SAKIR ALMOROUJ k. For General Contracts Project Title :EPCC OF FLOW LINES & TRUNK LINES ( ) 4/28/

Size: px
Start display at page:

Download "SAKIR ALMOROUJ k. For General Contracts Project Title :EPCC OF FLOW LINES & TRUNK LINES ( ) 4/28/"

Transcription

1 MSK SAKIR ALMOROUJ k. For General Contracts PCH Project Title :EPCC OF FLOW LINES & TRUNK LINES ( ) 1

2 MSK-PCH-CONTRACT 2

3 1.Introduction FLOW LINES AND TRUNK LINES Project (the Project ) and Related System Project is carried out by MSK as EPC contractor for PetroChina International Iraq FZE according to letter of award dated on 27 Dec The project in handled in Halfaya Oil Field located 35 km southeast of Amarah city, Missan Governorate, southern part of the Republic of Iraq. MSK activities are performed based on signed service agreement with PetroChina for the period of four years until Project Location; The Halfaya Oil Field is situated in the Missan governorate of Iraq, 35 km southeast of Amarah city Client; PetroChina International Iraq FZE Iraq Branch Contractor; SAKIR ALMOUROJ K. FOR GENERAL CONTRACTS LTD (MSK) Project name; EPCC OF FLOW LINES & TRUNK LINES ( ) Project number; PRID-3680 HFY-CONF&C Service order number; SO01 Project Activities; A. Engineering B. Procurement C. Construction D. Testing E. Commissioning 3

4 1.1 HFY OIL FIELD MAP 4

5 1.2 Reference a) PCH and HALFAYA oilfield specifications and requirements b) Design Bases c) 0893 ITB Final PDF files d) The Project documents e) Overall Layout 5

6 2.Understanding the Scope of Work for the project. The Scope of work to be performed be Contractor is only for ENGINEERING AND CONSTRUCTION OF FLOWLINES AND TRUNKLINES ).This project consist of the followings as per section 4.0 from contract: 1. Flow lines and trunk lines 2. Civil works 3. Anticorrosion protection. 2.1 SCOPE OF WORK FOR (SO01) a) The flowlines shall be of carbon steel API 5L-PSL2- BNS/X52NS b) The flowline shall be buried together in common trench where they have the same route, the minimum cover of pipeline is 1200 mm (top of pipe) c) The estimated lengths of the flowlines will base on Location Plan of the respective well at the relevant Site 6

7 2.2 Scope & Quantities; No. Description Details Unit Quantity 1 Pipeline 6" with 3PE/3PP/FBE Coating m " with 3PE/3PP/FBE Coating m Road Crossing (Excavation method) 6" pipeline road crossing m 700 8" pipeline road crossing m Road Crossing (Jacking method) 6" pipeline road crossing m 700 8" pipeline road crossing m Road Crossing (Reserved Culvert) 6" pipeline road crossing m 700 8" pipeline road crossing m River/Channel Crossing (with excavation) 6" Pipeline River/Channel Crossing m 200 8" Pipeline River/Channel Crossing m 80 6 River/Channel/Road Crossing (HDD) 6" Pipeline River/Channel/Road Crossing m 450 8" Pipeline River/Channel/Road Crossing m Underground pipeline/cable crossing Pipeline crossing each 39 Cable crossing each 20 8 Anchor block m³ 20 9 Drying and Nitrogen filling 6" pipeline m 900 8" pipeline m 300

8 2.3 Overall Layout 8

9 3.Battery Limit PAD WELL WELLPADS &TIE-IN FLOWLINE TIE-IN & OGM EXPANSION NEW TL TIE-IN & CPF EXPANSION HF091 (Old HF082) M091 JK091D1 JK091D2 JK091D3 CONTRCATOR & PRID HF0853 (Old HF085) HF0397 (Old HF039) HF0888 (Old HF080) *HF0107 HF0478 (Old HF040) *HF0224 (Old HF0236) HF064 HF119 HF005 M0853D1 JK0853D1 JK0853D2 M0853D2 M0397D1 M0397D2 M0397D3 M0397D4 M0888D2 M0888 M0888D1 M0107D1 M0107D2 M0478D1 M0478D2 M0478D3 M0478D4 M0224D1 M0224D2 K0224H1 M064D1 M064D2 JK064 M119D2 JK005D1 MSK PRID-3680 SO01 9

10 4. Project Organization Chart 4.1 Project Management Organization MSK-PRID-3680-Project Manager Planner Inspection Supervisor Security Supervisor Engineering Coordinator Document Control Center (DCC) Accountent Construction Manager HSE Manager QC Manager Commissioning Supervisor 10

11 4. Project Organization Chart 4.2 Project Engineering Subcontractor ORG.Chart 11

12 4. Project Organization Chart 4.3 Project Procurement ORG.Chart HOME OFFICE HOME OFFICE ON SITE ON SITE 12

13 4. Project Organization Chart 4.4 Project Construction ORG.Chart Construction Manager Civil Engineer Piping Engineer Instruent Engineer Quality Engineer Testing Supervisor Workshop Supervisor Equipment Supervisor Surveyors HSE Supervisor Coating Supervisor 13

14 4. Project Organization Chart 4.5 Project QA/QC ORG.Chart 14

15 5-Project Milstones. Project Milstones.(Start Date) Service Order effective date:mar 20 nd 2018 Mobilization: 21-Apr-18 Engineering: 20-Mar-18 Construction-6 Pipeline & 8 Pipeline: 12-May-18 Commissioning and Demobilization: 28-Oct-18 15

16 6. Overall Project Execution Schedule for SO 01 Level 3 (Start Date & Finish Date) 16

17 6. 1 Engineering Execution Schedule Level 3 (Start Date & Finish Date) 17

18 7. Site Mobilization Plan (Man Power, Tools & Tackles, Camp, Machinery etc.) 7. 6 HISTOGRAM Chart Title Project Week Indirect Manpower Direct Manpower Equipment 18

19 8. Project Execution activities 8.1. TOPOGRAPHIC SURVEY 8.2 ENGINEERING 8.3 PROCUREMENT 8.4 CONSTRUCTION 8.5 COMMISIONING 19

20 8. Project Execution activities TYPICAL DRAWING FOR PIPELINES CROSSING 20

21 21

22 8. Project Execution activities A Typical Drawing Right of Way and Working Strip Dimensions 22

23 23

24 9.Project Control System The elements of project control system shall include: Work Breakdown Structure (WBS) for the project Project Execution Schedule Progress Measurement/Monitoring System Progress S Curve Manpower Histograms 24

25 Thank You for Your Attention 25