Peter Madsen Rederi A/S Company presentation

Size: px
Start display at page:

Download "Peter Madsen Rederi A/S Company presentation"

Transcription

1 Peter Madsen Rederi A/S Company presentation

2 Agenda Background Offshore Wind Stone Works Boulder clearance Seabed reinforcement Scour protection Reef reinstatement Dredging Trenching Backfilling Hydrographic Survey BlueView/subsea Video Diving Work Pipe and cable laying

3 Background

4 Introduction Peter Madsen Rederi A/S: Family run business for more than 60 years Experienced Staff of around 70 Turnover EUR 10-16m 6 vessels + 1 survey boat Accurate RTK positioning land base or Virtual Accurate placement using PDS2000 Baltic, North Sea, UK Waters Vessels using 3 point anchor systems and spud legs for easy and safe positioning around offshore foundations and other structures Experienced at: Stone works Boulder clearance, Dredging, Trenching, Cable laying Scour protection, Seabed levelling for foundations MBES survey, Video, Side Scan GEO scan and Blueview Engineering Diving work Clients: EON, Vattenfall, DONG, FCBC, Statoil, Hochtief, Aarsleff, NordStream, ENBW, Energinet.DK, DEME, ports, authorities etc.

5 Offshore Wind

6 Offshore wind Boulder clearance Route clearance Levelling of stone beds for gravity foundations Scour protection (including unique sand bag solution) Ballasting for foundations Installation of external flex pipes for cables Dredging / jetting for cable trenches Survey works Support to jack-up vessels (stone beds, maintenance of spud can holes, recovery of embedded jack-up legs)

7 Offshore Wind

8 Offshore Wind 15 years in Offshore Wind 1. Nysted OWF (DK) Horns Rev 1 OWF (DK) Kentish Flats OWF (UK) Burbo Bank OWF (UK) Lillgrund OWF (S) Rhyl Flats OWF (UK) Horns Rev 2 OWF (DK) Rødsand 2 OWF (DK) Robin Rigg OWF (UK) Sprogø OWF (DK) Baltic 1 OWF (D) Egmond aan Zee (NL) Anholt OWF (DK) Great Yarmouth (UK) Scroby Sands OWF (UK) Amrumbank OWF (D) Kårehamn OWF (S) Helwin trafo OWF (D) Westermost Rough (UK) Baltic II OWF (D) Dantysk OWF (D/DK) Borkum BKR1 OWF (D) FéCamp (F) Rampion OWF (UK) Arkona Becken (DE)

9 Stone Works

10 Stone works Rampion and Arkona Boulder clearance incl. MBES and BlueView Anholt OWF Trafo. foundation

11 Stone works Rampion and Arkona Boulder clearance, as found and as laid

12 Stone works Boulder clearance, grabs

13 Stone works - Old Lillebælt bridge Seabed Ballasting incl. MBES, Fm3

14 Stone works Rødsand 2 OWF Ballasting concrete foundations, Scour protection and Collision protection with stones incl. MBES (80-18pcs.)

15 Stone works Anholt OWF, Fécamp Levelling of Stone beds for foundations incl. MBES Anholt With Divers +/-5cm Anholt OWF Trafo. foundation FeCamp Without Divers +/ cm Average over 1x1m/ 5x5m Grid

16 Stone works FCBC Forth Bridge Dredging and Scour Protection of piers incl. MBES Anholt OWF Trafo. foundation

17 Stone works Svendborgsund bridge Collision protection with stones incl. MBES

18 Stone works Nord Stream Gas pipe Construction of artificial reefs, without anchors incl. MBES, Side scan and Back scatter

19 Dredging

20 Dredging - Capital dredging m3, at 3-45 m water depth Frederikshavn Fm3 contaminated material to be dredged and disposed onshore Ireland Bantry Fm3 to be dredged

21 Dredging/Trenching/Backfilling Rødsand 2 OWF, 70 km Trenching Rødsand 2, slope 1:0, Hard Clay Kontek 50 km Trenching and backfilling

22 Dredging for foundations Anholt trafo Sunderland UK

23 Total volumes Dredging & stone works Year Total vol. Major Projects Amrumbank West (D) Helsingborg (S) Lillebælt (DK) Port Edgar (UK) Penzance (UK) Sunderland (UK) Workington (UK) Thyborøn (DK) Frederikshavn (DK) FCBC (UK) Aarhus (DK)

24 Survey MBES

25 Hydrographical MBES surveys

26 Hydrographical MBES surveys FCBC Forth Bridge Sunderland New Wear Bridge

27 Hydrographical MBES surveys Anholt OWF Trafo foundation

28 Under Water Video/BlueView Rhyl Flats OWF Arkona-Becken OWF

29 HSE and QA

30 Safety first

31 Certifications ISM certified

32 Documentation

33 Handover documentation Onshore filling - QA and Progress Reporting

34 Handover documentation Progress Chart

35 Handover documentation Out-survey of placed sandbags, presented in both charts and in XYZ files

36 Fleet

37 Fleet 390 m3, L 46,5 x W 12 m x D 3,5 m Hydraulic excavator, max 13 m water 200 m3, L 34,9 x W 8,5 m x D 3,1 m Wire crane, max 30 (60) m water 100 m3, L 29,2 x W 8,0 m x D 1,9 m Wire crane, max 30 (60) m water 235 m3, L 35,4 x W 9,2 m x D 3,1 m Hydraulic excavator, max 10 m water 175 m3, L 42,19 x W 7,5 m x D 2,6 m Wire crane, max 30 (60) m water 200 m3, L 34,9 x W 8,5 m x D 2,3 m Wire crane, max 30 m water

38 Contacts

39 Contacts For further details, please contact: Kristen Nedergaard Dreiøe Senior Sales Manager Tel: Mail: Christian Kragelund-Leer Head of Sales & Marketing Tel: Mail:

40 The End :-)