1 Project Name: US-2 Chain Lake Rd. Intersection Improvements Date: 8/31/10 Subject: Thomco is prepping the Shell driveway for HMA Location: SW side of US-2 Comment: The irrigation sleeve was installed prior to placing the CSTC for HMA sub-grade Subject: HMA prep behind the TES at Shell Location: SW corner of US-2 Comment: CSTC was placed and compacted to prep for the HMA Subject: Driveway prep Location: East Lewis St. Comment: Thomco prepped the driveway at Darci s for HMA

2 Project Name: US-2 Chain Lake Rd. Intersection Improvements Date: 8/30/10 Subject: Thomco removing the Darci s driveway Location: East side of Lewis St. Comment: The concrete was removed and disposed of at recycle Subject: Sidewalks and Driveway placement Location: East side of Lewis St. Comment: CC was placed and finished by Caliber Concrete Subject: Grade checking tool calibration Location: East side of Lewis St. Comment: The Smart levels are checked against each other daily to check for calibration. In the photo the bottom level is the contractor and the top level is the inspector.

3 Project Name: US-2 Chain Lake Rd. Intersection Improvements Date: 8/26/10 Subject: Duct bank interference Location: NE side of CB # 9 Comment: The concrete over the duct bank was modified to facilitate the new 12 DIP Subject: Wells Fargo lighting Location: US-2 northeast side Comment: Valley Electric is working to restore the outdoor lighting at the Wells Fargo area. Subject: Wells Fargo irrigation Location: US-2 NE corner Comment: The Wells Fargo irrigation was cut and moved to the new location behind the wall

4 Project Name: US-2 Chain Lake Rd. Intersection Improvements Date: 8/25/10 Subject: Old conduit removal Location: NW corner of US-2 Comment: After relocation of the utilities the old conduits were removed Subject: Roadway Excavation Location: US-2 northwest side Comment: Excavation was required to meet the specifications of the new roadway. This is day two of this activity Subject: CSBC installation Location: US-2 North side Comment: CSBC was placed and compacted to prep for HMA ½ This is day three of this activity

5 Project Name: US-2 Chain Lake Rd. Intersection Improvements Date: 8/24/10 Subject: Sidewalk prep Location: Along east side of Lewis St. Comment: The existing landscaping was trimmed to place the new sidewalk Subject: Roadway Excavation Location: US-2 north side Comment: Excavation was required to meet the specifications of the new roadway. This is day two of this activity Subject: CSBC installation Location: US-2 North side Comment: CSBC was placed and compacted to prep for HMA ½

6 Project Name: US-2 Chain Lake Rd. Intersection Improvements Date: 8/23/10 Subject: Storm system at CB # 8 Location: Along US-2 north side Comment: The storm system is close to the edge line of US-2 The Thomco crew was careful to not impact the traffic on US-2 Subject: Roadway Excavation Location: US-2 north side Comment: Excavation was required to meet the specifications of the new roadway. Subject: Extra layer of Asphalt Location: US-2 North side Comment: During the roadway excavation an extra layer of asphalt was encountered about 6 below the existing roadway, this material was separated for recycle disposal.

7 Project Name: US-2 Chain Lake Rd. Intersection Improvements Date: 8/18/10 Subject: Curb removal Location: Along Sno Co Ford Comment: The curb and gutter was removed to facilitate the drainage requirements Subject: Driveway and sidewalk Location: Darci s on Lewis St. Comment: New driveway was checked for proper cross slope as per ADA requirements Subject: Temp curb ramps Location: US-2 South side Comment: The temporary sidewalk and driveway are ADA compliant

8 Project Name: US-2 Chain Lake Rd. Intersection Improvements Date: 8/17/10 Subject: Sidewalk prep Location: SE corner US-2 Comment: Thomco placed CSTC and compacted prior to concrete sidewalk placement Subject: Driveway and sidewalk Location: Darci s on Lewis St. Comment: New driveway will be lower and facilitate a better approach to the east from Lewis St. Subject: Curb, Gutter, and sidewalk Location: Lewis St. eastside Comment: The new sidewalk and driveway are ADA compliant

9 Project Name: US-2 Chain Lake Rd. Intersection Improvements Date: 8/16/10 Subject: Topsoil placement Location: US-2 along Sno Co Ford Comment: Yellow Iron placed the topsoil and graded for future planting Subject: Driveway and sidewalk removal Location: Darci s driveway Comment: New driveway will be lower and facilitate a better approach to the east from Lewis St. Subject: Curb and Gutter tie-in Location: Lewis St. Stretch St. Comment: The curb and gutter will tie-in to the new radius for a continuous flow along Lewis St.

10 Project Name: US-2 Chain Lake Rd. Intersection Improvements Date: 8/2/10 Shift 2 Subject: Surgical excavation Location: NE corner US-2 Comment: Thomco used spotter when locating the Comcast conduit and the gas line Subject: Gas line located Location: NE corner US-2 Comment: The plastic gas line was approx. 3 below grade and had no sand bedding around the black pipe, this made the locating very difficult Subject: Thrust block Location: New NE corner of US-2 Comment: The CC block was 2 x2 x6 with a cable picking source

11 Project Name: US-2 Chain Lake Rd. Intersection Improvements Date: 8/2/10 Subject: HMA prep Location: SE Stretch St. Comment: Thomco prepped the radius at Stretch St. to facilitate HMA placement by Lakeside Subject: HMA Placement Location: Mi Tierra driveway Comment: Lakeside placed the HMA ½ As per the new driveway grades and layout Subject: HMA placement Location: Lewis St. Stretch St. Comment: The HMA was placed in three lifts as to obtain good compaction