1 Blount County Community Action Agency, Inc. WORK ORDER INFORMATION Work Order Type: Weatherization Audit Name: 10001BL10086 CLIENT INFORMATION Address: MARYVILLE, TN AGENCY INFORMATION Agency: Blount County Community Action Agency Agency Phone: (865) Address: 3509 Tuckaleechee Pike Fax: (865) Maryville, TN Address: Company Name & License Number: Contractor's Signature: COMMENT 1080 SQUARE FOOT DOUBLE WIDE MOBILE HOME MANUFACTURED IN ALL WORK TO BE DONE IN ACCORDANCE WITH THE TENNESSEE STANDARD WORK SPECIFICATIONS AS ADOPTED BY THE TENNESSEE HOUSING DEVELOPEMANT AGENCY. CONTRACTOR IS RESPONSIBLE TO VERIFY DIMENSIONS AND SCOPE OF WORK PRIOR TO BID. SURVEY ON 4/4/2017 BY RON CARLISLE (423) INITIAL BLOWER DOOR POST WORK TARGET MUST BE REACHED OR EXCEEDED Page 1 of 8

2 Measures Measure 1 Seal Ducts CommentUSE MASTIC OR APPROPRIATE MATERIAL TO SEAL THE DUCTWORK AS PER THE THDA SWS THE OBJECTIVE IS TO REDUCE THE PRESSURE PAN READINGS TO LESS THAN 1 OR AS TIGHT AS POSSIBLE. PRESSURE PAN READINGS: LIVING ROOM 5.8 KITCHEN 3.4 BEDROOM 3.2 BEDROOM 3.5 BATH ROOM 3.4 BATH ROOM 2.7 BEDROOM Insulation Duct sealing (setup cost) Each 1 10 Miscellaneous Su Duct Sealing Each 1 Measure Sub : Sub : Page 2 of 8

3 Measure 2 General Air Sealing Comment Initial Blower Door Reading: Post Work Target of Must Be Met or Exceeded TARGET WILL LIKELY BE MET BY STORM WINDOW INSTALLATION AND DUCT TIGHTENING. FURTHER OPPORTUNITY EXISTS UNDER GARDEN TUB 1 Insulation General air sealing Each 1 (setup cost) 10 Miscellaneous Su Infiltration Reduction Each 1 Measure Sub : Sub : Measure 3 DWH Pipe Insulation CommentINSULATE THE FIRST 6 FEET OF HOT AND COLD WATER PIPE OUT OF THE WATER HEATER AS PER THE TN SWS 1 Insulation DWH Pipe Insulation Each 1 2 Labor DWH Pipe Insulation Each 1 Measure Sub : Sub : Page 3 of 8

4 Measure 4 DWH Tank Insulation CommentAS PER THE TN SWS- Wrap the 40 Gallon Electric Water Heater Located in the With R-10 or Better Insulation. Secure With Tape And Zip Ties. 1 Insulation DWH Tank Insulation Each 1 2 Labor DWH Tank Insulation Each 1 Measure Sub : Sub : Page 4 of 8

5 Measure 5 Roof Fiberglass Loose Comment Insulate Mobile Home Roof cavity with loose fill Fiberglass insulation. In Progress-Cut holes in roof or ceiling to fill cavity to insert insulation machine nozzle Ensure that hole is large enough for nozzle. Ensure that each hole cut is to be patched with appropriate materials to insure no leaks. If installed from interior use proper plugs for holes cut in ceiling area. A dated receipt signed by the installer will be provided that includes: Insulation type- Must be Fiberglass Coverage area R-value Installed thickness and minimum settled thickness Number of bags installed in accordance with manufacturer specifications 1 Insulation Roof Insulation - Bag 22 Fbergls,Blwn 2 Labor Roof Insulation - Bag 22 Fbergls,Blwn Measure Sub : Sub : Page 5 of 8

6 Measure 6 Glass Storm Windows 3 CommentStorm Windows should be sized correctly and fit tightly in the opening. Caulk storm windows around the frame except for weep holes at the bottom that must not be sealed. If weep holes are not manufactured into the storm they should be drilled. Refer to house diagram with window sizes. Responsibility of contractor to verify measurements in the field before ordering window Don t allow storm windows to restrict or ventilation through movable windows.choose windows that are openable from the inside or install pin on storm sashes that open along with the moveable primary window.. Refer to house diagram with window sizes. Responsibility of contractor to verify measurements in the field before ordering window screen(s). 1 Windows Glass storm windows SqFt Labor Glass storm windows SqFt Other Glass storm windows Each 1 Measure Sub : Sub : Page 6 of 8

7 Measure 7 Fix Water Leak Present CommentREPAIR THE LEAK IN THE PIPE AT THE WATER HEATERR 1 Health and Safety Equipment Each 1 2 Labor Labor Hour 1 Measure Sub : Sub : Measure 8 Install Bathroom Exhaust Fan CommentINSTALL BATH FAN WITH A NEW TWO SPEED ASHRAE COMPLIANT FAN. SET TO 50 CFM CONTINOUS. VENT TO THE OUTSIDE WITH A TRIM KIT AS PER THE TN SWS. 1 Health and Safety Bathroom exhaust fan Each 1 2 Labor Labor Each 1 Measure Sub : Sub : Page 7 of 8

8 Measure 9 Smoke Detector is Needed CommentINSTALL SMOKE DETECTORS IN ALL BEDROOMS AND COMMON AREA (HALLWAY) 1 Health and Safety Smoke detector Each 4 2 Labor Labor Each 4 Measure Sub : Sub : Work Order Grand : Grand : Page 8 of 8