DISTRICT OF TOFINO BARRS MOUNTIAN RESERVOIR REPLACEMENT PROJECT. Attached, please find Addendum # 1 for the above noted project.

Size: px
Start display at page:

Download "DISTRICT OF TOFINO BARRS MOUNTIAN RESERVOIR REPLACEMENT PROJECT. Attached, please find Addendum # 1 for the above noted project."

Transcription

1 DATE DESTINATION NO OF PAGES (INCL THIS PAGE) FILE January 13, 2017 n/a TO FROM ALL DOCUMENT HOLDERS C. Pogson COMPANY CITY ORIGINALS TO BE: Filed Mailed Couriered OTHER (SPECIFY) MESSAGE DISTRICT OF TOFINO BARRS MOUNTIAN RESERVOIR REPLACEMENT PROJECT Attached, please find Addendum # 1 for the above noted project. Electronic PDF includes: 1 page Cover 3 page Addendum #1 2 page Appendix 1 Schedule of Quantities and Prices 1 page Air Release Valve Assembly DWG W6A-SD 1 page Xylem Hatch Details 1 page Construction Access Plan (Figure 4) 1 page MCSL Drawing page MCSL Drawing 103 McElhanney Consulting Services Ltd.

2 DISTRICT OF TOFINO Barrs Mountain Reservoir Replacement Project File: January 13, 2017 Addendum # 1 The following information and corrections are added to the Tender Documents for this project: 1. Revise IT Part I Section 3.0 Submission of Tenders, Tender Closing Date as follows: The Tender Closing date has been extended. The Closing Date is revised as follows: Tenders Close Wednesday January 25 th, 2017 at 2:00pm. All other conditions remain the same. 2. Revise IT Part I Section 4.0 subsection as follows: Tender questions will be accepted until 2:00pm, Friday January 20 th, The following drawings have been revised as follows: a. Drawing 101 (Valve Chamber Detail) Drawing re issued, see attached b. Drawing 103 (Reservoir Typical Section) Removed High and Low Floats refer to electrical drawings Drawing re issued, see attached. c. Drawing D1 Add: 50mm Air / Vacuum Break Valve at approximate station Exact location beyond traveled road to be determined in the field. Air valve as per Tofino DWG. W6A SD. All pipe and fittings to be 50mm diameter. Drawing not re issued. d. Drawing D1 Add: Clearing and grubbing to be completed for width of road right of way for length of new supply pipe. No clearing or grubbing is to be completed outside of the road right ofway. 4. The following Supplementary Specifications have been revised as follows: a. 8.1 Water System Operation Add: Temporary bypass line shall be a minimum of 200mm diameter and suitable for potable water use. b. 8.3 Incidental Works Add: Road Construction / Surface Restoration 5. Appendix 1 SCHEDULE OF QUANTITIES Prices have been revised as follows: - Schedule of quantities re-issued, see attached. a. Item 2.6 Select Granular Sub Base (MMCD Spec, Provisional) Deleted from project McElhanney Consulting Services Ltd. Page 1

3 DISTRICT OF TOFINO Barrs Mountain Reservoir Replacement Project File: January 13, 2017 Addendum # 1 b. Add Item mm Air / Vacuum Break Valve Payment for this item shall include all of the work and materials required to supply and install the 50mm air valve assembly at approximate station Exact location beyond traveled road to be determined in the field. Work shall include supply and installation of the air valve assembly as detailed on District of Tofino Standard Drawing W6A SD. All pipe and fittings to 50mm diameter. Includes chamber. Payment shall be made at the tendered unit price. c. Item 6.1 Level Controls Item now Optional Work and includes and Allowance. d. Item 6.2 Relocate Existing Utilities Deleted from project Clarifications: 6. Question: Will alternate reservoir suppliers be accepted? Answer: Tenderers are permitted to submit alternate tenders in addition to, and not in substitution for, a tender which conforms to the requirements of the contract documents. Bidders can do this through the process outlined in MMCD specification section 6.0 in Instructions to Tenderers Part II.6.0 Qualifications, Modifications, Alternative Tenders 6.1, 6.2 and Question: Can further detail be provided on the valve chamber hatch? Answer: Xylem Aluminum/Steel (Safe Hatch) access Frame detail attached (Document No. ES ) 8. Question: Does all blasted rock need to be removed from the site? Answer: Yes, all surplus materials need to be removed from site. 9. Question: Is blasting permitted by Tofino bylaws? Answer: Yes, blasting is permitted. However, all works must adhere to the District of Tofino noise bylaw. Works are permitted from 7am until 10pm. 10. Question: Can the base plates for the Kee Klamp railing be drilled, tapped and bolted into the reservoir roof or should they be welded? Answer: Depending on the actual conditions of the roof encountered, both options would be considered acceptable. McElhanney Consulting Services Ltd. Page 2

4 DISTRICT OF TOFINO Barrs Mountain Reservoir Replacement Project File: January 13, 2017 Addendum # Question: Access to Reservoir Site Answer: The Contractor is to assume that they will have access to the reservoir site for the duration of the project with the following: The road right of way shown on drawing D1 The secondary gravel access road shown in Figure 4 (attached) 12. Question: Under what payment item shall clearing and grubbing be covered for the roadway? Answer: Clearing, grubbing, and tree removal for the road way is to be considered incidental works as noted in Supplemental Specification 8.3 Incidental Works. END McElhanney Consulting Services Ltd. Page 3

5 DISTRICT OF TOFINO Barrs Mountain Reservoir Replacement Project APPENDIX 1 - SCHEDULE OF QUANTITIES PRICES ITEM NO. MMCD REF. DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT GENERAL CONDITIONS Specifications Mobilization and Demobilization Lump Sum 1 Specifications Site Maintenance and Sediment Management Plan Lump Sum 1 SUBTOTAL - GENERAL CONDITIONS 2.0 SITE WORKS and Supplementary Spec's Trench Rock Removal Cubic metre and Supplementary Spec's Mass Rock Removal for Reservoir and Roadway Construction Cubic metre and Supplementary Spec's Site Preparation for Bolted Steel Reservoir Lump Sum m high chain link fence Linear meter m chain link gate x 2.4 m high Each Select Granual Sub-Base (MMCD Spec, Provisional) SUBTOTAL - SITE WORKS Item Deleted From Project 3.0 WATER WORKS: 3.1 Specifications Temporary Water Service Lump Sum Specifications Remove and Dispose Existing AC Watermain Linear meter Tie-into Existing Watermain at Sta /- Lump Sum Tie-into Existing Reservoir Lump Sum Tie-into Existing Watermain at Reservoir Site Lump Sum mm Diameter Watermain (HDPE DR 17) Linear meter Specifications Miscellaneous Waterworks at Reservoir Site Lump Sum mm Gate Vave Each , and Supplementary Specs Reservoir Valve Chamber Lump Sum and Supplementary Specs Below Grade Flushout Each Specifications Watermain Concrete Cap Linear meter mm Diameter Watermain (PVC DR18 C900) Linear meter and 3.13 Supplementary Specs 50 mm Air / Vacuum Break Valve Assembly Each 1 SUBTOTAL - WATER WORKS 4.0 DRAINAGE WORKS and Supplementary Specs 150 mm Drain (PVC SDR 28) Linear meter 125 Specifications Below Grade Reservoir Drain Lump Sum 1 Specifications Reservoir Overflow and Absorption Pit Lump Sum 1 Specifications Trench Dams Each 13 Specifications Cleanouts Each Class 50 Rip Rap Cubic metre and Supplementary Specs 750mm Manhole Each Specifications Ditching Linear meter and Supplementary Specs Ductile Iron Culvert Lump Sum 1 SUBTOTAL - DRAINAGE WORKS Z:\Proj-Active\ District of Tofino - Barrs Mountain Reservoir Construction Services\05.0 Tender & Construction\ Tender\ Tender Documents\Addenda\Addendum 1\ Schedule of Quantities - SO.xls 1/2

6 DISTRICT OF TOFINO Barrs Mountain Reservoir Replacement Project APPENDIX 1 - SCHEDULE OF QUANTITIES PRICES ITEM NO. MMCD REF. DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT 5.0 RESERVOIR 5.1 Specifications Bolted Steel Reservoir Lump Sum Specifications Handrail on Existing Reservoir Lump Sum 1 SUBTOTAL - RESERVOIR 6.0 ELECTRICAL 6.1 Specifications 6.2 Specifications [Optional Work] Level Controls c/w all conduits, cabling, transducer and commissioning. Allowance 1 $30, $30, Relocate Existing Utilities: Seaview Cable Building, a generator, satellite dishes, and concrete Item Deleted From Project SUBTOTAL - ELECTRICAL Tenderer s Initials Z:\Proj-Active\ District of Tofino - Barrs Mountain Reservoir Construction Services\05.0 Tender & Construction\ Tender\ Tender Documents\Addenda\Addendum 1\ Schedule of Quantities - SO.xls 2/2

7

8

9 ³

10 REQUIRED REMOVALS & RELOCATES NOTES: 01 ³ ³ 01 DISTRICT OF TOFINO TOFINO, B.C. Drawing No. 0 1: Estevan Road Suite 1 Nanaimo BC Canada V9S 3Y3 Tel Approved Sealed BARRS MOUNTAIN RESERVOIR UPGRADE GENERAL ARRANGEMENT PLAN Project Number Rev. 01

11 SPRAYER ASSEMBLY FLOW SWITCH ELEVATIONS 01 RESERVOIR DESIGN CRITERIA ³ ³ ³ RESERVOIR NOTES ³. DISTRICT OF TOFINO TOFINO, B.C. Drawing No. 0 1: Estevan Road Suite 1 Nanaimo BC Canada V9S 3Y3 Tel Approved Sealed BARRS MOUNTAIN RESERVOIR UPGRADE RESERVOIR DETAILS Project Number Rev. 01