DECEMBER 5, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $5,000,000) Bids

Size: px
Start display at page:

Download "DECEMBER 5, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $5,000,000) Bids"

Transcription

1 General Info Number: PROJECT NO : BRIDGE DECK REPAIR AND BRIDGE REMOVAL OHIO TURNPIKE OVER QUARRY ROAD, M.P OHIO TURNPIKE OVER INACTIVE RAILROAD, M.P LORAIN COUNTY, OHIO Deadline: DECEMBER 5, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $5,000,000) Bids Business Bid Total Kokosing Construction Company, Inc. $6,336, The Great Lakes Construction Co. $6,418,359.60

2 KOKOSING CONSTRUCTION COMPANY, INC. ROADWAY (Ref. Nos. 1-16) CLEARING AND GRUBBING 1 LS $29, $29, PAVEMENT REMOVED 7428 SY $18.00 $133, CONCRETE BARRIER REMOVED 636 FT $23.00 $14, PIPE REMOVED, 24" AND UNDER 38 FT $13.00 $ GUARDRAIL REMOVED 1106 FT $1.62 $1, BRIDGE TERMINAL ASSEMBLY REMOVED 8 EACH $95.04 $ FENCE REMOVED 342 FT $2.00 $ EXCAVATION 1666 $44.00 $73, EMBANKMENT 6831 $22.00 $150, A 204 EXCAVATION OF SUBGRADE 142 $33.00 $4, B 204 EMBANKMENT 142 $8.50 $1, SUBGRADE COMPACTION SY $1.00 $10, GUARDRAIL, TYPE MGS, WITH LONG STEEL POSTS 1418 FT $19.41 $27, MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 2 EACH $2, $4, MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2 2 EACH $ $1, FENCE, TYPE FT $21.50 $4, CURB, TYPE FT $7.75 $23, CONCRETE BARRIER, TYPE B-50, AS PER PLAN 771 FT $ $96, Total: $579, EROSION CONTROL (Ref. Nos ) SOIL ANALYSIS TEST 2 EACH $50.00 $ TOPSOIL 361 $26.00 $9, SEEDING AND MULCHING 3252 SY $0.73 $2,373.96

3 REPAIR SEEDING AND MULCHING 163 SY $2.00 $ INTER-SEEDING 163 SY $0.01 $ COMMERCIAL FERTILIZER 0.44 TON $ $ LIME 0.67 ACRE $0.01 $ WATER 9.22 MGAL $0.01 $ SLOPE EROSION PROTECTION 1920 SY $2.00 $3, EROSION CONTROL EACH $1.00 $57, Total: $73, DRAINAGE (Ref. Nos. 26A - 31A) 26A 601 TIED CONCRETE BLOCK MAT, TYPE 1 25 SY $ $3, B SP 604 INLET, NO. 1-3B50 DOUBLE GRATE 1 EACH $13, $13, " SHALLOW PIPE UNDERDRAINS WITH FABRIC $14.00 $39, FT SP 605 WRAP 28 SP 605 6" BASE PIPE UNDERDRAINS 2835 FT $7.00 $19, SP 605 AGGREGATE DRAINS, TYPE II 240 FT $17.50 $4, A 605 AGGREGATE DRAINS 250 FT $35.00 $8, B 605 6" UNCLASSIFIED PIPE UNDERDRAINS 100 FT $20.00 $2, MANHOLE ADJUST TO GRADE 1 EACH $ $ CATCH BASIN ADJUST TO GRADE 4 EACH $ $1, A SPECIAL PRECAST REINFORCED CONCRETE OUTLET 8 EACH $ $2, Total: $95, PAVEMENT (Ref. Nos ) PROOF ROLLING 32 HR $ $6, PAVEMENT PLANING, ASPHALT CONCRETE SY $3.75 $39,791.25

4 34 $ $2, SP 202B CRACK REPAIR, 1" OR LESS, USING SAND ASPHALT 35 CRACK REPAIR, 1" OR LESS, USING HOT JOINT $ $10, GAL SP 202B SEALER 36 CRACK REPAIR, WIDER THAN 1" AND LESS THAN $ $2, SP 202B 1" IN DEPTH, USING ITEM SP 404 (PG 64-22) 37 CRACK REPAIR, WIDER THAN 1" AND GREATER $ $2, SP 202B THAN 1" IN DEPTH, USING ITEM SP 404 (PG 64-22) 38 3 CORNER CRACK REPAIR, USING ITEM SP 402 $1, $4, SP 202B (PG 64-22) 39 REPAIR EXISTING EXPANSION JOINT, USING ITEM $ $4, SP 202B SP 404 (PG 64-22) 40 SP 302 ASPHALT CONCRETE BASE, PG $ $471, SP 304 AGGREGATE BASE 3124 $50.00 $156, ASPHALT CONCRETE INTERMEDIATE COURSE, PG $ $197, SP (FR) 43 ASPHALT CONCRETE SURFACE COURSE, USING $ $197, SP 404 CRUSHED SLAG, PG (FR) 44 SP 451 FULL DEPTH PAVEMENT REPAIRS (ASPHALT) SY $ $76, NON-TRACKING TACK COAT GALLON $2.50 $36, Total: $1,208, TRAFFIC CONTROL (Ref. Nos A) 46 SPECIAL SONIC NAP ALERT PATTERN (SNAP) 2.99 MILE $2, $7, SP 626 BARRIER REFLECTOR 70 EACH $7.48 $ EDGE LINE, 6" 1.25 MILE $2, $2, LANE LINE, 6" 1.25 MILE $ $ A SP 641C REMOVAL OF PAVEMENT MARKING 2 MILE $1, $2, Total: $14,955.07

5 STRUCTURES (Ref. Nos ) 50 SP 202 PORTIONS OF STRUCTURE REMOVED 1 LS $425, $425, GRANULAR EMBANKMENT 126 $ $16, SP 203 LIGHTWEIGHT FILL 6561 $80.00 $524, SP 203 SETTLEMENT PLATFORM 9 EACH $ $5, SP 203 TEMPORARY SURCHARGE EMBANKMENT 1 LS $275, $275, GEOTEXTILE FABRIC, , TYPE D 2114 SY $3.00 $6, " CONSTRUCTION UNDERDRAINS, FT $20.00 $24, " CONDUIT, TYPE F, FT $40.00 $10, CONDUIT, MISC.: DRAINAGE BOARD 2640 SF $6.00 $15, SPECIAL PRECAST REINFORCED CONCRETE OUTLET 20 EACH $ $9, SP 509 EPOXY COATED REINFORCING STEEL, GRADE LB $1.60 $3, REINFORCING STEEL, REPLACEMENT OF $1.60 $ LB 509 EXISTING REINFORCING STEEL RESET BEARING, AS PER PLAN 36 EACH $ $27, SP 516A CRACK REPAIR USING EPOXY INJECTION 28 FT $ $11, SP 516B SEALING OF CONSTRUCTION JOINTS 798 FT $10.00 $7, SP 516G REPLACE EXPANSION BEARING DEVICE 36 EACH $4, $162, SP 519 PATCHING CONCRETE STRUCTURE 386 SF $ $50, REINFORCED CONCRETE APPROACH SLABS $ $124, SY 526 (T=12") 68 FALSEWORK, TEMPORARY BRACING AND $75, $75, LS SP 527 PROTECTIVE STRUCTURES 69 SPECIAL STRUCTURES: SETTLEMENT MONITORING 1 LS $ $ CONTINUOUS ELASTOMER SEAL IN A PORTLAND $ $90, FT SP 533D CEMENT CONCRETE JOINT 71 CONCRETE WEATHERPROOFING, DECK, $7.22 $14, SY SP 536 ABUTMENT SLABS AND APPROACH SLABS 72 SP 536 CONCRETE WEATHERPROOFING, PARAPETS 320 SY $7.22 $2,310.40

6 73 $7.22 $7, SY SP 536 CONCRETE WEATHERPROOFING, SUBSTRUCTURE 74 MICRO SILICA MODIFIED CONCRETE OVERLAY $80.00 $123, SY 848 USING HYDRODEMOLITION (2" THICK) 75 SURFACE PREPARATION USING $75.00 $115, SY 848 HYDRODEMOLITION 76 MICRO SILICA MODIFIED CONCRETE OVERLAY $ $3, (VARIABLE THICKNESS), MATERIAL ONLY HAND CHIPPING 38 SY $ $35, TEST SLAB 4 $1, $7, FULL DEPTH REPAIR 8 $4, $36, GEOGRID, TYPE P SY $5.00 $11, GEOGRID, TYPE S SY $5.50 $9, REINFORCED EMBANKMENT 1174 $70.00 $82, Total: $2,315, MAINTENANCE OF TRAFFIC (Ref. Nos ) 83 SPECIAL "SNAP" MILL AND FILL 9788 FT $8.00 $78, WORK ZONE IMPACT ATTENUATOR 4 EACH $2, $10, REPLACEMENT SIGN 5 EACH $ $1, PORTABLE CHANGEABLE MESSAGE SIGN, AS PER $20.00 $29, DAY 614 PLAN WORK ZONE LANE LINE, CLASS I 1.14 MILE $ $ WORK ZONE EDGE LINE, CLASS I 2.28 MILE $ $2, WORK ZONE CHANNELIZING LINE, CLASS I FT $0.47 $15, SP 614C REMOVAL OF PAVEMENT MARKINGS 2 MILE $1, $2, SP 621 RAISED PAVEMENT MARKERS 140 EACH $35.36 $4, TEMPORARY PORTABLE BARRIER (WITHOUT $21.00 $154, FT SP 622A GLARE SCREEN)

7 93 94 TEMPORARY PORTABLE BARRIER, BRIDGE SP 622A MOUNTED SIGNING, MISC.: ADDITIONAL SIGNS, GROUND SP 630 MOUNTED, AS DIRECTED BY THE ENGINEER 640 FT 80 SF $26.00 $16, $20.00 $1, Total: $318, GENERAL (Ref. Nos ) 95 SP 614 MAINTAINING TRAFFIC 1 LS $1,375, $1,375, SP 619 FIELD OFFICE 1 LS $90, $90, SP 623 CONSTRUCTION LAYOUT SURVEY 1 LS $36, $36, MOBILIZATION 1 LS $200, $200, PREMIUM FOR CONTRACT PERFORMANCE BOND $30, $30, LS IB.ART.6 AND PAYMENT BOND TOTAL BID AMOUNT (REF. NOS. 1 THRU 99): $6,336,872.32

8 THE GREAT LAKES CONSTRUCTION ROADWAY (Ref. Nos. 1-16) Item No. Units CLEARING AND GRUBBING 1 LS $75, $75, PAVEMENT REMOVED 7428 SY $13.00 $96, CONCRETE BARRIER REMOVED 636 FT $35.00 $22, PIPE REMOVED, 24" AND UNDER 38 FT $30.00 $1, GUARDRAIL REMOVED 1106 FT $1.60 $1, BRIDGE TERMINAL ASSEMBLY REMOVED 8 EACH $94.00 $ FENCE REMOVED 342 FT $2.00 $ EXCAVATION 1666 $30.00 $49, EMBANKMENT 6831 $14.00 $95, A 204 EXCAVATION OF SUBGRADE 142 $30.00 $4, B 204 EMBANKMENT 142 $34.00 $4, SUBGRADE COMPACTION SY $2.00 $21, $19.20 $27, GUARDRAIL, TYPE MGS, WITH LONG STEEL POSTS FT MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 2 EACH $2, $4, MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2 2 EACH $ $1, FENCE, TYPE FT $21.50 $4, CURB, TYPE FT $9.50 $28, CONCRETE BARRIER, TYPE B-50, AS PER PLAN 771 FT $ $77, Total: $517, EROSION CONTROL (Ref. Nos ) Units Item No SOIL ANALYSIS TEST 2 EACH $50.00 $100.00

9 TOPSOIL 361 $26.00 $9, SEEDING AND MULCHING 3252 SY $0.73 $2, REPAIR SEEDING AND MULCHING 163 SY $2.00 $ INTER-SEEDING 163 SY $1.00 $ COMMERCIAL FERTILIZER 0.44 TON $ $ LIME 0.67 ACRE $1.00 $ WATER 9.22 MGAL $1.00 $ SLOPE EROSION PROTECTION 1920 SY $2.00 $3, EROSION CONTROL EACH $1.00 $57, Total: $73, DRAINAGE (Ref. Nos. 26A - 31A) Item No. Units 26A 601 TIED CONCRETE BLOCK MAT, TYPE 1 25 SY $ $6, B SP 604 INLET, NO. 1-3B50 DOUBLE GRATE 1 EACH $1, $1, SP 605 6" SHALLOW PIPE UNDERDRAINS WITH FABRIC $11.00 $31, WRAP FT 28 SP 605 6" BASE PIPE UNDERDRAINS 2835 FT $8.00 $22, SP 605 AGGREGATE DRAINS, TYPE II 240 FT $23.00 $5, A 605 AGGREGATE DRAINS 250 FT $15.00 $3, B 605 6" UNCLASSIFIED PIPE UNDERDRAINS 100 FT $23.00 $2, MANHOLE ADJUST TO GRADE 1 EACH $ $ CATCH BASIN ADJUST TO GRADE 4 EACH $ $2, A SPECIAL PRECAST REINFORCED CONCRETE OUTLET 8 EACH $ $2, PAVEMENT (Ref. Nos ) Item No. Total: $79, Units PROOF ROLLING 32 HR $ $9,600.00

10 PAVEMENT PLANING, ASPHALT CONCRETE SY $2.95 $31, SP 202B CRACK REPAIR, 1" OR LESS, USING SAND ASPHALT 3 $2, $6, CRACK REPAIR, 1" OR LESS, USING HOT JOINT $ $11, SP 202B 100 SEALER GAL 36 CRACK REPAIR, WIDER THAN 1" AND LESS THAN $2, $6, SP 202B 3 1" IN DEPTH, USING ITEM SP 404 (PG 64-22) 37 CRACK REPAIR, WIDER THAN 1" AND GREATER $2, $6, SP 202B 3 THAN 1" IN DEPTH, USING ITEM SP 404 (PG 64-22) 38 3 CORNER CRACK REPAIR, USING ITEM SP 402 $2, $6, SP 202B 3 (PG 64-22) 39 REPAIR EXISTING EXPANSION JOINT, USING ITEM $ $2, SP 202B 6 SP 404 (PG 64-22) 40 SP 302 ASPHALT CONCRETE BASE, PG $ $471, SP 304 AGGREGATE BASE 3124 $50.00 $156, SP 402 ASPHALT CONCRETE INTERMEDIATE COURSE, PG $ $172, (FR) 43 SP 404 ASPHALT CONCRETE SURFACE COURSE, USING $ $158, CRUSHED SLAG, PG (FR) 44 SP 451 FULL DEPTH PAVEMENT REPAIRS (ASPHALT) SY $ $53, NON-TRACKING TACK COAT GALLON $2.00 $29, TRAFFIC CONTROL (Ref. Nos A) Item No. Total: $1,119, Units 46 SPECIAL SONIC NAP ALERT PATTERN (SNAP) 2.99 MILE $2, $6, SP 626 BARRIER REFLECTOR 70 EACH $7.40 $ EDGE LINE, 6" 1.25 MILE $1, $1, LANE LINE, 6" 1.25 MILE $1, $1, A SP 641C REMOVAL OF PAVEMENT MARKING 2 MILE $1, $3, Total: $14,361.25

11 STRUCTURES (Ref. Nos ) Item No. Units 50 SP 202 PORTIONS OF STRUCTURE REMOVED 1 LS $540, $540, GRANULAR EMBANKMENT 126 $ $12, SP 203 LIGHTWEIGHT FILL 6561 $85.00 $557, SP 203 SETTLEMENT PLATFORM 9 EACH $1, $11, SP 203 TEMPORARY SURCHARGE EMBANKMENT 1 LS $650, $650, GEOTEXTILE FABRIC, , TYPE D 2114 SY $4.00 $8, " CONSTRUCTION UNDERDRAINS, FT $16.00 $19, " CONDUIT, TYPE F, FT $32.00 $8, CONDUIT, MISC.: DRAINAGE BOARD 2640 SF $8.00 $21, SPECIAL PRECAST REINFORCED CONCRETE OUTLET 20 EACH $ $6, SP 509 EPOXY COATED REINFORCING STEEL, GRADE LB $2.00 $4, REINFORCING STEEL, REPLACEMENT OF $2.00 $ EXISTING REINFORCING STEEL LB RESET BEARING, AS PER PLAN 36 EACH $1, $36, SP 516A CRACK REPAIR USING EPOXY INJECTION 28 FT $ $2, SP 516B SEALING OF CONSTRUCTION JOINTS 798 FT $8.00 $6, SP 516G REPLACE EXPANSION BEARING DEVICE 36 EACH $3, $118, SP 519 PATCHING CONCRETE STRUCTURE 386 SF $90.00 $34, REINFORCED CONCRETE APPROACH SLABS $ $124, (T=12") SY 68 SP 527 FALSEWORK, TEMPORARY BRACING AND $35, $35, PROTECTIVE STRUCTURES LS 69 SPECIAL STRUCTURES: SETTLEMENT MONITORING 1 LS $10, $10, CONTINUOUS ELASTOMER SEAL IN A PORTLAND $ $156, SP 533D 241 CEMENT CONCRETE JOINT FT 71 SP 536 CONCRETE WEATHERPROOFING, DECK, $10.00 $20, ABUTMENT SLABS AND APPROACH SLABS SY 72 SP 536 CONCRETE WEATHERPROOFING, PARAPETS 320 SY $10.00 $3,200.00

12 73 SP 536 $10.00 $10, CONCRETE WEATHERPROOFING, SUBSTRUCTURE SY MICRO SILICA MODIFIED CONCRETE OVERLAY $90.00 $138, USING HYDRODEMOLITION (2" THICK) SY SURFACE PREPARATION USING $65.00 $100, HYDRODEMOLITION SY MICRO SILICA MODIFIED CONCRETE OVERLAY $ $3, (VARIABLE THICKNESS), MATERIAL ONLY HAND CHIPPING 38 SY $ $13, TEST SLAB 4 $ $1, FULL DEPTH REPAIR 8 $1, $12, GEOGRID, TYPE P SY $3.00 $6, GEOGRID, TYPE S SY $2.00 $3, REINFORCED EMBANKMENT 1174 $50.00 $58, Total: $2,737, MAINTENANCE OF TRAFFIC (Ref. Nos ) Item No. Units 83 SPECIAL "SNAP" MILL AND FILL 9788 FT $7.75 $75, WORK ZONE IMPACT ATTENUATOR 4 EACH $1, $7, REPLACEMENT SIGN 5 EACH $ $ PORTABLE CHANGEABLE MESSAGE SIGN, AS PER $20.00 $29, PLAN DAY WORK ZONE LANE LINE, CLASS I 1.14 MILE $ $1, WORK ZONE EDGE LINE, CLASS I 2.28 MILE $1, $2, WORK ZONE CHANNELIZING LINE, CLASS I FT $0.40 $13, SP 614C REMOVAL OF PAVEMENT MARKINGS 2 MILE $1, $3, SP 621 RAISED PAVEMENT MARKERS 140 EACH $77.60 $10, TEMPORARY PORTABLE BARRIER (WITHOUT $20.00 $147, SP 622A 7360 GLARE SCREEN) FT

13 TEMPORARY PORTABLE BARRIER, BRIDGE 93 SP 622A MOUNTED SIGNING, MISC.: ADDITIONAL SIGNS, GROUND 94 SP 630 MOUNTED, AS DIRECTED BY THE ENGINEER FT SF $25.00 $16, $14.50 $1, Total: $309, GENERAL (Ref. Nos ) Item No. Units 95 SP 614 MAINTAINING TRAFFIC 1 LS $1,200, $1,200, SP 619 FIELD OFFICE 1 LS $50, $50, SP 623 CONSTRUCTION LAYOUT SURVEY 1 LS $32, $32, MOBILIZATION 1 LS $200, $200, IB.ART.6 PREMIUM FOR CONTRACT PERFORMANCE BOND AN 1 LS $85, $85, TOTAL BID AMOUNT (REF. NOS. 1 THRU 99): $6,418,359.60