The Environmental Protection Specialists

Size: px
Start display at page:

Download "The Environmental Protection Specialists"

Transcription

1 The Environmental Protection Specialists National Plant Services, Inc., a Carylon Company Michelle Beason, PE Western Regional Manager

2 CLEANING INSPECTION REPAIR LARGE AND SMALL DIAMETER PIPE CLEANING ROOT REMOVAL WWTP CLEANING SERVICES LATERAL AND MAINLINE CCTV INSPECTION MULTI-SENSOR INSPECTIONS MANHOLE INSPECTIONS LATERAL LINING CENTRIFUGALLY CAST STRUCTURAL COATINGS GROUTING CIPP POINT REPAIRS

3 Tools to Assess Asset Condition Planning and Prioritization of Results Maintenance and Rehab Options with Project Examples

4

5 TYPES OF INSPECTION TECHNOLOGIES Basic Level CCTV Lateral Launch Pole Camera/Zoom Camera Manhole Inspections Other Inspections Smoke Testing Dye Testing Air Testing Man-entry/Visual Advanced Level High Definition CCTV Laser Sonar Combination Sonar/Laser/HDCCTV Profiling SL RAT Acoustical Testing

6 Wastewater Inspection Tools CCTV Cameras CCTV with Defect Coding Pan Tilt Zoom, or 360 degree cameras Multi Sensor Inspection (MSI) Cameras CCTV 3D or 2D laser Sonar 6

7 Why Laser and Sonar LASER Measure Ovality Measure Corrosion Measure large defects/cracks Help design rehab projects size of lining needed, etc SONAR Prioritize and Direct Cleaning Determine large defects in the pipe under water

8 CCTV vs Laser Profiling - Corrosion

9 CCTV vs Laser Profiling - Corrosion Corrosion to 41mm Surface Damage Noted by Operator Corrosion to the original pipe wall Corrosion to 7mm Surface Damage Noted by Operator

10 Key Benefits of Multi Sensor Inspection (CCTV, Laser, and Sonar) Quantification of pipe wall loss Extensive Detailed Engineered Reports Predict life expectancy of existing pipe Determine if Pipe Cleaning is necessary/ methodology Define exact debris quantities/ disposal costs Provide accurate data for rehabilitation methodology

11 TYPES OF LASER 3D LASER X, Y, AND Z WITH LOCATING 2D LASER X AND Y MEASUREMENTS DIODE LASERS 2 PRECISE LASERS THAT SPIN TO CREATE A SPIRAL SCAN. RING LASER RING OF LIGHT PROJECTED ON THE PIPE WALL, CAMERA RECORDS LIGHT RING, THEN A MEASUREMENT GRID IS USED TO COMPUTE PIPE DIMENSIONS.

12 3D LASER These lasers take hundreds of thousands of measurements in every direction as the platform moves throughout the pipe. Measures corrosion levels, ovality, deflection, and can measure large defects. Custom A-Zoom HD Pan-tilt camera Accuracy from 1/16 Inspects 30 and larger pipelines.

13

14

15 BUILDUP, CORROSION, AND OVALITY EXPORT TO EXCEL

16 SONAR ONLY WORKS UNDER WATER USED TO INSPECT UNDER THE WATER LINE IN SIPHONS AND INTERCEPTORS

17

18 SONAR HEAD DEPLOYMENT CAGE

19 ACTUAL SONAR SCAN MPEG RELATIVELY CLEAN SIPHON SIPHON WITH SIGNIFICANT DEBRIS We process this sonar data and provide debris quantities at each location. MPEG sonar movies are also provided for import into your asset management system.

20

21

22

23

24

25

26 EXAMPLE OF COMBINED PACP WITH SONAR/LASER RESULTS

27

28

29 Levels of Trenchless Repair and Rehabilitation MAINLINES Maintenance/Point Repairs Injection Grouting CIPP Point Repairs Manhole to Manhole Rehab CIPP UV Lining Cemenitious structural coatings Slip Lining Glass Reinforced Plastics MANHOLES Maintenance/Point Repairs Injection Grouting Protective Coatings (Epoxy) Liners CIPP Lining Cementitious structural coating/lining.

30 WHAT DO I DO WHEN?

31

32 TESTING AND SEALING TO STOP INFILTRATION 32

33 Injection Grouting 33

34

35 MANUAL GROUTING

36 GROUTING KEYS TO SUCCESS Pipe must be cleaned first to provide a good seal for the packer. Air test the joint first to make sure it needs grout, unless you are certain. Set the appropriate gel time per size of pipe, and degree of infiltration. CCTV camera must be watching and recording all grouting work. Coding of results in CCTV software. If roots are an issue, add root inhibitor to the grout mix. Use the correct kind of grout for the job (acrylamide, foam, etc). Don t use as a permanent fix for structural issues (breaks). Bid schedules should include setup charge, air test fee, and gallons of grout used.

37

38 Trenchless CIPP Short Liners Resin-impregnated fiberglass, typically in 3-foot long sections.

39 Trenchless CIPP Short Liners Short liner spot repairs to rehabilitate holes, cracks and eliminate sources of heavy infiltration. Can overlap several liners to fix a longer problem area. 39

40 CIPP POINT REPAIRS KEYS TO SUCCESS Pipe must be cleaned of debris and large roots prior to repairs. Any runner or gusher infiltration should be grouted prior to repair. Do a pre-inspection so you know the diameter and length of repair needed, along with precise locations. Do not use if the pipe is collapsed (deformed shape is fine). Compare cost of doing multiple point repairs vs. lining the entire segment.

41

42 Exceptional bonds to Host Surfaces Early high Strength System - initial set 150 minutes - final set 240 minutes - compressive strength 3,000 Psi (24 hours) - compressive strength 8,000 Psi (28 days) Extremely Dense seamless Liner - water tight - no joints Resistance to - abrasion and corrosion - freeze/thaw cycling - chloride penetration Manning s n value City of Chicago - Worlds Largest ManHole Rehabilitation Project AP/M Permacast Lined ManHole Remains intact (and reused) after 21 of rainfall collapsed the Street Time Tested and Performance Proven Technology

43 ENGINEERED MORTAR SYSTEMS High Strength High Density Watertight Mortars

44 THE APM PERMAFORM PRODUCTS PL-8000 STRUCTURAL PIPE WALL COATING PL INVERT REPAIR MORTAR MS MANHOLE REHAB MORTAR

45 CentriPipe Installation Equipment CentriPipe Bi-Directional Spincaster Mortar Mixer Pump Assembly CentriPipe Retrieval Sled Hydraulic Cable Winch Support Equipment (375 CFM Compressor not Shown)

46 Conforms to Host Shapes Minimizing area Reduction Before After

47 Clean Out Repairs to Host Pipe and Chemical Grouting Divert Water Inflow Rebuild Invert CentriPipe Liner Thickness Ball Park Costs = $ 5.00 to $ Inch Diameter/Foot

48 Set up a work canopy with air filter to capture the dust.

49 Project #1: Rockland NY Interceptor, 36, 750 feet long Portions of the crown were completely gone. Steel bands were put over the voids and secured with masonry anchors. Structural grout injected behind steel. Finished result was a new concrete pipe.

50 Project #2 Pua Nani Storm Drain Rehab Lihue, Kauai. 800 LF OF 84 CMP Completed September 2018

51 96 PALLETS DELIVERED IN 8 CONTAINERS VIA SHIP

52

53

54

55

56 SFPUC Box Sewer Rehab, Drumm/Jackson Street October 2018

57 Self-Healing Concrete from Crystal X additive

58 Cementitious Coatings Keys to Success Know the groundwater conditions, and assume the worst! Make sure bedding around the pipe is sound, or add a contingency for stabilizing it. Ensure all cleaning, prep-work, and grouting is done prior to coating. Ensure bypass is in place and in good working order. Set guide wires or screws to ensure design thickness is reached. Set up a containment system to ensure silica dust is captured and doesn t migrate to the public. Use a sealing/curing compound after the last coat to provide a slower cure with slower water loss to prevent cracking. Make C109 cube samples per the standard requirements and perform 24 hr, 7 day, and 28 day break tests to ensure material meets specifications.

59

60 REE400 6 through 24 RELINEUV GROUP Pipe Rehabilitation Technology Portable configuration REE through 48 Portable and Professional configurations REE through 72 Portable and Professional configurations Creating high performance pipe rehabilitation technologies

61 Light trains Creating high performance pipe rehabilitation technologies

62 World Leading Technology Provider Creating high performance pipe rehabilitation technologies

63 RELINEUV GROUP Pipe Rehabilitation Technology Liners delivered worldwide no refrigeration required up to 6 month storage Creating high performance pipe rehabilitation technologies

64 RELINEUV GROUP Pipe Rehabilitation Technology Alphaliner500 G workhorse design Fleece-laminated wrap film for higher density Excellent mechanical properties Up to 1,923,929 psi Wear layer made from glass with triple safety Increases transparency Overall system With Improved elasticity Creating High Performance Pipe Rehab Technology

65 Installation for larger liners utilizing RELINE UV s powered conveyor Creating high performance pipe rehabilitation technologies

66 Dezember 18

67 June 2016 Don't coat, line What is VERTILINER?.. short and sweet. An innovative liner system utilizing RELINE UV Composite materials Seamless, one-piece fibreglass reinforced impregnated with resin Pre-assembled in the factory Hardening with UV light Custom dimensions available

68 June 2016 Don't coat, line What can VERTILINER renovate?... broad range of dimensions and high material quality standard. Dimensions Diameter Length up to max. 36 feet Shaft shapes / cone types Round, rectangular, ovoid Mini cone, cover plates Material Unsaturated polyester resin Vinyl ester resin ECR glass

69 June 2016 Don't coat, line What can be renovated?. custom shaft shapes and cone types.

70 June 2016 Don't coat, line How is VERTILINER installed?.. using specialised equipment.

71 June 2016 Don't coat, line What will the customer see after renovation?.. visual and technical perfection

72 June 2016 Don't coat, line What will the customer see after renovation?.. visual and technical perfection before after

73 UV LINING KEYS TO SUCCESS Pre-inspect to verify length, diameter, and laterals to reinstate. Outer foil on liner is the UV protectant (100 mill HDPE) so wont tear liner. This means less prep work to host pipe. Grout major gushers down to drippers as large volumes of water can be trapped behind the liner as the end of the liner inflate first. You always TV right before you cure the UV liner UV protective sheath on the outside protects from light. Material has a 6 month shelf life. TQM controlled and factory set for curing from material contruction through install RFID cue code is read by machine which operates the pressure and light for that liner. Printout for QA/QC generated after the install showing ballast to each light, overall time/speed Final file is reviewed by the factory and they will certify liner was installed per spec.

74