1 1 / 29 Sukriti Planning Permit No.: PPA/WDCN13/04137/2015 Building Permit No. : BA/WDCN13/03879/2015 Floor Plans GROUND FLOOR PLAN

2 2 / 29 FIRST FLOOR PLAN SECOND FLOOR PLAN Availability FLAT NO AREA AVAILABILIT Y NO OF BEDROOMS GB 1122 SOLD OUT DOUBLE 1A 2133 SOLD OUT TRIPLE 1B 1141 SOLD OUT DOUBLE 2A 2151 SOLD OUT TRIPLE Construction Specifications

3 3 / The flats are to be constructed to this specification subject to minor changes in dimension, locations found desirable or necessary to ensure sound engineering practice at the sole discretion of the Builder. Foundation: 1. Soil test will be carried out. 2. Foundation will be designed as per the code of Seismic Zone III. Foundation will be as per the recommendations of the soil test report. 3. Depth of the Earth work excavation for foundations is according to the Structural Design and Detailed drawing by our Structural Consultant. 4. Laying P.C.C 1:4:8 for foundation or as per structural consultant's design. 5. The height of formed ground level from the road level is depending upon the site condition between 1'0" to 2' 0". 6. The height of Car parking level from the road level is depending upon the site condition between 1'6" to 2' 6". 7. Anti Termite will be carried out in 3 stages - All round the Foundation pit, On completion of filling at stilt floor PCC level. All around the building after paving area filling. 8. Laying of Floor PCC at stilt floor car park level with RMC M15 grade of 100 mm thick. Structure: 1. RCC frame structure with appropriate RCC columns, RCC beams and slabs ( Cement brands to be used- Ultratech/ Coromandel / ACC / Dalmia / Ramco). 2. Design of structure as per IS Supply and Fabrication of ISI TMT steel for all RCC works (Brand- Tulsian / ARS /Surana). 4. Generally, slab thickness (ROOF) will be 5 with RMC Grade M25.(Birla Ready Mix Concrete) Super Structure: 1. External walls will be 9" if brick wall and 6" if Porotherm block work. 2. Internal walls will be 4½" brick wall / 4" Porotherm block work. 3. Ceiling height will be 10' 0, except in toilets where it will be Lintels- As per Architectural, Structural design and detailed drawings. 5. Sunshade 1' 6" to 2' 0" projected from the external walls as per Architect's design. 6. Loft 1' 10½" to 2' 0" projected from the walls in bedroom and kitchen. 7. Cooking platform of 2' 0" width granite (G20) top over RCC slab will be provided in kitchen. Black granite or Green Marble. 8. Platform in the utility/ service area will be provided. Wall Plastering:

4 4 / Inner plastering will be 25 mm thick rough finish with CM 1:4. 2. Outer plastering will be 25 mm thick rough finish with CM 1:5. 3. Ceiling plastering will be 20 mm thick fine finish with CM1:3. 4. Water proof plastering to be done for all sunken slabs, Underground sump, Over head tank. Flooring: 1. Tiles brand will be Kajaria / Naveen / Somany /Asian. 2. Living, Dining, Bedrooms and Kitchen will be laid with 2' 0" x 2' 0" anti skid Vitrified tiles. 3. Toilet, wash area and Balcony tiles will be Ceramic non-skid tiles 4. Wall Dado- In toilet walls for 7' 0" level including pointing and finishing. 5. Wash area wall tiles will be 1' 0" x 1' 0" Glazed tiles upto the height of 4' 6" and in kitchen near counter for 2' 0" level including pointing. 6. Toilet counter tops will be G20 Granite slab (Black) over R.C.C platform, wherever possible. 7. Lift wall dado will be of Granite / marble (as per Architect's design). 8. Common area flooring (Staircase steps, Lobby, corridor etc) will be as per the Architect's deisgn (with Kota stone / Marble).- Non skid 9. Weathering course with brick bats coba will be provided over roof slab, finished with Water proof plastering CM 1:5 with necessary slope will be provided in Terrace roof. 10. Drive way and landscape area will be laid with interlocking paver blocks over compacted sand of 3". 11. Grano flooring will be provided in the car parking area. Joinery: 1. Main Door 2. Main door: As per Architect's Design. 3. Frame: Good quality Teak wood frame of size 5 x 3 4. Shutter: 36 / 38 mm Pannelled solid wooden door shutter. 5. Fittings: Antique finish brass (Brand- Milton / Sris Ma Fils / Jothi). 6. Godrej / Secure Locks, One Aldrop, Tower bolts, Safety chain and peep hole, door stopper,handle will be provided. 7. Main door will be of 7 height and width of door will be 3.5 Feet. 1. Bedroom doors 2. Frame: Good quality wooden frame of size 4" x 2½". 3. Shutter: 36mm door. 4. Fittings: Antique finish Brass (Brand- Milton / SrisMa Fils / Jothi). 5. Godrej / Secure Locks, Tower bolts, door stopper will be provided. 6. Bedroom doors will be of standard size of 7 x3 7. Balcony and toilet doors 8. Frame: Good quality wooden frame of 4 X Shutter: 36mm thick flush door with waterproof coat with enamel painting on either side. 10. Fittings: Antique finish Brass (Brand- Milton / SrisMa Fils / Jothi). 11. Aldrop, Baby latch, Tower bolts, door stopper will be provided. 12. Balcony and Toilet Doors will be of standard size of 7 x3 1. French doors 2. Frame: Good quality wooden frame of size 4" x 3 3. Shutter : Plain glass with fixed grill and openable shutter. 4. Fittings: Antique finish Brass (Brand- Milton / SrisMa Fils / Jothi). 5. Godrej/secure locks Aldrop, Baby latch, Tower bolts, door stopper will be provided.

5 5 / Ventilators 2. Frame: Good quality wooden frame of size 4" x Shutter : Aluminium adjustable louvers with pinhead glass or glass or wooden ventilators with adjustable louvers with exhaust fan provision / partially top hung shutter with exhaust hole provision with grill 4. Plain glass with fixed grill and openable shutter 5. Fittings: Antique finish Brass (Brand- Milton / SrisMa Fils / Jothi). Godrej/secure locks Aldrop, Baby latch, Tower bolts, door stopper will be provided. 1. Windows 2. Frame and Shutter : FINESTA UPVC Openable Windows. 3. Grills with ½" x ½" square rods. to be made 4 X 4 4. Grills will be fixed in the wall. 5. Staircase handrail 6. Railing height will be 3' 0". 7. Design as per Architect (with M.S. Pipe or wood) 8. Balconies 9. All Balconies will be closed with wall of ht of 2.5 feet and grill above up to ceiling drops. The grill will be fixed in the wall,the grill thickness will be ½"x½" square rods, the pattern squares of 4 X 4 Painting work: 1. The walls will be plastered suitably to take two coat cement based wall care putty and one coat wall primer and two coats plastic emulsion with roller finish. 2. Doors and Ventilators will be painted with enamel paint two coats with one coat wood primer. 3. Ceiling will be painted with white cement primer coat and white Colour cement paint two coats. 4. External wall will be painted with one coat of White Cement and one coat of Exterior Wall Primer and two Coats Exterior Emulsion (Apex/ Ultima). 5. Wooden handrails and Main door will be Melamine finish 6. Chimney provision will be done for Kitchen. 7. Exhaust fan provision (10 ) will be provided in the kitchen with grill. Electrical work: Electrical distribution and concealed wiring suitable for three phase power supply will be provided 1. LT Panel FSU : L&T / Siemens / C&S 2. MCB DB : Siemens/Legrand/GE/ Manilec 3. MCB's, RCCB : Siemens / Schneider 4. LT Cables : Gem / Polycab 5. CTs : Kappa 6. Switch / Switch box / Flush : MK / Anchor mounted socket / Fan regulator 7. TV / telephone point : MK / Anchor

6 6 / PVC wires : Finolex / Anchor / Orbit / Polycab 9. PVC conduits & Accessories : Avon / Vasvi 10. Industrial Type Plug & sockets : Standard / Siemens 11. Cable glands : Siemens / SIBG 12. Cable Trays & Accessories : Profab 13. Light Fitting (common Areas) : K-Lite / Philips 14. Light Fitting (External) : K-Lite / Philips 15. AC box : Havells /Siemens 16.Domestic range distribution board : standard or equivalent Plumbing works: 1. Inner cold water Pipes CPVC / UPVC : Astral/Ashirvador equivalent 2. Inner hot water pipes CPVC : Astral/ Ashirvad or equivalent 3. Soil and waste water pipes : Trubore/Finolex or equivalent- painted with two coats of enamel paint 4. Sewer and drain pipes : Trubore/Finolex or equivalent- painted with two coats of enamel paint 5. Man hole covers : Approved makes / RCC 6. Ball Valves : RB / TBS 7. Man hole covers (Cast iron) : BIC / NICO 8. Sanitary fittings : Parry ware / Hind ware or 9. EWC : Wall hung closet / wallvit pan - With Concealed Flushing cistern 10. Wash basins/colour : provided in all toilets :regular 22 X 18 cascade model with counters 11.CP fittings : Jaquar continental or equivalent 12. shower wall mixer 2 in 1 / 3 in Kitchen sink (36" x 18" SS singlebowl with drain board) : Franke / Nirali / Diamond (double bowl to be provided, subject to technical feasibility) 14. Wash area - SS sink Single bowl only (24" x 18") : Franke / Nirali / Diamond 15. Sink tap : Swan Neck from wall 16. Cockroach trap : Chilly / Viking 17. PVC traps : Fabrication trap 18. Provision for Aqua guard in the kitchen will be provided. Common area works: 1. One individual letter box will be provided at the entrance to the building and meter room 2. Adequate capacity of Underground sump will be provided 15,000 Ltr. (Approx) 3. Bore Well will be provided

7 7 / Motors and pump of sufficient capacity will be provided. 5. Common overhead tank of sufficient capacity with separate storage for metro water and bore well water will be provided 3000 Ltr. (approx). 6. Water line system will be provided as designed by our Plumbing Consultant. 7. Concealed PVC pipes for TV antenna will be provided in the living room and bedrooms. 8. A common board will be provided near the entrance to the Building for incoming telephone line, with provision for concealed wiring from this board to points in each flat in the living room and the bedrooms. 9. Automatic Lifts of (minimum 6 Passenger Capacity) KONE make will be provided. 10. Generator of adequate capacity connecting all the common lighting, lifts, motor pumps, one A/C per flat and all light & fan points and 5 amp points inside the flat will be provided. 11. Rain water harvesting shall be done. 12. Security cabin & Toilet for Watchmen will be provided. 13. Association room will be provided subject to feasibility of parking. If feasible this area will be added to the total saleable area. 14. Intercom facility will be provided from security to flats. 15. Monthly maintenance charges will be Rs.3/- per sq. ft. approx. Should the Developer require any change in the specifications the changed specifications would be equivalent or of higher standard and would have to be approved by the Contracting Party. Project Status Project Status as on 26th Jun 2017

8 8 / 29 Site view Final stage finishing work is in progress Final stage finishing work is in progress

9 9 / 29 Final stage finishing work is in progress Flats wood work is completed in (4/4).

10 10 / 29 Flats wood work is completed in (4/4). Flats wood work is completed in (4/4). Flats wood work is completed in (4/4). Flats Handed over (3/4)flats. All service connection obtained. Entire project is in useable condition Project Status as on 17th Jun 2017 Site view

11 11 / 29 Flats wood work is completed in (4/4) Flats wood work is completed in (4/4)

12 12 / 29 All flat cp& sanitary fittings fixing work is completed Flats wood work is completed in (4/4) Flats wood work is completed in (4/4)

13 13 / 29 Staircase handrail fixing work is completed

14 14 / 29 Post boxes fixing work is completed Landscape work is completed Flats wood work is completed in (4/4). Flats Handed over (3/4)flats. All service connection obtained. Entire project is in useable condition Project Status as on 9th Jun 2017

15 15 / 29 Site view Flats Handed over (2/4)flats. Flats Handed over (2/4)flats.

16 16 / 29 Flats Handed over (2/4)flats. Flats wood work is completed in (4/4). Flats Handed over (3/4)flats. All service connection obtained. Entire project is in useable condition Project Status as on 3rd Jun 2017 Site view

17 17 / 29 Flats wood work is completed in (4/4).

18 18 / 29 Flats wood work is completed in (4/4). Flats wood work is completed in (4/4). Flats Handed over (2/4)flats. All service connection obtained. Entire project is in useable condition Project Status as on 27th May 2017 Site view

19 19 / 29 Final stage finishing work is in progress Landscaping work is completed.

20 20 / 29 Landscaping work is completed. Flats Handed over (2/4)flats.

21 21 / 29 Flats Handed over (2/4)flats. Flats Handed over (2/4)flats.

22 22 / 29 Flats wood work is completed in (4/4). Flats wood work is completed in (4/4). Flats Handed over (2/4)flats. All service connection obtained. Entire project is in useable condition Project Status as on 20th May 2017 site view

23 23 / 29

24 24 / 29 Flats wood work is completed in (4/4). Flats Handed over (2/4)flats. All service connection obtained. Entire project is in useable condition. Project Status as on 13th May 2017

25 25 / 29 site view

26 26 / 29 name board & post boxes fixing work is in progress

27 27 / 29 Flats wood work is completed in (4/4). lats wood work is completed in (4/4). Flats wood work is completed in (4/4). Flats Handed over (2/4)flats. All service connection obtained. Entire project is in useable condition Project Status as on 6th May 2017 Site view

28 28 / 29 finishing work is in progress Flats wood work is completed in (2/4).

29 Powered by TCPDF ( 29 Flats wood work is completed in (2/4). finishing work is in progress Flats wood work is progress in (2 flats). Flats wood work is completed in (2/4). All toilets sanitary and cp fitting fixing work completed 4 flats. All service connection obtained. Entire project is in useable condition / 29