1 DOKA SLAB FORMWORK

2 Doka floor systems Dokamatic table Doka Xtra Dokaflex Load-bearing towers The unbeatably fast tableform with the perfect fit The manual system with integrated removal logic The versatile manual system for floor slabs The heavy-duty, easy-touse load-bearing tower 2 - DOKA FORMWORK SYSTEMS

3 Dokaflex Product overview The versatile hand-set system for floor-slabs Dokaflex can easily be adapted to fit any layout, simply by telescoping the Doka H20 beams. The materials planning work is done by slide-rule, which appreciably reduces the costs of planning and operations scheduling. - no structural-design work is needed, as shows you the maximum spacings for all slaps up to 30 cm thick - you can tell at a glance whether the formwork has been set up correctly Further advantages: - infill zones are managed within the system, making it easy to accommodate walls and columns - for shoring heights of up to 5.50 m - any type or form-facing can be used - no need to measure up 3 - DOKA FORMWORK SYSTEMS

4 Dokaflex System overview Small number of system components all perfectly co-ordinated A Plywood sheet B Doka beams H m and 2.65m - easy-to-distinguish primary (3.90m) and secondary (2.65m) beams - pre-defined positioning points, as reference marks for setting-up and checking the formwork C Lowering head H20 - integrated quick-lowering function for minimising damage when striking - stabilises the primary beams so that these can not tip over on the sides D Supporting head H20 DF - easy to mount to the floor prop - for securing intermediate props to the H20 beam E Doka floor props Eurex 20 - high load-bearing capacity - numbered pegging holes, for easier height adjustment - special thread geometry, for easier releasing even under high load - elbowed fastening clamps, for easier operating and reducing injuries F Removable folding tripod - for holding floor props upright - swing-out legs allow flexible placement in constricted situations such as along edges and in corners 4 - DOKA FORMWORK SYSTEMS

5 Dokaflex System description 5 - DOKA FORMWORK SYSTEMS

6 Dokaflex Sequence of erecting the formwork 6 - DOKA FORMWORK SYSTEMS

7 Dokaflex Reference photo 7 - DOKA FORMWORK SYSTEMS

8 8 - DOKA FORMWORK SYSTEMS

9 Dokaflex tables Product overview Slab heights: - up to approx m with Doka floor props Eurex - up to apporx m with Dokamatic table frame - for heights greater than this with Staxo or d2 load-bearing towers High capacity - slab thicknesses of up to 84 cm Rapid repositioning times - Ready-assembled units can be travelled - Handy, practical repositioning appliances - Higher speed and safety than with manhandled formwork - the more so the higher the room height Same system components as Dokaflex Load adjustment via heads Fast shifting no need to dismantle Safe and versatile along the edges of the slab - Integrable table platforms - Easy lateral adjustment of the props, to allow for table projections of up to 1.50m - System solutions for downstand beams and stop-ends - Swivel-mounted, lockable props, enabling the tables to be lifted out over parapets without hindrance 9 - DOKA FORMWORK SYSTEMS

10 Dokaflex tables Reference photo 10 - DOKA FORMWORK SYSTEMS

11 Doka table formwork Lifting hook DF 11 - DOKA FORMWORK SYSTEMS

12 Doka table formwork Vertical shifting 12 - DOKA FORMWORK SYSTEMS

13 Doka table formwork Vertical shifting 13 - DOKA FORMWORK SYSTEMS

14 Doka table formwork Reference picture Vertical shifting with Transport fork 14 - DOKA FORMWORK SYSTEMS

15 Doka shifting trolley DF Product overview 15 - DOKA FORMWORK SYSTEMS

16 Doka shifting trolley DF (with attachable drive unit DF) Reference photo 16 - DOKA FORMWORK SYSTEMS

17 Reference Photos of Chennai IT Park

18 Reference Photos of Chennai IT Park

19 Reference Photos of Chennai IT Park

20 Reference Photos of Chennai IT Park

21 21 - DOKA FORMWORK SYSTEMS

22 Example of pictures plus captions (Arial 25pt bold blue RGB: 0/80/157) How to use images and graphic boxes (coloured background) recommendation forming time 0.23 h/ m 2 actual sit e val ue forming time 0.27 h/ m 2 actual s i t e val ue forming time 0.31 h/ m 2 actual sit e val ue Weimar Nord District Centre Garbsen Town Hall Sportsclub Bad Saarow 22 - DOKA FORMWORK SYSTEMS

23 Example of pictures plus captions (Arial 25pt bold blue RGB: 0/80/157) How to use images and graphic boxes (coloured background) recommendation forming time 0.17 h/ m 2 actual s ite value forming time 0.19 h/ m 2 actual s ite value forming time 0.14 h/ m 2 actual s ite value Vacational training centre M. Shopping Centre Garbsen Ammonhof Dresden 23 - DOKA FORMWORK SYSTEMS

24 24 - DOKA FORMWORK SYSTEMS Thank you