1 1 / 34 Sri Chakra Sri Chakra Planning Permit : B / Spl. Bldg / 334 / 2013 dated Building Permit : CEBA/ WDCN09 / 369 /2013 dated Floor Plans Empty section. Edit page to add content here. Availability Empty section. Edit page to add content here. Construction Specifications

2 2 / 34 CONSTRUCTION SPECIFICATIONS 1. The flats are to be constructed to this specification subject to minor changes in dimension, locations found desirable or necessary to ensure sound engineering practice at the sole discretion of the Builder. 1. Necessary soil test will be carried out. 2. Foundation will be designed as per the code of Seismic Zone III. 3. Depth of the Earth work excavation for foundations is according to the Structural Design and Detailed drawing by our Structural Consultant. 4. Laying P.C.C 1:4:8 for foundation or as per structural consultant's design. 5. The height of formed ground level from the road level is depending upon the site condition between 1'0" to 2' 0". 6. The height of Car parking level from the road level is depending upon the site condition between 1'6" to 2' 6". 7. Anti-Termite will be carried out in 3 stages - (i) All round the Foundation pit, (ii) On completion of filling at stilt floor PCC level. (iii) All around the building after paving area filling. 8. Laying of Floor PCC at stilt floor car park level with RMC M15 grade of 100 mm 1. RCC frame structure with appropriate RCC columns, RCC beams and slabs (Cement brands to be used- Ultratech/ Coromandel / ACC / Dalmia / Ramco). 2. Design of structure as per IS Supply and Fabrication of ISI TMT steel for all RCC works (Brand- Tulsian / ARS 4. Generally, slab thickness (ROOF) will be 5 with RMC Grade M External walls will be 9" brick wall / 6" Porotherm block work. 2. Internal walls will be 4½" brick wall / 4" Porotherm block work. 3. Ceiling height will be 10' 0 (or can be slightly higher as per the client's

3 3 / 34 requisition, if it is within the permissible / allowed height limits), except in 4. Lintels- As per Architectural, Structural design and detailed drawings. 5. Sunshade 1' 6" to 2' 0" projected from the external walls as per Architect's 6. Loft 1' 10½" to 2' 0" projected from the walls in bedroom and kitchen.(one no 7. Cooking platform of 2' 0" width granite (G20) top over RCC slab will be 1. Inner plastering will be 12 to 25 mm thick semi rough finish with CM 1:4. 2. Outer plastering will be 15 to 25 mm thick rough finish with CM 1:5. 3. Ceiling plastering will be 12 to 25 mm thick fine finish with CM1:3. 4. Water proof plastering to be done for all sunken slabs, Underground sump, 1. Tiles brand will be Kajaria / Naveen / Somany /Asian. 2. Living, Dining, Bedrooms and Kitchen will be laid with 2' 0" x 2' 0" Vitrified tiles. 3. Toilet, wash area and Balcony flooring tiles will be 1' 0" x 1' 0" Anti-skid 4. Wall Dado- In toilet walls for 7' 0" level including pointing and finishing. 5. Wash area wall tiles will be of 1' 0" x 1' 0" Glazed tiles upto the height of Kitchen Window sill and in kitchen above counter for 2' 0" level including 6. Lift wall dado will be of Granite / marble (as per Architect's design). 7. Common area flooring (Staircase steps, Lobby, corridor etc) will be as per the Architect's design (with Kota stone / Marble). 8. Weathering course with brick bats coba will be provided over roof slab, finished with Water proof plastering CM 1:5 with necessary slope will be provided in 9. Drive way will be paved with interlocking paver blocks over compacted sand of 1. Main door: Good Quality Hard wood Door. 2. Frame: Good quality wooden teak wood frame measuring 5" x 3". 3. Shutter: 36 / 38 mm Semi Pannelled door. 4. Fittings: Antique finish brass 5. Godrej / Secure Locks, One Aldrop, One Tower bolt, Safety chain,peep hole,

4 4 / 34 Door stopper and Handle etc will be provided. B. Bedroom doors - Enamel painting on both side 1. Frame: Good quality wooden frame of size 4" x 2½". 4. Godrej / Secure Locks, Tower bolts, door stopper etc will be provided. 1. Frame: Good quality wooden frame of size 4" x 2½". 2. Shutter: 32 mm thick flush door shutter with waterproof coat with enamelpainting on either side Fittings: Antique finish Brass Aldrop,Baby latch Tower bolts, Door stopper and Handle etc. will be provided. D. French doors - Enamel painting on both side 1. Frame: Good quality wooden frame of size 4" x 3". 2. Shutter: Plain glass with fixed grill with openable shutter. 3. Fittings: Antique finish Brass. 4. Aldrop, Tower bolts, door stopper and Handle etc. will be provided. E. Ventilators - Enamel painting on both side 1. Frame: Good quality wooden frame of size 4" x 2½". 2. Shutter:Aluminium adjustable louvers with pinhead glass or wooden ventilator with adjustable louvers with Exhaust fan provision / partially top hung shutter with exhaust hole provision with grill. 1. Frame and Shutter : Sliding/ Open able UPVC Windows will be provided 2. MS Grills will be fixed in the wall. 2. Design as per Architect (with M.S. Pipe or wood) 1. The walls will be plastered suitably to take two coat cement based wall care putty and one coat wall primer and two coats plastic emulsion with roller finish 2. Doors and Ventilators will be painted with enamel paint two coats with one 3. Ceiling will be painted with white cement primer coat and white Colour 4. External wall will be painted with one coat of White Cement and one coat of

5 5 / 34 Exterior Wall Primer and two Coats Exterior Emulsion 5. Wooden handrails and Main door will be of Melamine finish 6. Chimney provision will be provided for Kitchen. 1. LT Panel FSU : L&T / Siemens / C&S 2. MCB DB : Siemens/Legrand/GE/ Maniler 3. MCB's, RCCB : Siemens / Schneider 4. LT Cables : Gem / Polycab 5. CTs : Kappa 6. Switch / Switch box / Flush : MK / Anchormounted socket / 7. TV / telephone point : MK / Anchor 8. PVC wires : Finolex / Anchor / Orbit / 9. PVC conduits & Accessories : Avon plast / Vasvi 10. Industrial Type Plug & sockets : Standard / Siemens 11. Cable glands : Siemens / SIBG 12. Cable Trays & Accessories : Profab 13. Light Fitting (common Areas) : K-Lite / Philips 14. Light Fitting (External) : K-Lite / Philips Light : 1 no Fan : 1 no Light : 3 no TV : 1 no Telephone : 1 no 5 Amp : 4 no Calling Bell : 1 no Chandelier : 1 no Fan : 1 no

6 6 / 34 Light : 3 no 5 Amp : 1 no 15 Amps : 1 no Fan : 1 no Light : 3 no TV : 1 no Telephone : 1 no A/C - 20Amps : 1 no (Window/Split) 5 Amp : 2 no Light : 1 no Exhuast Fan : 1 no Light : 1 no Mirror Light : 1 no Geyser : 1 no 5 Amp : 1 no Fan : 1 no Light : 3 no 15 Amps : 2 no 5 Amp : 6 no Exhaust Fan : 1 no Light : 1 no 15 Amps : 1 no CPVC / UPVC : Astral / Ashirvad or equivalent 2. Inner hot water pipes CPVC : Astral / Ashirvad or equivalent 3. Soil and waste water pipes : Varun/Trubore/Finolex or equivalent 4. Sewer and drain pipes : Varun/Trubore / Finolex or equivalent

7 7 / Man hole covers : Approved makes / RCC 6. Ball Valves : RB / TBS 7. Man hole covers (Cast iron) : BIC / NICO 8. Sanitary fittings : Parry ware / Hind ware or Equivalent 9. EWC : Wall hung closet / IWC Wash Basin - Regular : Regular - 22 x 18 cascade model 11. CP fittings : Jaguar continental or equivalent 12. Kitchen sink (36" x 18" SS single bowl with drain board) : Franke / Nirali / Diamond only (24" x 18") : Franke / Nirali / Diamond 14. Sink trap : Swan Neck from wall (Mixer tap) 15. Cockroach trap : Chilly / Viking 16. PVC traps : Fabrication trap 1. One individual letter box will be provided at the entrance to the building. 3. Sumps/Over Head Tanks will be provided. 4. Motors and pump of sufficient capacity will be provided. 5. Common overhead tank with separate storage for metro water and bore well 6. Concealed PVC pipes for TV antenna will be provided in the living room and 7. A common board will be provided near the entrance to the Building for incoming telephone line, with provision for concealed wiring from this board to points in each flat in the living room and the bedrooms. 8. Automatic Lifts of (6 Passenger Capacity) KONE/or Equivalent make will be 9. Generator of adequate capacity connecting all the common lighting, lifts, motor pumps and all light & fan points inside the flat (except A/c. and Geyser) 10. One No.Concealed tube for internet connection will be provided. 11. Rain water harvesting shall be done.

8 8 / 34 Project Status Project Status as on 30th June 2015 CP & Sanitary fixing work is in progress

9 9 / 34 All Floor wood work is in progress. All Floor wood work is in progress Final stage finishing work is in progress

10 10 / 34 Final stage finishing work is in progress External 1st coat painting work is completed

11 11 / 34 Elevation Flat handing over is progress in (1 of 6) flats External 1 st coat painting work is completed. All Floor wood work is in progress. All floor main tile flooring work is completed. Outer Paver block work is completed. Compound wall and gate fixing work is completed. Final stage finishing work is in progress. CC Obtained. Metro & Drainage connection obtained. MES connection Obtained Project Status as on 18th June 2015 All floor wood work is in progress

12 12 / 34 Site view Staircase flooring work is completed Second and third floor interior work is in progress

13 13 / 34 Toilet wall cladding work is completed All floor wood work is in progress

14 14 / 34 All floor wood work is in progress Second and third floor interior work is in progress External 1 st coat painting work is completed. All Floor wood work is in progress. 1 st floor main tile flooring work is completed. 2 nd and 3 rd floor main tile flooring work is (90%) completed. Outer Paver block work is completed. Compound wall and gate fixing work is completed. Final stage finishing work is in progress. CC Obtained. Metro & Drainage connection obtained. MES connection Obtained. Project Status as on 6th June 2015

15 15 / 34 CP & Sanitary fixing work is in progress Elevation External Paver block work is completed

16 16 / 34 Terrace floor plumbing pipe fixing work is completed Final stage finishing work is in progress Final stage finishing work is in progress

17 17 / 34 Final stage finishing work is in progress All Floor wood work is in progress External 1 st coat painting work is completed. All Floor wood work is in progress. 1 st floor main tile flooring work is completed. 2 nd and 3 rd floor main tile flooring work is (90%) completed. Outer Paver block work is completed. Compound wall and gate fixing work is completed. Final stage finishing work is in progress. Elevation Tile fixing work is completed.

18 18 / 34 CC Obtained. Metro & Drainage connection obtained. MES connection Obtained. Project Status as on 25th May 2015 All Floor wood work is in progress Final stage finishing work is in progress

19 19 / 34 Final stage finishing work is in progress External 1st coat painting work is completed Final stage finishing work is in progress

20 20 / 34 Final stage finishing work is in progress Cp fittings fixing work is in progress

21 21 / 34 All Floor wood work is in progress All Floor wood work is in progress External 1 st coat painting work is completed. All Floor wood work is in progress. 1 st floor main tile flooring work is completed. 2 nd and 3 rd floor main tile flooring work is (90%) completed. Outer Paver block work is completed. Compound wall and gate fixing work is completed. Final stage finishing work is in progress. Elevation Tile fixing work is completed.

22 22 / 34 CC Obtained. Metro & Drainage connection obtained. MES connection Obtained. Project Status as on 16th May 2015 CP & sanitary fixing work is in progress Elevation Tile fixing work is completed

23 23 / 34 Elevation All Floor wood work is in progress

24 24 / 34 All Floor wood work is in progress Final stage finishing work is in progress External 1 st coat painting work is completed. All Floor wood work is in progress. 1 st floor main tile flooring work is completed. 2 nd and 3 rd floor main tile flooring work is (90%) completed. Outer Paver block work is completed. Compound wall and gate fixing work is completed. Final stage finishing work is in progress. Elevation Tile fixing work is completed.

25 25 / 34 CC Obtained. Metro & Drainage connection obtained. MES connection Obtained. Project Status as on 9th May 2015 All Floor wood work is in progress External 1st coat painting work is completed.

26 26 / 34 Outer Paver block work is completed 1st floor main tile flooring work is completed 1st floor main tile flooring work is completed

27 27 / 34 1st floor main tile flooring work is completed All Floor wood work is in progress External 1 st coat painting work is completed. All Floor wood work is in progress. 1 st floor main tile flooring work is completed. 2 nd and 3 rd floor main tile flooring work is (90%) completed. Outer Paver block work is completed. Compound wall and gate fixing work is completed. Final stage finishing work is in progress. Elevation Tile fixing work is completed. CC Obtained. Metro & Drainage connection obtained. MES connection Obtained. Project Status as on 5th May 2015

28 28 / 34 Balcony glass parapet work is completed 2nd and 3rd floor main tile flooring work is (90%) completed

29 29 / 34 All Floor wood work is in progress Final stage finishing work is in progress Final stage finishing work is in progress

30 30 / 34 Toilet Cp fitting fixing work is in progress Staircase hand rail work is completed

31 31 / 34 Elevation Outer Paver block work is completed External 1 st coat painting work is completed. All Floor wood work is in progress. 1 st floor main tile flooring work is completed. 2 nd and 3 rd floor main tile flooring work is (90%) completed. Outer Paver block work is completed. Compound wall and gate fixing work is completed. Final stage finishing work is in progress. Elevation Tile fixing work is completed. CC Obtained. Metro & Drainage connection obtained. MES connection Obtained. Project Status as on 7th April 2015

32 32 / 34 Site view Outer paver block work is in progress

33 33 / 34 Final stage finishing work is in progress Final stage finishing work is in progress Final stage finishing work is in progress External 1 st coat painting work is completed. All Floor wood work is in progress. 1 st floor main tile flooring work is completed. 2 nd and 3 rd floor main tile flooring work is (90%) completed. Terrace Floor plumbing work is completed. Outer Paver block work is in progress. Compound wall and gate fixing work is completed. Final stage finishing work is in progress. Elevation Tile fixing work is completed.

34 Powered by TCPDF ( 34 CC Obtained. Metro & Drainage connection obtained. MES connection Obtained. / 34