1 GRAND TOTAL 2,119, DER 2,059, ,314, ,558, PRAIRIE S 2,827, Page 17

2 CLEARING REMOVAL OF REMOVAL OF REMOVAL OF REMOVAL OF AND STRUCTURES CATTLE FENCE ASPHALT GRUBBING AND GUARD (BARBED DRIVES OBSTRUCTIONS WIRE) LUMP SUM COST LUMP SUM COST EACH COST LINEAR FEET COST SQUARE YARD COST 10, , , % 10, % 3, , , , , , , , , , , , , , , , , , , , , , , , , PRAIRIE S 180, , , , , , , , Page 1

3 REMOVAL OF REMOVAL OF REMOVAL OF REMOVAL OF REMOVAL OF GENERAL CONCRETE CONCRETE PIPE PIPE SURFACING EXCAVATION CATCH WALKS AND (CROSS DRAIN) (SIDE DRAIN) AND (PLAN BASIN DRIVES (SAWCUT STABILIZED QUANTITY) REQUIRED) BASE EACH COST SQUARE YARD COST LINEAR FEET COST LINEAR FEET COST SQUARE YARD COST CUBIC YARD , , , , , , , , , , , , , , , , , , , , , , , PRAIRIE S 1, , , , , , , Page 2

4 GENERAL EMBANKMENT EXCAVATION & BORROW FOR BORROW EXCAVATION EMBANKMENT BACKFILLING (PIPE BACKFILL) FOR UNDERCUTTING (SELECT UNDERCUTTING OF THE MATERIAL) THE SUBGRADE SUBGRADE (HAULED FROM (NET SECTION) (NET SECTION) OFFSITE) (A) (A) (A)(B) COST CUBIC YARD COST CUBIC YARD COST LINEAR FEET COST CUBIC YARD COST CUBIC YARD COST , , , , , , , , , , , , , , , , , , , , , PRAIRIE S , , , , , Page 3

5 TEMPORARY TEMPORARY CLASS II CLASS II CLASS II LIME HAY OR SILT FENCE BASE COURSE BASE COURSE BASE COURSE (8% BY STRAW BALES (STONE) (8 1/2" THICK) (12" THICK) VOLUME) (6" THICK) ASPH. CONC. BASE EACH COST LINEAR FEET COST SQUARE YARD COST SQUARE YARD COST SQUARE YARD COST TON , , , , , (A) , , , , , , , , , , , , , , , , , , PRAIRIE S , , , , , , Page 4

6 A LIME AGGREGATE AGGREGATE TRAFFIC ASPHALTIC TREATMENT SURFACE COURSE ROADWAY MAINTENANCE CONCRETE (10" THICK) (CRUSHED SURFACING AGGREGATE (PAVED (TYPE D) CONCRETE NOT (STONE) (VEHICULAR DRIVEWAYS) ALLOWED) MEASUREMENT) (A) (B)( C) (B) COST SQUARE YARD COST TON COST TON COST TON COST TON COST , , , , , , , , , , , , , , , , , , , , , PRAIRIE S , , , , , Page 5

7 P COLD ASPHALTIC PLANING PAVEMENT PAVEMENT PORTLAND CEMENT CROSS DRAIN CONCRETE ASPHALTIC PATCHING WIDENING CONCRETE PAVEMENT PIPE PAVEMENT (12" MINIMUM (6" THICK)(4000 PSI) (24" RCP) (TYPE 90 WCP) (3" AVG.) THICKNESS) (TYPE B) ( MAY RETAIN) (A) TON COST SQUARE YARD COST TON COST SQUARE YARD COST SQUARE YARD COST LINEAR FEET , , , , , , , , , , , , , , , , , , , , , , , PRAIRIE S , , , , , , Page 6

8 CROSS DRAIN CROSS DRAIN CROSS DRAIN CROSS DRAIN CROSS DRAIN PIPE PIPE ARCH PIPE ARCH PIPE ARCH PIPE ARCH (30" RCP) (30" EQUIV. RCPA) (36" EQUIV. RCPA) (48" EQUIV. RCPA) (60" EQUIV. RCPA) COST LINEAR FEET COST LINEAR FEET COST LINEAR FEET COST LINEAR FEET COST LINEAR FEET COST , , , , , , , , , , , , , , , , , , , , , PRAIRIE S , , , , , Page 7

9 STORM DRAIN STORM DRAIN STORM DRAIN STORM DRAIN STORM STORM PIPE PIPE PIPE PIPE DRAIN PIPE ARCH DRAIN PIPE ARCH (15" RCP) (18" RCP) (24" RCP) (30" RCP) (18" EQUIV. RCPA) (24" EQUIV. RCPA) LINEAR FEET COST LINEAR FEET COST LINEAR FEET COST LINEAR FEET COST LINEAR FEET COST LINEAR FEET , , , , , , , , , , , , , , , , , , , , , PRAIRIE S , , , , , Page 8

10 STORM STORM SIDE SIDE SIDE DRAIN PIPE ARCH DRAIN PIPE ARCH DRAIN PIPE DRAIN PIPE DRAIN PIPE (30" EQUIV. RCPA) (36" EQUIV. RCPA) (15" RCP) (18" RCP) (24" RCP) COST LINEAR FEET COST LINEAR FEET COST LINEAR FEET COST LINEAR FEET COST LINEAR FEET COST , , , , , , , , , , , , , , , , , , , , , PRAIRIE S , , , , , Page 9

11 SIDE SIDE SIDE SIDE SIDE CONCRETE DRAIN PIPE DRAIN PIPE (EROSION) DRAIN PIPE DRAIN PIPE ARCH DRAIN PIPE ARCH COLLAR (30" RCP) (18" PP/CMP) (18" BCCSP) (30" EQUIV. RCPA) (36" EQUIV. RCPA) LINEAR FEET COST LINEAR FEET COST LINEAR FEET COST LINEAR FEET COST LINEAR FEET COST EACH , , , , , , , , , , , , , , , , , , , , , , , PRAIRIE S , , , , , , Page 10

12 MANHOLE CATCH BASIN CATCH BASIN SIDE SIDE (R-CB-11) (CAST IN (CB-02) DRAIN SAFETY DRAIN SAFETY PLACE TOPS) (CAST IN END (TYPE 1) END (TYPE 2) PLACE TOPS) COST EACH COST EACH COST EACH COST EACH COST EACH COST 1, , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , PRAIRIE S , , , , , , , , , , Page 11

13 BARBED COMBINATION DOUBLE CONCRETE FLOWABLE WIRE MESH & SWINGING DRIVE FILL TEMPORARY FENCE BARBED WIRE DRIVEWAY (6" THICK) SIGNS FENCE GATE AND BARRICADES LINEAR FEET COST LINEAR FEET COST DBGT COST SQUARE YARD COST CUBIC YARD COST LUMP SUM , , , , , , % , , , , , , , , , , , , , , , , , , , PRAIRIE S , , , , , , , Page 12

14 REFLECTORIZED PLASTIC PAVEMENT RAISED STRIPING (SOLID LINE) TEMPORARY BEDDING PAVEMENT (8" WIDTH) PAVEMENT MATERIAL MOBILIZATION MARKERS THERMOPLASTIC MARKINGS 90 MIL (EXTRUDED) (A)(B) (WHITE) COST LUMP SUM COST CUBIC YARD COST LUMP SUM COST EACH COST LINEAR FEET COST 10, , , , % 6, , % 50, , , , , , , , , , , , , , , , , , , , , PRAIRIE S 15, , , , , , , Page 13

15 PLASTIC PAVEMENT PLASTIC PAVEMENT PLASTIC PAVEMENT PLASTIC PAVEMENT PLASTIC PAVEMENT PLASTIC PAVEMENT STRIPING STRIPING (SOLID LINE) STRIPING (SOLID LINE) STRIPING STRIPING STRIPING (24" WIDTH) (4" WIDTH) (4" WIDTH) (DOTTED LINE) (DOTTED LINE) (LEGENDS (THERMOPLASTIC THERMOPLASTIC THERMOPLASTIC (4" WIDTH) (8" WIDTH) AND SYMBOLS) 125 MIL) 90 MIL 90 MIL THERMOPLASTIC (3' LENGTH) (ARROW-LEFT TURN) (YELLOW) (EXTRUDED) (EXTRUDED) 90 MIL THERMOPLASTIC (YELLOW) (WHITE) 90 MIL LINEAR FEET COST MILE COST MILE COST LINEAR FEET COST LINEAR FEET COST EACH , , , , , , , , , , , , , , , , , , , , PRAIRIE S , , , , , Page 14

16 NS PLASTIC PAVEMENT STRIPING HYDROSEEDING CONSTRUCTION UTILITY SAWCUTTING (LEGENDS (FIBER MULCH LAYOUT OVERSIGHT AND ASPHALTIC AND SYMBOLS) INCLUDED) COORDINATION CONCRETE (ARROW-RIGHT TURN) PAVEMENT (A) COST EACH COST ACRE COST LUMP SUM COST LUMP SUM COST IN/LINEAR FOOT COST , , , , , , % 20, % 20, , , , , , , , , , , , , , , , , , , , , , , , PRAIRIE S , , , , , , , , Page 15

17 NS CPS SAWCUTTING PRECONSTRUCTION EXISTING VIDEO (DVD MEDIA GRAND CONCRETE FORMAT ONLY) TOTAL PAVEMENT IN/LINEAR FOOT COST LUMP SUM COST , , % 2, ,119, , , , ,059, , , , ,314, , , , ,558, PRAIRIE S , , , ,827, Page 16