1 ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS CONTRACT # TRACS No. Project No. County District Gross Length Net Length Prepared By: 010 PN 232 H894101C 010-D-(219)S 8366 PINAL SOUTHCENT 1 Rene Teran Highway Termini Location Work Description CASA GRANDE - TUCSON HIGHWAY (I-10) PINAL AIRPARK TI UP STR #771 System Preservation (Engineering)

2 Printed: 10/10/2018 Page 1 of 10 BID RESULTS FOR Bid Opening Date : 8/10/2018, Prequalification Required, Engineer Specialist : Rene Teran Completion Date: 180 Calendar Days The proposed project is located in Pinal County on I-10, approximately 30 miles north of City of Tucson at Milepost (Exit 232). The proposed work consists of removal of the existing concrete bridge deck and railings and repair of damaged steel bridge girders. The work includes heat straightening and construction of a new cast-in-place bridge deck, approach slabs and bridge railings, removing and replacing existing guardrail, asphaltic concrete pavement, pavement marking, bridge mounted and ground mounted signing, and other related work. Bid Rank Department Estimate Bid Amount Contractor Extended Sum of s +% $1,393, DEPARTMENT ESTIMATE $1,393, % $1,678, % $1,679, FNF CONSTRUCTION, INC. 115 S. 48TH STREET TEMPE, AZ GRANITE CONSTRUCTION COMPANY 4115 E ILLINOIS ST TUCSON, AZ Winning Bidder is 20.4% Over Department Estimate (Difference = $284,957.52) $1,678, $1,679,679.00

3 Printed: 10/10/2018 Page 2 of 10 Measure Description Quantity Unit Price Extended Amount L.FT. REMOVAL OF EMBANKMENT CURB Bid Rank Department Estimate $5.000 $ FNF CONSTRUCTION, INC. $ $1, % 2 GRANITE CONSTRUCTION COMPANY $2.000 $ % EACH REMOVAL OF SIGNS Bid Rank Department Estimate $ $1, FNF CONSTRUCTION, INC. $ $7, % 2 GRANITE CONSTRUCTION COMPANY $ $1, % L.FT. REMOVE (Cable Barrier, Anchors and Posts) Bid Rank Department Estimate $ $12, FNF CONSTRUCTION, INC. $ $16, % 2 GRANITE CONSTRUCTION COMPANY $9.250 $7, % EACH REMOVE (Existing Bridge Mounted Sign) Bid Rank Department Estimate $1, $1, FNF CONSTRUCTION, INC. $3, $3, % 2 GRANITE CONSTRUCTION COMPANY $1, $1, % EACH REMOVE (End Treatments) Bid Rank Department Estimate $ $6, FNF CONSTRUCTION, INC. $ $4, % 2 GRANITE CONSTRUCTION COMPANY $ $3, % L.FT. REMOVE GUARD RAIL Bid Rank Department Estimate 4, $5.000 $20, FNF CONSTRUCTION, INC. $4.000 $16, % 2 GRANITE CONSTRUCTION COMPANY $2.300 $9, % SQ.YD. REMOVE BITUMINOUS PAVEMENT (MILLING) (2" TO 4") Bid Rank Department Estimate $ $9, FNF CONSTRUCTION, INC. $ $9, % 2 GRANITE CONSTRUCTION COMPANY $ $4, % SQ.YD. REMOVE DETOUR Bid Rank Department Estimate $8.000 $5, FNF CONSTRUCTION, INC. $ $16, % 2 GRANITE CONSTRUCTION COMPANY $ $7, % L.SUM REMOVE ASBESTOS MATERIAL Bid Rank Department Estimate $5, $5, FNF CONSTRUCTION, INC. $3, $3, % 2 GRANITE CONSTRUCTION COMPANY $1, $1, %

4 Printed: 10/10/2018 Page 3 of 10 Measure Description Quantity Unit Price Extended Amount L.SUM REMOVE LEAD-BASED PAINT MATERIALS Bid Rank Department Estimate $3, $3, FNF CONSTRUCTION, INC. $45, $45, % 2 GRANITE CONSTRUCTION COMPANY $28, $28, % L.SUM DISPOSE OF LEAD-BASED PAINT MATERIALS (FORCE ACCOUNT) Bid Rank Department Estimate $5, $5, FNF CONSTRUCTION, INC. $5, $5, % 2 GRANITE CONSTRUCTION COMPANY $5, $5, % SQ.YD. GRADING ROADWAY FOR PAVEMENT (Detour) Bid Rank Department Estimate $6.000 $3, FNF CONSTRUCTION, INC. $ $22, % 2 GRANITE CONSTRUCTION COMPANY $ $10, % CU.YD. AGGREGATE BASE, CLASS 2 Bid Rank Department Estimate $ $21, FNF CONSTRUCTION, INC. $ $22, % 2 GRANITE CONSTRUCTION COMPANY $ $14, % TON FOG COAT Bid Rank Department Estimate $1, $1, FNF CONSTRUCTION, INC. $1, $1, % 2 GRANITE CONSTRUCTION COMPANY $1, $1, % TON BLOTTER MATERIAL Bid Rank Department Estimate $ $ FNF CONSTRUCTION, INC. $ $ % 2 GRANITE CONSTRUCTION COMPANY $1, $2, % TON ASPHALTIC CONCRETE (MISCELLANEOUS STRUCTURAL) Bid Rank Department Estimate $ $71, FNF CONSTRUCTION, INC. $ $37, % 2 GRANITE CONSTRUCTION COMPANY $ $56, % EACH SLIP BASE (For Perforated Sign Post) Bid Rank Department Estimate $ $2, FNF CONSTRUCTION, INC. $ $1, % 2 GRANITE CONSTRUCTION COMPANY $ $2, % L.FT. SIGN POST (PERFORATED) (2 S) Bid Rank Department Estimate $ $ FNF CONSTRUCTION, INC. $ $ % 2 GRANITE CONSTRUCTION COMPANY $8.000 $ %

5 Printed: 10/10/2018 Page 4 of 10 Measure Description Quantity Unit Price Extended Amount L.FT. SIGN POST (PERFORATED) (2 1/2 S) Bid Rank Department Estimate $ $1, FNF CONSTRUCTION, INC. $ $1, % 2 GRANITE CONSTRUCTION COMPANY $9.000 $ % L.FT. SIGN POST (PERFORATED) (2 1/2 T) Bid Rank Department Estimate $ $2, FNF CONSTRUCTION, INC. $ $4, % 2 GRANITE CONSTRUCTION COMPANY $ $2, % EACH FOUNDATION FOR SIGN POST (CONCRETE) Bid Rank Department Estimate $ $4, FNF CONSTRUCTION, INC. $ $5, % 2 GRANITE CONSTRUCTION COMPANY $ $5, % SQ.FT. WARNING, MARKER, OR REGULATORY SIGN PANEL Bid Rank Department Estimate $ $4, FNF CONSTRUCTION, INC. $ $4, % 2 GRANITE CONSTRUCTION COMPANY $ $4, % SQ.FT. EXTRUDED ALUMINUM SIGN PANEL Bid Rank Department Estimate $ $5, FNF CONSTRUCTION, INC. $ $14, % 2 GRANITE CONSTRUCTION COMPANY $ $8, % SQ.FT. FLAT SHEET ALUMINUM SIGN PANEL Bid Rank Department Estimate $ $1, FNF CONSTRUCTION, INC. $ $1, % 2 GRANITE CONSTRUCTION COMPANY $ $1, % L.FT. TEMPORARY CONCRETE BARRIER (INSTALLATION AND REMOVAL) Bid Rank Department Estimate 1, $ $21, FNF CONSTRUCTION, INC. $ $29, % 2 GRANITE CONSTRUCTION COMPANY $ $36, % EACH TEMPORARY IMPACT ATTENUATORS (INSTALLATION AND REMOVAL) Bid Rank Department Estimate $1, $8, FNF CONSTRUCTION, INC. $1, $5, % 2 GRANITE CONSTRUCTION COMPANY $2, $12, % SQ.FT. SPECIALTY SIGNS Bid Rank Department Estimate $ $2, FNF CONSTRUCTION, INC. $ $5, % 2 GRANITE CONSTRUCTION COMPANY $ $6, %

6 Printed: 10/10/2018 Page 5 of 10 Measure Description Quantity Unit Price Extended Amount L.FT./DAY TEMPORARY CONCRETE BARRIER (IN USE) Bid Rank Department Estimate 50, $0.120 $6, FNF CONSTRUCTION, INC. $0.150 $7, % 2 GRANITE CONSTRUCTION COMPANY $0.150 $7, % EACH-DAY TEMPORARY IMPACT ATTENUATORS (IN USE) Bid Rank Department Estimate $ $3, FNF CONSTRUCTION, INC. $ $5, % 2 GRANITE CONSTRUCTION COMPANY $ $7, % EACH-DAY BARRICADE (TYPE II, VERT.PANEL, TUBULAR MARKER) Bid Rank Department Estimate 38, $0.250 $9, FNF CONSTRUCTION, INC. $0.130 $5, % 2 GRANITE CONSTRUCTION COMPANY $0.230 $8, % EACH-DAY BARRICADE (TYPE III, HIGH LEVEL FLAG TREES) Bid Rank Department Estimate 1, $0.350 $ FNF CONSTRUCTION, INC. $0.350 $ % 2 GRANITE CONSTRUCTION COMPANY $0.380 $ % EACH-DAY PORTABLE SIGN STANDS (SPRING TYPE) Bid Rank Department Estimate 1, $1.000 $1, FNF CONSTRUCTION, INC. $0.500 $ % 2 GRANITE CONSTRUCTION COMPANY $0.570 $ % EACH-DAY WARNING LIGHTS (TYPE A) Bid Rank Department Estimate 9, $0.250 $2, FNF CONSTRUCTION, INC. $0.150 $1, % 2 GRANITE CONSTRUCTION COMPANY $0.190 $1, % EACH-DAY WARNING LIGHTS (TYPE C) Bid Rank Department Estimate 38, $0.250 $9, FNF CONSTRUCTION, INC. $0.150 $5, % 2 GRANITE CONSTRUCTION COMPANY $0.190 $7, % EACH-DAY EMBEDDED SIGN POST Bid Rank Department Estimate 10, $0.250 $2, FNF CONSTRUCTION, INC. $0.050 $ % 2 GRANITE CONSTRUCTION COMPANY $0.090 $ % EACH-DAY TRUCK MOUNTED ATTENUATOR Bid Rank Department Estimate $ $12, FNF CONSTRUCTION, INC. $ $22, % 2 GRANITE CONSTRUCTION COMPANY $ $20, %

7 Printed: 10/10/2018 Page 6 of 10 Measure Description Quantity Unit Price Extended Amount EACH-DAY TEMPORARY SIGN (LESS THAN 10 S.F.) Bid Rank Department Estimate 3, $0.500 $1, FNF CONSTRUCTION, INC. $0.300 $1, % 2 GRANITE CONSTRUCTION COMPANY $0.380 $1, % EACH-DAY TEMPORARY SIGN (10 S.F. OR MORE) Bid Rank Department Estimate 5, $0.750 $4, FNF CONSTRUCTION, INC. $0.500 $2, % 2 GRANITE CONSTRUCTION COMPANY $0.570 $3, % EACH-DAY FLASHING ARROW PANEL Bid Rank Department Estimate $ $7, FNF CONSTRUCTION, INC. $ $4, % 2 GRANITE CONSTRUCTION COMPANY $ $6, % EACH-DAY CHANGEABLE MESSAGE BOARD (CONTRACTOR FURNISHED) Bid Rank Department Estimate $ $25, FNF CONSTRUCTION, INC. $ $21, % 2 GRANITE CONSTRUCTION COMPANY $ $27, % HOUR FLAGGING SERVICES (LOCAL ENFORCEMENT OFFICER) Bid Rank Department Estimate $ $4, FNF CONSTRUCTION, INC. $ $4, % 2 GRANITE CONSTRUCTION COMPANY $ $4, % HOUR FLAGGING SERVICES (DPS) Bid Rank Department Estimate $ $7, FNF CONSTRUCTION, INC. $ $7, % 2 GRANITE CONSTRUCTION COMPANY $ $7, % L.FT. PAVEMENT MARKING (WHITE EXTRUDED THERMOPLASTIC) (0.090") Bid Rank Department Estimate 3, $1.000 $3, FNF CONSTRUCTION, INC. $0.800 $3, % 2 GRANITE CONSTRUCTION COMPANY $1.250 $4, % L.FT. PAVEMENT MARKING (YELLOW EXTRUDED THERMOPLASTIC) (0.090") Bid Rank Department Estimate 3, $1.000 $3, FNF CONSTRUCTION, INC. $0.800 $3, % 2 GRANITE CONSTRUCTION COMPANY $1.250 $4, % EACH PAVEMENT SYMBOL (EXTRUDED THERMOPLASTIC) (ALKYD) (0.090") Bid Rank Department Estimate $ $ FNF CONSTRUCTION, INC. $ $ % 2 GRANITE CONSTRUCTION COMPANY $ $ %

8 Printed: 10/10/2018 Page 7 of 10 Measure Description Quantity Unit Price Extended Amount L.FT. REMOVAL OF CURING COMPOUND FOR PCCP STRIPING Bid Rank Department Estimate $1.000 $ FNF CONSTRUCTION, INC. $2.500 $2, % 2 GRANITE CONSTRUCTION COMPANY $3.000 $2, % EACH PAVEMENT MARKER, RAISED, TYPE D Bid Rank Department Estimate $8.000 $ FNF CONSTRUCTION, INC. $6.000 $ % 2 GRANITE CONSTRUCTION COMPANY $6.000 $ % L.FT. PERMANENT PAVEMENT MARKING (PAINTED) (WHITE) Bid Rank Department Estimate 3, $0.350 $1, FNF CONSTRUCTION, INC. $0.200 $ % 2 GRANITE CONSTRUCTION COMPANY $0.500 $1, % L.FT. PERMANENT PAVEMENT MARKING (PAINTED) (YELLOW) Bid Rank Department Estimate 3, $0.350 $1, FNF CONSTRUCTION, INC. $0.200 $ % 2 GRANITE CONSTRUCTION COMPANY $0.500 $1, % EACH PERMANENT PAVEMENT MARKING (PAINTED SYMBOL) (ARROW) Bid Rank Department Estimate $ $ FNF CONSTRUCTION, INC. $ $ % 2 GRANITE CONSTRUCTION COMPANY $ $ % L.SUM MOBILIZATION Bid Rank Department Estimate $150, $150, FNF CONSTRUCTION, INC. $200, $200, % 2 GRANITE CONSTRUCTION COMPANY $119, $119, % L.FT. MEDIAN CABLE BARRIER (High Tension) Bid Rank Department Estimate $ $20, FNF CONSTRUCTION, INC. $ $28, % 2 GRANITE CONSTRUCTION COMPANY $ $21, % EACH MEDIAN CABLE BARRIER ANCHOR (High Tension) Bid Rank Department Estimate $4, $8, FNF CONSTRUCTION, INC. $4, $9, % 2 GRANITE CONSTRUCTION COMPANY $4, $8, % L.FT. GUARD RAIL, W-BEAM, SINGLE FACE (MASH) Bid Rank Department Estimate 3, $ $71, FNF CONSTRUCTION, INC. $ $92, % 2 GRANITE CONSTRUCTION COMPANY $ $85, %

9 Printed: 10/10/2018 Page 8 of 10 Measure Description Quantity Unit Price Extended Amount L.FT. GUARD RAIL, W-BEAM, SINGLE FACE (Shop Curved)(MASH) Bid Rank Department Estimate $ $8, FNF CONSTRUCTION, INC. $ $9, % 2 GRANITE CONSTRUCTION COMPANY $ $7, % EACH GUARD RAIL TERMINAL (MASH) Bid Rank Department Estimate $3, $9, FNF CONSTRUCTION, INC. $4, $12, % 2 GRANITE CONSTRUCTION COMPANY $4, $12, % EACH GUARD RAIL, ANCHOR ASSEMBLY Bid Rank Department Estimate $ $2, FNF CONSTRUCTION, INC. $2, $6, % 2 GRANITE CONSTRUCTION COMPANY $1, $5, % EACH GUARD RAIL, ANCHOR ASSEMBLY (Detail C) Bid Rank Department Estimate $ $1, FNF CONSTRUCTION, INC. $2, $4, % 2 GRANITE CONSTRUCTION COMPANY $2, $4, % L.FT. EMBANKMENT CURB Bid Rank Department Estimate $ $3, FNF CONSTRUCTION, INC. $ $1, % 2 GRANITE CONSTRUCTION COMPANY $ $1, % L.SUM CONSTRUCTION SURVEYING AND LAYOUT Bid Rank Department Estimate $20, $20, FNF CONSTRUCTION, INC. $40, $40, % 2 GRANITE CONSTRUCTION COMPANY $30, $30, % A CU.YD. REMOVAL OF STRUCTURAL CONCRETE Bid Rank Department Estimate $ $90, FNF CONSTRUCTION, INC. $ $151, % 2 GRANITE CONSTRUCTION COMPANY $ $179, % A L.FT. REMOVE (Guard Rail on Bridge) Bid Rank Department Estimate $ $8, FNF CONSTRUCTION, INC. $6.000 $3, % 2 GRANITE CONSTRUCTION COMPANY $ $6, % A L.FT. REMOVE (Exist. Curb and Fence on Bridge) Bid Rank Department Estimate $ $7, FNF CONSTRUCTION, INC. $ $14, % 2 GRANITE CONSTRUCTION COMPANY $ $36, %

10 Printed: 10/10/2018 Page 9 of 10 Measure Description Quantity Unit Price Extended Amount A CU.YD. STRUCTURAL EXCAVATION Bid Rank Department Estimate $ $5, FNF CONSTRUCTION, INC. $ $6, % 2 GRANITE CONSTRUCTION COMPANY $ $3, % A CU.YD. STRUCTURE BACKFILL Bid Rank Department Estimate $ $3, FNF CONSTRUCTION, INC. $ $10, % 2 GRANITE CONSTRUCTION COMPANY $ $2, % A CU.YD. STRUCTURAL CONCRETE (CLASS S) (F'C = 3,500) Bid Rank Department Estimate $ $10, FNF CONSTRUCTION, INC. $1, $18, % 2 GRANITE CONSTRUCTION COMPANY $1, $14, % A CU.YD. STRUCTURAL CONCRETE (CLASS S) (F'C = 4,500) Bid Rank Department Estimate $ $202, FNF CONSTRUCTION, INC. $1, $253, % 2 GRANITE CONSTRUCTION COMPANY $1, $376, % A EACH BRIDGE REPAIR (Flame Straighten Girders, Stiffeners and Diaphragm) Bid Rank Department Estimate $50, $150, FNF CONSTRUCTION, INC. $10, $30, % 2 GRANITE CONSTRUCTION COMPANY $8, $25, % A L.FT. F-SHAPE BRIDGE CONCRETE BARRIER AND TRANSITION (34") Bid Rank Department Estimate $ $67, FNF CONSTRUCTION, INC. $ $56, % 2 GRANITE CONSTRUCTION COMPANY $ $62, % A L.FT. DECK JOINT ASSEMBLY (4X4 COMPRESSION SEAL) Bid Rank Department Estimate $ $13, FNF CONSTRUCTION, INC. $ $20, % 2 GRANITE CONSTRUCTION COMPANY $ $23, % A SQ.FT. APPROACH SLAB (SD 2.01) Bid Rank Department Estimate 1, $ $42, FNF CONSTRUCTION, INC. $ $49, % 2 GRANITE CONSTRUCTION COMPANY $ $35, % A EACH BEARING (Realign Existing) Bid Rank Department Estimate $3, $9, FNF CONSTRUCTION, INC. $5, $16, % 2 GRANITE CONSTRUCTION COMPANY $ $1, %

11 Printed: 10/10/2018 Page 10 of 10 Measure Description Quantity Unit Price Extended Amount A LB. STRUCTURAL STEEL (Bridge Mounting Sign Support) Bid Rank Department Estimate 3, $2.500 $8, FNF CONSTRUCTION, INC. $8.000 $27, % 2 GRANITE CONSTRUCTION COMPANY $ $33, % A LB. STRUCTURAL STEEL (MISC) Bid Rank Department Estimate 4, $2.500 $12, FNF CONSTRUCTION, INC. $5.000 $24, % 2 GRANITE CONSTRUCTION COMPANY $ $59, % A LB. REINFORCING STEEL Bid Rank Department Estimate 86, $1.000 $86, FNF CONSTRUCTION, INC. $1.500 $129, % 2 GRANITE CONSTRUCTION COMPANY $1.250 $107, % A EACH PLACE DOWELS Bid Rank Department Estimate $ $5, FNF CONSTRUCTION, INC. $ $6, % 2 GRANITE CONSTRUCTION COMPANY $ $3, % A SQ.FT. PAINT STRUCTURE (Repaired Areas) Bid Rank Department Estimate $ $17, FNF CONSTRUCTION, INC. $ $21, % 2 GRANITE CONSTRUCTION COMPANY $ $20, % A EACH THRIE-BEAM GUARD RAIL TRANSITION SYSTEM Bid Rank Department Estimate $2, $10, FNF CONSTRUCTION, INC. $4, $18, % 2 GRANITE CONSTRUCTION COMPANY $3, $13, % A EACH SPILLWAY (Remove and Replace) Bid Rank Department Estimate $2, $6, FNF CONSTRUCTION, INC. $4, $13, % 2 GRANITE CONSTRUCTION COMPANY $2, $6, % A L.SUM MISCELLANEOUS WORK (Repair Diaphragm) Bid Rank Department Estimate $7, $7, FNF CONSTRUCTION, INC. $17, $17, % 2 GRANITE CONSTRUCTION COMPANY $13, $13, %