1 Facility Assessment Report This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility item by visual observation only; they do not test the operation of equipment or perform destructive testing of walls, ceilings or floors. Each facility item is ranked on a 7-point scale: rank 7 means the item is in new or in good condition and no work is required while rank means the item has failed and has lead to an immediate life safety condition¹. The remaining ranks choices generally mean that the item requires regular maintenance (rank 5 or 6) or full replacement (rank 2, 3 or 4). For additional detail and definition on rank values as they relate to each assessed item, please visit the "CPS Guide to Biennial Facility Assessments" found on the Facilities Standards webpage under CPS Policies and Guidelines at Definitions for Quantity, Unit, Cost and Campus Total can be found at the end of this report. Campus Summary Building Name ear Constructed Number of Floors Building Area (Sq Ft) Assessed Need Main ,2 $5,387,248 SITE $364,988 Campus Total 93,2 $5,752,236 Category: Building Exterior Entrance Entrance Control - Audio and Video -Main EA 7 Exterior Doors - Exterior AMP Door -Main 8 EA 6 $5,392 Exterior Doors - Exterior FRP Door 2 4 EA 6 $2,526 Exterior Doors - Exterior FRP Door 3 2 EA 6 $,263 Exterior Doors - Exterior FRP Door 4 2 EA 7 Exterior Doors - Exterior FRP Door 5 4 EA 6 $2,526 Exterior Doors - Exterior Steel Door Boiler Room EA 6 $48 Exterior Doors - Transom Lite -Main 8 EA 4 $6,55 deteriorated/rotted wood frames Exterior Doors - Transom Lite 2 4 EA 4 $8,27 deteriorated/rotting wood frames Exterior Doors - Transom Lite 5 4 EA 4 $8,27 deteriorated/rotting wood frames Exterior Stairs - Concrete -Main 8 LF 7 Exterior Stairs - Concrete -Main 8 LF 5 $8,766 cracking Exterior Stairs - Concrete 2 45 LF 5 $4,93 missing metal nosings Exterior Stairs - Concrete 3 32 LF 6 $2,67 Exterior Stairs - Concrete 4 32 LF 6 $2,67 Exterior Stairs - Concrete 5 36 LF 6 $2,944 Ramp Handrail - Wood_Ramp Handrail 3 22 LF 5 $233 missing ballusters Ramps - Wood Ramp 3 24 LF 6 $3,66 Stair Handrail - Steel_Stair Handrail 2 2 LF 6 $73 Stair Handrail - Steel_Stair Handrail 3 4 LF 6 $35 Stair Handrail - Steel_Stair Handrail 4 4 LF 6 $35 THORP O Page of 32

2 Category: Building Exterior Entrance Stair Handrail - Steel_Stair Handrail 5 22 LF 6 $9 Foundation Lighting Roof System Foundation - Concrete Entire Building 777 LF 7 Foundation - Concrete Entire Building LF 6 $,942 water seepage near water heater Superstructure - Steel with Clay Tile Arch Entire Building 93,696 SF 7 Exterior Lighting - Parapet or Roof Mounted Entire Building 8 EA 6 $4,292 Exterior Lighting - Wall Mounted Entire Building 22 EA 6 $6,352 Exterior Lighting - Wall Mounted Entire Building 3 EA 5 $,282 Chimney - Brick Chimney- Concrete/ Mortar Liner D 74 LF 6 $7,646 strapped Chimney - Brick Chimney- Concrete/ Mortar Liner D 3 LF 4 $68,959 cracking, open joints, deteriorated corners Coping - Clay Tile C 24 LF 6 $77 Coping - Metal G 238 LF 6 $7,644 Coping - Stone A 38 LF 5 $33,729 open joints, spalls Coping - Stone B 52 LF 5 $5,694 open joints, spalls Coping - Stone C 7 LF 5 $,862 open joints, spalls Coping - Stone D 5 LF 5 $5,475 open joints, spalls Coping - Stone E 52 LF 5 $5,694 open joints, spalls Coping - Stone F 38 LF 5 $33,729 open joints, spalls Downspouts - Exterior Downspouts A 9 LF 6 $299 Downspouts - Exterior Downspouts B 7 LF 6 $565 Downspouts - Exterior Downspouts C 5 LF 6 $66 Downspouts - Exterior Downspouts E 7 LF 6 $565 Downspouts - Exterior Downspouts F 9 LF 6 $299 Downspouts - Exterior Downspouts G 5 LF 6 $498 Downspouts - Interior Downspouts A 9 LF 5 $9,98 rout/clean- overflows are utilized during heavy rains Downspouts - Interior Downspouts D 2 LF 5 $26,557 rout/clean- overflows are utilized during heavy rains Downspouts - Interior Downspouts F 9 LF 5 $9,98 rout/clean- overflows are utilized during heavy downpours Parapet - 6" - 3" Height A / North West 64 LF 4 $36,297 open joints, displaced/spalled brick Parapet - 6" - 3" Height D 5 LF 6 $,998 Parapet - 6" - 3" Height F / North East 63 LF 4 $35,73 open joints, displaced/spalled brick Parapet - Parapet < 6" Height A 62 LF 6 $3,452 Parapet - Parapet < 6" Height B 52 LF 6 $,8 Parapet - Parapet < 6" Height C 4 LF 6 $874 THORP O Page 2 of 32

3 Category: Building Exterior Roof System Parapet - Parapet < 6" Height E 52 LF 6 $,8 Parapet - Parapet < 6" Height F 62 LF 6 $3,452 Parapet - Parapet > 3" A / North West 47 LF 4 $4,999 open joints, displaced/spalled brick Parapet - Parapet > 3" A / West 35 LF 6 $2,68 Parapet - Parapet > 3" F / East 35 LF 6 $2,68 Parapet - Parapet > 3" F / North East 47 LF 4 $4,999 open joints, displaced/spalled brick Roof Structure - Steel with Clay Tile Arch A 8,76 SF 7 Roof Structure - Steel with Clay Tile Arch B 32 SF 7 Roof Structure - Steel with Clay Tile Arch C,378 SF 7 Roof Structure - Steel with Clay Tile Arch D 9,728 SF 7 Roof Structure - Steel with Clay Tile Arch E 32 SF 7 Roof Structure - Steel with Clay Tile Arch F 8,64 SF 7 Roof Structure - Steel with Clay Tile Arch G 6,987 SF 7 Roof - Metal D 48 SF 7 Roof - Modified Bitumen A 8,76 SF 6 $82,2 Roof - Modified Bitumen B 32 SF 6 $3, Roof - Modified Bitumen C,378 SF 6 $2,966 Roof - Modified Bitumen D 3,4 SF 4 $93,25 ponding, bubbling Roof - Modified Bitumen D 5,29 SF 6 $49,776 Roof - Modified Bitumen E 32 SF 6 $3, Roof - Modified Bitumen F 8,64 SF 6 $8,53 Roof - Modified Bitumen G 6,987 SF 6 $65,743 Walls Cheek-Wall - Stone Entire Building 4 SF 4 $27,9 doors 3 and 4. open joints with cracked/displaced stone. Cornice - Cast Stone Entire Building 737 LF 6 $25,557 Cornice - Metal Projecting Entire Building 238 LF 5 $35,87 main roof at auditorium: rusted, needs repainting Exterior Walls - Brick Entire Building 29,84 SF 6 $96,46 Exterior Walls - Brick Entire Building 7,64 SF 5 $49,3 top 4' of walls at light wells- tuckpoint Exterior Walls - Prefabricated Metal Panel Wall Entire Building 24 SF 5 $,853 east and west facades Exterior Walls - Prefabricated Metal Panel Wall Entire Building / Roof,83 SF 6 $,389 Exterior Walls - Stone-Cast Entire Building / South Façade,88 SF 7 including columns Exterior Walls - Stone-Cut Entire Building 3,65 SF 5 $48,593 open joints and spalls at base of walls and deteriorated stone at door 2 and adjacent window Exterior Walls - Stone-Cut Entire Building / 2nd Floor,8 SF 6 $9,23 Windows Curtain wall - Louver Entire Building 96 SF 6 $,76 north and south THORP O Page 3 of 32

4 Category: Building Exterior Windows Guard - Guards perforated Entire Building / st Floor 3,3 SF 6 $39,625 Lintels - Steel Entire Building,4 LF 6 $32,48 Skylite - Glass Double-Pane Entire Building / Main Roof 46 SF 7 at gym Skylite - Glass Single-Pane Entire Building / Main Roof 56 SF 6 $3,38 at courtyards Windows - Sash Aluminum Double-pane Entire Building,349 SF 6 $84,76 approximately 4 windows have bad balances Windows - Sash Aluminum Entire Building 2 SF 5 $4,39 at 34 light court- wood Building Exterior Subtotal: $,73,574 Category: Electrical System Emergency System Main Service Automatic Transfer Switch Boiler Room EA 6 $48 Emergency A/C Power - Auditoium and Aisle Lighting Entire Building 4,75 SF 6 $2,53 Engineer said some of the emergency lights do not work in auditorium Emergency A/C Power - Corridors and Stairs Entire Building 2,6 SF 6 $78 Emergency A/C Power - Gym Entire Building / 2nd Floor 2,829 SF 6 $,52 Emergency A/C Power - Lunchrooms Entire Building / st Floor,523 SF 6 $566 Emergency Battery Packs - Corridors and Stairs Entire Building 2 EA 6 $2,43 Emergency Battery Packs - Gym Entire Building / 2nd Floor 2 EA 6 $45 Exit Signs - Auditoium Entire Building 4 EA 6 $2,96 UPS has been disconnected, but signs are installed with batteries. Exit Signs - Corridors and Stairs Entire Building 29 EA 6 $4,343 UPS has been disconnected, but signs are installed with batteries. Exit Signs - Gym Entire Building / 2nd Floor 2 EA 6 $35 UPS has been disconnected, but signs are installed with batteries. Exit Signs - Lunchroom Entire Building / st Floor 2 EA 6 $299 UPS has been disconnected, but signs are installed with batteries. Exit Signs - Multipurpose Room Entire Building / st Floor 2 EA 6 $299 UPS has been disconnected, but signs are installed with batteries. Security System - Intrusion Detection Entire Building 93,696 SF 6 $24,7 Independent Electrical Service for emergency power Entire Building EA 6 $2,92 Main Electrical Service - 2 A 2/28/3PH Electrical Room EA 7 PA System Entire Building 93,696 SF 6 $3,87 THORP O Page 4 of 32

5 Category: Electrical System Power Distribution Lighting and Power Panels - A Entire Building 9 EA 6 $2,692 Lighting and Power Panels - Above A Entire Building 7 EA 6 $3,479 Lighting and Power Panels - Above A Entire Building / Mechanical Room EA 3 $6,578 Serves heaters Main Distribution Panels amp Entire Building / Electrical Room EA 7 Main Distribution Panels - Greater than 6 amp Entire Building / st Floor EA 7 In engineer's office Main Distribution Panels - Greater than 6 amp Entire Building / Electrical Room EA 7 Electrical System Subtotal: $86,2 Category: Safty System Fire Alarm Fire Alarm Panel Entire Building EA 4 $49,477 Appears to be more than 2 years old Fire Alarm Strobe Lights Entire Building 93,696 SF 4 $27,286 Fire Alarm_System Entire Building 93,696 SF 4 $86,24 Safty System Subtotal: $363,2 Category: Mechanical System Air Conditioning Condensing Unit- Ground Mounted - Less than 5 tons 2nd Floor EA 6 $3,334 Serves the MDF room Air Handling Systems Air Handling Unit- Built Up-Multi Zone- Steam Coils st Floor EA 6 $5,788 South AHU serves auditorium and classrooms Air Handling Unit- Built Up-Multi Zone-Double Delivery- Steam Coils - st Floor EA 6 $5,62 Greater than 6 cfm Air Intake st Floor / Roof EA 6 $5,765 Air Intake st Floor / South Façade EA 6 $5,765 Auxiliaries cfm st Floor EA 6 $5,788 The fan runs well, but is getting old. Unit serves classrooms and gym Auxiliaries - Greater than 6 cfm st Floor EA 6 $2,68 There are no pipe leaks. The control valves look to be relatively new. The exterior of the fan looks old and has peeling paint. Return Duct Work - Masonry and Ducts- Missing or Existing Shaft st Floor LF 4 The return air is drawn from the south corridor right next to unit Return Duct Work - Masonry and Ducts- Missing or Existing Shaft st Floor / Entire Building LF 5 $3,34 THORP O Page 5 of 32

6 Category: Mechanical System Air Handling Systems Zone Dampers st Floor EA 5 $9,35 Zone Dampers st Floor 47 EA 5 $89,936 Boiler Systems Heating Devices Boiler Auxiliary- Scotch Marine- Steam Low Pressure Boiler HP Boiler Room 2 EA 7 Chemical Feed System Boiler Room 2 EA 7 Combustion Dampers Boiler Room 2 EA 7 Condensate Pump Boiler Room / Entire Building 3 EA 6 $6,63 Feed Water Pumps and Tank Boiler Room EA 7 Non Condensing- Fire Tube- Scotch Marine- Steam- Low Pressure Boiler HP Boiler Room 2 EA 7 Piping - Condensate Pipe- Steel Boiler Room / Entire Building 3 LF 4 $54,359 Engineer said he has leaks in his pipes Piping - Steam Pipe- Steel Boiler Room / Entire Building 3 LF 5 $4,226 Engineer said he has leaks in his pipes Steam Traps Boiler Room / Entire Building EA 5 $,35 No significant blow through. Fin Tube - Steam Boiler Room 9 LF 6 $85 Unit Heater - Steam 2nd Floor EA 4 $,755 Steam unit heater in the gym is very old. Most of front cover is missing - not cost effective to refurbish. Unit Heater - Steam Boiler Room EA 7 Wall Heater - Electric Entire Building / st Floor EA 6 $39 In engineer's office Wall Heater - Electric Entire Building 9 EA 5 $,95 Temperature Control Ventilation DDC System Entire Building 93,696 SF 7 Thermostats - DDC Entire Building 6 EA 7 Exhaust Fans- Indoor CFM Entire Building / st Floor EA 6 $592 Exhaust Fans- Roof Mounted CFM Entire Building / Roof 7 EA 6 $4,47 Mechanical System Subtotal: $377,469 Category: Plumbing System Hot Water Gas Heater BTU/HR Boiler Room EA 7 THORP O Page 6 of 32

7 Category: Plumbing System Hot Water Piping Pumps Domestic Piping-Cold Water from Risers to Fixtures Entire Building 93,696 SF 4 $66,993 Engineer stressed piping was in bad shape. Many leaks and clamps. Domestic Piping-Cold Water Horizontal Lines Entire Building 93,696 SF 4 $35,325 Engineer stressed piping was in bad shape. Many leaks and clamps. Domestic Piping-Cold Water Risers Entire Building 93,696 SF 4 $75,32 Engineer stressed piping was in bad shape. Many leaks and clamps. Domestic Piping-Hot Water from Risers to Fixtures Entire Building 93,696 SF 4 $5,94 Engineer stressed piping was in bad shape. Many leaks and clamps. Domestic Piping-Hot Water Horizontal Lines Entire Building 93,696 SF 4 $2,587 Engineer stressed piping was in bad shape. Many leaks and clamps. Domestic Piping-Hot Water Return Lines Entire Building 93,696 SF 4 $8,39 Engineer stressed piping was in bad shape. Many leaks and clamps. Domestic Piping-Hot Water Return Risers Entire Building 93,696 SF 4 $45,555 Engineer stressed piping was in bad shape. Many leaks and clamps. Sanitary Piping Entire Building 93,696 SF 6 $85,75 Storm Piping Entire Building 93,696 SF 6 $8,73 Vent Piping Entire Building 93,696 SF 6 $62,973 Pumps - Domestic Booster Pump-Simplex Boiler Room EA 6 $,446 Pumps - Sump-Simplex Boiler Room EA 6 $745 Plumbing System Subtotal: $87,442 Category: Classrooms Classroom # (Kindergarten) Casework 8 LF 6 $455 Floor - Carpet 3 SF 5 $,54 Floor - Tile 53 SF 5 $2,33 Lighting - Pendent/Surface 6 EA 6 $743 4x4 THORP O Page 7 of 32

8 Category: Classrooms Classroom # (Kindergarten) Walls - Plaster/Drywall,3 SF 6 $3,588 Classroom #2 () Casework 9 LF 6 $227 Floor - Carpet 3 SF 5 $,54 Floor - Tile 53 SF 5 $2,33 Lighting - Pendent/Surface 6 EA 6 $743 Walls - Plaster/Drywall,26 SF 6 $3,477 Classroom #3 () Casework 9 LF 6 $227 Ceiling - Plaster/Drywall 83 SF 7 Floor - Carpet 3 SF 6 $639 Floor - Tile 53 SF 5 $2,33 Marker Board 6 LF 7 Walls - Plaster/Drywall,26 SF 7 Classroom #4 () Casework 9 LF 6 $227 Floor - Tile 83 SF 5 $3,65 4x4 fixtures cracked and chipped throughout cracked and chipped THORP O Page 8 of 32

9 Category: Classrooms Classroom #4 () Marker Board 36 LF 7 Walls - Plaster/Drywall,26 SF 6 $3,477 Classroom #5 () Casework 9 LF 6 $227 5 LF 4 $,377 Floor - Tile 83 SF 5 $3,65 Walls - Plaster/Drywall,24 SF 6 $3,422 cracked, chipped and mismatched tiles Classroom #6 (Special Program) Ceiling - Plaster/Drywall 422 SF 6 $,46 Doors - Transom Window 6 SF 6 $2 Floor - Carpet 422 SF 5 $2,66 Lighting - Pendent/Surface 6 EA 7 Marker Board 6 LF 7 Storage/ Closet 6 SF 6 $6 Walls - Plaster/Drywall 98 SF 6 $2,75 Classroom #7 () Casework 9 LF 6 $227 Floor - Tile 83 SF 5 $3,65 Marker Board 8 LF 7 Walls - Plaster/Drywall,26 SF 5 $9,55 cracked and chipped THORP O Page 9 of 32

10 Category: Classrooms Classroom #7 () Classroom #8 () Casework 8 LF 6 $455 Ceiling - Plaster/Drywall 825 SF 6 $2,855 Floor - Tile 825 SF 5 $3,74 Lighting - Pendent/Surface 5 EA 6 $,858 Marker Board 8 LF 7 Storage/ Closet 5 SF 6 $363 Walls - Plaster/Drywall,26 SF 6 $3,477 Classroom #9 () Casework 9 LF 6 $227 Ceiling - Plaster/Drywall 83 SF 5 $7,452 Floor - Wood 83 SF 6 $5,732 Walls - Plaster/Drywall,26 SF 6 $3,477 Classroom # (Music Room) Doors - Transom Window 8 SF 6 $35 Doors - Wood Doors inclu hw 2 EA 6 $62 Floor - Tile 83 SF 5 $3,65 Marker Board 8 LF 6 $7 Walls - Plaster/Drywall,26 SF 6 $3,477 cracked chipped and mismatched tile THORP O Page of 32

11 Category: Classrooms Classroom #2 () Casework 8 LF 5 $3,763 Doors - Wood Doors inclu hw EA 5 $,74 Floor - Wood 83 SF 6 $5,732 Walls - Plaster/Drywall,3 SF 6 $3,588 Classroom #22 () Casework 9 LF 5 $,882 Ceiling - Plaster/Drywall 825 SF 6 $2,855 Floor - Wood 825 SF 6 $5,86 Storage/ Closet 5 SF 6 $363 Walls - Plaster/Drywall,26 SF 6 $3,477 Classroom #23 () Casework 8 LF 6 $22 Floor - Wood 83 SF 5 $,893 Marker Board 24 LF 6 $54 Storage/ Closet 62 SF 7 Walls - Plaster/Drywall,28 SF 6 $3,533 THORP O Page of 32

12 Category: Classrooms Classroom #24 () Casework 8 LF 6 $22 Floor - Wood 83 SF 6 $5,732 Walls - Plaster/Drywall Classroom #25 (),26 SF 5 $9,55 Floor - Wood 83 SF 6 $5,732 Walls - Plaster/Drywall,26 SF 6 $3,477 Classroom #26 () Doors - Wood Doors inclu hw EA 5 $,74 Floor - Wood 83 SF 6 $5,732 Marker Board 24 LF 6 $54 Walls - Plaster/Drywall,3 SF 6 $3,588 peeling paint THORP O Page 2 of 32

13 Category: Classrooms Classroom #27 () Doors - Wood Doors inclu hw EA 5 $,74 Floor - Wood 83 SF 6 $5,732 Marker Board 3 LF 7 Walls - Plaster/Drywall,3 SF 6 $3,588 Classroom #29 () Floor - Wood 83 SF 6 $5,732 Walls - Plaster/Drywall,28 SF 6 $3,533 Classroom #2 () Floor - Wood 83 SF 6 $5,732 Walls - Plaster/Drywall,26 SF 6 $3,477 Classroom #2 () THORP O Page 3 of 32

14 Category: Classrooms Classroom #2 () Floor - Wood 83 SF 6 $5,732 Walls - Plaster/Drywall,26 SF 6 $3,477 Classroom #22 () Floor - Wood 83 SF 5 $,893 Marker Board 24 LF 6 $54 Walls - Plaster/Drywall,26 SF 6 $3,477 Classroom #3 () AC Units 2 EA 6 $99 Floor - Wood SF 6 $6,69 Walls - Plaster/Drywall,2 SF 6 $3,32 Walls - Plaster/Drywall 8 SF 5 $48 THORP O Page 4 of 32

15 Category: Classrooms Classroom #32 () AC Units 2 EA 6 $99 Doors - Wood Doors inclu hw EA 6 $3, Floor - Wood 83 SF 6 $5,732 Walls - Plaster/Drywall,28 SF 6 $3,533 Classroom #33 () AC Units 2 EA 6 $99 Floor - Wood 83 SF 6 $5,732 Walls - Plaster/Drywall,26 SF 6 $3,477 Classroom #34 () AC Units 2 EA 6 $99 Floor - Tile 83 SF 5 $3,65 Walls - Plaster/Drywall,26 SF 6 $3,477 cracked chipped and mismatched throughout Classroom #35 () AC Units 2 EA 6 $99 THORP O Page 5 of 32

16 Category: Classrooms Classroom #35 () Doors - Wood Doors inclu hw EA 4 $3,43 Floor - Wood 83 SF 6 $5,732 Walls - Plaster/Drywall,26 SF 6 $3,477 Classroom #36 () AC Units 2 EA 6 $99 Floor - Wood 83 SF 6 $5,732 Walls - Plaster/Drywall,3 SF 6 $3,588 damaged door and hardware Classroom #37 (Science Lab Level ) AC Units 2 EA 6 $99 Casework 9 LF 6 $48 Floor - Tile 83 SF 5 $3,65 Gas Line EA 6 $59 Marker Board 6 LF 7 Walls - Plaster/Drywall,3 SF 6 $3,588 Work Sink EA 6 $379 THORP O Page 6 of 32

17 Category: Classrooms Classroom #38 () AC Units 2 EA 6 $99 Floor - Wood 83 SF 5 $,893 Marker Board 22 LF 7 Walls - Plaster/Drywall,26 SF 6 $3,477 Classroom #39 () Floor - Wood 83 SF 6 $5,732 Walls - Plaster/Drywall,28 SF 6 $3,533 Classroom #3 () Floor - Wood 83 SF 6 $5,732 Walls - Plaster/Drywall,26 SF 6 $3,477 Classroom #3 (Special Education) THORP O Page 7 of 32

18 Category: Classrooms Classroom #3 (Special Education) Ceiling - Plaster/Drywall 574 SF 6 $,986 Floor - Tile 574 SF 5 $2,577 Lighting - Pendent/Surface 2 EA 6 $,487 Marker Board 6 LF 7 Walls - Plaster/Drywall,2 SF 6 $3,4 Classroom #32 (Computer Lab) AC Units 2 EA 6 $99 Ceiling - Plaster/Drywall,75 SF 6 $4,66 3 LF 4 $2,754 Floor - Tile,75 SF 5 $5,276 Lighting - Pendent/Surface 2 EA 6 $2,478 Storage/ Closet 6 SF 6 $6 Walls - Plaster/Drywall,36 SF 6 $3,753 Wireless System EA 6 $372 cracked and chipped cracked, chipped and pulling apart at joints Classroom #Art Room (Art Room) AC Units 3rd Floor 2 EA 6 $99 Casework 3rd Floor 4 LF 6 $354 Ceiling - Plaster/Drywall 3rd Floor 682 SF 6 $2,36 Doors - Transom Window 3rd Floor SF 6 $69 Doors - Wood Doors inclu hw 3rd Floor 3 EA 7 Floor - Carpet 3rd Floor 682 SF 4 $6,27 worn to the point of becoming a tripping hazard Lighting - Pendent/Surface 3rd Floor 4 EA 6 $496 4x4 fixtures Storage/ Closet 3rd Floor 8 SF 6 $58 Walls - Metal Panel 3rd Floor,28 SF 6 $8,42 Classrooms Subtotal: $65,357 Category: Rooms (Other Than Classrooms) THORP O Page 8 of 32

19 Category: Rooms (Other Than Classrooms) Administrative Suites/Offices AC Unit 28A Office EA 6 $496 Ceiling - Plaster/Drywall 28A Office 586 SF 7 Doors - Transom Window 28A Office 9 SF 6 $52 Doors - Wood Doors inclu hw 28A Office EA 6 $3 Floor - Carpet 28A Office 586 SF 6 $,249 Lighting - Pendent/Surface 28A Office 8 EA 7 Power Distribution 28A Office EA 7 Storage/ Closet 28A Office 2 SF 6 $87 Walls - Plaster/Drywall 28A Office,34 SF 7 Ceiling - Plaster/Drywall 28B Counselor 3 SF 7 Doors - Wood Doors inclu hw 28B Counselor EA 7 Floor - Carpet 28B Counselor 3 SF 6 $639 Lighting - Pendent/Surface 28B Counselor 8 EA 7 Power Distribution 28B Counselor 8 EA 7 Walls - Plaster/Drywall 28B Counselor 824 SF 6 $2,274 AC Unit 32A Teacher's Lounge EA 7 Ceiling - Plaster/Drywall 32A Teacher's Lounge 36 SF 7 Doors - Wood Doors inclu hw 32A Teacher's Lounge EA 6 $3 Floor - Tile 32A Teacher's Lounge 36 SF 5 $,66 Lighting - Pendent/Surface 32A Teacher's Lounge 6 EA 7 Power Distribution 32A Teacher's Lounge 6 EA 6 $2,749 Walls - Plaster/Drywall 32A Teacher's Lounge 99 SF 6 $2,59 Work SInk 32A Teacher's Lounge EA 6 $58 Ceiling - Plaster/Drywall 34 Office 4 SF 6 $,384 Doors - Wood Doors inclu hw 34 Office EA 6 $3 Floor - Wood 34 Office 4 SF 6 $2,82 Lighting - Pendent/Surface 34 Office 3 EA 6 $372 x8 Walls - Plaster/Drywall 34 Office 4 SF 6 $,32 Ceiling - Plaster/Drywall 3rd Floor Art Room Office 8 SF 6 $374 Doors - Wood Doors inclu hw 3rd Floor Art Room Office EA 6 $3 Floor - Carpet 3rd Floor Art Room Office 8 SF 4 $993 worn and stained Lighting - Pendent/Surface 3rd Floor Art Room Office EA 7 4x4 Power Distribution 3rd Floor Art Room Office 4 EA 6 $8,5 Walls - Plaster/Drywall 3rd Floor Art Room Office 475 SF 6 $,3 Ceiling - Plaster/Drywall Gym Office 35 SF 6 $467 Doors - Wood Doors inclu hw Gym Office EA 6 $3 Floor - Wood Gym Office 35 SF 5 $,975 THORP O Page 9 of 32

20 Category: Rooms (Other Than Classrooms) Administrative Suites/Offices Lighting - Pendent/Surface Gym Office 3 EA 6 $372 Power Distribution Gym Office 2 EA 6 $4,25 Walls - Plaster/Drywall Gym Office 537 SF 6 $,482 AC Unit Main Office EA 6 $496 Ceiling - Plaster/Drywall Main Office 334 SF 6 $,56 Doors - Wood Doors inclu hw Main Office EA 6 $3 Floor - Carpet Main Office 234 SF 6 $499 Floor - Tile Main Office SF 3 $859 cracked and chipped Lighting - Pendent/Surface Main Office 6 EA 6 $743 Power Distribution Main Office 8 EA 6 $6,999 Walls - Plaster/Drywall Main Office 688 SF 6 $,899 AC Unit Nurse's Office Suite (In Admin Suite) EA 6 $496 Ceiling - Plaster/Drywall Nurse's Office Suite (In Admin Suite) 75 SF 6 $66 Doors - Wood Doors inclu hw Nurse's Office Suite (In Admin Suite) EA 6 $3 Floor - Carpet Nurse's Office Suite (In Admin Suite) 75 SF 4 $,69 worn, stained, warped and zippering at the seams Lighting - Pendent/Surface Nurse's Office Suite (In Admin Suite) 3 EA 6 $372 Power Distribution Nurse's Office Suite (In Admin Suite) EA 6 $2,249 Walls - Plaster/Drywall Nurse's Office Suite (In Admin Suite) 825 SF 6 $2,277 AC Unit Principal's in Main Office EA 6 $496 Ceiling - Plaster/Drywall Principal's in Main Office 332 SF 7 Doors - Transom Window Principal's in Main Office 2 SF 6 $339 Doors - Wood Doors inclu hw Principal's in Main Office 2 EA 6 $62 Floor - Carpet Principal's in Main Office 332 SF 6 $77 Lighting - Pendent/Surface Principal's in Main Office 6 EA 6 $743 Power Distribution Principal's in Main Office 6 EA 6 $2,749 Walls - Plaster/Drywall Principal's in Main Office 669 SF 7 Auditorium & Theater Balcony Seating st Floor 632 EA 5 $24,5 Ceiling - Plaster/Drywall st Floor 4,75 SF 6 $39,6 Doors - Wood Doors inclu hw st Floor EA 5 $,74 designated balcony exit door is missing egress hardware Doors - Wood Doors inclu hw st Floor EA 6 $3,3 Floor - Tile st Floor,2 SF 5 $5,388 Floor - Wood st Floor 3,55 SF 6 $25,27 Lighting - Pendent/Surface st Floor 26 EA 6 $26,76 Main Floor Seating st Floor 594 EA 6 $3,36 Sound System st Floor EA 6 $,72 THORP O Page 2 of 32

21 Category: Rooms (Other Than Classrooms) Auditorium & Theater Stage st Floor 988 SF 5 $4,835 Stage Curtain st Floor 3 EA 6 Stage Lighting System st Floor EA 6 $8,77 Stage-Stairs - Wood st Floor 8 LF 6 $94 Walls - Plaster/Drywall st Floor 2,789 SF 6 $3,28 Gymnasia Bleacher Seating 2nd Floor 6 EA 6 $4,63 Ceiling - Plaster/Drywall 2nd Floor 2,829 SF 7 Doors - Transom Window 2nd Floor 36 SF 6 $6 Doors - Wood Doors inclu hw 2nd Floor 4 EA 6 $,24 Floor - Wood 2nd Floor 2,829 SF 6 $9,944 Lighting - Pendent/Surface 2nd Floor EA 6 $,239 Scoreboards 2nd Floor 2 EA 6 $4,489 Sound System 2nd Floor EA 6 $4,654 Storage/ Closet 2nd Floor 2 SF 6 $87 Walls - Plaster/Drywall 2nd Floor 4,429 SF 6 $2,224 Library AC Unit 223 EA 7 Casework LF 7 Ceiling - Plaster/Drywall 223,23 SF 7 Doors - Transom Window SF 6 $52 Doors - Wood Doors inclu hw 223 EA 6 $3 Floor - Carpet 223,23 SF 6 $2,393 Lighting - Pendent/Surface EA 6 $2,23 Walls - Plaster/Drywall 223,66 SF 7 Lunch & Multipurpose Room AC Unit - Cafeteria 2 EA 6 $99 Ceiling - Plaster/Drywall - Cafeteria,523 SF 6 $5,27 Doors - Transom Window - Cafeteria 8 SF 6 $35 Doors - Wood Doors inclu hw - Cafeteria 2 EA 6 $62 Floor - Tile - Cafeteria,523 SF 3 $3,89 cracked tile throughout Lighting - Pendent/Surface - Cafeteria 2 EA 6 $,487 4x4 fixtures Serving Line - Cafeteria 2 LF 6 $,25 Walls - Plaster/Drywall - Cafeteria,684 SF 6 $4,648 THORP O Page 2 of 32

22 Category: Rooms (Other Than Classrooms) MDF_IDF Finishes 2 SF 6 $856 Ventilation and Cooling EA 6 $,855 Mechanical/ Service Rooms Restroom Boiler Room st Floor,563 SF 6 $,98 Coal Room st Floor 298 SF 6 $2,35 Janitor's Closet st Floor 5 SF 5 $242 Mechanical/ Service Rooms st Floor 52 SF 6 $3,668 tank room Storage Room 2nd Floor 4 SF 6 $287 admin storage at 2nd floor corridor south Storage Room 2nd Floor 45 SF 6 $322 'map room 2' at 2nd floor corridor south Storage Room 2nd Floor 45 SF 6 $322 'map room ' at 2nd floor corridor south Accessories.5 Women NE 63 SF 5 $,247 Benches.5 Women NE 5 LF 5 $7 Ceiling - Plaster/Drywall.5 Women NE 63 SF 5 $577 Doors - Wood Doors inclu hw.5 Women NE EA 4 $3,43 warped and delaminating veneer Floor - Tile Ceramic/ Porcelain.5 Women NE 63 SF 5 $,6 Lavatory.5 Women NE EA 6 $32 Lighting - Pendent/Surface.5 Women NE EA 6 $24 Partitions.5 Women NE EA 5 $75 Walls - Plaster/Drywall.5 Women NE 63 SF 3 $634 cracked plaster and badly peeling paint Water Closet.5 Women NE EA 5 $,344 Accessories.5 Women NW 63 SF 5 $,247 Benches.5 Women NW 5 LF 6 $72 Ceiling - Plaster/Drywall.5 Women NW 63 SF 6 $28 Doors - Wood Doors inclu hw.5 Women NW EA 6 $3 Floor - Tile Ceramic/ Porcelain.5 Women NW 63 SF 5 $,6 Lavatory.5 Women NW EA 4 $7,342 obsolete design (double faucet) Lighting - Pendent/Surface.5 Women NW EA 5 $83 Partitions.5 Women NW EA 5 $75 Walls - Plaster/Drywall.5 Women NW 4 SF 5 $3,32 Water Closet.5 Women NW EA 5 $,344 Accessories A - Classroom Toilet Room 42 SF 7 Ceiling - Exposed A - Classroom Toilet Room 42 SF 6 $62 Doors - Wood Doors inclu hw A - Classroom Toilet Room EA 6 $3 Floor - Tile Ceramic/ Porcelain A - Classroom Toilet Room 42 SF 6 $89 THORP O Page 22 of 32

23 Category: Rooms (Other Than Classrooms) Restroom Lavatory A - Classroom Toilet Room EA 5 $,59 Lighting - Pendent/Surface A - Classroom Toilet Room EA 6 $24 Partitions A - Classroom Toilet Room EA 5 $75 Walls - Plaster/Drywall A - Classroom Toilet Room 5 SF 6 $47 Walls - Tile Ceramic/ Porcelain A - Classroom Toilet Room 2 SF 6 $452 Water Closet A - Classroom Toilet Room EA 6 $336 Accessories st Floor SE 56 SF 5 $,8 Ceiling - Plaster/Drywall st Floor SE 56 SF 5 $53 Doors - Wood Doors inclu hw st Floor SE EA 5 $,74 Floor - Tile Ceramic/ Porcelain st Floor SE 56 SF 5 $894 Lavatory st Floor SE EA 5 $,59 Lighting - Pendent/Surface st Floor SE EA 5 $83 Partitions st Floor SE EA 5 $75 Walls - Plaster/Drywall st Floor SE 44 SF 5 $3,335 Water Closet st Floor SE EA 5 $,344 Accessories st Floor SW Corner 78 SF 5 $,544 Ceiling - Plaster/Drywall st Floor SW Corner 78 SF 3 $,75 cracked plaster & peeling paint Doors - Wood Doors inclu hw st Floor SW Corner EA 5 $,74 Floor - Concrete Epoxy/ Painted st Floor SW Corner 78 SF 5 $34 Lavatory st Floor SW Corner EA 3 $7,342 malfunctioning faucet (running water); obsolete design (double faucet) Lighting - Pendent/Surface st Floor SW Corner 2 EA 5 $365 Partitions st Floor SW Corner 2 EA 5 $,52 Walls - Plaster/Drywall st Floor SW Corner 43 SF 5 $3,259 Water Closet st Floor SW Corner 2 EA 5 $2,688 Accessories st Floor 327 SF 6 $3,6 Accessories st Floor 298 SF 6 $2,749 Ceiling - Plaster/Drywall st Floor 298 SF 6 $,3 Ceiling - Plaster/Drywall st Floor 327 SF 7 Floor Drain st Floor EA 6 $,59 Floor Drain st Floor EA 5 $2,94 Floor - Tile Ceramic/ Porcelain st Floor 298 SF 5 $4,76 Floor - Tile Ceramic/ Porcelain st Floor 327 SF 5 $5,223 Hand Dryer st Floor 2 EA 7 Hand Dryer st Floor 2 EA 6 $46 Lavatory st Floor 2 EA 7 Lavatory st Floor 2 EA 6 $639 Lighting - Pendent/Surface st Floor 5 EA 6 $69 THORP O Page 23 of 32

24 Category: Rooms (Other Than Classrooms) Restroom Lighting - Pendent/Surface st Floor 3 EA 6 $372 Partitions st Floor 2 EA 6 $594 graffiti Partitions st Floor 7 EA 6 $2,78 Urinals st Floor 3 EA 6 $,8 Walls - Tile Ceramic/ Porcelain st Floor 675 SF 5 $,8 Walls - Tile Ceramic/ Porcelain st Floor 575 SF 3 $6,83 missing and damaged tile; mismatched tile patches Water Closet st Floor 7 EA 6 $2,352 Water Closet st Floor 2 EA 6 $672 Accessories 2.5 NE Men's 63 SF 5 $,247 Benches 2.5 NE Men's 5 LF 5 $7 Ceiling - Plaster/Drywall 2.5 NE Men's 63 SF 6 $28 Doors - Wood Doors inclu hw 2.5 NE Men's EA 5 $,74 Floor - Tile Ceramic/ Porcelain 2.5 NE Men's 63 SF 5 $,6 Lavatory 2.5 NE Men's EA 4 $7,342 obsolete fixture (double faucet) Lighting - Pendent/Surface 2.5 NE Men's EA 6 $24 Partitions 2.5 NE Men's EA 5 $75 Walls - Plaster/Drywall 2.5 NE Men's 4 SF 5 $3,32 Water Closet 2.5 NE Men's EA 6 $336 Accessories 2.5 NW Womens 63 SF 5 $,247 Benches 2.5 NW Womens 5 LF 6 $72 Ceiling - Plaster/Drywall 2.5 NW Womens 63 SF 5 $577 Doors - Wood Doors inclu hw 2.5 NW Womens EA 5 $,74 Floor - Tile Ceramic/ Porcelain 2.5 NW Womens 63 SF 6 $33 Lavatory 2.5 NW Womens EA 4 $7,342 obsolete fixture type (double faucet) Lighting - Pendent/Surface 2.5 NW Womens EA 5 $83 replace globe cover Partitions 2.5 NW Womens EA 5 $75 Walls - Plaster/Drywall 2.5 NW Womens 4 SF 5 $3,32 Water Closet 2.5 NW Womens EA 5 $,344 Accessories 2nd Floor 327 SF 6 $3,6 Accessories 2nd Floor 327 SF 6 $3,6 Ceiling - Plaster/Drywall 2nd Floor 327 SF 6 $,32 Ceiling - Plaster/Drywall 2nd Floor 327 SF 5 $2,997 water damage Floor Drain 2nd Floor 2 EA 5 $4,88 Floor Drain 2nd Floor EA 6 $,59 Floor - Tile Ceramic/ Porcelain 2nd Floor 327 SF 5 $5,223 Floor - Tile Ceramic/ Porcelain 2nd Floor 327 SF 5 $5,223 Hand Dryer 2nd Floor 2 EA 7 THORP O Page 24 of 32

25 Category: Rooms (Other Than Classrooms) Restroom Hand Dryer 2nd Floor 2 EA 7 Lavatory 2nd Floor 2 EA 6 $639 Lavatory 2nd Floor 2 EA 6 $639 Lighting - Lay-in 2nd Floor 7 EA 6 $833 Lighting - Pendent/Surface 2nd Floor 7 EA 6 $867 Partitions 2nd Floor 7 EA 5 $5,256 Partitions 2nd Floor 2 EA 4 $3,973 graffiti damage Urinals 2nd Floor 4 EA 6 $,344 Walls - Plaster/Drywall 2nd Floor 25 SF 5 $947 water damage Walls - Plaster/Drywall 2nd Floor 25 SF 6 $345 Walls - Tile Ceramic/ Porcelain 2nd Floor 65 SF 5 $,4 Walls - Tile Ceramic/ Porcelain 2nd Floor 65 SF 5 $,4 Water Closet 2nd Floor 2 EA 6 $672 Water Closet 2nd Floor 7 EA 6 $2,352 Accessories 3rd Floor Girls 327 SF 6 $3,6 Ceiling - Plaster/Drywall 3rd Floor Girls 327 SF 7 Floor Drain 3rd Floor Girls EA 6 $,59 Floor - Tile Ceramic/ Porcelain 3rd Floor Girls 327 SF 6 $692 Hand Dryer 3rd Floor Girls 2 EA 7 Lavatory 3rd Floor Girls 2 EA 6 $639 Lighting - Pendent/Surface 3rd Floor Girls 7 EA 6 $867 Partitions 3rd Floor Girls 7 EA 5 $5,256 Walls - Plaster/Drywall 3rd Floor Girls 25 SF 7 Walls - Tile Ceramic/ Porcelain 3rd Floor Girls 65 SF 6 $,469 Water Closet 3rd Floor Girls 7 EA 6 $2,352 Accessories 3rd Floor 327 SF 6 $3,6 Ceiling - Plaster/Drywall 3rd Floor 327 SF 6 $,32 Floor Drain 3rd Floor 2 EA 6 $2,8 Floor - Tile Ceramic/ Porcelain 3rd Floor 327 SF 3 $9,46 chipped and missing tiles Hand Dryer 3rd Floor 2 EA 6 $46 Lavatory 3rd Floor 2 EA 6 $639 Lighting - Pendent/Surface 3rd Floor 7 EA 6 $867 Partitions 3rd Floor 2 EA 5 $,52 Urinals 3rd Floor 4 EA 6 $,344 Walls - Plaster/Drywall 3rd Floor 25 SF 6 $345 Walls - Tile Ceramic/ Porcelain 3rd Floor 65 SF 6 $,469 Water Closet 3rd Floor 2 EA 6 $672 THORP O Page 25 of 32

26 Category: Rooms (Other Than Classrooms) Restroom Accessories Engineer's Toilet Room 3 SF 5 $64 Ceiling - Exposed Engineer's Toilet Room 3 SF 7 painted Doors - Wood Doors inclu hw Engineer's Toilet Room EA 6 $3 Floor - Concrete Epoxy/ Painted Engineer's Toilet Room 23 SF 6 $2 Lavatory Engineer's Toilet Room EA 4 $7,342 obsolete design (double faucet) Lighting - Wall Mounted Engineer's Toilet Room EA 6 $24 Student Lockers - One Tier Engineer's Toilet Room 3 EA 5 $42 staff lockers - rusted Walls - Masonry Engineer's Toilet Room 29 SF 6 $689 Water Closet Engineer's Toilet Room EA 6 $336 Accessories in Main Office 9 SF 5 $,8 Ceiling - Plaster/Drywall in Main Office 9 SF 6 $35 Doors - Wood Doors inclu hw in Main Office EA 6 $3 Floor - Tile Ceramic/ Porcelain in Main Office 9 SF 6 $93 Lavatory in Main Office EA 2 $7,342 The sink and counter for this toilet room is being used as an office kitchenette! Lighting - Pendent/Surface in Main Office 2 EA 6 $248 Partitions in Main Office EA 2 $,986 This toilet partition is being used as the back wall of a makeshift kitchenette! Remove and reconfigure room for a designated use allowed by the Illinois plumbing code. Walls - Plaster/Drywall in Main Office 25 SF 6 $69 Walls - Tile Ceramic/ Porcelain in Main Office 245 SF 6 $554 Water Closet in Main Office EA 2 $7,669 This fixture should be removed, since the room is being used as a kitchenette. Accessories Lunchroom Unisex (used as Office) 298 SF 6 $2,749 Ceiling - Plaster/Drywall Lunchroom Unisex (used as Office) 298 SF 6 $,3 Floor Drain Lunchroom Unisex (used as Office) EA 6 $,59 Floor - Tile Ceramic/ Porcelain Lunchroom Unisex (used as Office) 298 SF 4 $8,335 chipped, broken & missing tiles Hand Dryer Lunchroom Unisex (used as Office) 2 EA 6 $46 Lavatory Lunchroom Unisex (used as Office) 2 EA 6 $639 Lighting - Lay-in Lunchroom Unisex (used as Office) 5 EA 7 Partitions Lunchroom Unisex (used as Office) 6 EA 6 $,782 Walls - Tile Ceramic/ Porcelain Lunchroom Unisex (used as Office) 24 SF 5 $3,267 Water Closet Lunchroom Unisex (used as Office) 5 EA 6 $,68 Rooms (Other Than Classrooms) Subtotal: $,49,3 THORP O Page 26 of 32

27 Category: Building Interior Corridor Ceiling - Plaster/Drywall st floor corr - West 3,272 SF 6 $2,26 Doors - Wood Doors include hw st floor corr - West 8 EA 6 $2,48 Drinking Fountains - Single Fountain st floor corr - West 2 EA 6 $55 Floor - Concrete Epoxy/ Painted st floor corr - West 3,272 SF 6 $,59 Lighting - Pendent/Surface st floor corr - West 8 EA 6 $2,23 Student Lockers - One Tier st floor corr - West 6 EA 6 $5,663 Walls - Plaster/Drywall st floor corr - West 2,557 SF 6 $,335 Ceiling - Plaster/Drywall st flr corr - east 3,276 SF 6 $2,285 Doors - Wood Doors include hw st flr corr - east 8 EA 6 $2,48 Drinking Fountains - Single Fountain st flr corr - east 2 EA 6 $55 Floor - Concrete st flr corr - east 3,276 SF 6 $,733 Lighting - Pendent/Surface st flr corr - east 8 EA 6 $2,23 Student Lockers - One Tier st flr corr - east 6 EA 6 $5,663 Walls - Plaster/Drywall st flr corr - east 2,557 SF 6 $,335 Ceiling - Plaster/Drywall st flr corr - middle 934 SF 7 Floor - Concrete Epoxy/ Painted st flr corr - middle 934 SF 6 $454 Lighting - Pendent/Surface st flr corr - middle 8 EA 6 $2,23 Walls - Plaster/Drywall st flr corr - middle,76 SF 6 $7,82 Ceiling - Plaster/Drywall 2nd Floor outside of Administration 549 SF 6 $3,399 offices Floor - Tile/Sheet 2nd Floor outside of Administration offices 549 SF 4 $5,37 Lighting - Pendent/Surface 2nd Floor outside of Administration 4 EA 6 $,735 offices Walls - Plaster/Drywall 2nd Floor outside of Administration 773 SF 6 $3,427 offices Ceiling - Plaster/Drywall 2nd flr corr - east 2,69 SF 6 $6,656 Drinking Fountains - Single Fountain 2nd flr corr - east 2 EA 6 $55 Floor - Concrete Epoxy/ Painted 2nd flr corr - east 2,69 SF 6 $,38 Lighting - Pendent/Surface 2nd flr corr - east 8 EA 7 Student Lockers - One Tier 2nd flr corr - east 6 EA 6 $5,663 Walls - Plaster/Drywall 2nd flr corr - east 2,326 SF 6 $,3 Ceiling - Plaster/Drywall 2nd Flr Corr - West 2,69 SF 6 $6,656 Drinking Fountains - Single Fountain 2nd Flr Corr - West 2 EA 6 $55 Floor - Concrete Epoxy/ Painted 2nd Flr Corr - West 2,69 SF 6 $,38 Lighting - Pendent/Surface 2nd Flr Corr - West 8 EA 6 $2,23 Student Lockers - One Tier 2nd Flr Corr - West 6 EA 6 $5,663 Walls - Plaster/Drywall 2nd Flr Corr - West 2,326 SF 6 $,3 Ceiling - Plaster/Drywall 2nd flr corr-middle 934 SF 7 Floor - Concrete Epoxy/ Painted 2nd flr corr-middle 934 SF 6 $454 pitted, discolored, chipped, separating at seams, THORP O Page 27 of 32

28 Category: Building Interior Corridor Lighting - Pendent/Surface 2nd flr corr-middle 2 EA 6 $2,478 Student Lockers - One Tier 2nd flr corr-middle 6 EA 6 $5,663 Walls - Plaster/Drywall 2nd flr corr-middle,76 SF 6 $7,82 Ceiling - Plaster/Drywall 3rd Floor Corridor - East 2,69 SF 7 Drinking Fountains - Single Fountain 3rd Floor Corridor - East 2 EA 6 $55 Floor - Concrete Epoxy/ Painted 3rd Floor Corridor - East 2,69 SF 6 $,38 Lighting - Pendent/Surface 3rd Floor Corridor - East 8 EA 6 $2,23 Student Lockers - One Tier 3rd Floor Corridor - East 6 EA 6 $5,663 Walls - Plaster/Drywall 3rd Floor Corridor - East 2,326 SF 6 $,3 Ceiling - Plaster/Drywall 3rd Flr. Corr - Middle 934 SF 7 Floor - Concrete Epoxy/ Painted 3rd Flr. Corr - Middle 934 SF 6 $454 Lighting - Pendent/Surface 3rd Flr. Corr - Middle 2 EA 6 $2,478 Student Lockers - One Tier 3rd Flr. Corr - Middle 6 EA 6 $5,663 Walls - Plaster/Drywall 3rd Flr. Corr - Middle,76 SF 6 $7,82 Ceiling - Plaster/Drywall 3rd Flr. Corr-West 2,69 SF 6 $6,656 Drinking Fountains - Single Fountain 3rd Flr. Corr-West 2 EA 6 $55 Floor - Concrete Epoxy/ Painted 3rd Flr. Corr-West 2,69 SF 5 $4,66 cracked Lighting - Pendent/Surface 3rd Flr. Corr-West 8 EA 6 $2,23 Student Lockers - One Tier 3rd Flr. Corr-West 6 EA 6 $5,663 Walls - Plaster/Drywall 3rd Flr. Corr-West 2,326 SF 6 $,3 Ceiling - Plaster/Drywall Admin Corridor 2 SF 6 $743 Floor - Carpet Admin Corridor 2 SF 3 $,3 stained, zippering at seams, very warped (trip hazard) Lighting - Pendent/Surface Admin Corridor 2 EA 7 Walls - Plaster/Drywall Admin Corridor 566 SF 6 $2,59 Stairs Ceiling - Plaster/Drywall Northeast Stairway 6 SF 6 $4,393 Floor - Tile Northeast Stairway 22 SF 5 $988 Handrails Northeast Stairway 24 LF 6 $,75 Lighting - Lay-in Northeast Stairway EA 6 $,9 Stairs - Tile Northeast Stairway 39 LF 5 $7,5 Walls - Plaster/Drywall Northeast Stairway 2,335 SF 7 Ceiling - Plaster/Drywall Northwest Stairway 6 SF 7 Floor - Tile Northwest Stairway 22 SF 5 $988 Handrails Northwest Stairway 24 LF 6 $,75 Lighting - Lay-in Northwest Stairway EA 6 $,9 Stairs - Tile Northwest Stairway 39 LF 5 $7,5 THORP O Page 28 of 32

29 Category: Building Interior Stairs Walls - Structural Glazed Tile Northwest Stairway 2,335 SF 6 $7,346 Ceiling - Plaster/Drywall Southeast Stairway 6 SF 6 $4,393 Floor - Tile Southeast Stairway 244 SF 4 $2,97 furniture at 3rd floor landing is blocking the balcony's designated exit Handrails Southeast Stairway 24 LF 6 $,75 Lighting - Lay-in Southeast Stairway 2 EA 6 $,428 Stairs - Tile Southeast Stairway 42 LF 5 $7,544 Walls - Plaster/Drywall Southeast Stairway 2,335 SF 6 $6,444 Ceiling - Plaster/Drywall Southwest Stairway 6 SF 6 $4,393 Floor - Tile Southwest Stairway 244 SF 5 $,96 furniture at 3rd floor landing is blocking the balcony's designated exit Handrails Southwest Stairway 24 LF 6 $,75 Lighting - Lay-in Southwest Stairway 2 EA 6 $,428 Stairs - Tile Southwest Stairway 42 LF 5 $7,544 Walls - Plaster/Drywall Southwest Stairway 2,335 SF 6 $6,444 Building Interior Subtotal: $358,26 Total Building Cost $5,387,248 SITE Category: Site Athletic Surface - Asphalt West 8,866 SF 6 $2,426 Civil/Drainage Fencing Landscape Civil/ Drainage - Catch Basin Entire Site 3 EA 7 Civil/ Drainage - Site Manhole Entire Site 3 EA 7 Fencing - Chain Link Entire Site / Site North 77 LF 6 $,446 Fencing - New Standard Ornamental Entire Site / Site - East 285 LF 7 Fencing - Old Standard Ornamental Entire Site,56 LF 6 $8,755 Benches Entire Site 6 EA 7 east and west Irrigation Entire Site / Site West 39,67 SF 6 $44,755 THORP O Page 29 of 32

30 SITE Category: Site Landscape Parking Lot Sidewalks Signage Landscape - Grass Entire Site / Site West 39,67 SF 5 $6,5 bare/dirt spots throughout Landscape - Hardscape- Concrete Entire Site 2,78 SF 7 Parkway trees Entire Site 52 EA 7 Parkway trees Entire Site 4 EA 4 $,496 east and south- stumps Planting Beds/ Area Entire Site,4 SF 7 Planting Beds/ Area Entire Site / West Entrances 36 SF 6 $793 Play Area - Asphalt/ Hardscape Entire Site / Site - East 3,785 SF 6 $74,398 Trash Receptacles Entire Site 4 EA 7 Surface - Asphalt Entire Site / Site - East 4,82 SF 6 $35,85 Surface - Concrete Entire Site / Site North 2,92 SF 6 $7,37 Trash Compactor Entire Site / Site North EA 6 Trash Enclosure Entire Site / Site North 78 SF 6 Vehicular Screening Entire Site / Site - East 385 LF 7 Sidewalks - Perimeter Sidewalks Entire Site 3,677 SF 6 $27,86 Flag Pole - Building Mounted Flag Pole Entire Site / East Façade EA 6 $828 Marquee - Free Standing Back Lighted Entire Site / South East EA 6 Site Subtotal: $364,988 Total Site Cost $364,988 Campus Total ² ³ $5,752,236 ¹ It is very rare for assessors to find a feature in this condition. If assessors do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked in this report; by the time the report is compiled, they have been resolved. ² As stated above, Total Assessed Campus Need does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Total Assessed Campus Need includes current deficiencies and is based on current unit cost estimates; it does not reflect a complete project cost. ³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are estimates only and are based solely on the data that was collected as of the assessment date in the footer below. THORP O Page 3 of 32

31 Definitions Quantity means, for each item, the total number (or amount) of that item that exists and was evaluated. Unit means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement EA for each. Other items, like chimneys, are measured in terms of linear feet ( LF ). Still other items, like flooring, are generally measured in square feet ( SF ). Cost means a basic estimate for each item needing some level of repair or replacement. Cost does not include all expenses that would be necessary to complete a repair or replacement project. This is because, depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and additional work triggered by building codes. For the same reason, the Total Campus Need listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features. Campus Total also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to alleviate overcrowding; these are viewed as separate capital needs. THORP O Page 3 of 32

32 Classroom Summary Current Usage Intended Usage Room Location Room Number Floor Plan Room Number Area (SF) Voice Outlets Data Outlets Elect. Outlets Glazed Window Area Operable Window Area Noise Level Window Stop Power Strip Smart- Board Main Art Room Computer Lab Kindergarten Music Room Science Lab Level Special Education Special Program Lunch Room Other Instructional Use Kindergarten Kindergarten Science Classroom Library Kindergarten 3rd Floor Art Room Tchr Lunch , N N N N THORP O Page 32 of 32