ReColor. The concept of the project

Size: px
Start display at page:

Download "ReColor. The concept of the project"

Transcription

1

2 The concept of the project Paris. Paris XIX Arrondissment. the city of contrasts Pantin

3 parking The concept of the project Accessibility Comfort

4 Offices Baby club Exhibition hall Education centre Social service centre Library Restaurant Fitness centre The concept of the project This building is the centre for recreation and development

5 The concept of the project This building will express innovative, creative dimension and diverse life experience for the local community.

6 North-west The part of the concept building of the project This building will be known as Refreshing colors.

7 Night view North-west part of the building This building will be known as Refreshing colors.

8 Night view south-west part of the building This building will be known as Refreshing colors.

9 graffiti along the building facades

10 South-east view

11 The system of transitions and connections between blocks

12 Heat generated by household appliances and people is used for space heating The use of solar collectors for reducing the load on the heating system Location of all the technical facilities to the north allows diminishing heat losses due to minimal glazing Solid insulation and the absence of cold bridges ensure irreducible losses through the building envelope The use of the forced ventilation with prepurifcation and incoming air processing in order to maintain optimum microclimate of the building Triple glazing meets the requirements of the ISOVER Multi Comfort House Heat recovery (the temperature of incoming air will be 17 C) Fresh air submission Forced air pumping MCH Sound-proofing on every store using ECOPHONE with an aim to reduce sound reverberation Passive geothermal heat exchanger

13 The use of photoelectric solar cells for the buildings power supply The us of rainwater and water warmed by solar collectors The use of river water for technical purposes Efficient lighting with photo sensors to reduce energy costs Use of horizontal sun blinds to ensure optimal conditions for winter and summer insolation MCH Artificial waterfall to maintain moisture conditions in the building adhering to the principle of the constant circulation of the same volume of water

14 MCH The use of the smart Glass Clear View of the projection function, and smart glass Switch Pro to change the transparency

15 A. Ventilated facades 1. Facing slab 2. Air gap 3. Thermal insulation Isover Ol-E 4. Vapor sealing 5. Internal profiled plate 6. Reinforced concrete framing 7. Interior finish B. Flat inversed roofing 1. Gritting 2. Geotextiles 3. Thermal insulation Isover XPS Hydraulic seal 5. Protective layer 6. Ground coat 7. Reinforced concrete roof plank 8. Ecophone akusto m m W/m2K W/m2K W/m2K 0.70 W/m2K 0.75 W/m2k Ja 33.00% MCH Resolutions C. Basement 1. Flooring 2. Coupling 3. Vapor sealing 4. Thermal insulation Isover EPS 5. Reinforced concrete basement KWh/(m2a) 5.12 KWh/(m2a) KWh/(m2a) KWh/(m2a) 7.22 KWh/(m2a) KWh/(m2a) KWh/(m2a) Spec. heat requ.: 1.80 kwh/(m2a)

16 Thank you for your attention! Rudakova Irina Nesipbekov Edige Music by Koop Drum Rhythm A The Pixies Where Is My Mind