1 ADDENDUM NO. 6 5TH STREET BRIDGE REPLACEMENT PROJECT CONTRACT JUNE 22, 2017 OWNER City of Yuba City 1201 Civic Center Blvd Yuba City CA (530) (530) (Fax) GENERAL Scope A. This Addendum forms a part of the bidding and contract documents and modifies the Project Specifications and Project Plans described below. B. This Addendum consists of 46 pages. Acknowledgment A. Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to acknowledge this addendum may result in rejection of bid. THE FOLLOWING PROJECT PLAN SHEETS ARE REVISED AND ATTACHED: Sheets 62, 66-69, and 126. Substitute for the like-numbered sheet. BOOK 1 BID BOOK IS MODIFIED AS FOLLOWS: The following items have been replaced since the original Bid Documents: Bid Items 21, 22, 25, 35, 44, 49, 72, 79, 83, 89, 90, 95, 96, 98, 100, 114, 124, 135, 140, 141, 144, 149, 150, 152, 154, 155, 168, 193, 194,196, 220, 229, 241, 249, and 274. Bid item 33A, 96A and 144A are added. Replace the Bid Item List on pages 3-10 and pages with: 1

2 5TH STREET BRIDGE REPLACEMENT PROJECT CONTRACT NO BID ITEM LIST ITEM ITEM P- ITEM UNIT OF ESTIMATED UNIT ITEM NO. CODE F MEASURE QUANTITY PRICE TOTAL LEAD COMPLIANCE PLAN LS PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS DEVELOP WATER SUPPLY LS CONSTRUCTION AREA SIGNS LS TRAFFIC CONTROL SYSTEM LS TYPE III BARRICADE EA TEMPORARY PAVEMENT MARKING (PAINT) SQFT 5, TEMPORARY TRAFFIC STRIPE (PAINT) LF 140, PORTABLE DELINEATOR EA 1, TEMPORARY PAVEMENT MARKER EA 2, PORTABLE TEMPORARY SIGNAL ( BRIDGE/EB ON RAMP TO 5th ST AND SECOND ST AND BRIDGE ST) VOID EA PORTABLE CHANGEABLE MESSAGE SIGN EA TEMPORARY RAILING (TYPE K) LF 14, TEMPORARY CRASH CUSHION MODULE EA 164 2

3 ITEM ITEM P- ITEM UNIT OF ESTIMATED UNIT ITEM NO. CODE F MEASURE QUANTITY PRICE TOTAL TEMPORARY ALTERNATIVE CRASH CUSHION EA JOB SITE MANAGEMENT LS PREPARE STORM WATER POLLUTION PREVENTION PLAN LS RAIN EVENT ACTION PLAN EA STORM WATER SAMPLING AND ANALYSIS DAY EA STORM WATER ANNUAL REPORT EA TEMPORARY HYDROSEED SQYD 55, TEMPORARY DRAINAGE INLET PROTECTION EA TEMPORARY FIBER ROLL LF 20, TEMPORARY GRAVEL BAG BERM LF TEMPORARY CONSTRUCTION ENTRANCE EA STREET SWEEPING LS TEMPORARY ACTIVE TREATMENT SYSTEM LS TEMPORARY CONCRETE WASHOUT LS WATER QUALITY SAMPLING AND ANALYSIS DAY VOID EA WATER QUALITY MONITORING REPORT EA WATER QUALITY ANNUAL REPORT EA ASBESTOS COMPLIANCE PLAN LS 1 3

4 ITEM ITEM P- ITEM UNIT OF ESTIMATED UNIT ITEM NO. CODE F MEASURE QUANTITY PRICE TOTAL CONTRACTOR SUPPLIED QUALIFIED SWALLOW BIOLOGIST AND QUALIFIED BIRD EXCLUSION EXPERT LS 1 33A AIR BUBBLE CURTAIN SYSTEM LS REMOVE BOLLARD EA REMOVE 4" PVC (WATER) LF REMOVE STOP LOG SYSTEM LF REMOVE CONCRETE PAVEMENT (SQYD) SQYD REMOVE CONCRETE SIGN FOUNDATION EA REMOVE STEEL AND CONCRETE (MISCELLANEOUS)(CY) CY TEMPORARY HIGH VISIBILITY FENCE LF 5, RESIDENT ENGINEERS OFFICE LS REMOVE TREE (10" 24") EA CLEARING AND GRUBBING (LS) LS REMOVE TREE (25" 36") EA REMOVE TREE (> 36") EA ROADWAY EXCAVATION CY 54, ROADWAY EXCAVATION (UNSUITABLE MATERIAL) VOID CY F STRUCTURE EXCAVATION (BRIDGE) CY 7,068 4

5 ITEM ITEM P- ITEM UNIT OF ESTIMATED UNIT ITEM NO. CODE F MEASURE QUANTITY PRICE TOTAL STRUCTURE EXCAVATION (TYPE D) CY F STRUCTURE EXCAVATION (RETAINING WALL) CY 2, SAND BEDDING CY F STRUCTURE BACKFILL (BRIDGE) CY F STRUCTURE BACKFILL (RETAINING WALL) CY 4, F STRUCTURE BACKFILL (LEVEE FILL) CY 5, F PERVIOUS BACKFILL (RETAINING WALL) CY F 2" 4" GRAVEL CY DITCH EXCAVATION CY 2, LEVEE MATERIAL IMPORT BORROW CY 4, WEED GERMINATION SQYD 12, IRON SULFATE (LB) LB 657 VOID SOIL AMENDMENT CY RELOCATE BACKFLOW PREVENTER ASSEMBLY EA PACKET FERTILIZER EA 6, SLOW RELEASE FERTILIZER LB PLANT (GROUP K) 24" BOX EA PLANT (GROUP A) EA 2, PLANT ESTABLISHMENT WORK (1 YEAR) LS 1 5

6 ITEM ITEM P- ITEM UNIT OF ESTIMATED UNIT ITEM NO. CODE F MEASURE QUANTITY PRICE TOTAL ROCK MULCH (RETENTION BASIN) LS DECOMPOSED GRANITE SQFT 6, WOOD MULCH CY 1, RIVER COBBLE SET IN CONCRETE SQFT 4, BOULDERS LS ROOT BARRIER LF CONTROL AND NEUTRAL CONDUCTORS LS " REMOTE CONTROL VALVE EA /2" REMOTE CONTROL VALVE EA " REMOTE CONTROL VALVE EA STATION IRRIGATION CONTROLLER AND ENCLOSURE (ICC 'B') 24 STATION IRRIGATION CONTROLLER AND ENCLOSURE (ICC 'A', 'C' & 'D') EA 1 EA P F 1" SUPPLY LINE (COPPER PIPE) LF P F 2" SUPPLY LINE (COPPER PIPE) LF " POTABLE WATER CONNECTION ASSEMBLY AND ENCLOSURE VOID EA CONNECT TO EXISTING IRRIGATION MAILINE EA FLOW SENSOR EA 3 6

7 ITEM ITEM P- ITEM UNIT OF ESTIMATED UNIT ITEM NO. CODE F MEASURE QUANTITY PRICE TOTAL TREE WELL SPRINKLER ASSEMBLY (C 2 Mod) EA RISER SPRINKLER ASSEMBLY (GEAR DRIVEN) (A 5, A 7, A 11) POP UP SPRINKLER ASSEMBLY (GEAR DRIVEN) (A 6, A 8, A 12) POP UP SPRINKLER ASSEMBLY (SHRUB SPRAY) (B 1) EA 19 EA 302 EA " GATE VALVE EA P 8" GATE VALVE EA /4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) LF 8, " PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) LF 1, /4"PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) 1 1/2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) LF 1,150 LF " PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) LF 1, " PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) LF A " CORRUGATED HIGH DENSITY POLYETHYLENE PIPE CONDUIT VOID LF " PLASTIC PIPE (CLASS 315) (SUPPLY LINE) LF 4, " PVC PIPE CONDUIT (SLEEVE) LF 206 7

8 ITEM ITEM P- ITEM UNIT OF ESTIMATED UNIT ITEM NO. CODE F MEASURE QUANTITY PRICE TOTAL FIBER ROLLS LF 10, HYDROSEED SQFT 400, CLASS 2 AGGREGATE BASE (CY) CY 20, CEMENT TREATED BASE (ROAD MIXED, CLASS A)(CY) CY 5, PULVERIZED ROADBED SQYD 4, HIGH FRICTION SURFACE TREATMENT SQYD SLURRY SEAL TON REPLACE ASPHALT CONCRETE PAVEMENT CY HOT MIX ASPHALT (TYPE A) TON 16, PLACE HOT MIX ASPHALT DIKE (TYPE A) LF PLACE HOT MIX ASPHALT DIKE (TYPE E) LF PLACE HOT MIX ASPHALT OVERSIDE DRAIN EA REMOVE ASPHALT CONCRETE PAVEMENT (SQFT) SQFT 58, REMOVE ASPHALT CONCRETE DIKE LF COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD CONTINUOUSLY REINFORCED CONCRETE PAVEMENT VOID CY DRILL AND BOND (DOWEL BAR) EA 60 8

9 ITEM ITEM P- ITEM UNIT OF ESTIMATED UNIT ITEM NO. CODE F MEASURE QUANTITY PRICE TOTAL F ROCKERY RETAINING WALL CY BRIDGE TRESTLE LS TEMPORARY SHORING (5TH STREET BRIDGE) LS TEMPORARY SHORING (2ND STREET UC) LS TEMPORARY SHORING (ROADWAY) LS TEMPORARY PEDESTRIAN STAIRCASE LS " PERMANENT STEEL PILE CASING LF " CAST IN DRILLED HOLE CONCRETE PILING LF 5, " CAST IN DRILLED HOLE CONCRETE PILING LF P FURNISH PILING (CLASS 200) LF 4, DRIVE PILE (CLASS 200) EA P PRESTRESSING CAST IN PLACE CONCRETE LS F STRUCTURE CONCRETE, BRIDGE FOOTING CY F STRUCTURAL CONCRETE, BRIDGE CY 12, F STRUCTURAL CONCRETE, BRIDGE (POLYMER FIBER) VOID CY 4, F STRUCTURAL CONCRETE, RETAINING WALL CY F STRUCTURAL CONCRETE, APPROACH SLAB CY F STRUCTURAL CONCRETE, APPROACH SLAB CY 498 9

10 ITEM ITEM P- ITEM UNIT OF ESTIMATED UNIT ITEM NO. CODE F MEASURE QUANTITY PRICE TOTAL (TYPE N) F STRUCTURAL CONCRETE, HEADWALL CY F MINOR CONCRETE (MINOR STRUCTURE) CY F MINOR CONCRETE (BACKFILL) CY F ARCHITECTURAL TREATMENT SQFT DECORATIVE STEEL LB DRILL AND BOND DOWEL LF P F P F FURNISH PRECAST PRESTRESSED PRESTRESSED CONCRETE CA WIDE FLANGE GIRDER (140' 150') FURNISH PRECAST PRESTRESSED PRESTRESSED CONCRETE CA WIDE FLANGE GIRDER (150' 160') EA EA VOID F ERECT PRECAST CONCRETE GIRDER EA TEMPORARY HINGE DEAD WEIGHT LS P PTFE BEARING EA A P PTFE SHERICAL BEARING EA P JOINT SEAL ASSEMBLY (MR 4") LF P JOINT SEAL (MR 2") LF JOINT SEAL (TYPE A) LF P JOINT SEAL ASSEMBLY (MR 9") LF

11 ITEM ITEM P- ITEM UNIT OF ESTIMATED UNIT ITEM NO. CODE F MEASURE QUANTITY PRICE TOTAL P F BAR REINFORCING STEEL (BRIDGE) LB 5,636, P F BAR REINFORCING STEEL (RETAINING WALL) LB 211, PEDESTRIAN BARRICADE (TYPE A) EA RECONSTRUCT REMOVE RETAINING WALL (MASONRY WALL) LF F SOUND WALL (REINFORCED CONCRETE) SQFT VIBRATION MONITORING LS REMOVE RETAINING WALL (LF) LF BRIDGE REMOVAL (UPR No. 18C 0023) LS BRIDGE REMOVAL (UPR No. 18C 0018) LS BRIDGE REMOVAL (5th STREET No. 18C 0012) LS BRIDGE REMOVAL (2nd STREET No. 18C 0055) LS P F MISCELLANEOUS METAL (RESTRAINER CABLE TYPE) VOID LB 8, P 4" PLASTIC PIPE (SEWER) LF P 4" PLASTIC PIPE (WATER) LF P 4" PLASTIC PIPE (COMMUNICATIONS) LF 2, P 18" REINFORCED CONCRETE PIPE LF 6, P 24" REINFORCED CONCRETE PIPE LF P 30" REINFORCED CONCRETE PIPE LF

12 ITEM ITEM P- ITEM UNIT OF ESTIMATED UNIT ITEM NO. CODE F MEASURE QUANTITY PRICE TOTAL P 36" REINFORCED CONCRETE PIPE LF P 6" PERFORATED STEEL PIPE UNDERDRAIN LF " CORRUGATED STEEL PIPE RISER (0.109" THICK) LF WELDED STEEL PIPE CASING (BRIDGE) LF " WELDED STEEL PIPE CASING (BRIDGE) LF " WELDED STEEL PIPE CASING (BRIDGE) LF P 8" WELDED STEEL PIPE (.134" THICK) LF P 12" COATED WELDED STEEL PIPE (0.25" THICK)(BRIDGE) LF 2, " CONCRETE FLARED END SECTION EA SHALLOW MANHOLE EA MANHOLE EA 14 VOID ABANDON MANHOLE EA ABANDON PIPELINE EA REMOVE PIPE (LF) LF 1, REMOVE INLET EA REMOVE HEADWALL EA REMOVE MANHOLE EA REMODEL MANHOLE EA 3 12

13 ITEM ITEM P- ITEM UNIT OF ESTIMATED UNIT ITEM NO. CODE F MEASURE QUANTITY PRICE TOTAL ADJUST MANHOLE TO GRADE EA ADJUST VALVE BOX EA REMOVE SEWER PIPE LF F F REMOVE AND REPLACE ROCK SLOPE PROTECTION ROCK SLOPE PROTECTION (LIGHT, METHOD B) (CY) ROCK SLOPE PROTECTION (NO. 2, METHOD B)(CY) LS 1 CY 1,660 CY CONCRETE (CHANNEL LINING) CY SLOPE PAVING (CONCRETE) CY P ROCK SLOPE PROTECTION FABRIC (CLASS 8) SQYD 5, P FILTER FABRIC SY 165 VOID MINOR CONCRETE (TALL RETAINING CURB) LF F MINOR CONCRETE (CURB) (CY) CY MINOR CONCRETE (GUTTER) (LF) LF F MINOR CONCRETE (GUTTER) (CY) CY DETECTABLE WARNING SURFACE SQFT F MINOR CONCRETE (CURB AND GUTTER) CY F MINOR CONCRETE (DRIVEWAY) CY

14 ITEM ITEM P- ITEM UNIT OF ESTIMATED UNIT ITEM NO. CODE F MEASURE QUANTITY PRICE TOTAL F MINOR CONCRETE (SIDEWALK) CY MINOR CONCRETE (TEXTURED PAVING) CY F MINOR CONCRETE (CURB RAMP) CY REMOVE CONCRETE CURB (LF) LF 1, REMOVE CONCRETE (CURB AND GUTTER) LF 5, REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (LF) LF 4, P F MISCELLANEOUS IRON AND STEEL LB 27, UNDERSIDEWALK DRAIN EA MISCELLANEOUS METAL (BRIDGE) LB 2, P F BRIDGE DECK DRAINAGE SYSTEM LB 60, DESTROY WELL EA WATERLINE CRADLE EA DUCT BANK CRADLE EA CURED IN PLACE PIPELINER LF P 4" PLASTIC PIPE (COMMUNICATIONS) (IN BRIDGE) VOID LF 21, RESET FIRE HYDRANT EA P FIRE HYDRANT EA DOUBLE BALL EXPANSION JOINT EA 2 14

15 ITEM ITEM P- ITEM UNIT OF ESTIMATED UNIT ITEM NO. CODE F MEASURE QUANTITY PRICE TOTAL ADJUST MONITORING WELL TO GRADE EA SINGLE BALL EXPANSION JOINT EA PIPE BOLLARD EA " DUCTILE IRON PIPE LF 2, " DUCTILE IRON PIPE (APPROACH) LF AIR RELEASE VALVE EA PARKING BUMPER (PRECAST CONCRETE) EA CONTRACTOR SUPPLIED GENERATOR DAY PIPE FENCE LF TEMPORARY FENCE (TYPE CL 6) LF 2, ' TEMPORARY GATE (TYPE CL 6) EA P CHAIN LINK FENCE (TYPE CL 4, VINYL CLAD) LF 110 VOID P CHAIN LINK FENCE (TYPE CL 6, VINYL CLAD) LF P CHAIN LINK FENCE (TYPE CL 6, BREAK AWAY) LF 1, P PIPE GATE EA P 4' CHAIN LINK GATE (TYPE CL 6) EA P 10' CHAIN LINK GATE (TYPE CL 6) EA P 14' CHAIN LINK GATE (TYPE CL 6) EA REMOVE FENCE LF

16 ITEM ITEM P- ITEM UNIT OF ESTIMATED UNIT ITEM NO. CODE F MEASURE QUANTITY PRICE TOTAL REMOVE GATE EA P RECONSTRUCT FENCE LF RECONSTRUCT AND PAINT FENCE (PIPE RAILING) LF REMOVE PAVEMENT MARKER EA 1, REMOVE CHANNELIZERS EA TEMPORARY DELINEATOR (CLASS 1)(SURFACE MOUNTED) EA P PAVEMENT MARKER (RETROREFLECTIVE) EA 1, OBJECT MARKER (TYPE N) EA OBJECT MARKER (TYPE P) EA OBJECT MARKER (TYPE R) EA REMOVE RELOCATE MONUMENT SIGN EA REMOVE ROADSIDE SIGN EA RESET ROADSIDE SIGN EA FURNISH SINGLE SHEET ALUMINUM SIGN (0.063" UNFRAMED) SQFT ROADSIDE SIGN ONE POST EA ROADSIDE SIGN TWO POST EA INSTALL SIGN (STRAP AND SADDLE BRACKET METHOD) VOID EA 7 16

17 ITEM ITEM P- ITEM UNIT OF ESTIMATED UNIT ITEM NO. CODE F MEASURE QUANTITY PRICE TOTAL BRIDGE PLAQUES EA STEEL PICKET RAILING LF P F PIPE HANDRAILING LF P F STAIRWAY RAILING LF P F TUBULAR HAND RAILING LF 2, P TRANSITION RAILING (TYPE WB 31) EA ALTERNATIVE FLARED TERMINAL SYSTEM EA CRASH CUSHION EA CONCRETE BARRIER (TYPE 60) LF F CONCRETE BARRIER (TYPE 60A) LF 2, CONCRETE BARRIER (TYPE 60C) LF CONCRETE BARRIER (TYPE 60D) LF 140 VOID CONCRETE BARRIER (TYPE 60C MOD) LF F CONCRETE BARRIER (TYPE 736) LF F CONCRETE BARRIER (TYPE 742) (MOD) LF 2, F CONCRETE BARRIER (TYPE 742B MOD) LF REMOVABLE BARRIER EA F CONCRETE BARRIER (C412B) LF F CONCRETE BARRIER (C412) LF 4,097 17

18 ITEM ITEM P- ITEM UNIT OF ESTIMATED UNIT ITEM NO. CODE F MEASURE QUANTITY PRICE TOTAL REMOVE GUARDRAIL LF THERMOPLASTIC TRAFFIC STRIPE LF 50, THERMOPLASTIC PAVEMENT MARKING SQFT 5, PAINT TRAFFIC STRIPE (2 COAT) LF 13, REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 2, REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT P BRIDGE AND STREET LIGHTING LS P TRAFFIC SIGNAL (5th St/J St) LS P TRAFFIC SIGNAL (Sutter St/5th St On Off Ramp) LS P TRAFFIC SIGNAL (Second St /Bridge St) LS INTERCONNECTION CONDUIT AND CABLE (LS) LS TEMPORARY LIGHTING (SECOND STREET AND BRIDGE STREET) LS MOBILIZATION LS 1 Items designated with a "F" indicate final pay item. Items designated with a "P" indicate the item is eligible for progress payment TOTAL AMOUNT BID = VOID THE BIDDER'S EXECUTION ON THE SIGNATURE PORTION OF THIS PROPOSAL SHALL ALSO CONSTITUTE AN ENDORSEMENT AND EXECUTION OF THOSE CERTIFICATIONS WHICH ARE A PART OF THIS PROPOSAL 18

19 BOOK 2 NOTICE TO BIDDERS AND SPECIAL PROVISIONS IS MODIFIED AS FOLLOWS: Replace the Bid Item List on pages with: 5TH STREET BRIDGE REPLACEMENT PROJECT CONTRACT NO BID ITEM LIST ITEM ITEM P- ITEM UNIT OF ESTIMATED NO. CODE F MEASURE QUANTITY LEAD COMPLIANCE PLAN LS PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS DEVELOP WATER SUPPLY LS CONSTRUCTION AREA SIGNS LS TRAFFIC CONTROL SYSTEM LS TYPE III BARRICADE EA TEMPORARY PAVEMENT MARKING (PAINT) SQFT 5, TEMPORARY TRAFFIC STRIPE (PAINT) LF 140, PORTABLE DELINEATOR EA 1, TEMPORARY PAVEMENT MARKER EA 2, PORTABLE TEMPORARY SIGNAL ( BRIDGE/EB ON RAMP TO 5th ST AND SECOND ST AND BRIDGE ST) EA PORTABLE CHANGEABLE MESSAGE SIGN EA TEMPORARY RAILING (TYPE K) LF 14, TEMPORARY CRASH CUSHION MODULE EA TEMPORARY ALTERNATIVE CRASH CUSHION EA JOB SITE MANAGEMENT LS PREPARE STORM WATER POLLUTION PREVENTION PLAN LS 1 19

20 ITEM ITEM P- ITEM UNIT OF ESTIMATED NO. CODE F MEASURE QUANTITY RAIN EVENT ACTION PLAN EA STORM WATER SAMPLING AND ANALYSIS DAY EA STORM WATER ANNUAL REPORT EA TEMPORARY HYDROSEED SQYD 55, TEMPORARY DRAINAGE INLET PROTECTION EA TEMPORARY FIBER ROLL LF 20, TEMPORARY GRAVEL BAG BERM LF TEMPORARY CONSTRUCTION ENTRANCE EA STREET SWEEPING LS TEMPORARY ACTIVE TREATMENT SYSTEM LS TEMPORARY CONCRETE WASHOUT LS WATER QUALITY SAMPLING AND ANALYSIS DAY 20 EA WATER QUALITY MONITORING REPORT EA WATER QUALITY ANNUAL REPORT EA ASBESTOS COMPLIANCE PLAN LS CONTRACTOR SUPPLIED QUALIFIED SWALLOW BIOLOGIST AND QUALIFIED BIRD EXCLUSION EXPERT LS 1 33A AIR BUBBLE CURTAIN SYSTEM LS REMOVE BOLLARD EA REMOVE 4" PVC (WATER) LF REMOVE STOP LOG SYSTEM LF REMOVE CONCRETE PAVEMENT (SQYD) SQYD REMOVE CONCRETE SIGN FOUNDATION EA REMOVE STEEL AND CONCRETE (MISCELLANEOUS)(CY) CY TEMPORARY HIGH VISIBILITY FENCE LF 5, RESIDENT ENGINEERS OFFICE LS REMOVE TREE (10" 24") EA 100

21 ITEM ITEM P- ITEM UNIT OF ESTIMATED NO. CODE F MEASURE QUANTITY CLEARING AND GRUBBING (LS) LS REMOVE TREE (25" 36") EA REMOVE TREE (> 36") EA ROADWAY EXCAVATION CY 54, ROADWAY EXCAVATION (UNSUITABLE MATERIAL) 21 CY F STRUCTURE EXCAVATION (BRIDGE) CY 7, STRUCTURE EXCAVATION (TYPE D) CY F STRUCTURE EXCAVATION (RETAINING WALL) CY 2, SAND BEDDING CY F STRUCTURE BACKFILL (BRIDGE) CY F STRUCTURE BACKFILL (RETAINING WALL) CY 4, F STRUCTURE BACKFILL (LEVEE FILL) CY 5, F PERVIOUS BACKFILL (RETAINING WALL) CY F 2" 4" GRAVEL CY DITCH EXCAVATION CY 2, LEVEE MATERIAL IMPORT BORROW CY 4, WEED GERMINATION SQYD 12, IRON SULFATE (LB) LB SOIL AMENDMENT CY RELOCATE BACKFLOW PREVENTER ASSEMBLY EA PACKET FERTILIZER EA 6, SLOW RELEASE FERTILIZER LB PLANT (GROUP K) 24" BOX EA PLANT (GROUP A) EA 2, PLANT ESTABLISHMENT WORK (1 YEAR) LS ROCK MULCH (RETENTION BASIN) LS DECOMPOSED GRANITE SQFT 6, WOOD MULCH CY 1,100

22 ITEM ITEM P- ITEM UNIT OF ESTIMATED NO. CODE F MEASURE QUANTITY RIVER COBBLE SET IN CONCRETE SQFT 4, BOULDERS LS ROOT BARRIER LF CONTROL AND NEUTRAL CONDUCTORS LS " REMOTE CONTROL VALVE EA /2" REMOTE CONTROL VALVE EA " REMOTE CONTROL VALVE EA STATION IRRIGATION CONTROLLER AND ENCLOSURE (ICC 'B') 24 STATION IRRIGATION CONTROLLER AND ENCLOSURE (ICC 'A', 'C' & 'D') EA 1 EA P F 1" SUPPLY LINE (COPPER PIPE) LF P F 2" SUPPLY LINE (COPPER PIPE) LF " POTABLE WATER CONNECTION ASSEMBLY AND ENCLOSURE EA CONNECT TO EXISTING IRRIGATION MAILINE EA FLOW SENSOR EA TREE WELL SPRINKLER ASSEMBLY (C 2 Mod) EA RISER SPRINKLER ASSEMBLY (GEAR DRIVEN) (A 5, A 7, A 11) POP UP SPRINKLER ASSEMBLY (GEAR DRIVEN) (A 6, A 8, A 12) POP UP SPRINKLER ASSEMBLY (SHRUB SPRAY) (B 1) EA 19 EA 302 EA " GATE VALVE EA P 8" GATE VALVE EA /4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) LF 8, " PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) LF 1, /4"PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) LF 1,150 22

23 ITEM ITEM P- ITEM UNIT OF ESTIMATED NO. CODE F MEASURE QUANTITY /2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) LF " PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) LF 1, " PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) LF A " CORRUGATED HIGH DENSITY POLYETHYLENE PIPE CONDUIT LF " PLASTIC PIPE (CLASS 315) (SUPPLY LINE) LF 4, " PVC PIPE CONDUIT (SLEEVE) LF FIBER ROLLS LF 10, HYDROSEED SQFT 400, CLASS 2 AGGREGATE BASE (CY) CY 20, CEMENT TREATED BASE (ROAD MIXED, CLASS A)(CY) CY 5, PULVERIZED ROADBED SQYD 4, HIGH FRICTION SURFACE TREATMENT SQYD SLURRY SEAL TON REPLACE ASPHALT CONCRETE PAVEMENT CY HOT MIX ASPHALT (TYPE A) TON 16, PLACE HOT MIX ASPHALT DIKE (TYPE A) LF PLACE HOT MIX ASPHALT DIKE (TYPE E) LF PLACE HOT MIX ASPHALT OVERSIDE DRAIN EA REMOVE ASPHALT CONCRETE PAVEMENT (SQFT) SQFT 58, REMOVE ASPHALT CONCRETE DIKE LF COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD CONTINUOUSLY REINFORCED CONCRETE PAVEMENT CY DRILL AND BOND (DOWEL BAR) EA F ROCKERY RETAINING WALL CY BRIDGE TRESTLE LS 1 23

24 ITEM ITEM P- ITEM UNIT OF ESTIMATED NO. CODE F MEASURE QUANTITY TEMPORARY SHORING (5TH STREET BRIDGE) LS TEMPORARY SHORING (2ND STREET UC) LS TEMPORARY SHORING (ROADWAY) LS TEMPORARY PEDESTRIAN STAIRCASE LS " PERMANENT STEEL PILE CASING LF " CAST IN DRILLED HOLE CONCRETE PILING LF 5, " CAST IN DRILLED HOLE CONCRETE PILING LF P FURNISH PILING (CLASS 200) LF 4, DRIVE PILE (CLASS 200) EA P PRESTRESSING CAST IN PLACE CONCRETE LS F STRUCTURE CONCRETE, BRIDGE FOOTING CY F STRUCTURAL CONCRETE, BRIDGE CY 12, F STRUCTURAL CONCRETE, BRIDGE (POLYMER FIBER) CY 4, F STRUCTURAL CONCRETE, RETAINING WALL CY F STRUCTURAL CONCRETE, APPROACH SLAB CY F STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N) CY F STRUCTURAL CONCRETE, HEADWALL CY F MINOR CONCRETE (MINOR STRUCTURE) CY F MINOR CONCRETE (BACKFILL) CY F ARCHITECTURAL TREATMENT SQFT DECORATIVE STEEL LB DRILL AND BOND DOWEL LF P F P F FURNISH PRECAST PRESTRESSED PRESTRESSED CONCRETE CA WIDE FLANGE GIRDER (140' 150') FURNISH PRECAST PRESTRESSED PRESTRESSED CONCRETE CA WIDE FLANGE GIRDER (150' 160') EA EA

25 ITEM ITEM P- ITEM UNIT OF ESTIMATED NO. CODE F MEASURE QUANTITY F ERECT PRECAST CONCRETE GIRDER EA TEMPORARY HINGE DEAD WEIGHT LS P PTFE BEARING EA A P PTFE SHERICAL BEARING EA P JOINT SEAL ASSEMBLY (MR 4") LF P JOINT SEAL (MR 2") LF JOINT SEAL (TYPE A) LF P JOINT SEAL ASSEMBLY (MR 9") LF P F BAR REINFORCING STEEL (BRIDGE) LB 5,636, P F BAR REINFORCING STEEL (RETAINING WALL) LB 211, PEDESTRIAN BARRICADE (TYPE A) EA RECONSTRUCT REMOVE RETAINING WALL (MASONRY WALL) LF F SOUND WALL (REINFORCED CONCRETE) SQFT VIBRATION MONITORING LS REMOVE RETAINING WALL (LF) LF BRIDGE REMOVAL (UPR No. 18C 0023) LS BRIDGE REMOVAL (UPR No. 18C 0018) LS BRIDGE REMOVAL (5th STREET No. 18C 0012) LS BRIDGE REMOVAL (2nd STREET No. 18C 0055) LS P F MISCELLANEOUS METAL (RESTRAINER CABLE TYPE) LB 8, P 4" PLASTIC PIPE (SEWER) LF P 4" PLASTIC PIPE (WATER) LF P 4" PLASTIC PIPE (COMMUNICATIONS) LF 2, P 18" REINFORCED CONCRETE PIPE LF 6, P 24" REINFORCED CONCRETE PIPE LF P 30" REINFORCED CONCRETE PIPE LF P 36" REINFORCED CONCRETE PIPE LF 23 25

26 ITEM ITEM P- ITEM UNIT OF ESTIMATED NO. CODE F MEASURE QUANTITY P 6" PERFORATED STEEL PIPE UNDERDRAIN LF " CORRUGATED STEEL PIPE RISER (0.109" THICK) LF WELDED STEEL PIPE CASING (BRIDGE) LF " WELDED STEEL PIPE CASING (BRIDGE) LF " WELDED STEEL PIPE CASING (BRIDGE) LF P 8" WELDED STEEL PIPE (.134" THICK) LF P 12" COATED WELDED STEEL PIPE (0.25" THICK)(BRIDGE) LF 2, " CONCRETE FLARED END SECTION EA SHALLOW MANHOLE EA MANHOLE EA ABANDON MANHOLE EA ABANDON PIPELINE EA REMOVE PIPE (LF) LF 1, REMOVE INLET EA REMOVE HEADWALL EA REMOVE MANHOLE EA REMODEL MANHOLE EA ADJUST MANHOLE TO GRADE EA ADJUST VALVE BOX EA REMOVE SEWER PIPE LF F F REMOVE AND REPLACE ROCK SLOPE PROTECTION ROCK SLOPE PROTECTION (LIGHT, METHOD B) (CY) ROCK SLOPE PROTECTION (NO. 2, METHOD B)(CY) LS 1 CY 1,660 CY CONCRETE (CHANNEL LINING) CY SLOPE PAVING (CONCRETE) CY 60 26

27 ITEM ITEM P- ITEM UNIT OF ESTIMATED NO. CODE F MEASURE QUANTITY P ROCK SLOPE PROTECTION FABRIC (CLASS 8) SQYD 5, P FILTER FABRIC SY MINOR CONCRETE (TALL RETAINING CURB) LF F MINOR CONCRETE (CURB) (CY) CY MINOR CONCRETE (GUTTER) (LF) LF F MINOR CONCRETE (GUTTER) (CY) CY DETECTABLE WARNING SURFACE SQFT F MINOR CONCRETE (CURB AND GUTTER) CY F MINOR CONCRETE (DRIVEWAY) CY F MINOR CONCRETE (SIDEWALK) CY MINOR CONCRETE (TEXTURED PAVING) CY F MINOR CONCRETE (CURB RAMP) CY REMOVE CONCRETE CURB (LF) LF 1, REMOVE CONCRETE (CURB AND GUTTER) LF 5, REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (LF) LF 4, P F MISCELLANEOUS IRON AND STEEL LB 27, UNDERSIDEWALK DRAIN EA MISCELLANEOUS METAL (BRIDGE) LB 2, P F BRIDGE DECK DRAINAGE SYSTEM LB 60, DESTROY WELL EA WATERLINE CRADLE EA DUCT BANK CRADLE EA CURED IN PLACE PIPELINER LF P 4" PLASTIC PIPE (COMMUNICATIONS) (IN BRIDGE) LF 21, RESET FIRE HYDRANT EA P FIRE HYDRANT EA DOUBLE BALL EXPANSION JOINT EA 2 27

28 ITEM ITEM P- ITEM UNIT OF ESTIMATED NO. CODE F MEASURE QUANTITY ADJUST MONITORING WELL TO GRADE EA SINGLE BALL EXPANSION JOINT EA PIPE BOLLARD EA " DUCTILE IRON PIPE LF 2, " DUCTILE IRON PIPE (APPROACH) LF AIR RELEASE VALVE EA PARKING BUMPER (PRECAST CONCRETE) EA CONTRACTOR SUPPLIED GENERATOR DAY PIPE FENCE LF TEMPORARY FENCE (TYPE CL 6) LF 2, ' TEMPORARY GATE (TYPE CL 6) EA P CHAIN LINK FENCE (TYPE CL 4, VINYL CLAD) LF P CHAIN LINK FENCE (TYPE CL 6, VINYL CLAD) LF P CHAIN LINK FENCE (TYPE CL 6, BREAK AWAY) LF 1, P PIPE GATE EA P 4' CHAIN LINK GATE (TYPE CL 6) EA P 10' CHAIN LINK GATE (TYPE CL 6) EA P 14' CHAIN LINK GATE (TYPE CL 6) EA REMOVE FENCE LF REMOVE GATE EA P RECONSTRUCT FENCE LF RECONSTRUCT AND PAINT FENCE (PIPE RAILING) LF REMOVE PAVEMENT MARKER EA 1, REMOVE CHANNELIZERS EA TEMPORARY DELINEATOR (CLASS 1)(SURFACE MOUNTED) EA P PAVEMENT MARKER (RETROREFLECTIVE) EA 1, OBJECT MARKER (TYPE N) EA 2 28

29 ITEM ITEM P- ITEM UNIT OF ESTIMATED NO. CODE F MEASURE QUANTITY OBJECT MARKER (TYPE P) EA OBJECT MARKER (TYPE R) EA REMOVE RELOCATE MONUMENT SIGN EA REMOVE ROADSIDE SIGN EA RESET ROADSIDE SIGN EA FURNISH SINGLE SHEET ALUMINUM SIGN (0.063" UNFRAMED) SQFT ROADSIDE SIGN ONE POST EA ROADSIDE SIGN TWO POST EA INSTALL SIGN (STRAP AND SADDLE BRACKET METHOD) EA BRIDGE PLAQUES EA STEEL PICKET RAILING LF P F PIPE HANDRAILING LF P F STAIRWAY RAILING LF P F TUBULAR HAND RAILING LF 2, P TRANSITION RAILING (TYPE WB 31) EA ALTERNATIVE FLARED TERMINAL SYSTEM EA CRASH CUSHION EA CONCRETE BARRIER (TYPE 60) LF F CONCRETE BARRIER (TYPE 60A) LF 2, CONCRETE BARRIER (TYPE 60C) LF CONCRETE BARRIER (TYPE 60D) LF CONCRETE BARRIER (TYPE 60C MOD) LF F CONCRETE BARRIER (TYPE 736) LF F CONCRETE BARRIER (TYPE 742) (MOD) LF 2, F CONCRETE BARRIER (TYPE 742B MOD) LF REMOVABLE BARRIER EA F CONCRETE BARRIER (C412B) LF 82 29

30 ITEM ITEM P- ITEM UNIT OF ESTIMATED NO. CODE F MEASURE QUANTITY F CONCRETE BARRIER (C412) LF 4, REMOVE GUARDRAIL LF THERMOPLASTIC TRAFFIC STRIPE LF 50, THERMOPLASTIC PAVEMENT MARKING SQFT 5, PAINT TRAFFIC STRIPE (2 COAT) LF 13, REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 2, REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT P BRIDGE AND STREET LIGHTING LS P TRAFFIC SIGNAL (5th St/J St) LS P TRAFFIC SIGNAL (Sutter St/5th St On Off Ramp) LS P TRAFFIC SIGNAL (Second St /Bridge St) LS INTERCONNECTION CONDUIT AND CABLE (LS) LS TEMPORARY LIGHTING (SECOND STREET AND BRIDGE STREET) LS MOBILIZATION LS 1 Items designated with a "F" indicate final pay item. Items designated with a "P" indicate the item is eligible for progress payment 30

31 Replace the table in section B(2)(b)(ii) of the RSS with: Bid Form Submittal Schedule for a Non-Informal Bid Federal-Aid Contract with a DBE Goal Form Bid to the Department of Transportation Copy of the Bid to the Department of Transportation as submitted at the time of bid with the public works contractor registration number Subcontractor List Copy of the Subcontractor List as submitted at the time of bid updated with the percentage of bid item subcontracted c Copy of the Subcontractor List as submitted at the time of bid with the percentage of bid item subcontracted submitted updated to include the public works contractor registration number and annual gross receipts Small Business Status Opt Out of Payment Adjustments for Price Index Fluctuations a DBE Commitment DBE Confirmation DBE Good Faith Efforts Documentation Submittal deadline Time of bid except for the public works contractor registration number 10 days after bid opening Time of bid except for the public works contractor registration number, percentage of Bid Item subcontracted, and annual gross receipts 24 hours after bid opening 10 days after bid opening Time of bid Time of bid No later than 4 p.m. on the 4th day after bid opening b No later than 4 p.m. on the 4th day after bid opening b No later than 4 p.m. on the 4th day after bid opening b a Submit only if you choose the option. b If the last day for submitting the bid form falls on a Saturday or holiday, it may be submitted on the next business day with the same effect as if it had been submitted on the day specified. c Percentage of bid item subcontracted may be submitted in the following format: Item X: Y%. If number of bid items being subcontracted exceeds the space provided in the form, Bidders may insert See Attached on the Subcontractor List and provide a separate sheet listing Subcontractor name and the percentages of each bid item subcontracted in whatever format Bidder chooses. Add to section : Trees to be removed by you are identified in Appendix B of the Special Provisions. Remove trees as needed within the limits of clear and grub. Tree group locations are shown on sheet 10 of the plans. The group number corresponds to the section number shown in Appendix B. Trees are marked in the field with an identifying tag. 31

32 Replace section with: PTFE SPHERICAL BEARINGS A General A(1) Summary Section includes specifications for fabricating and installing PTFE spherical bearings. PTFE spherical bearings consist of PTFE and stainless steel bearing surfaces, stainless steel plates, and anchors. PTFE spherical bearings are either (1) fixed type with spherical bearing surfaces or (2) expansion type with spherical and sliding bearing surfaces A(2) Definitions load category: PTFE spherical bearings of differing vertical load capacity within a range defined as follows: 1. Bearings of 500 kips capacity or less 2. Bearings over 500 kips up to and including 2,000 kips capacity 3. Bearings over 2,000 kips capacity Bearings in 2 different load categories that have vertical load capacities within 180 kips of each other are considered to be in 1 load category for proof testing A(3) Submittals A(3)(a) General Submit proof that the bearing manufacturer has furnished PTFE spherical bearings that have had at least 3 years of satisfactory service for 2 projects with similar conditions to this project. Submit certificates of compliance for the materials used in PTFE bearings. Submit test reports for proof-tested bearings signed by the personnel conducting the testing. Include bearing numbers of the tested bearings and the names of the personnel interpreting the test results. If proof tests cannot be performed at the specified load, submit a testing plan listing additional physical tests to be performed A(3)(b) Shop Drawings Submit shop drawings to OSD, Documents Unit. Notify the Engineer of your submittal. Include in the notification the date and list of contents of the submittal. For initial review, submit 6 copies for railroad bridges and 4 copies for other structures. After review, submit 6 to 12 copies, as requested, for authorization and use during construction. Allow 55 days for the Department's review for railway bridges and at least 45 days for all other structures. Shop drawings must include a description of the method of mechanical interlocking of PTFE fabric to the metallic substrate. At locations other than hinges, shop drawings must include temporary support details for the bearing sole plate during concrete placement A(4) Quality Assurance A(4)(a) General The bearing manufacturer must have furnished PTFE spherical bearings that have had at least 3 years of satisfactory service for 2 projects with similar conditions to this project. A qualified representative of the bearing manufacturer must be present during installation of the 1st bearing and be available during remaining installations. Templates for the spherical surfaces must be available for inspection. 32

33 A(4)(b) Quality Control A(4)(b)(i) General Reserved A(4)(b)(ii) Proof Testing Proof test the PTFE spherical bearings in the Engineer's presence as follows: 1. Test fixed-type bearings for compression. 2. Test expansion-type bearings for compression and initial static coefficient of friction. Proof test 1 bearing from each lot of production bearings. A lot of bearings is 25 bearings, or fraction thereof, of the same type within a load category. The Engineer selects random test samples from each lot of production bearings. Notify the Engineer at least 7 days before starting proof testing. If proof tests cannot be performed at the specified load, perform the additional physical tests described in the testing plan in the presence of the Engineer. The tests must demonstrate that the requirements for proof testing at the specified load are satisfied. Before proof testing, the test bearings must be conditioned for 12 hours at 75 ± 5 degrees F. Clean the bearing surfaces before testing. For compression testing of PTFE spherical bearings: 1. Rotate the bearings at the design rotation or 0.02 radians, whichever is greater, and hold for 1 hour at a load of 1.5 times the maximum vertical load capacity. You may rotate the bearing by inserting a beveled plate between the bearing and the restraining surface before loading. 2. Maintain the bearing in a rotated position during testing. For coefficient of friction testing of PTFE spherical bearings: 1. Continuously load the bearing to the minimum dead load for 12 hours before testing. Maintain the dead load during testing. 2. Measure the initial static coefficient of friction on the 1st movement of the bearing. 3. Measure the initial static and dynamic coefficients of friction at a sliding speed of not more than 1 inch per minute. The initial static friction must not exceed that specified. 4. Cycle the test bearings for a minimum of 100 movements. Each movement must consist of at least 1 inch of relative movement at a sliding speed of not more than 12 inches per minute. After cycling, measure the initial static and dynamic coefficients of friction at a sliding speed of not more than 1 inch per minute. The initial static friction must not exceed that specified. Proof-tested bearings must not show any signs of the following: 1. Bond failure of bearing surfaces 2. Separation or lift-off of plates from each other or from PTFE surfaces 3. Excessive transfer of PTFE to the stainless steel surface 4. Other defects If a proof-tested bearing fails to comply with the above requirements, proof test all the remaining bearings in the lot B Materials B(1) General Welding must comply with AWS D1.1 except welding of stainless steel must comply with AWS D

34 PTFE spherical bearings must be self-lubricating. PTFE surfaces must be unfilled fabric made from virgin PTFE oriented multifilament and other fibers. Filament resin must comply with ASTM D4441. At the highest point of substrate and after compression, the PTFE fabric must have a thickness from 1/16 to 1/8 inch. Steel plates must comply with ASTM A709/A709M. Stainless steel plates must comply with ASTM A240/A240M, Type 304, and be at least 1/8 inch thick. Surfaces of flat stainless steel that mate with PTFE surfacing must have a minimum no. 8 mirror finish. Surfaces of curved stainless steel that mate with PTFE surfacing must have a finish of less than 16 microinches root mean square. Determine the finish under ANSI B46.1. PTFE spherical bearings must have an initial static coefficient of friction of at most Stud connectors must comply with section Protect bearing surfaces from contamination and weather damage B(2) Fabrication Flat stainless steel surfaces must be a weld overlay on structural steel plate or a solid or sheet stainless steel. Curved stainless steel surfaces must be solid stainless steel except curved stainless steel surfaces over 6 inches thick may be a weld overlay on structural steel plate. If a weld overlay is used for stainless steel surfacing, attach the overlay by submerged arc welding using Type 309L electrodes. The completed overlay must have a 3/32-inch minimum thickness after fabrication. If stainless steel sheets are used for stainless steel surfacing, attach the sheets by perimeter arc welding using Type 309L electrodes. After welding, the stainless steel surface must be smooth and without waves. Plate radius dimensional tolerances are from to inch for convex plates and from to inch for concave plates. Use full-size convex and concave metal templates for the spherical surfaces of each bearing radius. PTFE fabric backing material on bearing surfaces must be epoxy bonded and mechanically interlocked to the steel substrate. Bonding must be performed under controlled factory conditions. The mechanical interlock on the spherical concave surface must be integrally machined into the steel substrate. Welded retention grids are not allowed on the concave surface. Except for the selvage, oversaw or recess edges such that no cut fabric edges are exposed. During fabrication, the maximum temperature of bonded PTFE surfaces must be 300 degrees F. After bonding to the substrate, the PTFE surface must be smooth and free from bubbles. Assemble PTFE spherical bearings at the fabrication site. The PTFE and stainless steel interfaces must be in full bearing after completing assembly. Use at least 4 steel straps bolted to threaded holes in the masonry and sole plates to secure each bearing assembly as a unit for shipment. Steel straps must (1) not be welded and (2) be adequate to use for lifting the bearing assembly. Bearings must be shipped as a unit and remain intact when uncrated and installed. 34

35 C Construction Prepare concrete surfaces to receive PTFE spherical bearings under section C(3). The Engineer must be present during the dismantling of each bearing assembly at the job site. Temporarily support PTFE bearing sole plates during concrete placement. Temporary supports must prevent rotation or displacement of the bearings. Temporary supports must not (1) inhibit the function of the PTFE bearings after concrete is placed or (2) restrict movement at bridge joints due to temperature changes and prestress shortening. Materials for temporary supports must comply with the requirements for form fasteners in section C(2)(a). Replace or resurface damaged bearings and bearings with scratched mating surfaces. Resurfacing must be performed at the bearing manufacturer's plant D Payment The payment quantity for PTFE spherical bearings does not include the test bearings. A PTFE spherical bearing with more than 1 PTFE surface is 1 bearing. Replace section with: PTFE BEARINGS A General A(1) Summary Section includes specifications for fabricating and installing PTFE bearings. PTFE bearings consist of PTFE and stainless steel bearing surfaces, stainless steel plates, steel reinforced elastomeric bearing pads, and anchors. Steel reinforced elastomeric bearing pads must comply with section A(2) Definitions load category: PTFE bearings of differing vertical load capacity within a range defined as follows: 1. Bearings of 500 kips capacity or less 2. Bearings over 500 kips up to and including 2,000 kips capacity 3. Bearings over 2,000 kips capacity Bearings in 2 different load categories that have vertical load capacities within 180 kips of each other are considered to be in 1 load category for proof testing A(3) Submittals A(3)(a) General Submit proof that the bearing manufacturer has furnished PTFE bearings that have had at least 3 years of satisfactory service for 2 projects with similar conditions to this project. Submit certificates of compliance for the materials used in PTFE bearings. Submit test reports for proof-tested bearings signed by the personnel conducting the testing. Include bearing numbers of the tested bearings and the names of the personnel interpreting the test results. If proof tests cannot be performed at the specified load, submit a testing plan listing additional physical tests to be performed A(3)(b) Shop Drawings Submit shop drawings to the Engineer. 35

36 For initial review, submit 4 copies. After review, submit 6 to 12 copies, as requested, for authorization and use during construction. Allow 45 days for the Department's review. Shop drawings must include a description of the method of mechanical interlocking of PTFE fabric to the metallic substrate. At locations other than hinges, shop drawings must include temporary support details for the bearing sole plate during concrete placement A(4) Quality Assurance A(4)(a) General A qualified representative of the bearing manufacturer must be present during installation of the 1st bearing and be available during remaining installations A(4)(b) Quality Control A(4)(b)(i) General Reserved A(4)(b)(ii) Proof Testing Proof test the PTFE bearings in the Engineer's presence. Proof test 1 bearing from each lot of production bearings. A lot of bearings is 25 bearings, or fraction thereof, of the same type within a load category. The Engineer selects random test samples from each lot of production bearings. Notify the Engineer at least 7 days before starting proof testing. If proof tests cannot be performed at the specified load, perform the additional physical tests described in the testing plan in the presence of the Engineer. The tests must demonstrate that the requirements for proof testing at the specified load are satisfied. Before proof testing, the test bearings must be conditioned for 12 hours at 75 ± 5 degrees F. Clean the bearing surfaces before testing. For coefficient of friction testing of PTFE bearings: 1. Continuously load the bearing to the minimum dead load for 12 hours before testing. Maintain the dead load during testing. 2. Measure the initial static coefficient of friction on the 1st movement of the bearing. 3. Measure the initial static and dynamic coefficients of friction at a sliding speed of not more than 1 inch per minute. The initial static friction must not exceed that specified. 4. Cycle the test bearings for a minimum of 100 movements. Each movement must consist of at least 1 inch of relative movement at a sliding speed of not more than 12 inches per minute. After cycling, measure the initial static and dynamic coefficients of friction at a sliding speed of not more than 1 inch per minute. The initial static friction must not exceed that specified. Proof-tested bearings must not show any signs of the following: 1. Bond failure of bearing surfaces 2. Separation or lift-off of plates from each other or from PTFE surfaces 3. Excessive transfer of PTFE to the stainless steel surface 4. Other defects If a proof-tested bearing fails to comply with the above requirements, proof test all the remaining bearings in the lot. 36

37 B Materials B(1) General Welding must comply with AWS D1.1 except welding of stainless steel must comply with AWS D1.6. PTFE bearings must be self-lubricating. PTFE surfaces must be unfilled fabric made from virgin PTFE oriented multifilament and other fibers. Filament resin must comply with ASTM D4441. At the highest point of substrate and after compression, the PTFE fabric must have a thickness from 1/16 to 1/8 inch. Steel plates must comply with ASTM A709/A709M. Stainless steel plates must comply with ASTM A240/A240M, Type 304, and be at least 1/8 inch thick. Surfaces of flat stainless steel that mate with PTFE surfacing must have a minimum no. 8 mirror finish. Determine the finish under ANSI B46.1. PTFE bearings must have an initial static coefficient of friction of at most Stud connectors must comply with section Protect bearing surfaces from contamination and weather damage B(2) Fabrication Flat stainless steel surfaces must be a weld overlay on structural steel plate or a solid or sheet stainless steel. If a weld overlay is used for stainless steel surfacing, attach the overlay by submerged arc welding using Type 309L electrodes. The completed overlay must have a 3/32-inch minimum thickness after fabrication. If stainless steel sheets are used for stainless steel surfacing, attach the sheets by perimeter arc welding using Type 309L electrodes. After welding, the stainless steel surface must be smooth and without waves. PTFE fabric backing material on bearing surfaces must be epoxy bonded and mechanically interlocked to the steel substrate. Bonding must be performed under controlled factory conditions. The mechanical interlock on the surface must be integrally machined into the steel substrate. Welded retention grids are not allowed on the surface. Except for the selvage, oversaw or recess edges such that no cut fabric edges are exposed. During fabrication, the maximum temperature of bonded PTFE surfaces must be 300 degrees F. After bonding to the substrate, the PTFE surface must be smooth and free from bubbles. Assemble PTFE bearings at the fabrication site. The PTFE and stainless steel interfaces must be in full bearing after completing assembly. Use at least 4 steel straps bolted to threaded holes in the masonry and sole plates to secure each bearing assembly as a unit for shipment. Steel straps must (1) not be welded and (2) be adequate to use for lifting the bearing assembly. Bearings must be shipped as a unit and remain intact when uncrated and installed. Steel reinforced elastomeric bearing pads must be fully vulcanized to the steel plates under factory controlled conditions, and the bond must have a peel-strength of at least 30 lbs/in as determined by California Test