1 Civil Works: 1 Aluminium Partation Work: 1.1 providing and fixing Aluminium half and full partation with 5 mm thick glass and 9 mm thick laminated board of section (101 X 45X1.1) as per drawing, specification and site instruction all complete work. NEPAL RASTRA BANk BALUWATAR, KATHMANDU Sqft 3, Providing and fixing Aluminium Swing Door of section (101 X 45 X 1.1) with required all fitting as per drawing and specification. sqft Brick masonary work providing and laying First class chimmney made brick (1:4) work in super structure and complete to levels as per specification & direction complete work.. 3 Cement sand plaster Cuft

2 12.5 mm thick cement sand plaster(1:4) on walls, on columns, beams, top and underside of projections, ceiling, curbs including grooving in plaster including scaffolding and curing as per specifications and engineer all complete work. 4 Painting 4.1 Two coat of white wash over new plaster surface. 4.2 Emulsion paint over white wash. Painting the surface with two coats of Distemper paint of approved brand and color with two coats to even and uniform shade including primer. 4.3 Two coat of enamel paint of approved brand including one coat of primer on door and windows all complete work. Sqft Tile Works. 2

3 Providing and laying 20mm non Slipary tiles (300x300mm) on floor of bathroom and other specified area including with 12mm cement sand 5.1 mortar (1:3) and joints of tiles sqft finished with white cement as approved patterns as per drawing and specification all complete work directed by engineer. Providing and laying glazed ceramic tiles on wall of bathroom including with 12mm cement sand mortar (1:3) 5.2 and joints of tiles finished with white sqft cement as approved patterns as per drawing and specification all complete work directed by engineer. 6.0 Wood Works: 6.1 Supply and fitting well dry Sal wood Frame for door with necessary hooks, nails etc. Cft Supply and fitting 38X75 mm sal frame with 6 mm thick glass fitting all complete work. Sft Total Civil Cost: Electrical Works: 3

4 13-15 Amp 3 pin power 1.0 Socket.(Switch Socket,pvc/m set 45 Box,CM, Screw, Grips etc. 2.0 Supply, delivery, installation, testing and commissioning of following 16 SWG sheet steel flush mounted cubical type telephone distribution boards with hinged cover and builtin press-locking device including necessary press locking type connector, fixing and jointing materials, grouting, earthing etc. 4 input, 32 output, Intereom No Gang Switch one way, CPL, CLIPSAL or equivalent brand No Supply, delivery, installation, testing and commissioning of telephone pair Runnin wire of size of 10X2X0.45 mm g meter diameter annealed copper conductor from PABX room to individual floor 60 4 Networking accessaries and cable for each table as per drawing and Specafication. 4

5 5 2" Pvc Listy Set 50 6 Fixing Ac points and Cable by Extracting from old points. Sanitation Works: Total Electrical Cost: 1.0 Providing and fixing sanitation pan, basin, taps, towel stand, connecting to sewarage line all complete work as per detail drawing and instructed by site engineer. Total Sanitation Cost: Sub Total: Vat (13 %): Grand Total (Rs): 5