Scanned by CamScanner

Size: px
Start display at page:

Download "Scanned by CamScanner"

Transcription

1

2

3

4

5

6

7

8 JODHPUR MUNICIPAL CORPORATION G-SCHDULE NIT No. Date Sr No. Last Date of Sale :- Earnest Money : Rs... Date of Receipt :- CR No. Dated.. Copy issued to M/s STORM WATER DRAINAGE MASTER PLAN FOR THE CITY OF JODHPUR NAME OF WORK : EXTENSION OF UNIVERSITY CAMPUS DRAIN FROM CAMPUS GATE TO ABSTRACT ESTIMATE - CH 4470 TO Sl No Ref No Quantity Description of work Rate Per Amount PART (A) - FOR DRAIN 1 Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below atural ground / Road top level. a Depth upto 1.5m m3 In all soils upto 1.5m m b m3 Depth above 1.5m m m³ Providing and laying in position m³ cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size). (Drain Foundation) m3 Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) (Benching) m & m3 Coursed rubble masonry (Second sort) with hard stone in foundation and plinth with :Cement mortar 1:6 (1 cement : 6 coarse sand) Drain Side walls with Stone Masonry m m2 Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand) : Raised and cut pointing m Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size). (Open Channel with CC lining) m3 For Open Channel m & m2 Cement plastering including T&P, scaffolding, material and complete labpour, including cost of water, curing, racking of joints etc. CM 1:4 with 20 mm cement plaster of mix : (on top of Stone masonry wall) m

9 m3 Reinforced cement concrete work in beams, suspended floors roofs having slope upto 15 landings, balconies, shelves, chajjas lintels, bands, plain window sills, staircases and spiral stair cases upto two stories excluding the cost of centring, shuttering, finishing and reinforcement: for Drain Cover Slab (RCC M30grade with 20mm metal) Kgs Reinforcement for R.C.C. work at all levels including straightening, cutting, bending, placing in position and binding all complete. with Hot rolled deformed bars Rmt Providing Barricading for Trenches using mm dia Wooden Ballies as vertical post, atleast 1.5m above ground level and atleast cm below ground level at a spacing of 3 m. Two rows of PVC Tape (preferabley red in colour) strip barricading horizontal strip securely tied by the vertical members. Vertical members shall be painted in red and white colour. Rate is inclusive removal and cleaning of site complete in all respect Cum Kg mt Rmt Providing weep holes in brick/ stone masonry/ Plain/ Reinforced concrete abutment, wing wall/ return wall with following dia AC pipe, extending through the full width of the structure with slope of 1V : 20H towards drawing face complete as per drawing, technical specifications and clause 2205 of MoRT&H Specification including all scaffolding, material, labour, machinery etc. (100mm dia) Centring and shuttering with plywood or steel sheet upto two stories or height upto 7.5 metre above plinth level including strutting, propping etc. and removal of form for : SQm Foundations, footings, bases of columns, etc. for mass concrete SQm Providing and fixing of reinforced Ferro-Cement drain covers designed for 'AA' class loading duly marked on cover with adequate steel reinforcement having thickness 75mm to 150mm anti corrosive bitumen painted M.S. plate, Rim and M.S. lifting hooks, Admixtures like plasticizer, bond improving compound, shrinkage, resistance compound, abrasion resistant complete as per approved design etc.standard Size 2100x500mm Nos Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit to required compaction as per MoRT&H specification clause 201. (Measurment of girth to be done at height of 1 m above ground level - Girth from 300 mm to 600 mm ) Rmt Sqm sqm no From Ch 7000 to 10140

10 hec Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to a lead of 50 metres from road boundary including removal and disposal of top organic soil not exceeding 150 mm in thickness as directed by Engineer. From Ch to Cum Carriage of materials by Mechanical transport including loading, unloading and stacking of Earth.Lead up-to 3Km hec Cum Sqm Dressing of earth work in surface Sqm excavation including cutting and filling upto 30cm depth including disposal of excavated earth upto 50m and lift upto 1.5 m. TOTAL PART (A) Rs PART (B) - FOR CULVERT 1 Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below atural ground / Road top level. For upto 1.5m depth For Drain Portion Cum Cum For above 1.5m depth For Drain Portion Cum Cum Cum Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size). For bed Cum For Drain Portion CUm Cum Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) (Benching) CUm Cum Coursed rubble masonry (second sort) with hard stone in foundation and plinth with :Cement mortar 1:3 (1 cement : 3 coarse sand) Cum Cum Cement plastering including T&P, scaffolding, material and complete labpour, including cost of water, curing, racking of joints etc. CM 1:4 with 20 mm cement plaster of mix : Sqm Sqm

11 cum Reinforced cement concrete work in beams, suspended floors roofs having slope upto 15 landings, balconies, shelves, chajjas lintels, bands, plain window sills, staircases and spiral stair cases upto two stories excluding the cost of centring, shuttering, finishing and reinforcement: for Drain Cover Slab (RCC M30grade with 20mm metal) Cum Cum Providing and laying upto two stories reinforced cement concrete in kerbs, steps and the like excluding the cost of centring, shuttering, finishing and reinforcement with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size). (for Bed Blocks cum Cum Reinforcement for R.C.C. work at all levels including straightening, cutting, bending, placing in position and binding all complete. with Hot rolled deformed bars For Bed Blocks Kg Kg Rmt Providing weep holes in brick/ stone masonry/ Plain/ Reinforced concrete abutment, wing wall/ return wall with 99 1 Rmt following dia AC pipe, extending through the full width of the structure with slope of 1V : 20H towards drawing face complete as per drawing, technical specifications and clause 2205 of MoRT&H Specification including all scaffolding, material, labour, machinery etc. (100mm dia) 10 Centring and shuttering with plywood or steel sheet upto two stories or height upto 7.5 metre above plinth level including strutting, propping etc. and removal of form for : Sqm Foundations, footings, bases of columns, etc. for mass concrete Sqm TOTAL PART (B) TOTAL PART (A+B) SAY PART (C) Provision towards Traffic diversion PART (D) Provision for Road Restoration PART (E) Shifting of Utilities Electric poles, PART (F) Shifting of Utilities Transformers -(7 to 9 nos) PART (G) Provision towards Permission from R & B Dept, Electrical Dept etc TOTAL PART ( A+B+C+D+E+F) IN LACS (+) 3 % (+) Price 3 % GRAND TOTAL IN LACS SAY Crores