1 ADVERTISEMENT FOR BIDS (October 7, 2015) Sealed proposals will be received by Bethel Township (Lebanon County), located at 3015 S. Pine Grove Rd, Fredericksburg, PA 17026, for the construction of a 4,750 sq. ft. Municipal Office Building to be located on their property, until 2PM prevailing time on November 11, 2015 at which time all proposals will be publicly read at this same location. Contractor s bid must be sealed with the envelope clearly marked Municipal Office Project. Bidding documents will be available from the Architect via electronic transfer of files for a nonrefundable fee of $30.00 or prospective bidders can arrange with the Architect to pick up hard copies of the bid at his office for a non-refundable fee of $100/set beginning October 20, Contact the Architect- Mark J. Schillaci of Schillaci Architects, Ltd. at or schillarcs@gmail.com. Address for the Architect is 11 E. Trout Run Rd., Ephrata, PA All bidding questions and requests should be addressed to the Architect via or in written form. Notice is hereby given that the project for which construction proposals are being solicited hereby is a project constituting public works and is subject to the applicable provisions of the Pennsylvania Human Relations Act and the Pennsylvania Prevailing Wage Act as amended, and the Regulations issued pursuant to. No bid will be accepted after the stated bid due date/ time nor accepted unless accompanied by a certified check or bid bond in an amount no less than 10% of the total bid. Such bid security shall be made payable to Bethel Township. Each bidder is required to meet the requirements of the Public Works Employment Act, Act 127 of With respect to each contract, the Owner shall award the contract to the lowest responsive and responsible bidder or shall reject all bids within sixty (60) days of the date of the bid opening, and no bidder may withdraw his bid prior to the expiration of the sixty (60) day period. The Owner reserves the right, at its option, to waive all informalities, irregularities, defects, errors or omissions in any or all proposals and to reject any or all proposals.

2 October 20, 2015 Bethel Township Municipal Building 3015 Pine Grove St. Fredericksburg, PA INSTRUCTIONS FOR BIDDERS 1. See attached ADVERTISEMENT FOR BIDDERS for pertinent bidding information to be followed and adhered to for bidding of this project. 2. There is no site work for this project in this bid. Site work bidding is being handled by the Township. The scope of work line for this bid is 5 outside of the building perimeter-repair site and entry road to original condition if damaged while construction takes place. 3. There is sufficient lay-down space on the site for materials as needed 4. There is sufficient space on site for a job trailer 5. Utilities: water and electric is available on site and will be provided by the Owner 6. GC is to provide and maintain their own restroom facilities 7. GC must file a Waiver of Rights of Mechanics Lein in the County Courthouse prior to any work commencing 8. Work days to be 7am to 4pm unless otherwise agreed upon with the Owner 9. Project is scheduled to begin in Spring of 2016 with a tentative completion of late Fall Any material or construction alternatives must be submitted in writing to the Architect and be granted his approval before they can be implemented into the project. 11. AIA Document A Edition: General Conditions of the Contract for Construction- this document will become part of the signed contract documents for the successful bidder of this project. Therefore, any GC submitting a bid for this project is to familiarize himself with its contents. 12. Both a Bid Bond and a Payment and Performance Bond are required of each general contractor submitting a bid. 13. The Township will be responsible for all permitting/inspection fees- however, the GC is responsible for scheduling all required inspections. 14. The GC is responsible for producing all required shop drawings for approvals. 15. The GC is to provide a 1 year warranty on all workmanship under their contract scope of services.

3 Bethel Township Office Building Bid Form 1. Bid Recipient: This bid is submitted to: The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with Owner to perform all Work as specified and documented on the Project Bidding Documents for the prices and within the times indicated in this Bid in accordance with all other terms and conditions of the Bidding Documents. 2. Bidder s Acknowledgments: Bidder accepts all of the terms and conditions set forth in these documents, including without limitation those dealing with the disposition of Bid security. This Bid will remain subject to acceptance for 60 days after the Bid opening, or for such longer period of time that Bidder may agree to in writing upon request of the Owner. Bidder has received and based his Bid upon the following Documents considered the Bidding Documents: A. Drawings produced by Schillaci Architects, Ltd. dated 10/20/15 B. Instructions For Bidders dated 10/20/15 C. Advertisement for Bidders dated 10/20/15 D. Material Specifications dated 10/20/15 3. Bidder s Representations: In submitting this Bid, Bidder represents that: A. Bidder has examined and carefully studied the Bidding Documents, the other related data identified in the Bidding Documents, and the following Addenda, receipt of which is hereby acknowledged: Addendum No. Addendum :

4 B. Bidder has visited the Site and become familiar with and is satisfied with the general, local and Site conditions that may affect cost, progress, and performance of the Work C. Bidder is familiar with all applicable federal, state and local Laws and Regulations that may affect cost, progress and performance of the Work. D. Bidder has obtained and carefully studied (or accepts the consequences for not doing so) all additional or supplementary examinations, investigations, explorations, tests, studies and data concerning conditions ( surface, subsurface and Underground Facilities) at or contiguous to the Site which may affect cost, progress of performance of the Work. E. Bidder does not consider that any further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of this Bid for performance of the Work at the price bid and within the times and in accordance with the other terms and conditions of the Bidding Documents. F. Bidder is aware of the general nature of the work to be performed by the Owner and others at the Site that relates to the Work as indicated in the Bidding Documents. G. Bidder has correlated the information known to Bidder, information and observations obtained from visits to the Site, reports and drawings identified in the Bidding Documents, and all additional examinations, investigations, explorations, tests, studies and data with the Bidding Documents. H. Bidder has given Architect written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding Documents, and the written resolution thereof by Architect to Bidder. I. The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance of the Work for which this Bid is submitted. J. Bidder will submit written evidence of its authority to do business in the state where the Project is located not later than the date of its execution of the Agreement. 4. Further Representations: Bidder further represents that: A. This Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any agreement or rules of any group,association, organization or corporation. B. Bidder has not directly or indirectly induced or solicited any other Bidder to obtain a false or sham Bid.

5 C. Bidder has not solicited or induced any individual or entity to refrain from bidding D. Bidder has not sought by collusion to obtain for itself any advantage over any other Bidder or over Owner. 5. Basis of Bid: Bidder will complete the Work in accordance with the Contract Documents for the following price: Lump sum Bid price of: $ 6. Time of Completion To be determined once a contract start date in 2016 is determined Signature of Bidder

6 Material Specifications: Bethel Township Municipal Building October 20, 2015 The following represents the grade/quality/performance required for each product. As equal substitutions may be submitted to the architect for approval. Front Doors: YKK Corp of America Model #350 - Smart Series Pulls - Dor-O-Matic 1690 Series - Concealed Vertical Rod Exit Device Exterior Windows: YKK Corp of America - YOW 350 XT - 1 insulated glass - Thermally Broken - Casement Operation Interior Doors: Grahamn Doors: Mason City, Iowa - Grahamn Custom Wood Door - WDMA. I.S. 1-A Customer Grade - Face Veneer Meets WDMA A Grade - Face Vaneer - Min 1/50 thick - Type 1 Adhesive - Face to core - Core type: Engineered Composite - internal Blocking for Hardware - Rotary Cut Birch (Stained) Flooring: VCT: Armstrong; Lancaster, PA - ArtEffects Series - 2 colors - 1/8 thick - 12 X 12-5 Yr Commercial Warranty - ASTM F 1066 Class 3

7 Transaction Window: Security Solutions; Fowlerville, MI - TSS HST Aluminum Horizontal Slider Transaction Window - Manual Slide Operation - Size: Per Drawings - 3/4 Glazing Thickness - Bullet Resistant Level 1 - Aluminum Sections to be Manufactured in Accordance with ASTM B209 Toilet Partitions: MetPar, Westbury N.Y. - Solid Phenolic w/melamine Surface both sides - Floor - Mounted - Full Height Aluminum Brackets - Doors: Finished Thickness: 3/4 - Panels: Finished Thickness : 1/2 - Pilasters: Finished Thickness: 3/4 - All edges beveled & polished - Class B Fire rating - HardwareL Stainless Steel - Hinge Material: 12 Gauge 304 Stainless Steel w/ bearing angles of 16 gauge 304 Toilet Accessories: - Paper Towel Dispenser: Bobrick B Toilet Paper Dispenser: Bobrick B Carpet: Carpet Tile by J&J Flooring Group or Equal - Pattern: City Blocks - Dye Method: Solution/yard dyed - Construction: Patterned Loop - Gauge 1/12 - Pattern Repeat: None - Fiber Type: 100% Ecore BCF Nylon with Recycled Content - Backing: Nexus Modular - TechnologiesL ProSept (antimicrobial) and Sentir (odor-blocking) - Size: 24 X 24 Warranties: - Lifetime for fiber performance for wear and static - Lifetime for tuft bind strength (edge ravel, yarn pulls, zippering) - Lifetime for protection from delimitation failure - Lifetime for dimensional stability - Recommended installation method: monolithic, ashlar, quarter - turn

8 Ceramic Tile: Crossville or Equal - Series: Vista Americana - porcelain stone - Size: 18 X 18 nominal - Coordinating Trim piece: 4 X 12 single bullnose - Coordinating Mosaic: Sheet of 2 X 2 mosaic tiles - S.O.F. must meet ASTM C1028 Wet: >0.6 and Dry: >0.7 - Breaking Strength; >450lbf - ATSM C648 - Grout: Laticrete standard color palette - Recycled Content: must contain at least 2% pre-consumer Roofing: Everlast Roofing, Inc., Lebanon, PA - Everseam year paint warranty - Galvalume Coating Siding: McElroy Metals, Bossier City, LA - MEGA RIB Series RIB Spacing - 26 Guage Coverage Soffit: McElroy Metals, Bossier City, LA - Marquee - LOR RIB w/vents - 12 Wide Brick: Glen Gery Brick, Wyomising, PA - Extruded Brick - Dimensions: of 3 5/8 X 2 1/4 X 7 5/8 - ASTM C 126, Gradr SW, Type FBS

9 Clock: The Verdin Company, Cincinnati, OH - Series III Clock Dial: 36 Diameter - Face Style: El Quantro II - Hand Style: #H9 (Aluminum Composite Material) - Backlit: Rear Mounted Lighting System - Dial Face: Translucent Acrylic Sheet, 3/8 Thick, Color: White - Numerals: Pressure - Sensitive Film, 2 MIL Thick, Color: Black Acoustical Ceilings: Armstrong, Lancaster, PA - Ceiling Type #1: - MESA Second Look - 24 X 48 - # 688: Angled Tegular Edge 15/16 - Ceiling Type #2: - Cortega Lay-In - 24 X 48 - #703: Angled Tegluar Edge 15/16

10 Project Name: Bethel Township Municipal Building Awarding Agency: Bethel Township Contract Award : 4/1/2106 Serial Number: Project Classification: Building Determination : 10/19/2015 Assigned Field Office: Harrisburg Field Office Phone Number: Toll Free Phone Number: Lebanon County Building Asbestos & Insulation Workers Asbestos & Insulation Workers Asbestos & Insulation Workers Asbestos & Insulation Workers Asbestos & Insulation Workers Asbestos & Insulation Workers Asbestos & Insulation Workers Asbestos & Insulation Workers Boilermaker (Commercial, Institutional, and Minor Repair Work) Boilermaker (Commercial, Institutional, and Minor Repair Work) Boilermaker (Commercial, Institutional, and Minor Repair Work) Boilermaker (Commercial, Institutional, and Minor Repair Work) Boilermaker (Commercial, Institutional, and Minor Repair Work) Boilermaker (Commercial, Institutional, and Minor Repair Work) Boilermakers Boilermakers Boilermakers 6/28/2010 $30.63 $20.13 $ /27/2011 $33.88 $18.88 $ /2/2012 $32.17 $21.59 $ /1/2013 $32.17 $22.59 $ /30/2014 $31.90 $23.86 $ /29/2015 $31.90 $24.61 $ /27/2016 $32.90 $24.61 $ /26/2017 $33.90 $24.61 $ /1/2010 $23.59 $15.15 $ /1/2011 $24.22 $16.02 $ /1/2012 $24.84 $16.90 $ /1/2013 $25.53 $17.51 $ /1/2014 $25.79 $17.95 $ /1/2015 $26.52 $18.22 $ /1/2011 $37.35 $28.12 $ /1/2012 $37.62 $29.85 $ /1/2013 $38.69 $31.13 $69.82 Page 1 of 13 10/20/2015

11 Building Boilermakers Boilermakers Boilermakers Bricklayers, Stone Masons, Pointers, Caulkers, Cleaners Bricklayers, Stone Masons, Pointers, Caulkers, Cleaners Bricklayers, Stone Masons, Pointers, Caulkers, Cleaners Bricklayers, Stone Masons, Pointers, Caulkers, Cleaners Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers Cement Finishers Cement Finishers Cement Finishers Cement Finishers Cement Finishers Cement Finishers 4/1/2013 $38.54 $31.43 $ /1/2014 $39.06 $32.81 $ /1/2015 $40.31 $33.31 $ /1/2013 $30.75 $14.49 $ /1/2014 $31.08 $14.96 $ /3/2015 $31.71 $15.18 $ /1/2016 $32.26 $15.53 $ /1/2008 $23.31 $11.02 $ /1/2009 $24.56 $11.52 $ /1/2010 $25.71 $12.02 $ /1/2011 $26.86 $12.52 $ /1/2012 $26.88 $13.25 $ /1/2013 $27.18 $13.80 $ /1/2014 $27.78 $14.25 $ /1/2015 $27.93 $14.75 $ /1/2016 $28.40 $15.23 $ /1/2017 $28.88 $15.75 $ /1/2010 $30.85 $10.75 $ /1/2011 $32.45 $11.15 $ /1/2012 $33.30 $11.15 $ /1/2013 $34.15 $11.15 $ /1/2014 $35.05 $11.15 $ /1/2015 $35.47 $11.58 $47.05 Page 2 of 13 Serial Number:

12 Building Dockbuilder, Pile Drivers Dockbuilder, Pile Drivers Dockbuilder, Pile Drivers Dockbuilder, Pile Drivers Drywall Finisher Drywall Finisher Drywall Finisher Drywall Finisher Drywall Finisher Drywall Finisher Electric Lineman Electric Lineman Electric Lineman Electric Lineman Electricians Electricians Electricians Elevator Constructor Elevator Constructor Elevator Constructor Elevator Constructor Elevator Tender (Use Elevator Apprentice or Constructor) Glazier Glazier Glazier Glazier Iron Workers (Bridge, Structural Steel, Ornamental, Precast, Reinforcing) Iron Workers (Bridge, Structural Steel, Ornamental, Precast, Reinforcing) Iron Workers (Bridge, Structural Steel, Ornamental, Precast, Reinforcing) Laborers (Class 01 - See notes) 1/1/2010 $29.95 $12.25 $ /1/2011 $30.35 $13.10 $ /1/2012 $30.85 $13.70 $ /1/2013 $31.45 $14.20 $ /1/2013 $23.30 $11.04 $ /1/2014 $23.30 $11.14 $ /1/2015 $23.30 $11.49 $ /1/2015 $27.01 $16.67 $ /1/2016 $23.30 $11.89 $ /1/2017 $23.30 $12.39 $ /3/2013 $40.78 $18.31 $ /2/2014 $42.68 $19.35 $ /1/2015 $44.63 $19.88 $ /30/2016 $46.16 $20.29 $ /1/2013 $28.00 $20.18 $ /1/2014 $28.75 $20.70 $ /1/2015 $29.50 $21.34 $ /1/2009 $37.33 $21.20 $ /1/2010 $38.84 $22.82 $ /1/2011 $40.33 $24.44 $ /1/2012 $41.84 $26.06 $ /1/2008 $0.00 $0.00 $0.00 5/1/2009 $25.05 $7.53 $ /1/2010 $23.64 $9.44 $ /1/2011 $24.64 $9.44 $ /1/2012 $26.14 $9.44 $ /1/2015 $30.02 $28.21 $ /1/2016 $30.02 $28.71 $ /1/2017 $30.02 $29.21 $ /1/2013 $19.67 $13.09 $32.76 Page 3 of 13 Serial Number:

13 Building Laborers (Class 01 - See notes) Laborers (Class 01 - See notes) Laborers (Class 01 - See notes) Laborers (Class 03 - See notes) Laborers (Class 03 - See notes) Laborers (Class 03 - See notes) Laborers (Class 04 - See notes) Laborers (Class 04 - See notes) Laborers (Class 04 - See notes) Laborers (Class 05 - See notes) Laborers (Class 05 - See notes) Laborers (Class 05 - See notes) Millwright Millwright Millwright Millwright Millwright Millwright 5/1/2014 $19.97 $13.74 $ /1/2015 $20.47 $14.19 $ /1/2016 $19.97 $15.59 $ /1/2010 $21.43 $11.13 $ /1/2011 $21.42 $11.84 $ /1/2012 $21.42 $12.64 $ /1/2013 $21.67 $13.09 $ /1/2014 $21.97 $13.74 $ /1/2015 $22.47 $14.19 $ /1/2016 $21.97 $15.59 $ /1/2014 $21.69 $13.82 $ /1/2015 $22.19 $14.27 $ /1/2016 $21.69 $15.77 $ /1/2014 $23.19 $13.82 $ /1/2015 $23.69 $14.27 $ /1/2016 $23.19 $15.77 $ /1/2014 $23.69 $13.82 $ /1/2015 $24.19 $14.27 $ /1/2016 $23.69 $15.77 $ /1/2011 $20.77 $11.84 $ /1/2012 $20.77 $12.64 $ /1/2013 $21.02 $13.09 $ /1/2014 $21.32 $13.74 $ /1/2015 $21.82 $14.19 $ /1/2016 $21.32 $15.59 $ /1/2010 $28.91 $13.99 $ /1/2011 $30.27 $14.63 $ /1/2012 $31.14 $15.26 $ /1/2013 $32.16 $15.74 $ /1/2014 $33.17 $16.23 $ /1/2015 $33.27 $16.98 $50.25 Page 4 of 13 Serial Number:

14 Building Millwright Millwright Operators (Building, Class 01 - See Operators (Building, Class 01A - See Operators (Building, Class 02 - See Operators (Building, Class 02A - See Operators (Building, Class 03 - See Operators (Building, Class 04 - See Operators (Building, Class 05 - See Operators (Building, Class 06 - See Operators (Building, Class 07A- See Operators (Building, Class 07B- See Operators (Heavy, Class 01 - See Operators (Heavy, Class 01A - See Operators (Heavy, Class 02 - See Operators (Heavy, Class 02A - See Operators (Heavy, Class 03 - See Operators (Heavy, Class 04 - See Operators (Heavy, Class 05 - See Operators (Heavy, Class 06 - See Operators (Heavy, Class 07A - See Operators (Heavy, Class 07B - See Painters Class 1 (see notes) Painters Class 1 (see notes) Painters Class 2 (see notes) Painters Class 2 (see notes) Painters Class 2 (see notes) Painters Class 3 (see notes) 5/1/2016 $33.59 $17.51 $ /1/2017 $33.79 $18.16 $ /1/2015 $33.57 $22.89 $ /1/2015 $35.82 $23.55 $ /1/2015 $33.30 $22.79 $ /1/2015 $35.55 $23.46 $ /1/2015 $30.57 $21.99 $ /1/2015 $29.43 $21.66 $ /1/2015 $28.98 $21.53 $ /1/2015 $28.11 $21.26 $ /1/2015 $40.29 $26.26 $ /1/2015 $39.96 $26.14 $ /1/2015 $32.70 $22.61 $ /1/2015 $34.95 $23.27 $ /1/2015 $32.40 $22.54 $ /1/2015 $34.65 $23.21 $ /1/2015 $29.49 $21.67 $ /1/2015 $28.35 $21.34 $ /1/2015 $27.90 $21.21 $ /1/2015 $27.02 $20.95 $ /1/2015 $39.24 $25.94 $ /1/2015 $38.89 $25.84 $ /1/2013 $23.07 $11.92 $ /1/2014 $23.47 $12.42 $ /1/2012 $24.95 $11.12 $ /1/2013 $24.95 $11.92 $ /1/2014 $25.35 $12.42 $ /1/2012 $29.95 $11.12 $41.07 Page 5 of 13 Serial Number:

15 Building Painters Class 3 (see notes) Painters Class 3 (see notes) Pile Driver Divers (Building, Heavy, Highway) Pile Driver Divers (Building, Heavy, Highway) Pile Driver Divers (Building, Heavy, Highway) Pile Driver Divers (Building, Heavy, Highway) Plasterers Plasterers Plumber/Pipefitter Plumber/Pipefitter Plumbers and Steamfitters Plumbers and Steamfitters Roofers (Composition) Roofers (Composition) Roofers (Composition) Roofers (Shingle, Slate, Tile) Roofers (Shingle, Slate, Tile) Roofers (Shingle, Slate, Tile) Sheet Metal Workers Sheet Metal Workers Sheet Metal Workers Sheet Metal Workers Sheet Metal Workers Sheet Metal Workers Sign Makers and Hangars Sign Makers and Hangars Sprinklerfitters Sprinklerfitters Sprinklerfitters Sprinklerfitters 5/1/2013 $29.95 $11.92 $ /1/2014 $30.35 $12.42 $ /1/2010 $44.39 $12.25 $ /1/2011 $45.53 $13.00 $ /1/2012 $46.28 $13.60 $ /1/2013 $47.18 $14.10 $ /1/2014 $23.48 $19.53 $ /1/2015 $23.83 $20.03 $ /1/2016 $36.27 $22.56 $ /1/2017 $37.77 $22.56 $ /1/2014 $33.97 $22.16 $ /1/2015 $34.87 $22.56 $ /1/2013 $31.05 $28.40 $ /1/2014 $32.15 $28.65 $ /1/2015 $33.65 $28.65 $ /1/2012 $24.00 $16.37 $ /1/2014 $24.50 $17.37 $ /1/2015 $25.00 $18.37 $ /1/2013 $31.58 $30.45 $ /6/2014 $31.58 $30.95 $ /1/2014 $32.55 $30.98 $ /1/2014 $32.64 $31.39 $ /1/2015 $32.64 $32.39 $ /1/2015 $32.64 $32.89 $ /1/2009 $24.17 $15.99 $ /21/2010 $24.33 $16.37 $ /1/2010 $33.85 $17.60 $ /1/2011 $33.35 $18.45 $ /1/2011 $34.18 $18.45 $ /1/2012 $34.18 $18.60 $52.78 Page 6 of 13 Serial Number:

16 Building Sprinklerfitters Sprinklerfitters Sprinklerfitters Sprinklerfitters Sprinklerfitters Sprinklerfitters Terrazzo Finisher Terrazzo Finisher Terrazzo Setter Terrazzo Setter Tile & Marble Finisher Tile & Marble Finisher Tile & Marble Finisher Tile & Marble Finisher Tile & Marble Layer Tile & Marble Layer Tile & Marble Layer Tile & Marble Layer Truckdriver class 1(see notes) Truckdriver class 1(see notes) Truckdriver class 1(see notes) Truckdriver class 2 (see notes) Truckdriver class 2 (see notes) Truckdriver class 2 (see notes) Truckdriver class 3 (see notes) Truckdriver class 3 (see notes) Truckdriver class 3 (see notes) 4/1/2012 $35.21 $18.65 $ /1/2013 $35.21 $18.80 $ /1/2013 $33.03 $20.12 $ /1/2013 $33.69 $20.12 $ /1/2014 $34.36 $20.47 $ /1/2015 $35.05 $20.62 $ /1/2013 $29.13 $14.58 $ /1/2014 $29.47 $14.99 $ /1/2013 $28.39 $17.54 $ /1/2014 $28.67 $18.01 $ /1/2013 $24.62 $12.73 $ /1/2014 $24.91 $13.14 $ /1/2015 $25.55 $13.30 $ /1/2016 $26.19 $13.56 $ /1/2013 $27.28 $14.21 $ /1/2014 $27.51 $14.68 $ /1/2015 $28.09 $14.90 $ /1/2016 $28.64 $15.25 $ /1/2010 $29.58 $0.00 $ /1/2011 $30.73 $0.00 $ /1/2012 $30.98 $0.00 $ /1/2010 $29.65 $0.00 $ /1/2011 $30.80 $0.00 $ /1/2012 $31.05 $0.00 $ /1/2010 $30.14 $0.00 $ /1/2011 $31.29 $0.00 $ /1/2012 $31.54 $0.00 $31.54 Page 7 of 13 Serial Number:

17 Heavy/Highway Carpenters Carpenters Carpenters Carpenters Carpenters Laborers (Class 01 - See notes) Laborers (Class 01 - See notes) Laborers (Class 01 - See notes) Laborers (Class 01 - See notes) Laborers (Class 01 - See notes) Laborers (Class 01 - See notes) Laborers (Class 01 - See notes) Laborers (Class 03 - See notes) Laborers (Class 03 - See notes) Laborers (Class 03 - See notes) Laborers (Class 03 - See notes) Laborers (Class 03 - See notes) Laborers (Class 03 - See notes) Laborers (Class 03 - See notes) Laborers (Class 04 - See notes) Laborers (Class 04 - See notes) Laborers (Class 04 - See notes) Laborers (Class 04 - See notes) Laborers (Class 04 - See notes) 5/1/2013 $27.92 $12.84 $ /1/2014 $28.72 $13.24 $ /1/2015 $29.13 $13.83 $ /1/2016 $29.67 $14.54 $ /1/2017 $30.12 $15.34 $ /1/2009 $16.22 $11.03 $ /1/2010 $16.77 $11.88 $ /1/2011 $17.32 $12.78 $ /1/2012 $17.71 $13.39 $ /1/2013 $18.16 $14.04 $ /1/2014 $18.66 $14.69 $ /1/2015 $19.21 $15.34 $ /1/2009 $22.84 $11.03 $ /1/2010 $23.39 $11.88 $ /1/2011 $23.94 $12.78 $ /1/2012 $24.33 $13.39 $ /1/2013 $24.78 $14.04 $ /1/2014 $25.28 $14.69 $ /1/2015 $25.83 $15.34 $ /1/2009 $19.83 $11.03 $ /1/2010 $20.38 $11.88 $ /1/2011 $20.93 $12.78 $ /1/2012 $21.32 $13.39 $ /1/2013 $21.77 $14.04 $ /1/2014 $22.27 $14.69 $ /1/2015 $22.82 $15.34 $ /1/2009 $20.18 $11.03 $ /1/2010 $20.73 $11.88 $ /1/2011 $21.28 $12.78 $ /1/2012 $21.67 $13.39 $ /1/2013 $22.12 $14.04 $36.16 Page 8 of 13 Serial Number:

18 Heavy/Highway Laborers (Class 04 - See notes) Laborers (Class 04 - See notes) Laborers (Class 05 - See notes) Laborers (Class 05 - See notes) Laborers (Class 05 - See notes) Laborers (Class 05 - See notes) Laborers (Class 05 - See notes) Laborers (Class 05 - See notes) Laborers (Class 05 - See notes) Laborers (Class 07 - See notes) Laborers (Class 07 - See notes) Laborers (Class 07 - See notes) Laborers (Class 07 - See notes) Laborers (Class 07 - See notes) Laborers (Class 07 - See notes) Laborers (Class 07 - See notes) Laborers (Class 08 - See notes) Laborers (Class 08 - See notes) Laborers (Class 08 - See notes) Laborers (Class 08 - See notes) Laborers (Class 08 - See notes) Laborers (Class 08 - See notes) Laborers (Class 08 - See notes) 5/1/2014 $22.62 $14.69 $ /1/2015 $23.17 $15.34 $ /1/2009 $20.85 $11.03 $ /1/2010 $21.40 $11.88 $ /1/2011 $21.95 $12.78 $ /1/2012 $22.34 $13.39 $ /1/2013 $22.79 $14.04 $ /1/2014 $23.29 $14.69 $ /1/2015 $23.84 $15.34 $ /1/2009 $20.27 $11.03 $ /1/2010 $20.82 $11.88 $ /1/2011 $21.37 $12.78 $ /1/2012 $21.76 $13.39 $ /1/2013 $22.21 $14.04 $ /1/2014 $22.71 $14.69 $ /1/2015 $23.26 $15.34 $ /1/2009 $20.56 $11.03 $ /1/2010 $21.11 $11.88 $ /1/2011 $21.66 $12.78 $ /1/2012 $22.05 $13.39 $ /1/2013 $22.50 $14.04 $ /1/2014 $23.00 $14.69 $ /1/2015 $23.55 $15.34 $ /1/2009 $21.04 $11.03 $ /1/2010 $21.59 $11.88 $ /1/2011 $22.14 $12.78 $ /1/2012 $22.53 $13.39 $ /1/2013 $22.98 $14.04 $ /1/2014 $23.48 $14.69 $ /1/2015 $24.03 $15.34 $39.37 Page 9 of 13 Serial Number:

19 Heavy/Highway Operators (Highway, Class 01 - See Operators (Highway, Class 01 - See Operators (Highway, Class 01 - See Operators (Highway, Class 01 - See Operators (Highway, Class 01 - See Operators (Highway, Class 01 - See Operators (Highway, Class 01 - See Operators (Highway, Class 01a - See Operators (Highway, Class 01a - See Operators (Highway, Class 01a - See Operators (Highway, Class 01a - See Operators (Highway, Class 01a - See Operators (Highway, Class 01a - See Operators (Highway, Class 01a - See Operators (Highway, Class 02 - See Operators (Highway, Class 02 - See Operators (Highway, Class 02 - See Operators (Highway, Class 02 - See Operators (Highway, Class 02 - See Operators (Highway, Class 02 - See Operators (Highway, Class 02 - See Operators (Highway, Class 03 - See Operators (Highway, Class 03 - See Operators (Highway, Class 03 - See Operators (Highway, Class 03 - See Operators (Highway, Class 03 - See 5/1/2009 $27.45 $16.30 $ /1/2010 $28.79 $17.26 $ /1/2011 $30.09 $18.26 $ /1/2012 $30.09 $19.51 $ /1/2013 $30.09 $20.76 $ /1/2014 $30.38 $21.72 $ /1/2015 $31.27 $22.18 $ /1/2009 $29.70 $16.98 $ /1/2010 $31.04 $17.94 $ /1/2011 $32.34 $18.94 $ /1/2012 $32.34 $20.19 $ /1/2013 $32.34 $21.44 $ /1/2014 $32.63 $22.40 $ /1/2015 $33.52 $22.86 $ /1/2009 $26.27 $15.96 $ /1/2010 $27.61 $16.92 $ /1/2011 $28.91 $17.92 $ /1/2012 $28.91 $19.17 $ /1/2013 $28.91 $20.42 $ /1/2014 $29.21 $21.37 $ /1/2015 $30.09 $21.84 $ /1/2009 $25.58 $15.75 $ /1/2010 $26.91 $16.72 $ /1/2011 $28.21 $17.72 $ /1/2012 $28.21 $18.97 $ /1/2013 $28.21 $20.22 $48.43 Page 10 of 13 Serial Number:

20 Heavy/Highway Operators (Highway, Class 03 - See Operators (Highway, Class 03 - See Operators (Highway, Class 04 - See Operators (Highway, Class 04 - See Operators (Highway, Class 04 - See Operators (Highway, Class 04 - See Operators (Highway, Class 04 - See Operators (Highway, Class 04 - See Operators (Highway, Class 04 - See Operators (Highway, Class 04 - See Operators (Highway, Class 05 - See Operators (Highway, Class 05 - See Operators (Highway, Class 05 - See Operators (Highway, Class 05 - See Operators (Highway, Class 05 - See Operators (Highway, Class 05 - See Operators (Highway, Class 05 - See Operators (Highway, Class 06 - See Operators (Highway, Class 06 - See Operators (Highway, Class 06 - See Operators (Highway, Class 06 - See Operators (Highway, Class 06 - See Operators (Highway, Class 06 - See Operators (Highway, Class 06 - See Operators (Highway, Class 06/A - See Operators (Highway, Class 06/A - See 5/1/2014 $28.50 $21.18 $ /1/2015 $29.39 $21.64 $ /1/2008 $23.84 $14.61 $ /1/2009 $25.13 $15.62 $ /1/2010 $26.46 $16.59 $ /1/2011 $27.76 $17.59 $ /1/2012 $27.75 $18.85 $ /1/2013 $27.75 $20.10 $ /1/2014 $28.05 $21.05 $ /1/2015 $28.93 $21.52 $ /1/2009 $24.62 $15.47 $ /1/2010 $25.95 $16.44 $ /1/2011 $27.25 $17.44 $ /1/2012 $27.25 $18.69 $ /1/2013 $27.25 $19.94 $ /1/2014 $27.54 $20.90 $ /1/2015 $28.42 $21.37 $ /1/2009 $27.69 $16.36 $ /1/2010 $29.03 $17.32 $ /1/2011 $30.33 $18.32 $ /1/2012 $30.33 $19.57 $ /1/2013 $30.33 $20.82 $ /1/2014 $30.62 $21.78 $ /1/2015 $31.50 $22.25 $ /1/2009 $29.94 $17.02 $ /1/2010 $31.28 $17.98 $49.26 Page 11 of 13 Serial Number:

21 Heavy/Highway Operators (Highway, Class 06/A - See Operators (Highway, Class 06/A - See Operators (Highway, Class 06/A - See Operators (Highway, Class 06/A - See Operators (Highway, Class 06/A - See Operators (Highway, Class 07/A - See Operators (Highway, Class 07/A - See Operators (Highway, Class 07/A - See Operators (Highway, Class 07/A - See Operators (Highway, Class 07/A - See Operators (Highway, Class 07/A - See Operators (Highway, Class 07/A - See Operators (Highway, Class 07/B - See Operators (Highway, Class 07/B - See Operators (Highway, Class 07/B - See Operators (Highway, Class 07/B - See Operators (Highway, Class 07/B - See Operators (Highway, Class 07/B - See Operators (Highway, Class 07/B - See Piledrivers Piledrivers Piledrivers Steamfitters (Heavy and Highway - Gas Distribution) Steamfitters (Heavy and Highway - Gas Distribution) Steamfitters (Heavy and Highway - Gas Distribution) Steamfitters (Heavy and Highway - Gas Distribution) Steamfitters (Heavy and Highway - Gas Distribution) 5/1/2011 $32.58 $18.98 $ /1/2012 $32.59 $20.23 $ /1/2013 $32.58 $21.48 $ /1/2014 $32.87 $22.44 $ /1/2015 $33.75 $22.91 $ /1/2009 $32.94 $18.67 $ /1/2010 $34.55 $19.72 $ /1/2011 $36.10 $20.83 $ /1/2012 $36.10 $22.28 $ /1/2013 $36.10 $23.73 $ /1/2014 $36.45 $24.88 $ /1/2015 $37.51 $25.44 $ /1/2009 $31.53 $18.25 $ /1/2010 $33.13 $19.31 $ /1/2011 $34.69 $20.41 $ /1/2012 $34.69 $21.86 $ /1/2013 $34.69 $23.31 $ /1/2014 $35.04 $24.46 $ /1/2015 $36.10 $25.02 $ /1/2009 $25.30 $9.86 $ /1/2010 $25.98 $10.83 $ /1/2011 $27.03 $11.43 $ /1/2010 $30.27 $26.09 $ /1/2012 $34.87 $26.86 $ /1/2013 $36.02 $27.73 $ /1/2014 $37.19 $28.83 $ /1/2015 $38.31 $30.08 $68.39 Page 12 of 13 Serial Number:

22 Heavy/Highway Truckdriver class 1(see notes) Truckdriver class 2 (see notes) Truckdriver class 3 (see notes) 5/1/2015 $32.57 $0.00 $ /1/2015 $32.64 $0.00 $ /1/2015 $33.13 $0.00 $33.13 Notes: If you can not find a classification under Heavy/Highway please refer to the Building classifications. The Bureau of Labor Law Compliance updated its Pennsylvania Building Journeyperson Laborer Notes to clarify existing tasks performed throughout the Commonwealth. The Building Laborer Notes link on the Bureau s website provides a list of those tasks that should be read in conformity with custom and usage of the construction industry in the geographic region in which they are utilized. "Notes as Referenced in Predeterminations" For further information on construction types review the on the Labor and Industry Website. Go to scroll down to the picture labeled "Labor Law Compliance" and click the picture. Then scroll down on the left menu and click on the "Prevailing Wage" link. Page 13 of 13 Serial Number: