1 TABLE OF CONTENTS VOLUME 1 DIVISION 00 - INTRODUCTORY INFORMATION, BIDDING REQUIREMENTS, CONTRACT FORMS & CONDITIONS OF THE CONTRACT Pages SCHEDULE OF DRAWINGS PROJECT PERSONNEL & DIRECTORY BIDDING DOCUMENTS AND CONTRACT FORMS INVITATION TO BID BIDDING DEPOSITORIES FORM OF PROPOSAL, 702 KAR 4:160, BID BOND (AIA DOCUMENT A ) INSTRUCTIONS TO BIDDERS (AIA DOCUMENT KDE A ) AVAILABLE PROJECT INFORMATION PERFORMANCE BOND AND PAYMENT BOND (AIA DOCUMENT KDE A ) STANDARD FORM OF AGREEMENT BETWEEN OWNER AND CONTRACTOR (AIA DOCUMENT KDE A ) CHANGE ORDER (AIA DOCUMENT G ) APPLICATION AND CERTIFICATE FOR PAYMENT (AIA DOCUMENT G ) CONTINUATION SHEET (AIA DOCUMENT G ) CERTIFICATE OF SUBSTANTIAL COMPLETION (AIA DOCUMENT G ) CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND CLAIMS (AIA DOCUMENT G ) CONTRACTOR'S AFFIDAVIT OF RELEASE OF LIENS (AIA DOCUMENT G706A-1994) CONSENT OF SURETY COMPANY TO FINAL PAYMENT (AIA DOCUMENT G ) CONSENT OF SURETY COMPANY TO REDUCTION IN OR PARTIAL RELEASE OF RETAINAGE (AIA DOCUMENT G707A-1994) CONDITIONS OF THE CONTRACT CONDITIONS OF THE CONTRACT FOR CONSTRUCTION (AIA DOCUMENT KDE A ) SUPPLEMENTARY GENERAL CONDITIONS SPECIFICATIONS Pages DIVISION 01 - GENERAL REQUIREMENTS SUMMARY PRICE AND PAYMENT PROCEDURES ALTERNATES ADMINISTRATIVE REQUIREMENTS CONSTRUCTION PROGRESS SCHEDULE QUALITY REQUIREMENTS TEMPORARY FACILITIES AND CONTROLS PRODUCT REQUIREMENTS VOLATILE ORGANIC COMPOUND (VOC) CONTENT RESTRICTIONS EXECUTION AND CLOSEOUT REQUIREMENTS CLOSEOUT SUBMITTALS DIVISION 02 - EXISTING CONDITIONS DEMOLITION New Board Office Page - 1 Table of Contents

2 DIVISION 05 - METALS PIPE AND TUBE RAILINGS DIVISION 06 - WOOD, PLASTICS AND COMPOSITES ROUGH CARPENTRY DIVISION 07 - THERMAL AND MOISTURE PROTECTION JOINT SEALANTS DIVISION 08 - OPENINGS HOLLOW METAL DOORS AND FRAMES SLIDING DOORS AND OFFICE FRONTS FLUSH WOOD DOORS ACCESS DOORS AND PANELS ALUMNINUM-FRAMED STOREFRONTS DOOR HARDWARE GLAZING DIVISION 09 - FINISHES COMMON WORK RESULTS FOR FLOORING PREPARATION GYPSUM BOARD ASSEMBLIES RESILIENT FLOORING AND BASE TILE CARPETING PAINTING AND COATING DIVISION 10 - SPECIALTIES SIGNAGE WALL AND CORNER GUARDS FIRE EXTINGUISHERS AND ACCESSORIES DIVISION 12 - FURNISHINGS COUNTERTOPS DIVISION 14 VERTICAL TRANSPORTATION VERTICAL WHEELCHAIR LIFTS DIVISION 20 - MECHANICAL GENERAL PROVISIONS SCOPE OF THE MECHANICAL WORK SHOP DRAWINGS, DESCRIPTIVE LITERATURE, MAINTENANCE MANUALS, PARTS LISTS, SPECIAL KEYS AND TOOLS DEMOLITION AND SALVAGE COORDINATION AMONG TRADES, CONNECTION OF EQUIPMENT SLEEVING, CUTTING, PATCHING AND REPAIRING PIPE, PIPE FITTINGS, AND PIPE SUPPORT ACCESS TO VALVES, EQUIPMENT, FILTERS, ETC INSULATION TESTING, BALANCING, LUBRICATION AND ADJUSTMENTS DIVISION 22 - PLUMBING PLUMBING FIXTURES, FITTINGS AND TRIM New Board Office Page - 2 Table of Contents

3 DIVISION 23 - HEATING VENTILATING AND AIR CONDITIONING HVAC EQUIPMENT CONDENSATE DRAINAGE SHEET METAL & FLEXIBLE DUCT DIVISION 26, 27 AND 28 - ELECTRICAL GENERAL PROVISIONS SCOPE OF THE ELECTRICAL WORK SHOP DRAWINGS, LITERATURE, MANUALS, PARTS LISTS AND SPECIAL TOOLS SLEEVING, CUTTING, PATCHING AND REPAIRING DEMOLITION, RESTORATION AND SALVAGE COORDINATION AMONG TRADES, SYSTEMS INTERFACING AND CONNECTION OF EQUIPMENT FURNISHED BY OTHERS CONDUCTORS, INDENTIFICATIONS, SPL GROUNDING AND BONDING CABINETS, OUTLET BOXES AND PULL BOXES RACEWAYS AND FITTINGS EXCAVATION, TRENCHING, BACKFILLING AND GRADING IDENTIFICATIONS WIRING DEVICES AND PLATES VOICE/DATA/VIDEO COMMUNICATION SYSTEM DIGITAL VIDEO SURVEILLANCE SYSTEM FIRE ALARM SYSTEM DIVISION 31, 32 AND 33 - SITE/CIVIL ASPHALT PAVING CONCRETE PAVING PARKING BUMPERS PAINTED PAVEMENT MARKINGS DECORATIVE METAL FENCES AND GATES END TABLE OF CONTENTS New Board Office Page - 3 Table of Contents

4

5 SCHEDULE OF DRAWINGS NO. TITLE DATE A0 Title Sheet and Project Data 11/1/2018 U1 Site Electric Plan 11/1/2018 D1 Demolition Plan 11/1/2018 A1 Architectural Plan 11/1/2018 A2 Building Elevations 11/1/2018 A3 Interior Elevations & Details 11/1/2018 M1.0 Mechanical Legend 11/1/2018 M2.0 Mechanical Demolition Plan 11/1/2018 M3.0 Mechanical New Work Plan 11/1/2018 E1.0 Electrical Legend and General Notes 11/1/2018 E2.0 Electrical Demolition Plan 11/1/2018 E3.0 Electrical Power New Work Plan 11/1/2018 E4.0 Electrical Systems New Work Plan 11/1/2018 E5.0 Audio Visual New Work Plan 11/1/2018 E6.0 Electrical ddetails 11/1/2018 New Board Office