1. SUBJECT: DURO-LAST, DURO-LAST EV, DURO-TUFF, DURO-FLEECE, and DURO-FLEECE PLUS ROOFING MEMBRANES

Size: px
Start display at page:

Download "1. SUBJECT: DURO-LAST, DURO-LAST EV, DURO-TUFF, DURO-FLEECE, and DURO-FLEECE PLUS ROOFING MEMBRANES"

Transcription

1 UL Evaluation Report UL ER Issued: January 22, 2016 Revised: September 30, 2018 Visit UL s On-Line Certifications Directory: for status of Report. UL Category Code: ULFB CSI MasterFormat DIVISION: THERML ND MOISTURE PROTECTION Sub-level 2: Membrane Roofing Sub-level 3: Thermoplastic Membrane Roofing Sub-level 4: Polyvinyl-Chloride Roofing COMPNY:, Inc. 525 Morley Drive Saginaw, MI US (800) SUBJECT: DURO-LST, DURO-LST EV, DURO-TUFF, DURO-FLEECE, and DURO-FLEECE PLUS ROOFING MEMBRNES 2. SCOPE OF EVLUTION 2018, 2015, 2012, and 2009 International Building Code (IBC) 2018, 2015, 2012, and 2009 International Residential Code (IRC) ICC ES cceptance Criteria for Roof-Covering Systems (C75), Dated pril 2014 ICC ES cceptance Criteria for Quality Documentation (C10), Dated June 2014 The products were evaluated for the following properties: Roofing Systems for Exterior Fire Exposure (NSI/UL 790, STM E108) Roofing Systems, Wind Uplift Resistance (NSI/UL 1897, FM 4474) Physical Properties (STM D4434, STM G155) Impact Resistance (NSI/UL 2218, STM D3746, FM 4470) Foot Traffic Resistance (FM 4470) Page 1 of 29

2 3. REFERENCED DOCUMENTS NSI/UL790, Eighth Edition (STM E108), Test Methods for Fire Tests of Roof Coverings NSI/UL 1897, Seventh Edition, for Uplift Tests for Roof Covering Systems STM D , Specification for Poly (Vinyl Chloride) Sheet Roofing STM D (2008), Test Method for Impact Resistance of Bituminous Roofing Systems STM G155-05a, Practice for Operating Xenon rc Light pparatus for Exposure of Non- Metallic Materials FM 4470, Single-Ply, Polymer-Modified Bitumen Sheet, Built-Up Roof (BUR) and Liquid pplied Roof ssemblies for use in Class 1 and Noncombustible Roof Deck Construction FM 4474, Evaluating the Simulated Wind Uplift Resistance of Roof ssemblies Using Static Positive and/or Negative Differential Pressures ICC ES cceptance Criteria for Membrane Roof-Covering Systems (C75), Dated September 2016 ICC ES cceptance Criteria for Quality Documentation (C10), Dated June USES, EV, Duro-Tuff, Duro-Fleece, and Duro-Fleece Plus single-ply PVC roof membranes are used as roof coverings in mechanically fastened or fully adhered Class, B or C roof assemblies installed on combustible or non-combustible roof decks. 5. PRODUCT DESCRIPTION, EV, Duro-Tuff, Duro-Fleece, and Duro-Fleece Plus are reinforced single ply polyvinyl chloride (PVC) membranes designed to be used in adhered roofing systems or mechanically fastened roofing systems as described in this report. The membranes are provided in rolls of various lengths and widths. These roofing systems consist of the single-ply PVC roofing membrane, insulation where used, barrier board or slip sheet where used, flashing, mechanical s, and adhesives that are installed on a combustible or non-combustible roof deck. These roofing assemblies comply with the following properties when installed as described in this report. Fire Classification: Roofing assemblies covered under this report have been tested for fire classification Class, B or C in accordance with NSI/UL790 or (STM E108), as required by Section of 2018, 2015, 2012, and 2009 IBC and Section R902.1 of the 2018, 2015, 2012, and 2009 IRC. Wind Resistance: Roofing assemblies covered under this report have been tested for wind uplift resistance in accordance with FM 4474, and therefor qualify for use under Roofing membranes Section of the 2018, 2015, 2012, and 2009 IBC. Metal edge securement for all systems shall be designed in accordance with NSI/SPRI ES-1, complying with Section of the 2018, 2015, 2012, and 2009 IBC. For certifications of metal edge securement systems in accordance with NSI/SPRI ES-1, see UL Online Certifications Directory Roof-edge Systems, Metal, for Use with Low-slope Roofing Systems (TGJZ). The roofing assemblies shall be designed to resist the design wind load pressures for components and claddings in accordance with Section 1609 of the 2018, 2015, 2012, and 2009 IBC and Section R905.1 of the 2018, 2015, 2012, and 2009 IRC. Physical Properties: The roofing membranes covered under this Report have been tested for physical properties in accordance with STM D4434 and STM G155, and therefore qualify for use under Section and Section of the 2018, 2015, 2012, and 2009 IBC and Section R of the 2018, 2015, 2012, and 2009 IRC. Page 2 of 29

3 Impact Resistance: The single-ply roofing membranes covered under this Report have been tested for impact resistance in accordance with Resistance to Foot Traffic Test in Section 5.5 of FM 4470 and therefore qualify for use under Section of the 2018, 2015, 2012, and 2009 IBC. In addition, each of the membranes covered under this report have been tested in accordance with STM D3746 for impact resistance as it relates to puncture. 5.1 Membranes: PVC (40 60 mils), EV (50 60 mils), and Duro-Tuff (50 80 mils) are membranes having a proprietary thermoplastic formulation consisting of PVC resins, plasticizers, stabilizers, biocides, flame retardants and U.V. absorbents which incorporate a weft-insertion knitted scrim that is laminated between two layers of PVC film giving the membrane strength and durability Duro-Fleece (50 80 mils) and Duro-Fleece Plus (50 60 mils) are Duo-Last PVC membranes combining its proprietary thermoplastic formulation. These membranes are manufactured with a fleece bound to the underneath side of the membrane for enhanced adhesion characteristics. Duro-Fleece and Duro-Fleece Plus are bound with 3.8 ounce and 5.5-ounce fleece, respectively. 5.2 Insulation: Foam plastic insulation when used shall have a flame spread index of not more than 75 when tested at the maximum thickness intended for the use in accordance with NSI/UL 723 or STM E 84 to qualify for use under Section and Exception 3 of the 2018, 2015, 2012, and 2009 IBC. To qualify for use under Section of the 2018, 2015, 2012, and 2009 IBC, a thermal barrier is not required for foam plastic insulation that is part of a Class, B or C roof-covering assembly, provided the assembly with foam plastic insulation complies with FM 4450 or UL s: s used to mechanically fasten insulation and membranes to the roof deck shall be corrosion resistant. Refer to the assemblies in les 1-18 for the specific s to be used. 5.4 dhesive: The adhesive used for adhering PVC membranes to the insulation or roofing substrate shall be as noted in the ppendix of this Report. 5.5 Sealer: Hybrid lap seams utilize solvent-based contact bonding agent to adhere adjacent sections of PVC membranes. 5.6 sphalt: Hot roofing asphalt, when specified in the roofing assemblies shall conform to STM D312, Type III or Type IV. Page 3 of 29

4 6. INSTLLTION single ply PVC membranes shall be installed in accordance with the applicable code, this report and the manufacturer s published installation instructions. The membranes shall be installed in accordance with Section of the 2018, 2015, 2012, and 2009 IBC or Section R of the 2018, 2015, 2012, and 2009 IRC as applicable, except as noted in this report. The manufacturer s published installation instructions shall be available at all times on the jobsite during installation. The slope of the roof on which the membranes are installed shall be a minimum of ¼:12 (2% slope) and shall not be more than the maximum slope indicated in les 1-16 of this Report. Penetrations and terminations of the roof covering shall be flashed and made watertight in accordance with the requirements of the membrane manufacturer, Section of 2018, 2015, 2012, and 2009 IBC or Section R903.2 of 2018, 2015, 2012, and 2009 IRC and applicable code. 7. Fire Classification 7.1 New Construction: Roof assemblies utilizing (40 60 mil), EV (50 60 mils), Duro-Tuff (50 80 mil), Duro-Fleece (50 80 mil), and Duro-Fleece Plus (50 60 mil) single ply PVC roof coverings are described in UL Certification Category for Roofing Systems, (TGFU), under File R10128 and in les Reroofing: The existing roof shall be inspected in accordance with the provisions and limitations of Section 1510 of the 2018, 2015, 2012, and 2009, or Section R907 of the 2018, 2015, 2012, and 2009 IRC, as applicable. The existing deck shall be inspected to verify that the structure to be reroofed is structurally sound and adequate to support and secure the roofing membrane. Prior to installation of new roof coverings, inspection by and approval from the code official having jurisdiction is required. PVC membranes may be installed over existing Classified Class, B or C roofing systems as described in the UL Certification Category for Roofing Systems (TGFU), File R10128 under the heading Class, B and C for Maintenance and Repair for applicable coverage and details of the roof assemblies and in les Class, B or C roof coverings may be installed over existing classified roof assemblies under the following conditions without additional roof classification tests, provided the resulting classification is the lower of the new and existing roof classifications under the following conditions: New uninsulated roof coverings installed only over existing uninsulated assemblies. New insulated roof coverings installed over existing uninsulated assemblies only. 8. Wind Resistance 8.1 New Construction: The allowable wind uplift pressures for the roof assemblies are noted in the les Metal edge securement for all systems shall be designed in accordance with NSI/SPRI ES-1, complying with Section of 2018, 2015, 2012, and 2009 IBC. For certifications of metal edge securement systems in accordance with NSI/SPRI ES-1, See UL Online Certifications Directory Roof-edge Systems, Metal for Use with Low-slope Roofing Systems (TGJZ). 8.2 Reroofing: Roof covering systems employing mechanical s shall be qualified, to the satisfaction of the code official, as to the adequacy of s penetrating through existing roof coverings into structural substrates. Since the composition and/or condition of installed roofing covering materials may vary, and reroofing material may vary, reroofing with adhered systems is outside the scope of this report. Page 4 of 29

5 9. CONDITIONS OF USE The single ply PVC roofing membranes described in this Report comply with, or are suitable alternatives to, what is specified in those codes listed in Section 2 of this Report, subject to the following conditions: 9.1 Materials and methods of installation shall comply with this Report and the manufacturer s published installation instructions. In the event of a conflict between the installation instructions and this Report, this Report governs. 9.2 single ply PVC roofing membranes shall be installed by professional roofing contractors trained and approved by the manufacturer. 9.3 See UL Online Certification Directory Roofing Systems (TGFU) File R lso refer to the les in the ppendix of this Report. 9.4 bove-deck thermal insulation board shall comply with the applicable standards listed in le in Section of 2018, 2015, 2012, and 2009 IBC. 9.5 Wind uplift pressures on any roof area, including edges and corner zones shall not exceed the allowable wind pressure for the roof covering installed in that particular area. Refer to the les 1-14 in this Report. 9.6 The allowable wind uplift pressures listed in the les in the ppendix of this Report are for the roof systems only. The deck and framing to which the roofing system is attached shall be designed for the applicable components and cladding, wind loads in accordance with the applicable codes. 9.7 When application is over an existing roof, documentation of the wind uplift resistance of the composite roof construction shall be submitted to the code official. 9.8 The metal edge securement shall be designed and installed for wind loads in accordance with Chapter 16 of 2018, 2015, 2012, and 2009 IBC and test for resistance in accordance with Test Methods RE-1, RE-2 and RE-3 of NSI/SPRI ES-1, except V ult wind speed shall be determined from Figure (1), (2), or (3) of 2018 IBC or Figure 1609, 1609B, or 1609C of 2015, 2012, and 2009 IBC as applicable. 9.9 The thermoplastic single ply membranes covered under this report are produced by in Saginaw, MI, Grants Pass, OR, Jackson, MS, Carrollton, TX, Sigourney, I, and Ludlow, M under the UL LLC Classification and Follow-Up Service Program, including audits in accordance with quality elements of ICC-ES cceptance Criteria for Quality Documentation, C10. Page 5 of 29

6 10. SUPPORTING EVIDENCE 10.1 Data in accordance with ICC-ES cceptance Criteria for Membrane Roof-Covering Systems, C Manufacturer s descriptive product literature, including installation instructions UL Classification Reports in accordance with NSI/UL 790, NSI/UL 1897, and NSI/UL See UL Product Certification Category under File R10128 for Roofing Systems (TGFU), Roofing Systems, Uplift Resistance (TGIK), and Roof-covering Materials, Impact Resistance (TGM), respectively Data in accordance with FM Data in accordance with FM Data in accordance with STM D4434 and STM G Documentation of quality system elements in accordance with ICC-ES cceptance Criteria for Quality Documentation, C IDENTIFICTION The thermoplastic single ply membranes described in this evaluation report are identified by a marking bearing the report holder s name (), the plant identification (if required), the product designation, the UL Classification Mark, and the evaluation report number UL ER The validity of the evaluation report is contingent upon this identification appearing on the product or UL Classification Mark certificate. 12. USE OF UL EVLUTION REPORT 12.1 The approval of building products, materials or systems is under the responsibility of the applicable authorities having jurisdiction UL Evaluation Reports shall not be used in any manner that implies an endorsement of the product, material or system by UL The status of this report, as well as a complete directory of UL Evaluation Reports may be found at UL.com via our On-Line Certifications Directory at Page 6 of 29

7 INDEX le Deck pplication Type Description 1 Wood 1 New, Reroof(Tear- Mechanically ttached Insulation, -1 Off), Recover Mechanically ttached Roof Cover 2 Wood 1 Reroof(Tear-Off) or Recover -2 dhered Roof Cover (Direct to Deck) 3 Wood 1 New, Reroof(Tear- Mechanically ttached Insulation, dhered -3 Off), Recover Roof Cover 4 Wood 1 Reroof(Tear-Off) or Recover -4 dhered Insulation, dhered Roof Cover 5 Steel New, Reroof(Tear- Mechanically ttached Insulation, -1 Off), Recover Mechanically ttached Roof Cover 6 Steel New, Reroof(Tear- Mechanically ttached Insulation, dhered -4 Off), Recover Roof Cover 7 Structural Concrete 8 Structural Concrete 9 Structural Concrete 10 Structural Concrete 11 Steel 12 Steel 13 Structural Concrete Lightweight Insulating Concrete Existing Lightweight Insulating Concrete New, Reroof(Tear- Off), Recover New, Reroof(Tear- Off), Recover New, Reroof(Tear- Off), Recover New, Reroof(Tear- Off), Recover New, Reroof(Tear- Off), Recover New, Reroof(Tear- Off), Recover New, Reroof(Tear- Off), Recover New, Reroof(Tear- Off) Reroof(Tear-Off), Recover -1-4 Mechanically ttached Insulation, Mechanically ttached Roof Cover Mechanically ttached Insulation, dhered Roof Cover -2 dhered Roof Cover (Direct to Deck) -3 dhered Insulation, dhered Roof Cover -3 dhered Insulation, dhered Roof Cover -6-6 Mechanically ttached Insulation, Spot ttached Roof Cover Mechanically ttached Insulation, Spot ttached Roof Cover -2 dhered Roof Cover (Direct to Deck) -7 Mechanically ttached Roof Cover New, Reroof(Tear- Mechanically ttached Insulation, 16 Tectum -1 Off), Recover Mechanically ttached Roof Cover 17 Gypsum New, Recover -7 Mechanically ttached Roof Cover 18 Gypsum New or Reroof(Tear- Off) -3 1 Wood framing members spaced 24 inches on center unless otherwise noted. dhered Insulation, or Spot dhered Roof Cover Page 7 of 29

8 The following notes apply to the systems outlined herein: 1. Roof decks shall be in accordance with IBC or IRC requirements to the satisfaction of the HJ. Wind load resistance of the roof deck shall be documented through proper codified and/or FBC pproval documentation. Wind load resistance of the roof deck shall be documented through proper codified pproval documentation. 2. Unless otherwise noted, s and stress plates for insulation attachment shall be as follows. s shall be of sufficient length for the following engagements: Steel Deck: #14HD, TruFast #15 EHD, and #15 Extra Heavy Duty Drill Point must penetrate steel decking a minimum ¾-inch into the top flute of the steel deck. Concrete Deck: #14 Concrete Screw or Fluted Concrete Nail 1-inch embedment. s installed with a pilot hole in accordance with the manufacturer s published installation instructions. 3. Preliminary insulation attachment for System Type -1 four s per 4 x 8 ft board or minimum two s per 4 x 4 ft board. 4. Unless otherwise noted, insulation adhesive application rates are as follows. Ribbon or bead width is at the time of application; the ribbons/beads shall expand as noted in the manufacturer s published instructions: Hot asphalt [H]: Full coverage at lbs/sq. Duro-Fleece Membrane dhesive: Continuous 3 /4 inch wide Note: When multiple layers(s) of insulation and/or coverboard are installed in ribbon-applied adhesive, adhesive ribbons shall be staggered a distance of half the ribbon spacing of the previous layer. Note: The maximum edge distance from the adhesive ribbon to the edge of the insulation board shall be not less than one-half the specified ribbons spacing 5. Unless otherwise noted, all insulations are flat-stock or tapered board of the minimum thickness noted. Tapered polyisocyanurate at the following thickness limitations may be substituted with the following Design Pressure (MDP) limitations. 6. Bonded polyisocyanurate insulation boards shall be maximum 4 x 4 ft. 7. For System Types -1, -4, and -5, steel deck applications, the roof membrane shall be run with its length perpendicular to the steel deck flutes. 8. For recover applications using System Type -1, the insulation is optional. lternatively, min inch Invinsa, DensDeck, DensDeck Prime, SECUROCK Gypsum-Fiber RoofBoard may be used as a separator board, preliminarily attached prior to roof cover installation. For all recover applications, the existing roof system shall be suitable for a recover application. 9. For adhered membrane systems, side laps shall be minimum 3 inches wide sealed with min. 1.5-inch heat weld, unless otherwise noted. dhesive application rates are as follows: Membrane dhesive Method Rate, Duro-Tuff, Duro-Fleece, Duro-Fleece Plus Sealer Contact (both sides) 30 square feet per gallon SB I, SBIV, WB II Contact/Wet Lay 60 square feet per gallon/100 square feet per gallon Duro-Tuff SBIV, WB II Contact/Wet Lay 60 square feet per gallon/100 square feet per gallon Duro-Fleece CR-20, WB II Wet Lay Spatter/100 square feet per gallon Duro-Fleece Plus CR-20, WB II Wet Lay Spatter/100 square feet per gallon 10. MDP = Design Pressure is the result of testing for wind load resistance based on allowable wind loads. Refer to FBC for determination of design wind loads. Page 8 of 29

9 LLOWBLE CPCITY DECKING TBLE 1: WOOD DECKS - NEW CONSTRUCTION or REROOF (Tear-Off) or RECOVER SYSTEM -1: MECHNICLLY TTCHED INSULTION 1 and ROOF COVER INSULTION MEMBRNE LP /32- inch plywood or minimum 2-inch wood plank Hybrid 2 FSTENER One or more 1-45 layers, foam Hybrid 2 #14 HD and Poly-plates plastic insulation #15 Extra Heavy 2-52 Duty Drill Point and 2.4 inch Barbed Seam 3-52 Hybrid 2 #14 HD and 3-inch Metal None 7 7 #14 HD and Poly-plates ½ inch minimum Duro- Guard EPS Nom. 1 x 6-inch T&G board decking One or more layers, approved foam plastic insulation Hybrid 2 1 Unless noted, follow installation instructions for preliminary attachment of insulation 2 placed at midline of the 6 inch lap treated with Sealer t least one insulation layer must be ISO IV- 4 t least one insulation layer must be Duro-Gard ISO IV-H 5 line located 2-3 / 4 inches from the tab edge 6 Wood framing members spaced 120 inches on center 7 Requires two layers GF Elk VersaShield beneath roof cover to achieve fire rating 8 Wood framing members spaced 60 inches on center 9 placed at midline of the 6 inch lap #14 HD and 2⅜ inch Cleat #14 HD and Poly-plates #15 Extra Heavy Duty Drill Point and Poly-plates, 2⅜ inch Cleat, or Oval Cleat #15 Extra Heavy Duty Drill Point and Poly-plates, 2⅜ inch Cleat, or Oval Cleat #15 Extra Heavy Duty Drill Point s with OMG 2⅜ inch Eyehook or 2⅜ inch Cleat Width SPCING (inches) (inches) FIRE RTING UL790/STM E108 Class 1:12 3 ½: : : : : : B 1: B 1: :12 3 ½:12 4 Page 9 of 29

10 LLOWBLE CPCITY DECKING TBLE 1: WOOD DECKS - NEW CONSTRUCTION or REROOF (Tear-Off) or RECOVER SYSTEM -1: MECHNICLLY TTCHED INSULTION 1 and ROOF COVER (CONTINUED) INSULTION Top insulation layer ¼-inch DensDeck Roofing Board, SECUROCK Gypsum- Fiber Roof Board, or DEXcell F Glass Mat Roof Board 3 MEMBRNE 50 mil or Duro-Tuff LP FSTENER Width SPCING (inches) (inches) #15 Extra Heavy /32- Duty Drill Point s inch plywood 50 mil with Poly- or Duro-Tuff Class FIRE RTING UL790 1 Preliminary fastening of insulation may be required prior to application of roof covering material 2 Wood framing members spaced maximum 32 inches on center 3 May be substituted with ⅜- Duro-Fold Underlayment or ½- EPS,, ISO II-G, Insulfoam R-Tech Fan Fold, ISO HD-, ISO HD-G, DEXcell Cement Roof Board, 1- ISO II- or EPS FGF TBLE 2: WOOD DECKS - REROOF (Tear-Off) or RECOVER SYSTEM -2: DHERED ROOF COVER FIRE RTING SYSTEM LLOWBLE CPCITY DECKING MEMBRNE DHESIVE UL790/STM E108 Class Existing 19 /32-inch plywood Duro-Fleece Plus CR-20 (spatter) Maintain Existing Class, B, or C rating 2:12 2:12 2:12 SYSTEM LLOWBLE CPCITY TBLE 3: WOOD DECKS NEW, REROOF (Tear-Off), or RECOVER SYSTEM -3: MECHNICLLY TTCHED INSULTION 1 with DHERED ROOF COVER DECKING INSULITON - TTCHMENT MEMBRNE DHESIVE Existing 19 /32-inch plywood None - N/ Duro-Fleece Plus /32-inch plywood ¼ DEXcell F Roof Board secured with (16) #15 Extra Heavy Duty Drill Point and 3-inch Metal per 4x8 ft board ¼ DEXcell F Roof Board secured with (18) #15 Extra Heavy Duty Drill Point and inch Metal per 4x8 ft board 2 1 Unless noted, follow installation instructions for preliminary attachment of insulation 2 Base layer insulations optional with DEXcell F as top insulation board 3 5 lbs-100 ft lbs-100 ft 2 50 mil Duro-Tuff or EV 50 mil Duro-Fleece or Duro- Fleece Plus 50 mil Duro-Fleece or Duro- Fleece Plus 50 mil Duro-Tuff or EV CR-20 (spatter) WB II CR-20 (spatter) 3 CR-20 (spatter) 4 WB II FIRE RTING UL790 Class Maintain Existing Class, B, or C rating Unlimited Unlimited 2:12 2:12 Unlimited Unlimited Page 10 of 29

11 TBLE 4: WOOD DECKS - REROOF (Tear-Off) or RECOVER SYSTEM -4: DHERED INSULTION with DHERED ROOF COVER LLOWBLE CPCITY DECKING INSULITON/ TTCHMENT MEMBRNE DHESIVE lbs-100 ft 2 15 /32-inch plywood 1 19 /32-inch plywood 1 Class FIRE RTING UL790 ¼ DEXcell F Roof Board adhered in CR-20 (spatter) 1 Duro-Fleece Plus WB II Unlimited ¼ DEXcell F Roof Board adhered in CR-20 (spatter) 1 50 mil Duro-Tuff WB II Unlimited 50 mil Duro-Tuff SB IV Unlimited Duro-Fleece Plus WB II Unlimited Duro-Fleece Plus WB II Unlimited Page 11 of 29

12 LLOWBLE CPCITY DECKING TBLE 5: STEEL DECKS - NEW CONSTRUCTION or REROOF (Tear-Off) or RECOVER SYSTEM -1: MECHNICLLY TTCHED INSULTION 1 and ROOF COVER INSULTION MEMBRNE Min ga. One or more layers, Grade 33 foam plastic steel insulation Min. 22 ga. Grade 80 stee LP FSTENER #14 HD and Poly-plates #14 HD and 2 inch Polyplates #14 HD and 2 inch Polyplates #14 HD and Poly-plates Width SPCING (inches) FIRE RTING UL790/STM E108 Class : ½: ½: ½ inch minimum to TruFast #15 EHD s or 3 inch maximum #15 Extra Heavy thickness Duty Drill Point s and ISO II- or Cleat ISO III One or more layers, #14HD and :12 4 foam plastic insulation 2 Poly-plates ½: ½-inch minimum to 4 inch maximum thickness, ENRGY 3, ISO-95+GL, Multi-max F-3, Duro- Guard ISO II- or Duro- Guard ISO III One or more layers, foam plastic insulation 2 Hybrid 5 Hybrid 5 #15 Extra Heavy Duty Drill Point s and TruFast #15 EHD s or 2.4 inch Cleat Hybrid Min. 22 ga. Grade 80 steel 1½ inch minimum to 4 inch maximum thickness, ENRGY 3, ISO-95+GL, Multi-max F-3, Duro- Guard ISO II- or Duro- Guard ISO III- Hybrid 5 1 Unless noted, follow installation instructions for preliminary attachment of insulation 2 t least one insulation layer must be ISO II- 3 line located 1¾ inches from the tab edge 4 Max incline 2:12 with 1½ base layer EPS 5 placed at midline of the 6 inch lap, which is treated with Sealer 4725 #14 HD and Poly-plates #14 HD and Poly-plates #15 Extra Heavy Duty Drill Point and 3 Metal #15 Extra Heavy Duty Drill Point and 3 Metal TruFast #15 EHD s or #15 Extra Heavy Duty Drill Point s and Cleat ½: : ½: ½: ½: ½:12 Page 12 of 29

13 LLOWBLE CPCITY DECKING Min. 22 ga. Grade 80 steel Min. 22 ga. Grade 80 steel Min. 22 ga. Grade 80 steel TBLE 5: STEEL DECKS - NEW CONSTRUCTION or REROOF (Tear-Off) or RECOVER SYSTEM -1: MECHNICLLY TTCHED INSULTION 1 and ROOF COVER (CONTINUED) INSULTION 1½-inch minimum to 4 inch maximum thickness, ENRGY 3, ISO-95+GL, Multi-max F-3, Duro- Guard ISO II- or Duro- Guard ISO III- One or more layers, foam plastic insulation 3 1½-inch minimum to 4 inch maximum thickness, ENRGY 3, ISO-95+GL, Multi-max F-3, Duro- Guard ISO II- or Duro- Guard ISO III- Min. 22 ga. Grade 80 steel One or more layers, Min. 22 foam plastic insulation ga. Grade 80 steel Min. 22 ga. Grade 80 steel Min. 22 ga. Grade 80 steel 1½-inch minimum to 4 inch maximum thickness, ISO-95+GL, ISO II- or ISO III- One or more layers, foam plastic insulation 3 MEMBRNE LP Hybrid 2 FSTENER TruFast #15 EHD s or #15 Extra Heavy Duty Drill Point s and Cleat #15 Extra Heavy Duty Drill Point and 2.4-inch Barbed Metal Seam Hybrid 2 1 Unless noted, follow installation instructions for preliminary attachment of insulation 2 placed at midline of the 6 inch lap, which is treated with Sealer Top insulation layer must be ISO II- 4 Wood fiber board and Smooth Surface BUR recover ½:12 slope Class 5 Foil faced insulation1½:12 slope Class 6 Hytec 1.2 roof insulation slope Class C 7 ISO-95+GL 1:12 slope Class 8 ISO II- slope Class 9 ISO III- slope Class Hybrid 2 TruFast #15 EHD s or #15 Extra Heavy Duty Drill Point s and Cleat #14 HD and 2 inch Polyplates #15 Extra Heavy Duty Drill Point and 3-inch Metal Trufast #15 EHD s and 2.4 in. Cleat #15 Extra Heavy Duty Drill Point and 3 Metal Width SPCING (inches) FIRE RTING UL790/STM E108 Class ½: ½: C C 1½:12 ½:12 4 1½: : Page 13 of 29

14 LLOWBLE CPCITY DECKING 22 gage Grade 80 steel TBLE 5: STEEL DECKS - NEW CONSTRUCTION or REROOF (Tear-Off) or RECOVER SYSTEM -1: MECHNICLLY TTCHED INSULTION 1 and ROOF COVER (CONTINUED) INSULTION 1½ inch minimum to 4 inch maximum thickness, ISO-95+GL, ISO II- or ISO III- 1½ inch minimum to 4 inch maximum thickness, ISO-95+GL, ISO II- or ISO III- MEMBRNE LP Hybrid " EPS Flute fill 1.5# w/ 24 gage R-panel 6 1/2" EPS Fan Fold gage Grade 33 steel 9 22 gage Grade 33 steel 26 gage R-Panel 10 1 inch Duro- Guard ISO II- or Duro- Guard ISO III- Existing roof system with single-ply cover 1 inch Duro- Guard ISO II- or Duro- Guard ISO III- 1½ inch Duro- Guard ISO II- 1 inch Duro- Guard ISO II- or Duro- Guard ISO III- 1 inch Duro- Guard ISO II- or Duro- Guard ISO III- 1 inch Duro- Guard ISO II- or Duro- Guard ISO III- ny approved flute fill. dded layers optional FSTENER #15 Extra Heavy Duty Drill Point and 2.4 inch Barbed Metal Seam #15 Extra Heavy Duty Drill Point s with OMG 2 3 /8-inch Eyehook #15 HD and Poly-plates #15 HD and Poly-plates #15 HD and Poly-plates #15 HD and Poly-plates Duro-Tuff Duro-Tuff #15 HD and Poly-plates #15 HD and Poly-plates Trufast #15 EHD s and 2.4 inch Cleat #14 HD and 2 inch Polyplates #14 HD and 2 inch Polyplates #14 HD and 2 inch Polyplates #15 Extra Heavy Duty Drill Point s and Poly-plates Width SPCING (inches) FIRE RTING UL790/STM E108 Class : : Unlimited 7 2:12 8 Unlimited 7 2:12 8 Unlimited 7 2: Maintain Existing Class, B, or C rating C 1½:12 1 Unless noted, follow installation instructions for preliminary attachment of insulation 2 placed at midline of the 6 inch lap, which is treated with Sealer ISO-95+GL 1:12 slope Class 4 ISO II- slope Class 5 ISO III- slope Class 6 60 inch maximum span 7 Requires one layer tlas FR 10 slip sheet underneath roof cover 8 Requires two layers GF Elk VersaShield slip sheet underneath roof cover 9 72 inch maximum span 10 Grade 80, at 60 inch maximum span. R-Panel secured 6-inches oc to structure with #12 x 1-¼ inch HWH s and 20-inches oc with #14 x ⅞ inch HWH s at the laps. Page 14 of 29

15 O. LLOWBLE CPCITY DECKING 26 gage R-Panel TBLE 5: STEEL DECKS - NEW CONSTRUCTION or REROOF (Tear-Off) or RECOVER SYSTEM -1: MECHNICLLY TTCHED INSULTION 1 and ROOF COVER (CONTINUED) INSULTION ny approved flute fill. dded layers optional. MEMBRNE Duro-Tuff LP FSTENER Width SPCING (inches) FIRE RTING UL790 Class C Unlimited #15 Extra Heavy Duty Drill Point s C Unlimited and Poly-plates One or more layers any C Unlimited 22 gage combination of C Unlimited Supports spaced 72 inches oc Grade 50 steel 1 approved insulation, minimum 1-inch 50 mil Duro- Last EV #15 Extra Heavy Duty Drill Point s and Cleat Plate C Unlimited Page 15 of 29

16 TBLE 6: STEEL DECKS - NEW CONSTRUCTION or REROOF (Tear-Off) or RECOVER SYSTEM -4: MECHNICLLY TTCHED INSULTION with DHERED ROOF COVER LLOWBLE FIRE RTING INSULTION COVERBORD SYSTEM MEMBRNE UL790/STM E108 DECKING DHESIVE CPCITY (lbs/ft 2 Type Rate Type ttachment Rate Class ) 1½ (Optional) ISO II-, 1½ inch 3 /4 inch ISO III-, Duro-Fleece Plus WB II 2:12 thick Duro- Duro- wide ENRGY-3, Guard ISO Fleece ribbons ISO 95+ GL II-, ISO Membrane spaced 6 H-Shield, #15 Extra 95+ GL or dhesive inches Heavy Duty 2 ft Drill Point 2 per ½ o.c and DensDeck Duro-Fleece Plus WB II 2:12 inch-thick Metal SB IV 1½:12 ISO IV gage Grade 33 steel Min. 1 /2-inch SECUROCK Gypsum- Fiber Roof Board or DensDeck (Optional) One or more layers, foam plastic insulation 1½ ISO II-, ISO III-, ENRGY-3, ISO 95+ GL H-Shield, 2- inch-thick ISO IV- Loose Laid Loose Laid N/ N/ None N/ N/ Duro-Fleece Plus WB II Unlimited Min. 1 /4-inch SECUROCK Gypsum- Fiber Roof Board or DensDeck 1 /4-inch SECUROCK Gypsum- Fiber Roof Board or DensDeck #15 Extra Heavy Duty Drill Point and Duro- Last 3 Metal #14 HD and Duro- Last 3 Metal 2 ft 2 per 1.33 ft 2 per Duro-Fleece Plus WB II Unlimited WB II Unlimited WB II Unlimited Page 16 of 29

17 LLOWBLE CPCITY TBLE 6: STEEL DECKS - NEW CONSTRUCTION or REROOF (Tear-Off) or RECOVER SYSTEM -4: MECHNICLLY TTCHED INSULTION with DHERED ROOF COVER (CONTINUED) DECKING FIRE RTING INSULTION COVERBORD UL790/STM E108 MEMBRNE DHESIVE Type Rate Type ttachment Rate Class #14 HD Min. 22 1½ gage 2 ft and Duro- per Grade 33 Last 3 steel ISO II- Metal None N/ N/ SB IV Unlimited Min. 22 gage Grade 33 steel Min. 22 gage Grade 33 steel Min. 22 gage Grade 33 steel Min. 22 gage Grade 33 steel 22 gage Grade 33 steel Min. 1½-inchthick Duro- Guard ISO II-, ISO III-, Duro- Guard ISO IV-, ENRGY-3, ISO 95+ GL, Multi- Max F-3 1½ ISO II-, Duro- Guard ISO III-, ENRGY-3, ISO 95+ GL, Multi- Max F-3 1½ ISO II-, Duro- Guard ISO III-, ISO IV-, ENRGY-3, ISO 95+ GL, Multi- Max F-3 2 ISO IV- One or more layers of Invinsa Roof Board, ½ Loose Laid Loose Laid Loose Laid #15 Extra Heavy Duty Drill Point and Duro- Last 3 Metal #14 HD and Duro- Last 3 Metal N/ N/ N/ 2 ft 2 per 2 ft 2 per Min. ¼- inch-thick Invinsa Roof Board 1 /4-inch SECUROCK Gypsum- Fiber Roof Board or DensDeck Min. 1 /4-inch DensDeck Prime #14 HD and Duro- Last 3 Metal #14 HD and Duro- Last 3 Metal #15 Extra Heavy Duty Drill Point and Duro- Last 3 Metal 2 ft 2 per SB IV Unlimited 2 ft 2 per 1.6 ft 2 per SB IV Unlimited SB IV 1½:12 None N/ N/ SB IV 1½:12 None N/ N/ SB IV 1½:12 Page 17 of 29

18 LLOWBLE CPCITY TBLE 6: STEEL DECKS - NEW CONSTRUCTION or REROOF (Tear-Off) or RECOVER SYSTEM -4: MECHNICLLY TTCHED INSULTION with DHERED ROOF COVER (CONTINUED) INSULTION COVERBORD FIRE RTING UL790/STM E108 DECKING MEMBRNE DHESIVE Type Rate Type ttachment Rate Class One or more #14 layers of HD 1.33 ft 22 gage DensDeck 2 and per None N/ N/ WB II 2:12 Grade 33 Prime, 3 Metal steel 1 22 gage Grade 33 steel 22 gage Grade 33 steel 22 gage steel 22 gage steel One or more layers of DensDeck Prime, 1 One or more layers of SECUROCK Gypsum-Fiber Roof Board, 1 1½ XPS with minimum ½ inch Securock above and below 2 C Foam II 2 ISO II- #15 Extra Heavy Duty Drill Point s and 3 Metal #14 HD s and 3 Metal #12 s and 3 Metal Loose Laid TruFast #15 EHD s and 2 7 /8" hex plate 1.6 ft 2 per 1.33 ft 2 per 1 ft 2 per N/ 2 ft 2 per None N/ N/ SB IV 2:12 None N/ N/ SB IV 1½:12 None N/ N/ Duro-Tuff WB II Unlimited 1 /4 inch DensDeck Prime or Securock Roof Board TruFast #15 EHD s and Duro- Last 2 7 /8" hex plate 1 ft 2 per SB IV WB II N/ N/ N/ SB IV 2:12 Page 18 of 29

19 LLOWBLE CPCITY TBLE 7: STRUCTURL CONCRETE DECKS - NEW CONSTRUCTION or REROOF (Tear-Off) or RECOVER SYSTEM -1: MECHNICLLY TTCHED INSULTION and ROOF COVER INSULTION None MEMBRNE LP FSTENER Hybrid Hybrid Hybrid Hybrid inch Duro- Guard ISO II- or Duro- Guard ISO III- Min. 1½-inch-thick Min. 1½-inch-thick Hybrid 1 Hybrid 1 1 placed at midline of the 6 inch lap, which is treated with Sealer 4725 #14 Concrete Screw or Fluted Concrete Nail and Polyplates #14 Concrete Screw or Fluted Concrete Nail and Polyplates #14 Concrete Screw or Fluted Concrete Nail and Polyplates #14 Concrete Screw or Fluted Concrete Nail and 2.4- inch Barbed Seam #14 Concrete Screw or Fluted Concrete Nail and 3 inch Barbed Seam #14 Concrete Screw or Fluted Concrete Nail and 3 inch Barbed Seam #14 Concrete Screw or Fluted Concrete Nail and OMG 2-3 /8-inch Eyehook #14 HD s with Cleat #14 HD s with Cleat Width SPCING (inches) FIRE RTING UL790/STM E108 Class Page 19 of 29

20 TBLE 8: STRUCTURL CONCRETE DECKS - NEW CONSTRUCTION or REROOF (Tear-Off) or RECOVER SYSTEM -4: MECHNICLLY TTCHED INSULTION with DHERED ROOF COVER LLOWBLE FIRE RTING INSULTION UL790/STM E108 MEMBRNE DHESIVE CPCITY (lbs/ft 2 Type Rate Class ) One or more #14 Concrete layers min. Screw or 1½-inch-thick Fluted 2 ft 2 per Concrete Nail ISO II- or and Duro- SB I 2:12 Last 3 inch ISO III- Barbed Seam One or more layers min. 1½-inch-thick ISO II- or ISO III- One or more layers of SECUROCK Gypsum- Fiber Roof Board, 1- #14 Concrete Screw or Fluted Concrete Nail and Duro- Last 3 inch Barbed Seam #14 HD and 3 Metal 2 ft 2 per 1.33 ft 2 per SB IV 1½:12 SB IV 1½:12 TBLE 9: STRUCTURL CONCRETE DECKS - NEW CONSTRUCTION or REROOF (Tear-Off) or RECOVER SYSTEM -2: DHERED ROOF COVER LLOWBLE FIRE RTING SYSTEM UL790/STM E108 MEMBRNE DHESIVE CPCITY (lbs/ft 2 Class ) Duro-Fleece CR 20 Unlimited Page 20 of 29

21 TBLE 10: STRUCTURL CONCRETE DECKS - NEW CONSTRUCTION or REROOF (Tear-Off) or RECOVER SYSTEM -3: DHERED INSULTION with DHERED ROOF COVER SYSTEM LLOWBLE CPCITY FIRE RTING INSULTION COVERBORD MEMBRNE UL790/STM E108 DHESIVE Type ttachment Rate Type dhesive Rate Class ¾ inch wide 2 inch-thick ribbons CR ISO IV- inches None N/ N/ Duro-Fleece CR 20 1½:12 on center Two layers minimum 1½inch-thick ISO II- Two layers minimum 1 1 /2 inch-thick ISO IV- Olybond Insulation dhesive CR 20 ¾ inch wide ribbons 12 inches on center 3 inch wide ribbons 12 inch on center None N/ N/ Duro-Tuff WB II ¼ inch Securock CR 20 3 inch wide ribbons 12 inch on center Duro-Fleece CR 20 1½:12 TBLE 11: STEEL DECKS - NEW CONSTRUCTION or REROOF (Tear-Off) or RECOVER SYSTEM -3: DHERED INSULTION with DHERED ROOF COVER SYSTEM LLOWBLE CPCITY FIRE RTING INSULTION MEMBRNE UL790/STM E108 DHESIVE Type ttachment Rate Class One or more layers of SECUROCK Gypsum- Fiber Roof Board or DensDeck, Max. 1-inchthick Duro-Fleece Membrane dhesive 3 /4-inch ribbons spaced 6 inches o.c. Duro-Fleece Plus WB II 2:12 Page 21 of 29

22 TBLE 12: STEEL DECKS - NEW CONSTRUCTION or REROOF (Tear-Off) or RECOVER SYSTEM -6: MECHNICLLY TTCHED INSULTION with SPOT TTCHED ROOF COVER LLOWBLE FIRE RTING INSULTION MEMBRNE UL790/STM E108 TTCHMENT CPCITY (lbs/ft 2 Type Rate Class ) 1 ISO IV-, Duro- #15 Extra Guard ISO II-, Heavy Duty 6 ft ENRGY-3, ISO Drill Point / 95+ GL, with 2:12 SECUROCK Gypsum-Fiber Roof Board or 1302 DensDeck gage 33 ksi B Deck 1½ 1½ 1½ 1½ 1½ #14 HD s with Duro- Bond 1302 or 1306 #14 HD s with Duro- Bond 1302 or 1306 #15 EHD s #15 EHD s #15 EHD s 6 inch o.c. rows spaced 60 inches o.c. 6 inch o.c. in rows spaced 48 inches o.c 6 inch o.c. in rows spaced 48 inches o.c 6 inch o.c. in rows spaced 48 inches o.c 6 inch o.c. in rows spaced 96 inches o.c 60 mil 60 mil 1302, 1306, or RhinoBond Induction 1302, 1306, or RhinoBond Induction 1302, 1306, or RhinoBond Induction 2:12 2:12 2:12 2:12 2:12 Page 22 of 29

23 TBLE 12: STEEL DECKS - NEW CONSTRUCTION or REROOF (Tear-Off) or RECOVER SYSTEM -6: MECHNICLLY TTCHED INSULTION with SPOT TTCHED ROOF COVER (CONTINUED) LLOWBLE FIRE RTING INSULTION MEMBRNE UL790/STM E108 TTCHMENT CPCITY (lbs/ft 2 Type Rate Class ) 1½ inch 6 inch o.c. in 1302, 1306, or thick #15 EHD rows spaced mil RhinoBond s inches o.c Induction 2: gage 33 ksi B Deck 1½ inch thick 1½ inch thick 1½ inch thick 1½ inch thick 1½ inch thick 1½ inch thick #15 EHD s #15 EHD s #15 EHD s #14 HD s with Duro- Bond 1302 or 1306 #14 HD s with Duro- Bond 1302 or 1306 #14 HD s with Duro- Bond 1302 or inch o.c. in rows spaced 48 inches o.c 6 inch o.c. in rows spaced 48 inches o.c 12 inch o.c. in rows spaced 120 inches o.c 2.67 ft 2 / 12 inch o.c. rows spaced 48 or 60 inches o.c 60 mil 60 mil 60 mil 2 ft 2 / 60 mil 1302, 1306, or RhinoBond Induction 1302, 1306, or RhinoBond Induction 1302, 1306, or RhinoBond Induction 2:12 2:12 2:12 2:12 2:12 2:12 Page 23 of 29

24 TBLE 12: STEEL DECKS 1 - NEW CONSTRUCTION or REROOF (Tear-Off) or RECOVER SYSTEM -6: MECHNICLLY TTCHED INSULTION with SPOT TTCHED ROOF COVER (CONTINUED) LLOWBLE EXTERIOR FIRE INSULTION RTING - UL790 MEMBRNE TTCHMENT CPCITY Type Rate Class ISO II- 3 ISO II-G 3 3 ISO III- 3 ISO III-H 3 ISO II- 3 ISO II-G 3 3 ISO III- 3 ISO III-H 3 OMG XHD s #15 EHD s SFS Intec Dekfast DF- One or more layers # minimum 1½-inches #12 or Dekfast DF- Classified insulation, SFS Intec any combination, Dekfast DF- # gage 33 ksi B Deck unless otherwise noted 2 20 gage 40 ksi N Deck 3 One or more layers, top layer minimum 1-4 slope when top layer is minimum 1½-inches thick 5 22 gage 40 ksi B Deck 6 22 gage 80 ksi B Deck 4 ft 2 / 6 ft 2 / (24 x 36 inch grid) 6 inch o.c. rows spaced 60 inches o.c. 12 inch o.c. rows spaced 60 inches o.c. 40 mil or 50 mil Duro-Tuff or EV 40 mil or 50 mil Duro-Tuff or EV 40 mil or 50 mil Duro-Tuff or EV 40 mil or 50 mil Duro-Tuff or EV 40 mil or 50 mil Duro-Tuff or EV 40 mil or 50 mil Duro-Tuff or EV 40 mil or 50 mil Duro-Tuff or EV 40 mil or 50 mil Duro-Tuff or EV 40 mil or 50 mil Duro-Tuff or EV 40 mil or 50 mil Duro-Tuff or EV 40 mil RhinoBond Induction RhinoBond Induction Isoweld 1:12 4 1:12 4 1:12 4 1:12 4 1:12 4 1:12 4 1:12 4 1:12 4 1:12 4 1:12 4 1:12 4 1:12 4 1:12 4 1:12 4 1:12 4 1:12 4 1:12 4 1:12 4 1:12 4 1:12 4 1:12 4 1:12 4 1:12 4 1:12 4 1:12 4 1:12 4 1:12 4 1:12 4 1:12 4 1:12 4 1:12 4 1:12 4 1:12 4 Page 24 of 29

25 TBLE 13: STRUCTURL CONCRETE DECKS - NEW CONSTRUCTION or REROOF (Tear-Off) or RECOVER SYSTEM -6: MECHNICLLY TTCHED INSULTION with SPOT TTCHED ROOF COVER (CONTINUED) LLOWBLE CPCITY EXTERIOR FIRE INSULTION RTING MEMBRNE DHESIVE UL790/STM E108 Type Rate Class 1½ inch thick 1½ inch thick 1½ inch thick #14 HD s with Duro- Bond 1302 or 1306 #14 HD s with Duro- Bond 1302 or 1306 #14 HD s with Duro- Bond 1302 or inches on center in 2 inch tab rows 6 inches on center in 2 inch tab rows 4 ft 2 / 2:12 2:12 2:12 TBLE 14: LIGHTWEIGHT INSULTING CONCRETE DECKS - NEW CONSTRUCTION or REROOF (Tear-Off) or RECOVER SYSTEM -2: DHERED ROOF COVER EXTERIOR FIRE RTING MEMBRNE DHESIVE UL790/STM E108 SYSTEM LLOWBLE CPCITY Class 117 1,2-60 Duro-Fleece Plus WB II Unlimited 118 1, Duro-Fleece Plus WB II Unlimited Duro-Fleece 4 CR 20 Unlimited Duro-Fleece 4 SB IV Unlimited Duro-Fleece 4 WB II Unlimited Duro-Fleece Plus CR 20 2:12 1 Celcore MF over minimum 22 gauge vented steel liner deck, Type B 2 60 inch purlin spacing psi Celcore with HS Rheology Modifying dmixture and PV Curing Compound 4 2 inch wide laps psi Elastizell with Zell-Crete Fibers Page 25 of 29

26 SYSTEM TBLE 14: LIGHTWEIGHT INSULTING CONCRETE DECKS 1 - NEW CONSTRUCTION or REROOF (Tear-Off) or RECOVER SYSTEM -2: DHERED ROOF COVER (CONTINUED) EXTERIOR FIRE RTING MEMBRNE DHESIVE UL790/STM E108 LLOWBLE CPCITY SYSTEM LLOWBLE CPCITY Duro-Fleece Plus Duro-Fleece Plus 1 Celcore MF over structural concrete deck Duro-Fleece Membrane dhesive applied in 3 /4 inch wide ribbons spaced 6 inches o.c. Duro-Fleece Membrane dhesive applied in 1inch wide ribbons spaced 4 inches o.c. Class Unlimited Unlimited TBLE 15: EXISTING LIGHTWEIGHT INSULTING CONCRETE DECKS - REROOF (Tear-Off) or RECOVER SYSTEM -7: MECHNICLLY TTCHED ROOF COVER MEMBRNE LP Hybrid LLOWBLE CPCITY FSTENER OMG Polymer GypTec OMG Polymer GypTec #15 Extra Heavy Duty and Poly-plates SPCING (inches) EXTERIOR FIRE RTING UL790/STM E108 Width Class TBLE 16: TECTUM DECKS - NEW CONSTRUCTION or REROOF (Tear-Off) or RECOVER SYSTEM -1: MECHNICLLY TTCHED INSULTION and ROOF COVER INSULTION MEMBRNE LP FSTENER Width SPCING (inches) None Liquid uger None Hybrid 1 Liquid uger ½ inch minimum to 4 inch maximum thickness, ISO-95+GL, ISO II- or Duro- Guard ISO III- Hybrid 1 Liquid uger with shland Pliogrip 7779L/220 Structural dhesive Hybrid ½ inch ISO 3 Duro-uger with 2½ inch II- or ISO III- Hybrid 1 Plate placed at midline of the 6 inch lap, which is treated with Sealer Tectum Cementitious Wood Fiber 3 placed at midline of the 6 inch lap EXTERIOR FIRE RTING UL790/STM E108 Class 1½:12 1½:12 1½:12 C 1½:12 C 1½:12 C C 1½:12 Page 26 of 29

27 LLOWBLE CPCITY MEMBRNE mil or Duro-Tuff mil or Duro-Tuff 50 mil or Duro-Tuff TBLE 17: GYPSUM DECKS 1 - NEW CONSTRUCTION or RECOVER SYSTEM -7: MECHNICLLY TTCHED ROOF COVER SPCING (inches) EXTERIOR FIRE RTING - UL790 LP FSTENER Width (inches) Class 10-inch wide Cover strip 1 Support Tees spaced maximum 24 inches oc 2.5-inch Duro- uger and uger or TruFast Twin Loc Coiled Batten Bar and 1.8-inch Twin-Loc Nail Batten 1.8-inch Twin-Loc Nail ssembled TruFast Twin Loc Coiled Batten Bar and 1.8-inch Twin-Loc Nail Batten :12 2:12 2:12 Page 27 of 29

28 LLOWBLE CPCITY Type Optional EPS, Duro- Guard ISO II-, G, or H Optional EPS, Duro- Guard ISO II-, G, or H Optional EPS, Duro- Guard ISO II-, G, or H 1-inch Duro- Guard ISO II-H Optional 1-inch EPS TBLE 18: GYPSUM DECKS 1 - NEW CONSTRUCTION or REROOF (Tear-Off) or RECOVER SYSTEM -3: DHERED INSULTION with DHERED ROOF COVER BSE INSULTION ttachment Ribbon dhered Ribbon dhered Ribbon dhered Ribbon dhered Ribbon dhered dhesive / Rate Duro-Grip 2 12 inches oc Duro-Grip 2 12 inches oc Duro-Grip 2 12 inches oc Duro-Grip 3 spaced 12 inches oc Duro-Grip 3 spaced 12 inches oc None None N/ EXTERIOR FIRE RTING TOP INSULTION MEMBRNE UL790 DHESIVE Type ttachment Rate Class Duro- DEXcell Ribbon Cement Grip 2,3,4 Duro-Tuff, Unlimited or Duro-Fleece WB II dhered Board 12 inches Plus Unlimited oc DEXcell F Glass Mat Roof Board DEXcell F Glass Mat Roof Board Optional DensDeck Prime or DEXcell Cement Board DensDeck Prime DEXcell Cement Board Ribbon dhered Ribbon dhered Ribbon dhered Ribbon dhered Ribbon dhered Duro- Grip 2,4 12 inches oc Duro- Grip 2,4 12 inches oc Duro-Grip 4 spaced 12 inches oc Duro-Grip 4 12 inches oc Duro-Grip 4 12 inches oc 1 Support Tees spaced 24 inches oc 2 OlyBond 3 TruFast 4 Insta-Stick 5 80 mil thick membrane 6 Fire rating shown is for assemblies utilizing DensDeck Prime or DEXcell Cement Board above the insulation. Duro-Tuff SB IV SB IV B B 5 Unlimited 2:12 Unlimited SB IV 6 Unlimited Duro-Tuff WB II 6 B 6 Unlimited Duro-Tuff SB IV 6 Unlimited 2:12 Duro-Fleece Plus WB II 6 Unlimited ¼:12 WB II B 2:12 SB IV 6 Unlimited Duro-Tuff WB II SB IV 6 B Unlimited Unlimited 2:12 Duro-Fleece Plus WB II 6 Unlimited Duro-Tuff WB II B ¼:12 2:12 SB IV 6 Unlimited WB II 6 B 6 Unlimited SB IV 6 Unlimited 2:12 Duro-Fleece Plus WB II 6 Unlimited Page 28 of 29

29 LLOWBLE CPCITY Type Optional Duro- Guard ISO II- TBLE 18: GYPSUM DECKS 1 - NEW CONSTRUCTION or REROOF (Tear-Off) or RECOVER SYSTEM -3: DHERED INSULTION with DHERED ROOF COVER (CONTINUED) BSE INSULTION ttachment Ribbon dhered dhesive / Rate Duro-Grip 2 12 inches oc EXTERIOR FIRE RTING TOP INSULTION MEMBRNE UL790 DHESIVE Type ttachment Rate Class Duro- DEXcell Ribbon Cement Grip 2,3,4 Duro-Tuff, Unlimited WB II dhered Board 12 inches Duro-Fleece Plus Unlimited oc Duro- Grip 2,3,4 12 inches oc Optional Duro- Ribbon Duro-Grip DEXcell Ribbon Cement Guard ISO dhered 12 inches oc dhered Board II- 1 Support Tees spaced 24 inches oc 2 OlyBond 3 TruFast 4 Insta-Stick 5 Fire rating shown is for assemblies utilizing DensDeck Prime or DEXcell Cement Board above the insulation. SB IV 5 Unlimited 2018 UL LLC This UL Evaluation Report is not an endorsement or recommendation for use of the subject and/or product described herein. This report is not the UL Listing or UL Classification Report that covers the subject product. The subject product s UL Listing or UL Classification is covered under a separate UL Report. UL disclaims all representations and warranties whether express or implied, with respect to this report and the subject or product described herein. Contents of this report may be based on data that has been generated by laboratories other than UL that are accredited as complying with ISO/IEC by the International ccreditation Service (IS) or by any other accreditation body that is a signatory to the International Laboratory ccreditation Cooperation (ILC) Mutual Recognition rrangement (MR). The scope of the laboratory s accreditation shall include the specific type of testing covered in the test report. s the accuracy of any non-ul data is the responsibility of the accredited laboratory, UL does not accept responsibility for the accuracy of this data. Page 29 of 29