-in-place jobs. FORM BOLTS, TIES AND BAR SUPPORTS Tie spacing should be a multiple of the form liner pattern repeat. Tight fitting holes may be cut with a hole saw or drilled. Patching and filling of holes is eliminated with the use of reinforced fiber glass rod ties. The rods are snapped off and ground flush with the concrete after stripping. Ties located in the valley of the concrete may be less obvious, however, patching tie holes in the peak of the concrete is easier. The leg spacing of the bar supports should match the pattern repeat of the form liner, with bar supports or spacers resting against the portion of the liner that is in contact with the formwork. To minimize rust stains on the finished concrete, use plastic or plastic tipped supports and spacers.

63 Architectural Concrete Form Liners Specification Data and Job Site Guide Use thin 1 4 plywood strips to prevent deforming the patterns when walking on precast and tilt-up work. The plywood strips distribute the load on the form liner and are easily removed through the bar mat. The concrete itself will distribute the load during placement. Walk on the reinforcing steel rather than the liner surface, if permissible. RELEASE AGENTS AND BOND BREAKERS Architectural Polymers form liners are made from nonabsorbing, rigid compounds that do not bond to the concrete. Architectural Polymers recommends using an approved release agent. The proper use of a release agent will aid in stripping, speed up clean up between pours and improve the surface appearance of the concrete. Architectural Polymers 2550 Form Oil is available for this purpose. Some release agents may damage the liner and cause subsequent failure. Apply release agent before each use at recommended rates, as over application may produce surface voids. CONCRETE MIX DESIGN Use concrete from one supplier, making sure that all ingredients come from the same sources, to ensure uniformity of color and texture. Slump should be 4 to 6 inches. The higher slump provides easier filling of pattern details. To avoid bug holes, avoid using overly sandy or high air entrained mixes. To prevent honeycombing and chipping in ribbed textures, use aggregate that is smaller than the width of one rib. Use an elephant trunk to minimize aggregate separation. Avoid dropping the concrete directly against the liner, as this may cause surface abrasion or deformation and result in a defect in the finished concrete. Pumping the concrete into the forms will typically reduce air voids in the surface of the concrete, however, it also raises the form pressures significantly which may cause damage to the liner. Using a plasticizer will minimize air voids. To keep form pressures at an acceptable level, the placement rate may have to be reduced. High pour rates may cause more air voids and create excessive form pressures, which may damage or deform the form liner. Thoroughly vibrate concrete to achieve good consolidation minimize air voids and eliminate lift lines. Concrete lifts should be less than 24 inches. Typically internal vibrators are used to loosen the liner from the formwork. External vibrators will also work; however, contact between the vibrator and form liner may cause damage to the liner. In addition, under and over vibration may cause defects in the concrete suface. Remove foot prints, standing water and airborne dirt and debris before placing concrete with precast and tiltup panels. Heat curing beds may harm the form liner. Contact Architectural Polymers for specific recommendations. STRIPPING AND CLEAN-UP Exercise extra care when stripping the formwork so that the textured surface is not damaged. Forms with architectural form liners require greater force to strip than smooth formwork. Formwork should be removed after at least 12 hours and stripped within 24 hours of concrete placement. More force may be required if the lapse time from placement to stripping exceeds 24 hours. Start stripping at the top of the form work. Slightly separate the form from the concrete and hold in this position for several minutes to allow the induced stress to diminish. Continue to separate the formwork from the concrete in stages until completely separated. Architectural Polymers form liners can be easily cleaned with household detergent and a stiff brush. FINAL FINISHING Rubbing: Remove seams and forming defects with a stone while concrete is still green. Sandblasting: Sandblasting may be used to roughen the surface, hide seams and forming defects and bring out the color of the aggregate. It will not hide discoloration from grout leakage. Patching: When patching tie holes or more serious forming defects, a close color match is crutial. Use the same materials used in the original mix and run several trials before working on the structure. Bad patches look worse than the original problem. Hire a consultant if in doubt.

64 Architectural Concrete Form Liners Specification Data and Job Site Guide AVAILABILITY AND COST Availability: Architectural Polymers form liners are distributed through various concrete forming and accessory dealers. Contact Architectural Polymers to find a representative in your area. Lead-Time: Lead times will vary according to pattern, quantity and production backlog. Cost: Contractor cost will vary according to pattern, quantity and liner grade. TECHNICAL SERVICES Architectural Polymers distributors have the skill and knowledge to answer most questions. Architectural Polymers can also provide consultation during design, specification and product installation. Product brochures, a formatted specification, technical notes and additional information are available upon request. The following ACI Committee reports are recommended: ACI 117; Specifications for Tolerances for Concrete Construction and Materials Commentary ACI 301 CH.6; Specifications for Structural Concrete ACI 303R; Guide to Cast-in-Place Architectural Concrete Practice ACI 309 CH.7; Guide for Consolidation of Concrete ACI 347 CH.5; Guide to Formwork for Concrete Material ABS Alloy HIPS Alloy Tensile Strength - 5,100 2,500 Yeild (PSI) ASTM D638 Flexural Modulus 270, ,000 (PSI) ASTM D790 Notched Izod Impact (ft.-lb/in) ASTM D Vicat Softening Point ( F) ASTM D1525 Heat Deflection Temp ( F) ASTM D PSI 264 PSI 2009 Architectural Polymers 1220 Little Gap Road Palmerton, PA PH: The information contained herein is considered accurate; however Architectural Polymers, Inc. makes no warranty regarding the accuracy of the information. The user must determine the suitability of the product for the intended use and accepts all risks and liability associated with that use.

65 TECHNICAL INFORMATION S P E C I F I C A T I O N S D A T A 1. PRODUCT NAME SuperTie fiberglass form tie system. 2. MANUFACTURER RJD Industries, LLC 75 Aero Camino, Ste. C Goleta, CA Toll Free: (800) Fax: (949) Info@rjdindustries.com 3. PRIMARY APPLICATION The SuperTie fiberglass form tie system, is used to secure concrete formwork during concrete placement and initial hydration, without the inherent limitations of previously popular steel form tie systems. The SuperTie system eliminates the possibility of rust stains and deterioration of the structure that are often caused by failure of patching for steel form tie holes. 4. FEATURES / BENEFITS Superior Finishes - Superior architectural finishes, without patches or rust. No Corrosion - The fiberglass form tie material cannot rust, eliminating the need to have a breakback, and subsequent plugging and patching to forestall rust. Watertight - Certified testing and actual experience show the cast- in- place form tie material to be watertight to up to 480 H 2O (208 psig). Natural Insulator - The form tie material is electromagnetically transparent, is an electrical insulator, will not promulgate radio frequency energy, and shields nuclear energy. 5. INSTALLATION Full installation instructions are contained in available product literature. No special skill is required. 6. AVAILABILITY & COST The SuperTie fiberglass formtie system is readily available throughout the world through a network of qualified, quality distributors of concrete-construction accessories. All raw materials are products of and all components are manufactured in the United States of America. 7. TECHNICAL SERVICES Full technical services are available from SuperTie distributors, a network of factory representatives, and directly from the manufacturer. 8. MAINTENANCE SuperTie hardware requires periodic maintenance, which is described in product literature. 9. GUARANTY A standard mercantile guaranty is offered, terms of which are in product literature. RJD INDUSTRIES, LLC