Size: px
Start display at page:

Download "54 th Annual Concrete Paving Workshop March 13, 2015"

Transcription

1 54 th Annual Concrete Paving Workshop March 13, 2015

2 Completed in 1970 North of St. Paul 1961 Maryland Ave to Little Canada Rd 1967 Maryland Ave to downtown St.Paul 1970 Little Canada Rd to 35E/35W Split

3 Constructed in CRCP 6 Class subgrade treatment

4 Interstate pavement throughout the project area dates back to between 1961 and year old continuous reinforced concrete pavement in this area was designed with a useful life of 20 years Resurfacing projects in 1992, 1998 and again in 2002 Resurfacing is anticipated in another six years (2009) Pavement in this area is nearing the end of its useful life

5 135,0000 ADT in Commons Area High number of traffic weaves reduces the effective capacity of I-694 and I-35E Lane drops cause significant congestion and increase the bottleneck effect

6 from Little Canada Rd to CR E Upgrade the highway condition Provide lane continuity and reduce weaving by an estimated 80% Increase capacity Lessen congestion Improve safety

7 Add lanes to increase capacity Widen the commons area from six lanes to 12 lanes

8

9

10

11 Typical 12.5 concrete pavement 4 Class 6 314,021 yd2 concrete pavement 105,728 yd3 concrete 175,330 stainless clad dowels Total Project Cost: $103 million Concrete Costs: $10.5 million

12 Constructed in CRCP 6 Class subgrade treatment

13 1982: Saw Concrete Pavement Joints 1992: 694 to Goose Lake Rd Bridge: 4 Bit Overlay 1994: GLR Bridge to North Split: 4.5 Bit Overlay 1995: Major Crack Repair 2001: 694 to County Road E: Route & Seal Cracks 2010: 694 to GLR Bridge: Fog/Chip Seal Shoulders 6 projects in 28 years ~ 4-5 years between traffic distruptions to perform pavement maintenance

14 New Federal Funding (ARRA) allowed the project to be moved up to 2011 Pavement Improvement Project Also extended to include N section from CR J to I-35 Unbonded Concrete Overlay Expected to last 20+ years before significant maintanance

15 Mill 3 bituminous Place 9 non-reinforced concrete on milled surface 332,616 yd2 concrete pavement 90,376 yd3 concrete 155,416 epoxy dowel bars Total Project Cost: $24.6 million Concrete Costs:$8 million

16 Constructed in 1961 and JRCP 4 Class 5 2 subgrade correction

17 1976, BNSF RR to Gateway Trail Bridge: Install Concrete Median Barrier, Shoulder Work, 1.75 Bit Overlay 1982, I-94 to Roselawn: 2 Bit M&O 1986, Roselawn to TH 36: CPR 1990, Pennsylvania to Maryland: CPR 1992, Pennsylvania to Gateway Trail Bridge: 2 Bit Overlay 1998, Pennsylvania to Little Canada Rd: 2 Mill, 4 Bit Overlay 2001, Arlington to the North: Route & Seal Cracks 2006, Pennsylvania to Maryland: CPR 8 maintenance projects over 30 years ~ 4 year average between traffic disruptions to do some maintenance activity in this stretch

18 I-94 to Maryland Ave Replacement of Cayuga Bridge on 35E as well as improved safety and capacity with addition of MnPASS lane Bridge replacement part of Chapter 152 funding Reconstruct 35E on new alignment, improved geometrics for interchanges and 35E 11 new bridges

19 10 non-reinforced concrete 4 Class 6 4 subcut 130,618 yd2 concrete pavement 32,819 yd3 concrete 49,338 rolled zinc alloy dowels Total Project Cost:$115 million Concrete Costs: $5 million

20 Maryland Ave to Little Canada Rd Increase capacity Improve pavement condition, part of Better Roads Program 9 bridges reconstructed

21 8 min non-reinforced doweled concrete unbonded overlay Placed over 1.5 bituminous with geotextile interlayer

22 312,000 yd2 concrete pavement 77,000 yd3 concrete 45,000 fiberglass dowels 10,500 epoxy dowels Approx 45,000 Zinc clad square dowels this year on SB Total Project Cost: $98 million Concrete Costs: $15 million

23

24

25

26

27

28

29 CR E to TH 96 Replace 35E bridge over Goose Lk Rd and complete concrete overlay between Unweave and Unbonded Overlay to the north Pvmt project combined with Chapter 152 funds for Goose Lake bridge replacement

30 1.6 miles long 118,119 yd2 concrete pavement 27,797 yd3 concrete 45,090 stainless clad dowels 19,321 epoxy dowels Mill 4.5 bit Place 9 non-reinforced concrete over geotextile fabric

31 2016 Addition of MnPASS lane from Little Canada Rd to CR J Identified as low cost/high benefit project with FHWA Add NB inside concrete lane and shoulder from TH 96 to CR J

32 Just south 35E/W split to Hwy 8 in Forest Lake Pavement Improvement Project Unbonded Concrete Overlay

33 20 miles 1.2 million yd2 concrete pavement 334,000 yd3 concrete 545,000 dowels Total Project Costs: $340 million Concrete Costs: $39 million