1 Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual observation only; they do not test operability or perform destructive testing inside walls, ceilings or floors. The rankings below reflect the assessors visual evaluations of the property condition as of that date. For additional information, you may review the detailed assessment report linked on this school s profile page and visit the Facilities Standards webpage under CPS Policies and Guidelines at Condition ings and Descriptions 7: The item/system is new or in good condition and no work is required. 6: The item/system requires general cleaning and/or routine maintenance. 5: The item/system requires repairs and has not reached the end of its serviceable life. 4: The item/system has reached its expected useful life, but is still fully operational. CPS will maintain until replacement occurs. 3: The item/system has surpassed its expected useful life and has limited operability. CPS will maintain until replacement occurs. 2: The item/system has surpassed its expected useful life and has low operability. CPS will maintain until replacement occurs. 1: The item s/system s failure leads to an immediate life safety condition for occupants or to the potential of an uninhabitable facility.¹ Definitions means, for each item, the total number (or amount) of that item that exists and was evaluated. Within that, different portions may have different rankings. means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement EA for each. Other items, like chimneys, are measured in terms of linear feet ( LF ). Still other items, like flooring, are generally measured in square feet ( SF ). means a basic estimate for each item needing some level of repair or replacement. does not include all expenses that would be necessary to complete a repair or replacement project. This is because, depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and additional work triggered by building codes. For the same reason, the Campus Need listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features. Campus Need also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to alleviate overcrowding; these are viewed as separate capital needs. EXTERIOR CHIMNEY Brick Chimney - Concrete/ Mortar Liner CORNICE LF $43,901 $43,901 Cornice - Masonry Projecting/Limestone Cornice - Metal Projecting GRE , LF $17,637 1,755 LF $17,637 Assessment Date: 4/17/2013 Page 1 of 16

2 DOORS Exterior FRP Door Exterior Steel Door Exterior Wood Door Side Lite Transom Lite GRE 6 4 GRE 7 8 GRE EA $330 4 EA $1,284 8 EA 2 $1,416 $3,030 ENTRANCE Concrete Exterior Stairs Entrance Controls - Audio and Video Power Door Operator and Controls GRE LF $3,754 $3,754 FOUNDATION Concrete Foundation GRE LF LIGHTING Exterior Lights - Wall Mounted GRE EA LINTELS Lintels - Steel Lintels - Stone GRE LF $82, LF $82,715 Assessment Date: 4/17/2013 Page 2 of 16

3 PARAPET Coping - Clay Tile Coping - Metal Coping - Stone Parapet < 16" Height Parapet > 30" Height Parapet 16" to 30" Height ROOF SYSTEM BLU GRE 6 54 GRE BLU GRE BLU LF $12, LF 839 LF 326 LF $78, LF $114, LF $88,906 $294,509 Asphalt Gravel Ballast Roof Exterior Downspouts Interior Downspouts Metal Roof Modified Bitumen Roof Roof Structure: Steel with Clay Tile Arch BLU 5 27,123 6 GRE 6 76 GRE BLU GRE 7 28,452 27,123 SF $345, LF $1, LF 1,160 SF $25, SF $1,196 28,452 SF $373,950 SUPERSTRUCTURE Steel with Clay Tile Arch GRE 7 59,392 59,392 SF WALLS Brick Prefabricated Metal Panel Wall Stone - Cut ,345 GRE GRE , ,515 SF $138, SF $8,290 2,311 SF $35,464 $182,016 Assessment Date: 4/17/2013 Page 3 of 16

4 WINDOWS Window - Guards perforated Windows - Sash Aluminum Double-pane EXTERIOR ELECTRICAL EMERGENCY SYSTEM GRE 6 4,067 GRE 6 8, ,067 SF 8,935 SF $76,662 $76,662 $1,078,174 Automatic Transfer switch Emergency A/C power - Corridors and Stairs Emergency A/C power - Gym and Lunch rooms Emergency A/C power - Students Toilets Emergency generator below 60 KW diesel - Outdoor Exit Signs - Corridors and Stairs Exit Signs - Lunchroom - Gym - multipurpose rooms Independent Electrical Service for emergency power Public Announcement System Security System - CCTV Security System - Intrusion detection GRE 7 2 GRE 7 9,554 GRE 7 6,607 GRE 7 2,052 GRE GRE 7 59,392 GRE 7 59,392 GRE 7 59,392 2 EA 9,554 SF 6,607 SF 2,052 SF 32 EA 10 EA $930 59,392 SF 59,392 SF 59,392 SF $930 MAIN SERVICE Main Electrical service 1600 A 120/208/3PH POWER DISTRIBUTION $9,295 $9,295 Lighting and power panels GRE EA $23,452 Assessment Date: 4/17/2013 Page 4 of 16

5 Main distribution panels amp Main distribution panels above 600 amp Main distribution panels less than 400 amp Transformers 120/ /208 ELECTRICAL FIRE PROTECTION FIRE ALARM GRE 7 2 GRE EA 2 EA $23,452 $33,677 Fire Alarm Strobe Lights Fire Alarm System FIRE PROTECTION GRE 7 59,392 GRE 7 57,743 59,392 SF 57,743 SF MECHANICAL AIR CONDITIONING Window A/C EA $36,465 $36,465 AIR HANDLING SYSTEMS Air Intake - Built Up Air Handling YEL 4 1 $26,169 Multi Zone Built Up Air Handling - Steam 15,001 to 25,000 cfm BLU EA $71,500 Multi Zone Built Up Air Handling Auxiliaries - Steam 15,001 to 25,000 cfm BLU EA $25,740 Return Duct Work - Masonry and Ducts - Existing or Missing Exterior Shaft YEL LF $793,650 Single Zone Built Up Air Handling - Steam 4,000 to 8,000 cfm BLU 5 1 $12,870 Single Zone Built Up Air Handling Auxiliaries - Steam 4,000 to 8,000 cfm BLU 5 1 $7,150 $937,079 Assessment Date: 4/17/2013 Page 5 of 16

6 BOILER SYSTEMS Boiler Assembly - Steam - Low Pressure Scotch Marine Boiler HP Boiler Auxiliary - Steam Boiler HP Combustion Dampers Feed Water Pumps and Tank - Steam Boilers Gas Boosters HEATING DEVICES BLU 5 2 BLU GRE 6 2 BLU 5 1 GRE EA $125,840 2 EA $22,880 2 EA $572 $19,305 2 EA $2,603 $171,200 Fin Tube Electric Heater - Hot Water Wall Heater - Electric GRE 6 8 YEL BLU LF $114 $7, EA $19,665 $26,930 MECHANICAL PLUMBING Piping - Condensate - Steel or Galvanized YEL LF $39,182 Piping - Steam - Steel or Galvanized BLU LF $19,791 $58,973 TEMPERATURE CONTROL Pneumatic System BLU 5 59,392 59,392 SF $254,792 Thermostats - Pneumatic YEL EA $19,734 Zone Dampers BLU EA $11,626 $286,152 VENTILATION Exhaust Fan - Indoor GRE EA $1,001 Assessment Date: 4/17/2013 Page 6 of 16

7 $1,001 MECHANICAL $1,517,799 PLUMBING HOT WATER Hot Water Heater - Gas 150, ,000 BTU/HR PIPING $4,147 $4,147 Domestic Piping - Cold Water from Risers to Fixtures Domestic Piping - Cold Water Risers Domestic Piping - Hot Water from Riser to fixtures Domestic Piping - Hot Water Return Risers Domestic Piping - Hot Water Risers Domestic Piping Cold Water Horizontal lines Domestic Piping Hot Water Horizontal lines Domestic Piping Hot Water Return Lines Sanitary Piping Storm Piping Vent Piping GRE 6 59,392 GRE 6 59,392 GRE 6 59,392 GRE 6 59,392 GRE 6 59,392 GRE 6 59,392 BLU 5 59,392 GRE 6 59,392 7 GRE 7 59,392 GRE 7 59,392 GRE 7 59,392 59,392 SF $6,794 59,392 SF $9,342 59,392 SF $9,342 59,392 SF $9,342 59,392 SF $9,342 59,392 SF $13,589 59,392 SF $31,424 59,392 SF $9,342 59,392 SF 59,392 SF 59,392 SF $98,519 PUMPS Domestic Booster Pump simplex YEL 4 1 $17,160 Sump Pump BLU 5 1 $5,148 $22,308 PLUMBING $124,974 Assessment Date: 4/17/2013 Page 7 of 16

8 INTERIOR ADMINISTRATIVE SUITES Ceiling - Lay-In Ceiling - Plaster/Drywall Flooring - Carpet Flooring - Concrete Flooring - Tile/Sheet Flooring - Wood Lighting - Lay-In Lighting - Pendant/Surface Walls - Plaster/Drywall GRE 6 395,628 BLU GRE GRE GRE 6 3 GRE GRE , SF $847 1,628 SF $4, SF $ SF $ SF $2, SF $1,589 3 SF $2 28 SF $48 6,082 SF $15,917 $26,973 CORRIDOR Stairs - Asphalt Stairs - Wood DOORS GRE 6 4 BLU LF $29 2 LF $72 $100 Interior Steel Doors incl hw Interior Wood Doors incl hw $ EA $24,916 $25,199 DRINKING FOUNTAINS Double Fountain GRE EA $1,316 $1,316 Assessment Date: 4/17/2013 Page 8 of 16

9 GYMNASIUM / AUDITORIUM Bleacher Seating Ceiling - Plaster/Drywall Flooring - Wood Lighting - Pendant/Surface Sound System Stage Curtain Walls - Plaster/Drywall Walls - Structural Glazed Tile KITCHEN Ceiling - Plaster/Drywall Flooring - Tile/Sheet Lighting - Pendant/Surface Wall - Plaster/Drywall LIBRARY GRE BLU 5 6,607 GRE 6 3,799 GRE GRE 6 2,758 GRE 6 3, BLU GRE , EA $9,667 6,607 SF $66,136 3,799 SF $28, EA $8,144 $5, EA $113,256 2,758 SF $23,664 3,448 SF $24,653 $279, SF $5, SF $1, SF $11 1,620 SF $3,822 $10,154 Casework Lighting - Pendant/ Surface GRE GRE LF $1, SF $1,534 LUNCHROOM Serving Line GRE LF $257 $257 Assessment Date: 4/17/2013 Page 9 of 16

10 MDF/IDF Finishes Ventilation and Cooling SF $517 $517 MECHANICAL/SERVICE ROOMS Boiler Room Janitor's Closet Storage Room STAFF RESTROOM BLU 5 4,204 6 GRE 6 3 GRE , ,204 SF $47,613 3 SF $14 1,471 SF $7,431 $55,058 Accessories Ceiling - Plaster/Drywall Floor Drain Flooring - Tile Ceramic/Porcelain Flooring - Tile/Sheet Hand Dryer Lavatory Lighting - Pendant/ Surface Partitions Urinals Wall - Concrete Block Wall - Plaster/Drywall Wall - Structural Glazed Tile Wall - Tile Ceramic/ Porcelain Water Closet ,187 GRE ,203 GRE 7 6, GRE GRE GRE , ,885 GRE ,291 SF $803 2,291 SF $6,736 6 EA 1,312 SF 317 SF $ EA 19 EA $4, SF $1 26 EA $ EA $3, SF 5,322 SF $14, SF $1,001 1,885 SF 26 EA $1,859 $33,230 Assessment Date: 4/17/2013 Page 10 of 16

11 VERTICAL CONVEYANCE Elevator - Roped Holeless Hydraulic INTERIOR $433,546 ROOM CASEWORK Casework CEILING GRE LF $8,187 $8,187 Plaster/Drywall GRE 6 4,125 13,234 1,658 19,017 SF $60,830 $60,830 CHALK BOARD Chalk Board YEL LF $18,476 $18,476 CORRIDORS Asphalt Pendant/Surface Plaster/Drywall Single Water Cooler Stair Handrails Stairs Structural Glazed Tile BLU GRE 6 9,552 6 GRE 6 21,516 GRE 6 9 GRE BLU , SF $5,731 9,558 EA $6,830 21,516 SF $50,767 9 EA $5, LF 17 EA $551 1,358 SF $9,710 Assessment Date: 4/17/2013 Page 11 of 16

12 Student Lockers Tile/Sheet Flooring Wall Mounted CORRIDORS CEILING GRE 6 60 GRE 6 9, EA $8,580 9,660 SF $13, EA $101,516 Plaster/Drywall FLOOR GRE , ,984 SF $33,464 $33,464 Tile/Sheet Wood BLU 5 2,487 1,768 7 GRE 6 5,803 8, ,255 SF $16,612 14,762 SF $143,538 $160,149 GYM_FLOOR Gymnasia Floor GYM_WALL Gymnasia Walls LIBRARY_CEILING Plaster/Drywall GRE 6 2, GRE , ,808 SF $21,202 $21, SF $5,920 $5,920 1,838 SF $5,204 $5,204 Assessment Date: 4/17/2013 Page 12 of 16

13 LIBRARY_FLOOR Library Floor ,838 1,838 SF LIBRARY_WALL Plaster/Drywall GRE 6 2,901 2,901 $6,845 LIGHTING $6,845 Pendant/Surface GRE EA MARKER BOARD Marker Board GRE LF RESTROOM_FLOOR Restroom Floor GRE SF STAIRS Tile SF $906 $906 Assessment Date: 4/17/2013 Page 13 of 16

14 WALL Plaster/Drywall ROOM GRE 6 5,076 24,879 1,269 31,224 SF $82,656 $82,656 $505,354 SITE CIVIL/DRAINAGE Catch Basin Site Manhole GRE EA $1,216 7 EA $1,216 FENCING Chain Link Ornamental Iron LANDSCAPE GRE 6 432, LF $6,196 1,084 LF $20,462 $26,658 Asphalt Play Area/Hardscape Benches Grass Hardscape - Concrete Parkway trees Planting Beds/ Areas Trash Receptacles GRE 6 8, GRE 7 5,470 GRE ,720 8 GRE 7 2,004 GRE 7 3 8,345 SF $7,160 3 EA $2,360 5,470 SF 2,740 SF $5, EA 2,004 SF 3 EA $14,778 Assessment Date: 4/17/2013 Page 14 of 16

15 PARKING LOT Asphalt Trash Compactor Trash Enclosure Vehicular Screening ,404 7 GRE GRE ,404 SF $16, SF 212 LF $16,649 PLAYGROUND Playground Equipment - School Age 5-12 Playground Surfacing - Poured Surface GRE 7 2 GRE 7 3,296 2 EA 3,296 SF SIDEWALKS Perimeter Sidewalks SIGNAGE , ,718 SF $24,006 $24,006 Flag Pole Marquee - Free Standing Back Lighted w/ LED SITE GRE EA $83,307 Assessment Date: 4/17/2013 Page 15 of 16

16 Campus Need ² ³ $3,776,831 ¹ It is very rare for an assessor to find a feature in this condition. If they do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked 1 in summary reports; by the time the report is compiled, they have been resolved. ² As stated above, Assessed Campus Need does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Assessed Campus Need includes current deficiencies and is based on current unit cost estimates; it does not reflect a complete project cost. ³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are estimates only and are based solely on the data that was collected as of the assessment date in the footer below. Assessment Date: 4/17/2013 Page 16 of 16