1 WELCOME NEW NORTH CONCOURSE PACKAGE #3 Open House 10/20/2017

2 Today s with Turner Team Introductions Project Overview Pre-Qualification Requirements & Bid Process Contracting Opportunities

3 Introductions: New North Concourse Turner Team Bill Bishop, Project Superintendent Joseph Graziosi, Project Manager Lee Palermiti, Preconstruction Manager Svet Neov, Engineer Mike Newman, Procurement Manager Michael Alloggio & Aida Wiebke, Procurement Agents Janice Johnson, Assistant Procurement Agent Carolyn Ellison, Community Benefits Manager

4 Airport Program Overview Secure National Hall (SNH) South Hangar Line (SHL) On Hold New North Concourse (NNC) Package #1: Temp Pavement/Utilities & Lot K Improvements - Awarded Package #2A: Demolition of Hangar 11 & 12 - Awarded Package #2B: Surcharge/PCC/Utilities Package #3: New North Concourse For more information on all packages, please visit our website:

5 Projects Overview New North Concourse Secure National Hall

6 South Hangar Line Renovation of Historic Hangar Line 2, 3, and 4 Interior & Exterior Alteration/Fit-outs Converting Hangar Space to Office and Facility Space Structural, Architectural, and MEP Trade Renovations PROJECT ON HOLD

7 Secure National Hall Construction of two new Security Screening Check Points (SSCP s) to facilitate the removal of the existing Security Screening Check Points located at each Concourse within the existing Airport. The new Security Screening Check Points are additions that will be constructed over the existing arrivals roadway The work entails full architectural fit out and finishes, MEP and Special Systems required for a complete and operational screening check point. PROJECT ON GOING

8 New North Concourse The project primarily includes the construction of a new concourse facility: Three-levels 230,000 SF 14 aircraft gates New North Concourse will replace the existing ground-loaded regional jet aircraft hardstand operation. The building architecture generally remains consistent with the existing Terminal B/C facility with exposed super structure, glazed exterior curtain wall systems and similar interior finish systems.

9 New North Concourse: Demolition of Existing Structure Hangar 11/12 and Hardstand Location Project Packaging and Phasing Package 1 Package 2A Package 2B Package 3 Improves Flow To and From Aircraft; reduces busing Structural, Architectural, MEP, Security and Specialty Trade Renovations Project Overview

10 New North Concourse Exterior

11 New North Concourse Exterior

12 New North Concourse Interior

13 New North Concourse Interior

14 New North Concourse Interior

15 New North Concourse Interior

16 New North Concourse Interior

17 Procurement Overview Subcontractor Bid Process Turner Prequalification Virginia Contractor s License LDBE and M/WBE Participation Program Specific Considerations Turner Subcontractor Components Upcoming Events/Key Dates

18 Subcontractor Bid Process All Subcontractors MUST be prequalified with Turner Bid Period: Nov 7, 2017 December 20, 2017 Proposals and bids must be submitted via BuildingConnected

19 Turner Prequalification Go to Click Become a Subcontractor located in the upper right Schedule an in-person meeting; request an appointment Questions? Contact Janice Johnson jmjohnson@tcco.com

20 Virginia Contractor s License Virginia State Law requires anyone engaging in contracting work to obtain a Contractor's License from the Virginia Board for Contractors. Go to:

21 LDBE and M/WBE PARTICIPATION LDBE = Local Disadvantage Business Enterprise Within a 100-mile radius of Washington, DC s Zero Mile Marker Average annual gross receipts must not exceed the small business size standard LDBE Project Requirement: 25% M/WBE = Minority and Women Business Enterprises M/WBE Project Goal: 15%

22 Program Specific Considerations Coordination with Airport work and activities MWAA Safety Program EMR Badging requirements for airside work All applicable taxes

23 Program Specific Considerations Aviation Owner Controlled Insurance Program (OCIP) includes: On-Site General and Excess Liability Insurance Pollution Liability Builder s Risk Subcontractor provided insurance must include: Off-Site General and Excess Liability Workman s Compensation Insurance (On and Off-Site) Construction Tradesman Minimum Wages Program

24 Turner Subcontract Components Form 36 VA (all subcontractors) Form 166 Purchase Contract (supply only contracts) Form 380 Professional Services Agreement (consultants) Applicable attachments: AP-1 Statement of Work AP-2 Contract Documents List AP-3 Supplementary Provisions & Accelerated Payment Program Rider AP-4 Logistics Plan AP-5 Construction Tradesmen Minimum Wage Program Subcontractors/Vendors must agree to Turner s standard terms and conditions

25 UPCOMING EVENTS/KEY DATES Package Documents Received Pre Bid Event/Locale Pre Bid, Site Walk Thru Bid Due Dates (approx.) * SH n/a Aug. 22/UW, Sept. 15/Airport 10/5 PROJECT ON HOLD NNC #1 Oct 3, 2016 Sept. 29/Turner Washington DC Oct. 17, 2016 Nov. 2, 2017 AWARDED AWARDED NNC #2A Jan 23, 2017 Dec. 8/Turner Reston VA Feb. 1, 2017 Feb. 21, 2017 AWARDED NNC #2B June 6, 2017 April 20/United Way June 15, 2017 July 10, 2017 NNC #3 Oct 18, 2017 Sept. 7, 2017/United Way Nov. 16, 2017 Dec. 20, 2017 AWARDED/PENDING Secure NH Mar. 10, 2017 Feb. 16, 2017/United Way April 25, 2017

26 Networking & Matchmaking Please note that matchmaking opportunities will be provided at the upcoming pre-bid walk through event: November 16, Reagan National Airport, Terminal A, Historic Lobby, 2:00pm Resources are listed on our project Website: Turner-DCAProjects.com

27 Turner Contracting Opportunities Lee Palermiti

28 Division Package Name 1 Final Cleaning 1 Pest Control 1 Scaffolding 1 Surveying 1 Commissioning 1 Damage Survey 1 Industrial Hygienist 1 Maintenance of Traffic 1 Scheduler 1 Temporary Facilities 1 Testing and Inspection 1 Utility Locator 2 Select Demolition 2 Abatement 2 Site Utilities 3 CIP Concrete 4 Masonry 5 Structural Steel 5 Drywall 5 Miscellaneous Metals 5 Ornamental Metals NEW NORTH CONCOURSE #3: Potential Trades Division Package Name 6 Rough Carpentry 6 Architectural Woodwork 4 Masonry 7 Waterproofing 7 Spray Foam Insulation 7 Air Barrier 7 Roofing 7 Glass 7 Metal Panels 7 Fireproofing 7 Caulking 7 Expansion Joints 8 Doors, Frames and Hardware 8 Overhead Doors 7 Waterproofing 8 Exterior Glass 8 Interior Glass 9 Terrazzo Flooring 9 Tile 9 Resilient Flooring 9 Interior Wall Panels Division Package Name 9 Paint 10 Signage 10 Toilet Partitions and Accessories 10 Wall Protection 10 Fire Extinguishers/AED's 10 Fire Accordion Partition 8 Exterior Glass 11 Fall Protection 12 Window Treatments 12 Furniture 14 Elevators 14 Moving Walkways 21 Sprinkler 22 HVAC/Plumbing 23 HVAC/Plumbing 23 HVAC BMS 26 Electrical 11 Fall Protection 27 Low Voltage 27 Audio Visual 28 Security Division Package Name 28 Radio System 31 Earthwork 31 Shoring 31 Dewatering 31 Driven Piles 31 Auger Cast Piles 32 Concrete Paving 32 Site Concrete 32 Asphalt 32 Flooring 32 Fencing 27 Low Voltage 27 Audio Visual 28 Security 28 Radio System 34 PBB-Passenger Board Bridges 34 Precast 34 Baggage Handling 34 PBB-Passenger Board Bridges

29 New North Concourse Package #3: Project Specifics 1. Construction phasing, maintenance of roadway traffic, airport aircraft area operations and terminal public and nonpublic passenger operational areas. 2. Demolition of Site utilities, underground structures, retaining walls, roadway paving, aircraft pavement systems and other project site features. Existing North Electrical Substation roof, walls and associated building systems. Portions of existing Terminal B/C roof, aluminum framed and glazed curtain wall system, structure and elements of the existing Loading Dock C, and associated building systems. 3. Utility infrastructure structures/conductors to support storm water systems, electrical duct banks, cabling, natural gas lines, sanitary sewer systems, sanitary pumping station, dedicated fire service lines, domestic water lines and telecommunications duct banks.

30 New North Concourse Package #3: Project Specifics 4. Roadway pavements, concrete sidewalk/curb/ramps, traffic signs, traffic pavement markings, landscaping with site irrigation. 5. Aircraft area pavements, concrete sidewalks/curbs/ramps, vehicle control and parking pavement markings. 6. Installation of cast-in-place concrete with driven piles and drilled concrete pier foundation systems, reinforced ground level slab system on piles. 7. Fabrication and installation of steel superstructure, including steel truss systems, exposed Architecturally Enhanced Structural Steel (AESS) and detailed visible steel fabrications.

31 New North Concourse Package #3: Project Specifics 8. Building enclosure including aluminum framed/glazed panel/metal panel curtain wall systems, insulated metal panel systems, non-insulated embossed metal panel systems, concrete masonry unit wall systems and single-ply membrane roofing. 9. Building interior CMU and gypsum board wall systems, interior glazed wall systems, hollow metal door and frames, glazed door systems and vehicle door systems. 10. Building interior finishes including multicolored and patterned terrazzo flooring systems, carpet flooring systems, ceramic tile flooring, ceramic tile walls, high-impact wall systems, column protection, architectural millwork systems, gypsum board systems with reveal patterns, perforated metal decorative wall panels, acoustical panel ceilings, acoustical metal panel systems, perforated metal decorative ceiling panel systems 11. Elevators, moving-walks and associated systems

32 New North Concourse Package #3: Project Specifics 12. Fire alarm, fire sprinkler, plumbing, mechanical, electrical, interior lighting, exterior lighting building systems. 13. Medium voltage electrical systems including underground electrical duct banks, new transformers and related equipment associated with the existing North Electrical Substation. 14. LED custom architectural lighting fixtures and controls 15. Telecommunications, security, CCTV, radio and facility-wide paging systems. 16. Outbound baggage handling system with new baggage make-up device and all associated control/power systems. 17. Passenger boarding bridge, pre-conditioned air, ground power, potable water, bag conveyor equipment and systems.

33 Anticipated Project Schedule: New North Concourse Package #3 Bid Documents Nov 6, 2017 Bid Period Nov 7 Dec 20, 2017 Pre-Bid & Site Walk RFI Cut Off SEALED Bids Due Anticipated NTP Nov 16, 2017, 2:00PM (Reagan National Airport) Nov 30, 2017 by 10:00AM Dec 20, 2017 by 7:00PM TBD Note: all dates are subject to change