NOTIFICATION OF ADDENDUM ADDENDUM NO. 2 DATED 1/04/2019

Size: px
Start display at page:

Download "NOTIFICATION OF ADDENDUM ADDENDUM NO. 2 DATED 1/04/2019"

Transcription

1 NOTIFICATION OF ADDENDUM ADDENDUM NO. 2 DATED 1/04/2019 Control Project RMC Highway FM0383 County RUNNELS Ladies/Gentlemen: Attached please find an addendum on the above captioned project. Included in the attachment is an adendum notification which details the changes the respective proposal pages which were added / or changed. Except for new bid insert pages, it is unnecessary to return any of the pages attached. Bid insert pages must be returned with the bid proposal submitted to the Department, unless your firm is submitting a bid using a computer print out. The computer print out must be changed to reflect the new bid item information. Contractors material suppliers, etc. who have previously been furnished informational proposals are not being furnished a copy of the addendum. If you have a subcontractor on the above project, please advise them of this addendum. Acknowledgment of this addendum is not requested if your company has been issued a proposal stamped This Proposal Issued for Informational Purposes. You are required to acknowledge receipt of this addendum on the Addendum Acknowledgement form contained in your bid proposal by placing a mark in the box next to the respective addendum. Failure to Acknowledge receipt of this addendum in your bid proposal will result in your bid not being read. 04/99

2 SUBJECT: PLANS AND PROPOSAL ADDENDUMS PROJECT: RMC CONTROL: COUNTY: RUNNELS LETTING: 01/08/2019 REFERENCE NO: 0104 PROPOSAL ADDENDUMS _ PROPOSAL COVER X BID INSERTS (SH. NO.: (sheet 4-4) ) _ GENERAL NOTES (SH. NO.: ) _ SPEC LIST (SH. NO.: ) _ SPECIAL PROVISIONS: ADDED: DELETED: _ SPECIAL SPECIFICATIONS: ADDED: DELETED: X OTHER: Changed qty of bid items ( , , ) Added items ( ) DESCRIPTION OF ABOVE CHANGES (INCLUDING PLANS SHEET CHANGES) Plan sheet other changes 1-1

3 PROPOSAL SHEET Printed Name of Authorized Signer: Signature of Authorized Signer: Date: PROJECT RMC COUNTY RUNNELS ALT ITEM NO ITEM-CODE DESC CODE S.P. NO. UNIT BID PRICE ONLY. WRITTEN IN WORDS REMOVING CONC (RIPRAP) SUBGRADE WIDENING (ORD COMP) BLADING DRILL SEEDING (PERM) (RURAL) (CLAY) DRILL SEEDING (TEMP)(WARM OR COOL) PROOF ROLLING FL BS (CMP IN PLACE)(TY A GR 1-2)(8") REWRKING BS MATL (TY C)(10")(ORD COMP) PRIME COAT (MC-30) EMULS ASPH (EROSN CONT)(MULTI) Proposal Sheet TxDOT FORM 234-B I-61-5M UNIT APPROX QUANTITIES SY STA HR AC AC HR SY 74, SY 54, GAL 15, DEPT USE ONLY GAL 1,

4 PROJECT RMC COUNTY RUNNELS ALT ITEM NO ITEM-CODE DESC CODE S.P. NO ASPH (AC-20-5TR) AGGR(TY-PD GR-3 SAC-B) AGGR(TY-PD GR-4 SAC-B) CONC BOX CULV (7 FT X 3 FT)(EXTEND) RC PIPE (CL III)(30 IN) RC PIPE (CL III)(36 IN) SET (TY I)(S= 7 FT)(HW= 3 FT)(6:1) (P) SET (TY II) (30 IN) (RCP) (6: 1) (P) SET (TY II) (36 IN) (RCP) (6: 1) (P) CLEAN EXIST CULVERTS REMOV STR (WINGWALL) REMOV STR (HEADWALL) UNIT BID PRICE ONLY. WRITTEN IN WORDS Proposal Sheet TxDOT FORM 234-B I-61-5M UNIT APPROX QUANTITIES DEPT USE ONLY GAL 70, CY CY LF LF LF EA EA EA EA EA EA

5 PROJECT RMC COUNTY RUNNELS ALT ITEM NO ITEM-CODE DESC CODE S.P. NO MOBILIZATION BARRICADES, SIGNS AND TRAFFIC HAN- DLING CONSTRUCTION EXITS (INSTALL) (TY 1) CONSTRUCTION EXITS (REMOVE) BIODEG EROSN CONT LOGS (INSTL) (12") BIODEG EROSN CONT LOGS (REMOVE) REFL PAV MRK TY I (W)24"(SLD)(100MIL) REFL PAV MRK TY II (W) 4" (SLD) REFL PAV MRK TY II (Y) 4" (BRK) REFL PAV MRK TY II (Y) 4" (SLD) PAVEMENT SEALER 24" UNIT BID PRICE ONLY. WRITTEN IN WORDS REF PROF PAV MRK TY I(W)4"(SLD)(100MIL) Proposal Sheet TxDOT FORM 234-B I-61-5M UNIT APPROX QUANTITIES DEPT USE ONLY LS MO SY SY LF LF LF LF 75, LF 8, LF 13, LF LF 75,

6 PROJECT RMC COUNTY RUNNELS ALT ITEM NO ITEM-CODE DESC CODE S.P. NO REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL) REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL) REFL PAV MRKR TY II-A-A PREFORMED CENTERLINE RUMBLE STRIP TMA (STATIONARY) TMA (MOBILE OPERATION) UNIT BID PRICE ONLY. WRITTEN IN WORDS Proposal Sheet TxDOT FORM 234-B I-61-5M UNIT APPROX QUANTITIES DEPT USE ONLY LF 8, LF 13, EA LF 3, DAY DAY

7 RMC Addendum #2 Summary January 4, 2019 PLAN SHEET REVISIONS Removed unnecessary page names numbers at the bottom of sheet 2 Changed extentions to extensions, woodrow to windrow, removed CONTRACTOR IS RESPONSIBLE FOR PREPARING THE RIGHT OF WAY PRIOR TO CONSTRUCTION. THIS WORK WILL INCLUDE BUT IS NOT LIMITED TO TREE TRIMMING, MOWING, LITTER PICK-UP, AND CULVERT CLEANING. THIS WORK IS CONSIDERED SUBSIDIARY TO VARIOUS BID ITEMS. from sheet 3. Changed STA 0+00 TO STA to STA 0+00 TO STA on sheet 3 under EXISTING TYPICAL SECTION. Corrected controlsection-job number in header of sheets 4 5. Removed item 100 on sheet 5.Removed SHADOW VEHICLES SHOWN ON THE PLANS ARE REQUIRED.USE HIGH LEVEL WARNING FLAGS ON ADVANCE WARNING SIGNS DURING DAYTIME OPERATIONS.ONE-WAY TRAFFIC CONTROL WILL BE INCLUDED IN PAYMENT FOR THIS ITEM.PROVIDE FLAGGERS AT SUCH TIMES AND LOCATIONS AS DIRECTED TO ENSURE THE SAFE PASSAGE OF TRAFFIC THROUGH CONSTRUCTION AREAS. WHEN FLAGGERS ARE USED TO CONTROL TRAFFIC, FURNISH AND INSTALL SIGNS CW20-7 FLAGGER SYMBOL, CW20-7AD "FLAGGER AHEAD", AND CW3-4 BE PREPARED TO STOP. FLAGGERS SHALL USE 24 IN. STOP/SLOW PADDLES. TEMPORARILY RELOCATE EXISTING PERMANENT SIGN ASSEMBLIES TO TEMPORARY SUPPORTS AS SHOWN ON THE PLANS, OR AS DIRECTED.OMIT ADVANCE WARNING SIGNS AND FURNISH AND INSTALL REDUCED SIZE SIGNS CW20-1 ROAD WORK AHEAD MOUNTED BACK TO BACK WITH REDUCED SIZE SIGNS G20-2 END ROAD WORK SIGNS AT INTERSECTING CITY STREETS AND COUNTY ROADS. FURNISH AND INSTALL SIGNS CW20-1D ROAD WORK AHEAD, G20-1AT ROAD WORK NEXT X MILES, NEXT X MILES, AND G20-2 END ROAD WORK AT INTERSECTING STATE HIGHWAYS. IN ADDITION TO PROVIDING A CONTRACTOR S RESPONSIBLE PERSON AND A PHONE NUMBER FOR EMERGENCY CONTACT, HAVE EMPLOYEE(S) AVAILABLE TO RESPOND ON THE PROJECT FOR EMERGENCIES AND FOR TAKING CORRECTIVE MEASURES WITHIN 30 MINUTES.FILL ANY HOLES LEFT BY BARRICADE OR SIGN SUPPORTS AND RESTORE THE AREA TO ITS ORIGINAL CONDITION. from sheet 6 under item 502.Changed Provide a minimum of four rollers to Provide an adequate number of rollers on sheet 6 under item 316.Changed Provide a minimum of four rotary, self-propelled brooms to Provide an adequate number of rotary, self-propelled brooms on sheet 6 under item 316. Changed Remove existing roadside signs. Removal is not a pay item. Roadside signs will be reinstalled by State Forces to Roadside signs will be removed reinstalled by State Forces. on sheet 7 under item 644.Revised quantities of items , , , on sheets 9 12.Added item to sheets 9 12.Revised quantity of item on sheets 9 13.Added item to sheets 9 13.Removed sheet 14, added sheets 14a-14c Added Engineer s signature date to sheets 2-3, 15, 20-21, 55.Added sheet 54a.Removed Engineer s seal from sheet 56. PROPOSAL REVISIONS Changed quantity of item from 2,948 to 1,474. Added item with a quantity of 3.

8 PAGE NUMBER CLARIFICATION In the original submittal, the SUPERELEVATION TABLES spanned pages In Addendum 1, the SUPERELEVATION TABLES were numbered as 14a-14c. The change in page numbers has moved sheets up two pages, to The numbering system from Addendum 1 will remain for all Addendums Change Orders.