13'-3" 2'-6" 10'-0" 12'-6" 11'-9" Kitchen 8'-3" 1'-2 3/8" 3'-0" 1'-4" 3'-0" 2'-8 7/8" 3'-0" Entry. 2' O/C (Engineered Design) Stoop 5'-7"

Size: px
Start display at page:

Download "13'-3" 2'-6" 10'-0" 12'-6" 11'-9" Kitchen 8'-3" 1'-2 3/8" 3'-0" 1'-4" 3'-0" 2'-8 7/8" 3'-0" Entry. 2' O/C (Engineered Design) Stoop 5'-7""

Transcription

1 A4 A A Plan View '-" '- 0'-0" '- '-9" 6'- /" 4'-0 /" 4'-7" 4'-9 /" '-0" W W W W A '-" '- 6'-0" 0'-" 5'- /" 5'-9" W W W Roof Layout cale: /=' '-" 5'-0 /4" 4'-8 /4" D # Bed Dining Room Bathroom Master Bed Room torage Lin. '-0 /4" 6'-" W W W 6'-0" 4'-5" 5'- /" '- '-9" 5'-0" '- Living Room A4 A Hallway 4'- /4" 6'-9" ' O/C (Engineered Design) 6'-9" '- /8" 50'-0" '-8 7/8" A '-4" W '-" 5'-7" Roof Line Kitchen Entry toop 8'-" Roof Layout cale: /=' '- Dryer Washer HWT ingle Garage 5'-9" 0'-0" D Driveway ' O/C (Engineered Design) 6'-0" W 0'-0" Roof Line 0'-0" 0'-0" NOTE chool District AND #6 PECIICATION. The positioning of this building shall be the responsibility of the framer. Proposed if there Residence is any doubt as for: to the location of the said property corners we recommend the services of a British Columbia land surveyor be employed at the owners expense and the property corners be shown to the framer before the concrete foundation tructural is poured. Data. ite Before Area starting construction of this Building building Area the framer 00 shall q. t. check and verify all dimensions on these drawings and if any discrepancies exist they are to be brought to the immediate attention of the designer. At no time shall the framer scale off Addition these drawings and Alterations but shall work to dimensions only after verification as stated in note. 4. Any deviation from these drawings shall be the responsibility of the owner or the contractor involved. 5. Electric heat and insulation shall D Kitchen conform to the latest B.C. Hydro specifications. 6. eptic tank and field shall conform to health board specifications. 7. All contractors shall work to their latest respective codes, and their work comply with the N.B.C., B.C.B.C. and all appropriate municipal by-laws. 8. All workers to comply to safety standards as set by W.C.B. 9. The contractor shall be responsible for final site cleanup and waste removal. 0/0/00 /4" = '-0" Dylan Hoen bkd G. NO. A

2 A4 A A A Plan View Electrical W W W W HWT WH W W Bathroom # Bed Dining Room torage Lin. Hallway CH 4 Kitchen R Dryer Washer D ingle Garage OHD ' O/C (Engineered Design) W chool District #6 W GI D Living Room Master Bed Room ' O/C (Engineered Design) W W W W Roof Line Entry toop D Driveway 4 Roof Line ymbol chedule ingle Pole witch Three Way witch our Way witch ite Area tructural Data 00 q. t. D Kitchen Power Panel Duplex Receptacle Room Area Percent of ootprint 8,70.45 q. t 90.0% Living Room 5.88 q. t 8.4% ingle Garage 5.5 q. t 6.58% Master Bed Room q. t.6% Kitchen 58.4 q. t.9% # Bed 0. q. t 0.0% Halway.08 q. t 9.% Dining Room 97.8 q. t 7.5% Bathroom Area q. t.9% ootprint Area,00.00 q. t Rooms Include Total Usable Area,70.45 q. t torage Area Efficiency 90.0% A Area chedule A A4 No. Req. ize Description D -' X X /8" LH Int. Mono olid -'0" X X /4" LH Ext. Mono olid 4 Pannel c/w Lite D 9-'0" X 7'-0" X /4" OH Garage ectional Metal -' X X /8" Bifold olid 4 4-'0" X X /8" Bifold Lovered -' X X /8" RH Int. Mono olid A Door chedule No. Req. ize Description W 4'-0" X XO Alum. Ther. Br. c/w cr. W '-0" X '- O Alum. Ther. Br. 4 A Window chedule WH R D OHD CH plit Duplex Receptacle Weatherproof Receptacle Water Heater Range Receptacle Doorbell Push Buton and Chime Outlet (Light ixture Ceiling or Wall) an moke Detector lourescent ixture Dryer Dishwasher Telephone head Garage Door 0/0/00 /4" = '-0" Dylan Hoen bkd G. NO. A A

3 A A4 A A oundation Plan Electrical 50'-0" 7'-0" '-" '-4" '-" tep 4" thick conc. 4'4" x ' 6'-" '-9" Crawls space access '0" 4'-4" 5'-" 9.. Loc. to uit '-9" 8" thick oundation Wall On 8" thick x Wide Cont. Conc. ooting. Re-bar As req'd Ø /"x Anchor 8" - 0" o/c # Hem-ir o/c 'x' access hatch "x4" crossbridge at midpoint of span # Hem-ir o/c Pony Wall X4 C/C On Continious 8" X ooting Crawl pace - " min ground seal over 6 mil poly -Insulate to NBC "x4" crossbridge at midpoint of span 9.. Loc. to uit Crawls space access '0" toop " thick conc. 4' x '0" 4" thick concrete slab 8'9" x 4'0" Garage lab 4" Concrete lab with x 0ga. mersh over min compacted sand fill. 9'-0" '- 0'-0" 0'-0" chool District #6 ite Area tructural Data 00 q. t. 9.. Loc. to uit 9.. Loc. to uit Driveway 4" thick concrete slab 0' x 5'0" D Kitchen 0'-0" ymbol chedule 86'-9" 6 45' 00"E 45'.5" 7'- /8" A A4 A A oundation Plan cale:/" = '-0" ingle Pole witch Duplex Receptacle Outlet (Light ixture Ceiling or Wall) N 78 5' 00" E 0' 6.5" 00 q. t. 7'- /" 5'-0" 55 0' 00" W 9' 00" Lang T. N 0/0/00 /4" = '-0" Dylan Hoen bkd 5'-0" N 6 45' 00" W 85' 00" Highview Drive Way All erv. Under Ground G. NO. A A

4 CA- '- 0" '- 0" Cont. Alum. Gutter "x ascia "x4" Lookout "x4" Doubler and Top plate Header ize as Req'd "x4" Doubler and Top plate Header ize as Req'd "x4" Doubler and Top plate Vented Alum. ofit ill 7'-" 8'-0" WA- WA- WA- chool District #6 Backfill WA- Bottom Plate A- A- Anchor Bolt Excavation Line WA- "x4" Mud ill On Damp Proofing With Ø/"x Long Anchor Bolts At 8'-0" o/c A- "x 4" Pony Wall with damp proofing on 8"x cont. conc. footing '-0 /" WA- tructural Data ite Area 00 q. t. Ø" Rain Water Leader Ø4" Drain Pipe Cover With Min. Drain Rock Wall Assembly chedule WA- Vinyl Drop iding Building Paper /" Ext. heathing o/c R-0 Insulation 4 Mil Poly V.B. /" Gypsum Board Paint Per chedule WA- Paint Per chedule /" Gypsum Board o/c /" Gypsum Board Paint Per chudule WA- Cement Parging Below inish Grade Asphalt Waterproofing Below inish Grade 8" Conc. Wall On Cont. 8"x Cont. Conc. ooting - Re-Bar As Req'd " Rigid Insulation Inside Typical ection loor Assembly chedule A4 A- Wall To Wall Carpet /8" Rubber Underlay 5/8" T&G Plywood ubfloor 4 Mil Poly V.B. o/c x Cross Center R-0 Insulation A- " Concrete Ground eal 6 Mil Poly Compacted Gravel Undisturbed Ground Ceiling Assembly chedule CA- Duroid hingles 45# 4 Mil Poly tarter trip /" olid Roof heathing W Truss - Engineered Design R-8 Insulation at Lower Chord 4 Mil Poly /" Gypsum Board Textured Ceiling D Kitchen 0/0/00 /4" /8" = '0" '-0" Dylan Hoen bkd G. NO. A4

5 Asphalt hingles Asphalt hingles CL 7'-0" 8'-0" Vinyl Drop iding Vinyl Drop iding L GL A5 A4 ront Elevation chool District #6 " " " " '-0" '-0" '-0" '-0" CL tructural Data 6'-0" 8'-0" ite Area Vinyl Drop iding Vinyl Drop iding Vinyl Drop iding 00 q. t. 4" L GL A4 A5 Left Elevation 4 A5 A4 Rear Elevation A5 A4 Right Elevation D Kitchen Asphalt hingles CL 8'-0" 0/0/00 Vinyl Drop iding /4" = '-0" L GL Dylan Hoen bkd G. NO. A5

6 Left Pictorial Rear Pictorial chool District #6 tructural Data ite Area 00 q. t. D Kitchen ront Perspective 0/0/00 Not /4" to = cale '-0" Dylan Hoen bkd G. NO.