1 INVITATION FOR BID (IFB) IFB NO. GSWA LAYON LANDFILL CONSTRUCTION OF CELL 3 ADDENDUM NO. 1 OCTOBER 8, 2018 ALL BIDDERS MUST ACKNOWLEDGE RECEIPT OF THIS ADDENDUM ON THE SPACE PROVIDED BELOW, AND RETURN TO GSWA BY EITHER , alicia.gswa@gmail.com, OR BY FAX, NAME OF PROPOSER: AUTHORIZED SIGNATURE: PRINT NAME: DATE:

2 LAYON LANDFILL CONSTRUCTION OF CELL 3 Project No. GSWA October 8, 2018 ADDENDUM NO. 1 This addendum shall form part of the Contract Documents. Failure by any proposer to acknowledge receipt of this addendum in its proposal shall be grounds for disqualification of its proposal. NOTICE TO BIDDERS: The Bid Documents of the above project are hereby amended as follows: Modified Add or Replaced With Description I. BID DOCUMENTS Bid Schedule of Values Replace with Bid Schedule of Values (AD-01) Revised Bid Schedule of Values table with a Detailed Schedule of Values table. Revised language and notes. II. DRAWINGS C-107 C-107 R1 Added monitoring well table descriptions. Revised locations of callout 4. III. SPECIFICATIONS Technical Specifications Table of Contents Section Measurement and Payment Section Layout of Work and Survey Section Submittals Section Health and Safety Plan Section Construction Facilities Replace with Technical Specifications Table of Contents (AD-01) Measurement and Payment (AD-01) Layout of Work and Survey (AD-01) Submittals (AD-01) Health and Safety Plan (AD-01) Construction Facilities (AD-01) Table of Contents has been revised to reflect the added and removed sections. References to the Revised Bid Schedule of Values have been added. References to an Unexploded Ordinance (UXO) Monitoring Plan were deleted. References to the UXO Monitoring Plan were deleted. References to conducting work over refuse was deleted. The section has been edited to fix some formatting issues.

3 Section Clearing and Striping Section Structure Demolition Section Site Earthwork Section Excavating and Stockpiling Section Engineered and Random Fill, Utility and Anchor Trench Backfill Section Geosynthetic Subgrade Prep Section Operations Layer Section Low Permeability Soil Liner Section Drainage Gravel Section Surface Water Drainage Systems Section Erosion and Sediment Control Section Trenching Section Leachate Pumping Stations Clearing and Striping (AD-01) Structure Demolition (AD-01) Deleted Section Site Earthwork Excavating and Stockpiling (AD-01) Engineered and Random Fill, Utility and Anchor Trench Backfill (AD-01) Added Section Geosynthetic Subgrade Preparation (AD-01) Added Section Operations Layer (AD-01) Low Permeability Soil Liner (AD-01) Added Section Drainage Gravel (AD-01) Surface Water Drainage Systems (AD-01) Erosion and Sediment Control (AD-01) Trenching (AD-01) Leachate Pumping Stations (AD-01) Section was updated. The referenced section number for Borehole or Well Abandonment has been changed to correctly refer to Section The section has been deleted. Refer to Sections 02222, and The section was revised to delete references to a UXO Monitoring Plan. Some of the sections referenced in the Related Sections have also been deleted. The requirement for UXO Monitoring Plan was deleted. This section has been revised to clarify the ASTM testing standard.

4 Section Forcemain Forcemain (AD-01) Section Corrugated High Density Polyethylene Corrugated High Density Polyethylene (AD- 01) Section Leachate Collection System Leachate Collection System (AD-01) New Section Add Section Aggregate Base Course (AD-01) Section Flexible Pavement Section High Density Polyethylene (HDPE) Piping Section Geotextile Section Geocomposite Drain Material Flexible Pavement (AD-01) Section High Density Polyethylene (HDPE) Piping (AD-01) Geotextile (AD-01) Geocomposite Drain Material (AD-01) Section Geomembrane Geomembrane (AD- 01) Section Concrete Reinforcement Section Cast in Place Concrete Section LFG Collection System Section Borehole or Well Abandonment Concrete Reinforcement (AD-01) Cast in Place Concrete (AD-01) LFG Collection System (AD-01) Borehole or Well Abandonment (AD-01) Section has been added to specify aggregate base requirements. Section has been updated to include specification for the aggregate base requirements. Updated Section Part 1.2D has been removed. Part 1.2D has been removed.. Note, the descriptions in the table above give a general understanding and location of the change, it is the Contractor s responsibility to review the changes in this addendum and incorporate as needed in their bid package.

5 IV. RESPONSES TO BIDDER S QUESTIONS Question #1: Considering the volume of work, quantity take-offs and estimate as well as return information for request for quote and pricing from suppliers, vendors and subcontractors, we respectfully would like to request for Bid Submission Extension of three (3) weeks from October 26, Response: The Bid Submission Date is extended to 2:00 pm on November 9, 2018 local Guam time. Question #2: Please confirm Bid Item 4.1 Excavation quantity is One (1) Cubic Yard? Response: Refer to attached updated BSOV (AD-01) Question #3: Please confirm Bid Item 4.2 Stockpiling quantity is One (1) Cubic Yard? Response: Refer to attached updated BSOV (AD-01) Question #4: Otherwise for bid uniformity please provide quantities for Bid Item 4.1 and 4.2 Response: Refer to attached updated BSOV (AD-01) Question #5: Please confirm Bid Item 4.0 does not include Bid Item 4.1 and 4.2? Response: Correct. Refer to attached updated BSOV (AD-01) Question #6: Who is the Funding Agency? Response: The Receiver on behalf of the Guam Solid Waste Authority (GSWA) Question #7: Please provide us a copy of the pre-bid minutes and attendance sheet. Response: See attached Pre-Bid Minutes and Attendance Sheet. Question #8: Division 25 Integrated Automation Specification was not included in the documents, please provide. Response: Division 25 Specifications will be provided with an Addendum #2. Question #9: Please confirm all cleared, grubbed and demolition debris will be dispose in the Layon Landfill at no charge. Response: All construction debris shall be disposed of in a proper hardfill facility. It is encouraged to use green waste onsite for compost to create a viable topsoil source that meets contract specification.

6 Question #10: Refer to Instruction To Bidders Item 9.0 Competency of Bidders, a. Experience on similar work. Does this mean the bidder should have constructed a landfill? Otherwise please explain further what is similar works mean. Response: Contractor shall demonstrate experience on similar work, however, not limited to the following: experience in handling, installing, and testing geosynthetic materials, experience in handling large earthwork projects in wet environments of clayey soils, experience in construction and installation of utility structures (power, water, storm drain, gas lines), experience in construction of an asphalt road. Question #11: Refer to Qualifications form, item B for Previous Project Experience, 1. Typical Contracts Completed During Last Five Years. Does Typical Contracts mean a Landfill Project? Otherwise please explain further what is Typical Contracts mean. Response: Refer to response to Question #9. Question #12: Refer to drawing sheet C-519 detail 2 for Abandon Well Head, please provide total deep of well. Response: See attached revised drawing sheet C-107-R1 ATTACHMENTS: 1. Bid Schedule of Values (AD 01) 2. Pre Bid Meeting Minutes 3. Pre Bid Meeting Attendance Sheet 4. C 107 R1 5. Section Measurement and Payment (AD 01) 6. Section Layout of Work and Survey (AD 01) 7. Section Submittals (AD 01) 8. Section Health and Safety Plan (AD 01) 9. Section Construction Facilities (AD 01) 10. Section Clearing and Striping (AD 01) 11. Section Structure Demolition (AD 01) 12. Section Excavating and Stockpiling (AD 01) 13. Section Engineering and Random Fill, Utility, and Anchor Trench Backfill (AD 01) 14. Section Geosynthetic Subgrade Preparation (AD 01). 15. Section Operations Layer (AD 01) 16. Section Low Permeability Soil Liner (AD 01) 17. Section Drainage Gravel (AD 01) 18. Section Surface Water Drainage Systems (AD 01) 19. Section Erosion and Sediment Control (AD 01) 20. Section Trenching (AD 01) 21. Section Leachate Pumping Stations (AD 01)

7 22. Section Forcemain (AD 01) 23. Section Corrugated High Density Polyethylene (AD 01) 24. Section Leachate Collection System (AD 01) 25. Section Aggregate Base Course (AD 01) 26. Section Flexible Pavement (AD 01) 27. Section High Density Polyethylene (HDPE) Piping (AD 01) 28. Section Geotextile (AD 01) 29. Section Geocomposite Drain Material (AD 01) 30. Section Geomembrane (AD 01) 31. Section Concrete Reinforcement (AD 01) 32. Section Cast in Place Concrete (AD 01) 33. Section LFG Collection System (AD 01) 34. Section Borehole or Well Abandonment (AD 01) 35. Specifications Table of Contents (AD 01) -END OF ADDENDUM No. 1-