1 Upper East Tennessee Human Development Agency WORK ORDER INFORMATION Work Order Type: Weatherization Audit Name: 18018UE10620 CLIENT INFORMATION Address: FALL BRANCH, TN AGENCY INFORMATION Agency: Upper East Tennessee Human Development Agency Agency Phone: (423) Address: 301 Louis Street Fax: (423) Kingsport, TN Address: Agency Contact: Carlisle, Ron Work Phone: Cell Phone: Address: (423) Company Name & License Number: Contractor's Signature: COMMENT 1056 SQUARE FOOT RANCH BUILT ON A CRAWL SPACE IN WITH AN ASPHALT SHINGLE ROOF. STONE AND VINYL SIDING EXTERIOR. ALL WORK TO BE DONE IN ACCORDANCE WITH THE TENNESSEE STANDARD WORK SPECIFICATIONS AS ADOPTED BY THE TENNESSEE HOUSING DEVELOPMENT AGENCY. CONTRACTOR IS RESPONSIBLE TO VERIFY DIMENSIONS AND SCOPE OF WORK PRIOR TO BID. SURVEY ON 11/18/2017 BY RON CARLISLE (423) INITIAL BLOWER DOOR POST WORK TARGET OF MUST BE MET OR EXCEEDED Contractor required to observe both RRP rule and LSW practices. CERTIFIED FIRM/RENOVATOR REQUIRED Page 1 of 11

2 Measures Measure1 Seal Ducts Comment USE MASTIC OR APPROPRIATE MATERIAL TO SEAL THE DUCTWORK AS PER THE THDA SWS THE OBJECTIVE IS TO REDUCE THE PRESSURE PAN READINGS TO LESS THAN 1 OR AS TIGHT AS POSSIBLE. PRESSURE PAN READINGS: RETURN 14.7 LIVING ROOM 23.4 KITCHEN 11.1, 12.2 BEDROOM 9.6 BEDROOM 11.0 BATH ROOM 9.9 BEDROOM 0.4 BATH ROOM Miscellaneous Su Duct Sealing Each 1 11 LABOR Hour Measure Sub : Sub : Page 2 of 11

3 Measure2 Infiltration Redctn Comment Initial Blower Door Reading: Post Work Target of Must Be Met or Exceeded Suggested Best Practice of Air Infiltration Reduction is to use two part foam and appropriate materials to seal the penetrations and openings in the Subfloor (accessible in the crawl space) and in the ceilings (accessible in the attic). If applicable- rake back existing insulation and use two part foam to seal the top plates of the walls. Use Rigid Foam Board and two part foam to close and seal openings and penetrations of soffits, chases, and duct perimeters. 10 Miscellaneous Su Infiltration Reduction Each 1 Measure Sub : Sub : Page 3 of 11

4 Measure3 User-Spec Ceiling R A1 Comment CREATE A NEW ATTIC ACCESS-Cut in the ceiling an attic access- 22 x 30 inches. Insulation on hatch lid to match existing insulation depth of attic after insulation is installed. Build an insulation dam around the attic access hatch. Build the dam with rigid materials like plywood ¾ or better so the dam supports the weight of the person entering or leaving the attic. Weather-strip the attic access to air seal the access and provide uninterrupted air barrier between the attic and conditioned space. Install eye hooks to provide positive closure. INCREASE THE EXISTING ATTIC INSULATION TO A CONSISTANT 18 INCH DEPTH WITH BLOWN FIBERGLASS. FOLLOW THE TENNESSEE STANDARD WORK SPECIFICATONS All electrical junction boxes will be flagged to be seen above the level of the insulation. Open electrical junction boxes will have covers installed. Insulation dams and enclosures will be installed as required Insulation will be adequately marked for depth a minimum of every 300 square feet of attic area. INSTALL AN ENERGY LID OVER THE ATTIC ACCESS W/S AND INSULATE 104 LINEAR FEET OF BAFFLES NEEDED BETWEEN 2 X 6 16" O.C. 5 /12 PITCH INSTALL A RIGID DAM BETWEEN THE CARPORT AND THE CONDITIONED LIVING AREA 32 LINEAR FT- 20" TALL 1 Insulation Attic Insulation - Blown SqFt 1056 Fiberglass - R-38 Attic Insulation - Blown SqFt 1056 Fiberglass - R-38 Measure Sub : Sub : Page 4 of 11

5 Measure4 DWH Tank Insulation Comment AS PER THE TN SWS- Wrap the 40 Gallon Electric Water Heater Located in the With R-10 or Better Insulation. Secure With Tape And Zip Ties. 1 Hot Water Equip DHW Tank Insulation Each 1 DHW Tank Insulation Each 1 Measure Sub : Sub : Measure5 DWH Pipe Insulation Comment INSULATE THE FIRST 6 FEET OF HOT AND COLD WATER PIPE OUT OF THE WATER HEATER AS PER THE TN SWS 1 Insulation DHW Pipe Insulation Each 1 DHW Pipe Insulation Each 1 Measure Sub : Sub : Page 5 of 11

6 Measure6 Storm Windows 5,6 Comment Storm Windows should be sized correctly and fit tightly in the opening. Caulk storm windows around the frame except for weep holes at the bottom that must not be sealed. If weep holes are not manufactured into the storm they should be drilled. Refer to house diagram with window sizes. Responsibility of contractor to verify measurements in the field before ordering window Don t allow storm windows to restrict or ventilation through movable windows.choose windows that are openable from the inside or install pin on storm sashes that open along with the moveable primary window.. Refer to house diagram with window sizes. Responsibility of contractor to verify measurements in the field before ordering window screen(s). 1 Windows Storm Window SqFt Storm Window SqFt Other Storm Window Each Window 2 Measure Sub : Sub : Page 6 of 11

7 Measure7 Wall Insulation E1,E2,N2,N3,S1,W1 Comment Contractor must use a dense pack blowing machine. Using fill tube, 100% of each cavity will be filled to a consistent density: Cellulose material will be installed to a minimum density of 3.5 pounds per cubic foot Install Chair Rail at the appropriate height to cover the plugs to be installed in the holes that are created to facilitate insulation installation. 1 Insulation Wall Insulation - Blown SqFt 1001 Cellulose - 2x4 Filled Wall Insulation - Blown SqFt 1001 Cellulose - 2x4 Filled Measure Sub : Sub : Measure8 Fix Wiring Problems (Walls) Comment Replace Missing Electrical Switch/Receptical Plate Covers- Kitchen 1 Health and Safety Equipment Each 2 Hour 2 Measure Sub : Sub : Page 7 of 11

8 Measure9 Install Bathroom Exhaust Fan Comment INSTALL BATH FAN WITH A NEW TWO SPEED ASHRAE COMPLIANT FAN. SET TO 50 CFM CONTINOUS. VENT TO THE OUTSIDE WITH A TRIM KIT AS PER THE TN SWS. ************INSTALL A 6' VENT PIPE TO ENSYURE PROPER VENTILATION************* 1 Health and Safety Bathroom exhaust fan Each 1 Each 1 Measure Sub : Sub : Measure10 Practice Lead Safe Weatherization (Walls) Comment PRACTICE LEAD SAFE WEATHERIZATION- DOCUMENT AND SUBMIT PICTURES TO THE AGENCY WITH INVOICE 1 Health and Safety Practice Lead Safety Each 1 Each 1 Measure Sub : Sub : Page 8 of 11

9 Measure11 PressureRelief Piping Needed Comment INSTALL A PRESSURE RELIEF PIPE EXTENSION AS PER THE TN SWS 1 Health and Safety Pressure relief piping Each 1 Each 1 Measure Sub : Sub : Measure13 Smoke Detector is Needed Comment INSTALL SMOKE DETECTORS IN ALL BEDROOMS AND COMMON AREA (HALLWAY)EACH FLOOR, 1 Health and Safety Smoke detector Each 4 Each 4 Measure Sub : Sub : Page 9 of 11

10 Measure14 Vapor Barrier Needed (Basement/Crawlspace) Comment INSTALL 6 MIL BLACK POLY VAPOR BARRIER AS PER THE TN SWS. SEAL THE SEAMS WITH MASTIC. LAP UP 12" UP AND ATTACH TO THE WALLS AND PEIRS 1 Health and Safety Basement / crawlspace SqFt 1350 vapor barrier SqFt 1350 Measure Sub : Sub : Page 10 of 11

11 Measure Replace the Existing Heat Pump With a New TWO Ton Heat Pump Comment Replace the Existing Heat/Air Conditioner with a New Heat Pump/Air Conditioner- Contractor Choice of Packaged unit or Split System- Retro-Fit to the Existing Ductwork. 1E +0 2 Mechanical permits will be required for all HVAC work, as per local code. All Heat pumps installed to be 15 SEER, 8.5 HSPF. All cooling equipment, ENERGY STAR labeled and shall be sized according to the latest editions of ACCA Manuals J and S.Specification of any type of heating unit shall be taken to include all connections, wiring, ducting, safety switches, thermostats, pad if existing does not fit new unit and all other work to provide a complete, Tight, efficient, balanced and operational system. All wiring shall be on separate circuits, wired from panel box or disconnects to HVAC unit by contractor. If installing a split system that does not have existing line set the cost should be included in bid to provide new line set. If leaving the existing line set the line is to be flushed and pressurized to insure no leakage. If installing a package unit it is to include a four sided shroud. All work to meet current code for city or county work is being performed. Must provide all warranty information with invoice. If unit warranty needs registered with factory contractor is to do this for client. 1 Heating Equipme Install a New Heat Each 1 Pump 24Kbtu Install a New Heat Hour 1 Pump 24 Kbtu Measure Sub : Sub : Work Order Grand : Grand : Page 11 of 11