1 Pre-Feasibility Report for Granite Building stone Quarry SURVEY NO. : 53/6 & 53/8-1, 53/8-2 & 53/13 VILLAGE TALUK DISTRICT STATE EXTENT : AYYAMPUZHA : ALUVA : ERNAKULAM : KERALA : HA LAND STATUS : PRIVATE LAND Applicant M/s Star Rock Products Pvt Ltd., Mr.T.C.Johnson Managing Director Oliveli, Ayyampuzha Village, Thabore P.O, Aluva Taluk Ernakulam Dist, Kerala

2 1. EXECUTIVE SUMMERY M/s. Star Rock Products Pvt Ltd., has obtained Quarrying Permit from Department of Mining & Geology to quarry Granite Building stone over an extent of Ha in Survey Nos: 53/6 & 53/8-1, 53/8-2 & 53/13 in Ayyampuzha Village, Aluva Taluk, Ernakulam District, Kerala state vide Letter No. 31/16-17/MM/GS/QP/DOE/1777/E2/16 dated 24 June 2016 for a period of one year from the date of sanction. SALIENT FEATURES OF THE PROJECT S.NO PARTICULAR DETAILS 1. Name of the Proponent M/s. Star Rock Products Pvt Ltd., Mr. T.C. Johnson, Managing Director 2. Type of Project Granite Building stone quarry 3. Location Survey No. 53/6 & 53/8-1, 53/8-2 & 53/13 Ayyampuzha Village, Aluva Taluk, Ernakulam District, Kerala state. 4. Permit applied area Hectares 5. Type of land Private land - Non forest Patta/forest/PWD 8. Life of mine The proposed mining is for Three years from the date of obtaining quarrying permit. 9. Production capacity It has been proposed to excavate a maximum of 78,634 MTA of Granite Building Stone by open cast semi-mechanized method. The proposed area is Hectare; Total minable reserve available is 2,27,717 Tonnes of stone. The expected life of mine will be 3 years. The mineral will be transported through trucks/ tippers. 10. Method of Mining Open cast semi mechanized mining method with 5.0m vertical bench with a bench width of 5.0m is being proposed. 11. Ultimate depth of Mining The quarry operation is Proposed a ultimate pit limit will be 68 m AMSL at conceptual stage 12. Latitude 10 15' 58.47" N to 10 16' 02.26" N 13. Longitude 76 27' 34.27" E to 76 27' 37.98" E 14. Topo sheet No. C43K8 (58B/8) 15. Topography of MSL area Highest elevation of the lease area is 114m AMSL and Lowest is 71m AMSL. 16. Land use classification It is a Proposal for Environmental clearance (the area has been quarrying operation earlier in the previous permit period) 17. Ground water level The Ground water is well below the ground level as it is a hilly terrain. 18. Climatic condition The annual rainfall ranges from 3233 to 3456 mm - 2 -

3 at different places of the district. 19. Land use pattern Description Extent in Ha Present land use End of Mine life Mined Area Undisturbed Area safety zone / plantation Total Proposed Permit area 20. Nearest habitation Ayyampuzha Village Nearest House Meters South 21. Nearest Town Kalady - 10 km S 22. Nearest Railway station Karukutty Railway station 10.5 km SW 23. Nearest Airport Cochin Airport km SW 24. Nearest National Highways & NH 47 Salem Kochi- Kanyakumari Road 10.1 State Highways Km - W 25. Nearest Hospital Dispensary facility is available in Ayyampuzha. Better higher facilities are available in Angamaly and Chalakudy. 26. Aerial distance to the nearest More than 500m from Eco sensitive areas, CRZ, Eco sensitive areas, CRZ, forest, wild life sanctuary, Interstate boundary, forest, wild life sanctuary, critically polluted area. Interstate boundary, critically polluted area if the quarry site is within 500m of these areas. 27. Details of other quarries for a M/s Vellayilkudam Granites ( Ha) radius of 500m around the quarry site M/s J & S Rocks ( Ha) 28. Man power About 15 employees 29. Water requirement & source Total water requirement for 8 KLD from water vendors & nearby Bore wells. 30. Overburden/Waste The overburden in the form of Top soil. The total quantity of waste to be generated from the proposed permit area is 7879 m3 (19697 MT). The top soil will be used for plantation purpose. The entire quarried out material will be transported to the needy crushing sites. 31. Cost of the project The Project cost: A. Fixed Asset cost = Rs. 1,60,00,000/- B. Operational cost = Rs 5,00,000/- C. EMP cost = Rs. 10,00,000/- Total cost = Rs. 1,75,00,000/

4 Malayattur RF More than 0.5 km (NE), Karakkad RF 4.5 km (S), Kumbadan RF 3.25 km (N), Inchakunda RF 5.4 km (SW), Kodasseri RF 4.7 km (SE) and Kurisumudi RF 6.8 km (SE) There is no CRZ within the radius of 5 km. There area is not fall in the HACA Region. There is no interstate boundary within radius of 5 km. There are no Bird sanctuaries, wild life sanctuary or National parks as per Wild life protection Act 1972, within the radius of 5 kms. The following information provided by the proponent I have applied for getting Environmental Clearance to DEIAA, Thrissur District for quarrying of Granite Building stone in S.F.Nos: 53/6 & 53/8-1, 53/8-2 & 53/13 over an extent of Ha in Ayyampuzha Village, Aluva Taluk and Ernakulam District. I will not deploy any child labours below 18 years for any type of quarrying operation. All labors engaged for quarrying operation will be insured till the end of life of quarry period. All type of safety / Protective equipments will be provided to all the labourers working in my quarry site. I will sincerely follow and execute the Afforestation and Green belt during the course of quarrying operation and maintain Afforestation after the expiry of quarrying lease. community. I ensure to involve and participate in the corporate social responsibilities of the local The quarrying operation will not cause any hindrance to the nearby public and also it will not cause any hindrance to nearby villagers and human settlements during transportation of mineral. The project area does not fall in HACA region. There is no interstate boundary within the radius of 5kms. The project area does not fall in CRZ zone within the radius of 5km. The project area is does not fall in Western Ghats boundary There are no Bird sanctuaries, wild life sanctuaries as per Wild life protection Act 1972, within the radius of 5kms

5 2.0 INTRODUCTION OF THE PROJECT OR BACKGROUND INFORMATION (i) Identification of project and project proponent: In case of mining project, a copy of mining lease/letter of intent should be given owner name and address of the Project proponent Identification of Project Name of the Project Granite Building stone quarry project Permit area Ha (Private land) - Non forest Location Survey Nos. 53/6 & 53/8-1, 53/8-2 & 53/13 Ayyampuzha Village, Aluva Taluk, Ernakulam District, Kerala State. Topo Sheet No. C43K8 (58B/8) Project Proponent Name with Address M/s Star Rock Products Pvt Ltd., Mr.T.C.Johnson Managing Director Oliveli, Ayyampuzha Village, Thabore P.O, Aluva Taluk Ernakulam Dist, Kerala. In case of mining project, a copy of mining lease/letter of intent should be given I. Quarrying Permit from Department of Mining & Geology vide letter No. 31/16-17/MM/GS/QP/DOE/1777/E2/16 dated 24 June (ii) Brief description of nature of the project The permit area is exhibits hillock topography. The Granite Building stone quarrying operation is proposed to carry out by conventional opencast Semi mechanized method by formation of benches. Initially pruning of benches as required will be carried out. The width of each bench is proposed not less than the height. The quarry operation involves drilling by jack hammer, blasting operation, Movement of HEMM, Loading & Unloading operation. The massive charnockite formation is clearly inferred with outcrops and existing quarry works. The granite occurs in a undulating terrain sloping from south to north. The elevation of the proposed permit area varies from +71m AMSL to +114m AMSL. Ultimate depth of the pit is proposed at 68m AMSL The maximum proposed production is around 78,634 MTA Topsoil will be used for plantation purpose. The waste/overburden will be used for road formation, filling of low lying areas nearby land owned by the proponent. Hence no waste dump is proposed during the life of the mine

6 (iii) Need for the project and its importance to the country and or region The Granite Building stone is important building material to our country and region; it s a vital material for Infrastructure development and Road widening project. Hence a lot of building stone is required for Granular sub base (GSB). The mining project will fulfill its end uses in construction purposes. The mining and associated activities in the mineral bearing areas will add to the revenue of the state through royalty on the mineral and the taxes as well as improve the economic conditions of the local people through direct and secondary employment. The mining project will provide employment to local people. Applicant will pay royalty for the mineral produced from the mine, direct and indirect taxes will be paid thereby contributing to the regional revenue. The public revenue so generated will further be put for use in infrastructural development and other sectors like health, education and social welfare. (iv) Demand and supply gap There is a huge demand of Granite Building stone for State and National Road projects, the projects are under massive development for its widening and strengthening operation, apart from this many bridges and fly overs are also being under construction. Granite building stone is widely used in construction activities as main raw material. It is available in almost all the parts of the State. The entry in the target market is easy and there is a notable gap in the supply and demand, which is growing. (v) Imports vs indigenous production The Granite building stone is available in local markets and hence, there is no scope of import. However, the demand for the stone is continuously increasing due to rising trend in the infrastructure projects. (vi) Export Possibility Granite Building Stone production from the mine will cater to the needs of well established domestic markets. (vii) Domestic/Export Markets Domestic demand is one of the main reasons for the rapid growth of granite building stone business in Kerala. Thus, domestic market for granite building stone as building material is well established. Since it is an allied industry of the construction sector, growth in construction sector may be considered as proxy for the growth in stone mining sector. The market scope for granite building stone is found to be encouraging in local market with the increased demand from building industry & construction projects

7 (viii) Employment Generation (Direct and Indirect) due to the project It is proposed to deploy about 15 employees directly and indirect employment opportunities will be created surrounding region. The tentative man power required for the proposed Granite building stone quarry shall be as follows. The proposed project would require significant workforce of non-technical and technical persons. Sl. No. Name of Post Nos. 1 Mines Manager 1 3 Mines Foreman 1 4 Mining Mate 1 5 Blasting Helper 1 6 Driller 2 7 Supervisor 1 8 Tipper Driver 2 9 Excavator Operator 2 Unskilled Labour (Security, Gardening, Spotter, etc.,) 4 Total 15 The above man power is adequate to meet out the production schedule and the machinery strength envisaged in the modified mining plan and also to comply with the stationary provisions of quarry safety regulation. It is been ensured that the labours will not be deployed less than 18 years, No Child labours will engaged or entertained for any kind of quarrying operations. All the labours engaged for quarrying operations will be insured till the end of life of quarry. 3.0 PROJECT DESCRIPTION (i) Type of project including interlinked and interdependent projects, if any The project is site specific. There is no interlinked & interdependent project. This is a quarrying project for production of Building stone at proposed to excavate a maximum of 78,634 Tonnes per annum of Granite Building Stone by open cast semi-mechanized method. The Lease area is Hectare; Total minable reserve available is 2,27,717 Tonnes of stone. The expected life of mine will be 3 years. The entire Building stone are transported to the nearby crushing unit to reduce into desirable size for construction of Road projects and other infrastructure development project work

8 (ii) Location (map showing general location, specific location, and project boundary & project site layout) with coordinates The area is located in Survey Nos. 53/6 & 53/8-1, 53/8-2 & 53/13 at Ayyampuzha Village, Aluva Taluk, and Ernakulam District. The entire quarry permit area falls in the Private land, the area exhibits hillock topography. The Altitude of the area is above +71m AMSL to +114m AMSL. The area is mentioned in GSI Topo sheet No. C43K8 (58B/8) The Latitude between of 10 15' 58.47" N to 10 16' 02.26" N The Longitude between of 76 27' 34.27" E to 76 27' 37.98" E on WGS 1984 datum. DRAWING SHOWN THE SURFACE PLAN WITH CO ORDINATES - 8 -

9 LOCATION MAP OF THE PROJECT AREA WITH CO ORDINATES LEASE AREA: Village: Ayyampuzha Taluk: Aluva District: Ernakulam Latitude: 10 15' 58.47" N to 10 16' 02.26" N Longitude: 76 27' 34.27" E to 76 27' 37.98" E - 9 -

10 (iii) Details of alternate sites considered and the basis of selecting the proposed site, particularly the environmental considerations gone into should be highlighted There is no alternative sites examined, the entire Granite building stone will be transported to the needy crusher. This project is site specific. (iv) Size or magnitude of operation The total area of the project is about Ha. It is proposed quantity is 78,634 MTA of Granite Building stone. The quarry proposed up to depth of 68m AMSL from the existing profile of the area. (v) Project description with process details (a schematic diagram/flow chart showing the project layout, components of the project etc. should be given) Method of Mining: Open cast-semi mechanized method with 5.0m vertical bench with a bench width is not a less than the bench height, the quarry operation involves jack hammer drilling, slurry blasting. Manual loading of building stone to needy crushers. SCHEMATIC DIAGRAM OF THE MINING PROCESS Mining Drilling Blasting Excavation with the help of excavator Loading into the tippers for the crushing units The Mining Activities shall be carried out under the guidance of a Competent Person Employed. Bench system shall be implemented from top to downwards, for extraction of Mineral: The height of the benches shall be maintained at 5.0 Mtrs. The width of the benches shall not be less than the height of 5 Meters at any point. Drilling shall be carried out by a Pneumatic Jack Hammer powered by compressed air

11 Drilling Pattern: Square or V Pattern Spacing = 1.2 Mtr Burden = 1 Mtr Depth of Drill Hole = 5 Ft Drill Hole Diameter = 34mm Diameter Drilling shall be carried out by a Jack Hammer drill of 34mm diameter, Nitrate Mixture Gelatine packets, and electric / ordinary detonators with delay elements will be used for blasting purpose. Drilling shall be done with Jack Hammer drills of 34mm diameter up to a depth of 5 ft with square or V pattern, with spacing 1.2m, burden 1 m, 2/3 of the drill hole is charged with 0.2m length Nitrate Mixture Gelatine packets, small diameter explosive cartridge each of 125 Gms and shall be initiated by means of the Electric Detonator or Ordinary Detonators with the help of Safety Fuse and adequate stemming shall be done. In order to confine the energy from the explosive, the top portion of the hole shall be stemmed with inert material, because of their proximity to the hole, drill cuttings or other material like stemming plugs shall be used. Blasting shall be carried out by a competent person and blasting will be carried out from the blasting shelter. The blasted material shall further be sorted out; the material shall be broken into required sizes for dispatch using an excavator mounted with rock breaker, the broken material shall be loaded into trucks by an excavator with bucket and shall be transported to the Stock or shall be dispatched directly. The roadways or haulage roads to the benches shall be made with gradient not less than 1 in 16 and the width of the roadway not less than the height of the bench. Machinery Required: I. Drilling Machine & Loading: S.No Type Nos 1. Hydraulic Excavator with rock 2 breaker 2. Tractor mounted compressor 2 attached with Jack hammer 3. Jack hammer 4 II. Transport Equipment: S.No Type Nos 1. Tipper

12 Reserves: (vi) Raw material required along with estimated quantity, likely source, marketing area of final products, Mode of transport of raw Material and Finished Products No raw material will be required for production of Granite building stone. The final product will be sent to consumer based on their demand. The mode of transportation of raw material and finished product will be by road. Tippers/ trucks will be used for transportation to the end users. (vii) Resource optimization/recycling and reuse envisaged in the project, if any, should be briefly outlined Building stone will be crushed and dispatched to different end users. Rainwater harvesting will be done in part of the excavated pit void and will be used for water conservation thereby reducing exploitation of groundwater. (viii) Availability of water its source, Energy/power requirement and source should be given This building stone quarry project does not require huge water and Electricity for the project. Purpose Quantity Sources Drinking & Domestic Purpose Dust suppression 5 KLD 2 KLD Water purchase from Approved water vendors on nearby village/ Existing Borehole on nearby the quarry. From water tanker supply/ rain water collected in pit. Green belt 1 KLD From water tanker supply/ rain water collected in pit. Energy Electricity for Mines office and Lights only at nights (working is restricted on day time only between 9Am to 5Pm) will be obtained from state electricity board. DG sets will be provided for emergency use. Around 50 LPH of HSD Diesel will be used for quarrying machineries. Diesel will be brought from nearby diesel pumps. No power is required for the project. Lightings on the Night will be taken from nearby electric poles after obtaining permission from concerned authorities. (ix) Quantity of wastes to be generated (liquid and solid) and scheme for their management/disposal Topsoil formation: The overburden in the form of Top soil. The total quantity of waste to be generated from the proposed permit area is 7879 m3 (19697 MT). The top soil will be used for plantation purpose

13 Waste water: There will not be any process effluent generation from the permit area. Domestic effluent from the mine office is discharged in septic tank and soak pit. There is no toxic effluent expected to generate in the form of solid liquid and gases and the no requirement of treatment of waste. (x) Schematic representations of the feasibility drawing which give information of EIA purpose Submission of Form 1 Along with pre-feasibility report & Approved Mining plan with Annexure to the DEIAA, Ernakulam Presentation for EC before the DEIAA 4.0 SITE ANALYSIS (i) Connectivity Mode Road connectivity Railway station & Railway line Air port Description 1. Edalakadu chully road is located more than 215 m (S). 2. Salem Kochi- Kanyakumari Road - NH km W. 1. Karukutty railway station is about 10.5 km (SW) away from the project site. 1. The Nearest Airport Cochin 13.5km South Western side. (ii) Land Form, Land use and Land ownership The quarry permit applied area is private land. The area falls in GSI Topo sheet No. C43K8 (58B/8). No forest land involved in this permit area. The applied area exhibits almost hillock topography. Environmental Clearance (iii) Topography (along with map) The permit applied area exhibits hillock topography, excavated pits are observed clearly, the massive Granite Building stone formation is clearly inferred from the existing pit. The granite occurs in a undulating terrain sloping from south to north. The elevation of the proposed permit area varies from +71m AMSL to +114m AMSL

14 (iv) Existing land use pattern (agriculture, non-agriculture, forest, water bodes (including area under CRZ), shortest distances from the periphery of the project to periphery of the forests, national park, wild life sanctuary, eco sensitive areas, water bodies (distance from the HFL of the river), CRZ. In case of notified industrial area, a copy of the Gazette notification should be given. The permit applied area exhibits hillock topography. The area is a dry barren land devoid of Agriculture and Habitations. The land is not used for any specific vegetation. No major water bodies in the permit area, the region experiences semi humid climate and there is scanty growth of vegetation in and around the permit applied area (seasonal vegetation is mostly practiced). There is no CRZ within the radius of 5km. There is no HACA region within the radius of 5km. There is no interstate boundary within radius of 5km. There is no Western Ghats within the radius of 5km. There are no Bird sanctuaries, wild life sanctuary or National parks as per Wild life protection Act 1972, within the radius of 10km. (v) Existing Infrastructure There is no existing infrastructure in the permit area. A permanent mine office has been proposed in the permit area. A well-equipped first aid facility will be made available. Permanent rest shelter is proposed. At the quarry site, urinal and latrine are proposed. Water for drinking purpose be supplied form the approved water vendors. A small water tank is also proposed which will be used for water sprinkling, plantation etc. (vi) Soil Classification Most of the applied mining area is already subjected to mining and there is no soil cover. In the undisturbed area within the applied mining area, a thin cover of top soil is present. These soils are well drained, low in organic matter and plant nutrients. Rock is exposed in most of the area. The top soil & over burden thickness varies from avg. 0.50m to 2.5m; the topsoil excavated from the quarry will be dumped separately at predetermined place and subsequently will be utilized in spreading over reclaimed areas for plantation. OB, will be utilized for laying internal haul road and will form base in reclamation/plantation

15 (vii) Climatic data form secondary sources The southwest monsoon is very active in Kerala during June to September and it is followed by NE monsoon commencing from October to December. Ernakulam district receives an annual rainfall between 3233 to 3456 mm. (viii) Social infrastructure available The nearest town is Kalady. Health & educational facilities are available there. Medical facilities, Primary Health Centre are available at the nearby villages, imparting services, for advance medical facilities. In each village, one health worker has been appointed by the Govt. to provide primary health facilities. Village people are availing drinking water facilities generally from the hand pump, open well and tube well. The water supply is also supplied through tanker in few villages. During summer scarcity of water has been noticed. Communication services like post office and telephones are available in the nearby village. Many of the villagers are having mobile phones. 5. PLANNING BRIEF (i) Planning Concept (type of industries, facilities, transportation etc) Town and Country Planning/Development authority Classification The quarry operation involves jackhammer drilling, slurry explosives blasting, the Granite Building stone will be loaded into the tippers with the help of excavator. There are no habitations or villages en-route between the quarry sites the loaded vehicles are allowed to move only below 40Kms per hour on the roads. The haul roads are sprinkled periodically to prevent dust. Other facilities such as power, transportation and communication, social infrastructure facilities are locally available near project site. Nearest town is Ernakulam, Hospital facility is available in Mookkannoor.Better higher facilities are available in Angamaly and Chalakudy

16 (ii) Land use planning (breakup along with green belt etc.) The land use planning of the permit area is given below Extent in Ha Description Present land use End of Mine life Mined Area Undisturbed Area safety zone / plantation Total Proposed Permit area (iv) Assessment of Infrastructure Demand (Physical & Social) The existing road facilities are already available which shall be used and maintained. The labors requirement is drawn from the nearest villages. The labors will be brought by jeeps and vans to the quarry site, Medical facilities are available near the project site, Government and private hospitals and other basic amenities and infrastructure facilities like communication center, school supermarket, bus stand are also available in Kalady at a distance of 10 kms (S). This quarry project will provide employment for about 15 persons directly. (v) Amenities/Facilities The simple methods adopted and the limited scale of activities involved in Granite Building stone quarrying does not require High Tension Electric Power supply or huge worship facilities. The quarrying work is restricted to one general shift during daytime 9.00am to 5.00pm with 1.00pm pm lunch break. Major Machinery repair works are attended at Ernakulam minor repairs are carried out by the nearby mechanics. All facilities and amenities are available in Ernakulam which is 35Km on the SE side of the area. 6. PROPOSED INFRASTRUCTURE (i) Industrial Area (Processing area) There is no processing area proposed within the permit applied area. (ii) Residential area (Non processing area) There is no residential area within 300mts of the permit applied area. (iii) Green Belt All along the boundary barrier is selected for Green belt development by planting and maintaining native species. The total area for proposed for Green belt is around out of

17 0.9842Ha. The estimated budget for plantation and maintenance of Green belt development would be around Rs. 20,000/- (iv) Social infrastructure About 15 employees will be directly benefited and 6 persons will be indirectly benefited, the lease ensure to share all responsible for special benefits like water, health care, Education benefits, and promotion of socio cultural activities of the nearby villages. (v) Connectivity (traffic and transportation road/ Rail/ Metro/ Water ways etc.,) Mode Road connectivity Railway station & Railway line Air port Description 1. Edalakadu chully road is located more than 215 m (S). 2. Salem Kochi- Kanyakumari Road - NH km W. 1. Karukutty railway station is about 10.5 km (SW) away from the project site. 1. The Nearest Airport Cochin 13.5km South Western side. (vi) Drinking Water management (Source & Supply of water) This proposed Granite building stone quarry project does not require huge water either for beneficiation or processing. Water required for drinking domestic consumption for labors is around 8 KLD. The packaged Drinking water for this will be brought from approved water vendors nearby village. (vii) Sewerage System soak pit. Toilets will be constructed on permanent structure and sewage will be discharged to (viii) Industrial Waste Management No industrial waste will be generated from the project. (ix) Solid Waste Management The waste generated during quarrying activity is negligible rock mass during handling and re handling. Hence, there is no waste in this quarrying operation. There is no solid waste generation during the quarrying operation. (x) Power Requirement & Supply / source The proposed building stone quarrying does not required any power supply for the quarrying operation. It is proposed to operate in day time only from 9 Am to 5Pm with 1 Hour lunch interval between 1Pm to 2Pm

18 7. REHABILITATION AND RESETTLEMENT (R & R PLAN) (i) Policy to be adopted (Central/State) in respect of the project affected persons including home oustees, land oustees and landless laborers (a brief outline to be given) There is no Rehabilitation and resettlement is involved. The employed labours will be insured as per the Government norms till the end of the life of the quarry. Periodical medical test will be conducted for the labors to monitor the occupational disease. The salaries and benefits will be paid as specified by the instruction given by the labor enforcement officers. 8. PROJECT SCHEDULE & COST ESTIMATES (i) Likely date of start of construction and likely date of completion (Time schedule for the project to be given) The Granite Building stone quarrying project is likely to get commenced after the sanction of lease. proposed to excavate a maximum of 78,634 MTA of Granite Building Stone by open cast semi-mechanized method. The Lease area is Ha; Total minable reserve available is 227,717MT of stone. The expected life of mine will be 3 years. (ii) Estimated project cost along with analysis in terms of economic viability of the project A. Fixed Asset Cost: Land cost (about 3Lakhs per Ha) = Rs. 58,50,000/- Machineries to be used = Rs. 1,00,00,000/- Labour shed = Rs. 50,000/- First aid room & Accessories = Rs. 50,000/- Sanitary facilities = Rs. 50,000/- Total Fixed assets cost = Rs. 1,60,00,000/- B. Operation cost: Fencing cost = Rs. 50,000/- Other operational cost = Rs. 4,50,000/- Total operation = Rs. 5,00,000/- C. EMP Cost/Annum: Sl.No Description of Item Capital Cost (Rs in Lakh) Recurring cost/ annum Rs in Lakhs 1 Dust suppression Monitoring of Environmental quality 3 Green belt and afforestation Occupational Health & Hygiene 5 CSR activities budget, etc., Total

19 The total project cost: A. Fixed Asset cost = Rs. 1,60,00,000/- B. Operational cost = Rs 5,00,000/- C. EMP cost = Rs. 10,00,000/- Total cost = Rs. 1,75,00,000/- The total project cost (A+B+C) and including CSR Cost is about Rs. 1,75,00,000/- Rupees One Crore Seventy Five Lakh only) The total EMP cost is around Rs. 10,00,000/- (Rupees Ten lakhs only) Population Benefit The company will ensure to take social responsibilities like providing School Note books, Uniforms to the Students in nearby areas. Company will also take part and contribute the native cultural activities in the nearby villages. During summer seasons packaged drinking water will be kept will be kept in the village for public and for tress passers. 9. ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS) (i) Financial and social benefits with special emphasis on the benefit to the local people including tribal population, if any, in the area The permit area is Private land in Ayyampuzha Village, Aluva Taluk and Ernakulam District. There are no tribal populations in and around the area about 15 personals directly will be benefited by these projects, besides the government. The proposed quarry will bring economic benefits to the state by the way of royalty for mineral, surface rent, sale tax/vat, income tax etc. It is envisaged that socio-economic impact due to this project will positively increase the chance of more employment opportunities for local inhabitants. There are no Resettlement and Rehabilitation issues involved in this project. The State Govt. will benefit from the revenue generated due to the project. The entire project area is devoid of any endangered flora and fauna. It is proposed to reclaim the land and develop green cover for eco-restoration with native species to a maximum possible extent. Thus the proposed project will help in improving the ecosystem of the area. The socio- Economic conditions of the village and distance will enhance due to the project, hence, the project should be allowed after considering all the parameters. The detail furnished in this modified mining plan is based on information provided by the State Government and the lessee. By considering the merit of the project the permission may be granted