ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS

Size: px
Start display at page:

Download "ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS"

Transcription

1 ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS CONTRACT # TRACS No. Project No. County District Gross Length Net Length Prepared By: 163 NA 395 H845501C 163-A-(201)T NAVAJO NORTHEAST 0.6 David Do Highway Termini Location Work Description KAYENTA-UTAH STATE LINE HWY (US 163) LAGUNA CREEK BRIDGE STR #20088 BRIDGE REPLACEMENT

2 Printed: 1/23/2019 Page 1 of 18 BID RESULTS FOR Bid Opening Date : 12/14/2018, Prequalification Required, Engineer Specialist : David Do Completion Date: 250 Working Days The proposed project is located in Navajo County, on US 163 within the Town of Kayenta on the Navajo Nation Reservation, beginning at Milepost and extending north along US 163 to Milepost The proposed work consists of removing the existing bridge and constructing a new concrete girder bridge, removing the existing pavement and replacing it with asphaltic concrete (miscellaneous structural) pavement, constructing guardrail, striping and other related work. Bid Rank Department Estimate Bid Amount Contractor Extended Sum of s +% $7,051, DEPARTMENT ESTIMATE $7,051, % $9,508, % $9,787, % $10,359, FNF CONSTRUCTION, INC. 115 S. 48TH STREET TEMPE, AZ VASTCO, INC. 425 INDUSTRIAL DRIVE CHINO VALLEY, AZ GRANITE CONSTRUCTION COMPANY 4115 E ILLINOIS ST TUCSON, AZ $9,508, $9,787, $10,359, Winning Bidder is 34.8% Over Department Estimate (Difference = $2,456,905.95)

3 Printed: 1/23/2019 Page 2 of 18 Measure Description Quantity Unit Price Extended Amount ACRE CLEARING AND GRUBBING Bid Rank Department Estimate $1, $7, FNF CONSTRUCTION, INC. $4, $20, % 2 VASTCO, INC. $1, $6, % 3 GRANITE CONSTRUCTION COMPANY $6, $30, % CU.YD. REMOVAL OF STRUCTURAL CONCRETE Bid Rank Department Estimate $ $4, FNF CONSTRUCTION, INC. $1, $9, % 2 VASTCO, INC. $1, $15, % 3 GRANITE CONSTRUCTION COMPANY $1, $11, % EACH REMOVE AND SALVAGE CATTLE GUARDS Bid Rank Department Estimate $2, $2, FNF CONSTRUCTION, INC. $7, $7, % 2 VASTCO, INC. $13, $13, % 3 GRANITE CONSTRUCTION COMPANY $4, $4, % L.FT. REMOVAL OF PIPE Bid Rank Department Estimate $ $6, FNF CONSTRUCTION, INC. $ $22, % 2 VASTCO, INC. $ $11, % 3 GRANITE CONSTRUCTION COMPANY $ $6, % EACH REMOVE (SIGNS) Bid Rank Department Estimate $ $2, FNF CONSTRUCTION, INC. $ $5, % 2 VASTCO, INC. $ $2, % 3 GRANITE CONSTRUCTION COMPANY $ $3, % EACH REMOVE AND SALVAGE (GUARDRAIL END TREATMENT) Bid Rank Department Estimate $ $3, FNF CONSTRUCTION, INC. $ $3, % 2 VASTCO, INC. $ $3, % 3 GRANITE CONSTRUCTION COMPANY $ $3, % L.FT. REMOVE AND SALVAGE GUARD RAIL Bid Rank Department Estimate $4.000 $3, FNF CONSTRUCTION, INC. $4.500 $3, % 2 VASTCO, INC. $3.800 $3, % 3 GRANITE CONSTRUCTION COMPANY $8.000 $7, % L.FT. REMOVE FENCE Bid Rank Department Estimate 2, $1.000 $2, FNF CONSTRUCTION, INC. $3.000 $7, %

4 Printed: 1/23/2019 Page 3 of 18 Measure Description Quantity Unit Price Extended Amount L.FT. REMOVE FENCE Bid Rank Department Estimate 2, $1.000 $2, VASTCO, INC. $2.530 $6, % 3 GRANITE CONSTRUCTION COMPANY $2.600 $6, % EACH REMOVE (CATCH BASIN) Bid Rank Department Estimate $1, $2, FNF CONSTRUCTION, INC. $2, $5, % 2 VASTCO, INC. $2, $4, % 3 GRANITE CONSTRUCTION COMPANY $1, $3, % EACH REMOVE (HEADWALL) Bid Rank Department Estimate $1, $2, FNF CONSTRUCTION, INC. $2, $5, % 2 VASTCO, INC. $2, $4, % 3 GRANITE CONSTRUCTION COMPANY $1, $3, % L.FT. REMOVE LEAD-BASED STRIPING Bid Rank Department Estimate 3, $5.000 $16, FNF CONSTRUCTION, INC. $4.000 $12, % 2 VASTCO, INC. $9.870 $31, % 3 GRANITE CONSTRUCTION COMPANY $9.100 $29, % L.SUM REMOVE LEAD-BASED PAINT MATERIALS Bid Rank Department Estimate $10, $10, FNF CONSTRUCTION, INC. $150, $150, % 2 VASTCO, INC. $23, $23, % 3 GRANITE CONSTRUCTION COMPANY $25, $25, % L.SUM DISPOSE OF LEAD-BASED PAINT MATERIALS (FORCE ACCOUNT) Bid Rank Department Estimate $5, $5, FNF CONSTRUCTION, INC. $5, $5, % 2 VASTCO, INC. $5, $5, % 3 GRANITE CONSTRUCTION COMPANY $5, $5, % CU.YD. ROADWAY EXCAVATION Bid Rank Department Estimate 12, $ $184, FNF CONSTRUCTION, INC. $ $245, % 2 VASTCO, INC. $ $315, % 3 GRANITE CONSTRUCTION COMPANY $ $466, % CU.YD. DRAINAGE EXCAVATION Bid Rank Department Estimate $ $6, FNF CONSTRUCTION, INC. $ $6, % 2 VASTCO, INC. $ $9, %

5 Printed: 1/23/2019 Page 4 of 18 Measure Description Quantity Unit Price Extended Amount CU.YD. DRAINAGE EXCAVATION Bid Rank Department Estimate $ $6, GRANITE CONSTRUCTION COMPANY $ $159, % CU.YD. STRUCTURAL EXCAVATION Bid Rank Department Estimate 1, $ $58, FNF CONSTRUCTION, INC. $ $32, % 2 VASTCO, INC. $ $38, % 3 GRANITE CONSTRUCTION COMPANY $ $72, % SQ.YD. GRADING ROADWAY FOR PAVEMENT (TURNOUTS) Bid Rank Department Estimate 1, $ $10, FNF CONSTRUCTION, INC. $6.000 $6, % 2 VASTCO, INC. $ $41, % 3 GRANITE CONSTRUCTION COMPANY $8.000 $8, % CU.YD. AGGREGATE BASE, CLASS 2 Bid Rank Department Estimate 3, $ $227, FNF CONSTRUCTION, INC. $ $382, % 2 VASTCO, INC. $ $346, % 3 GRANITE CONSTRUCTION COMPANY $ $454, % TON FOG COAT Bid Rank Department Estimate $1, $1, FNF CONSTRUCTION, INC. $1, $1, % 2 VASTCO, INC. $1, $1, % 3 GRANITE CONSTRUCTION COMPANY $1, $1, % TON BLOTTER MATERIAL Bid Rank Department Estimate $ $ FNF CONSTRUCTION, INC. $ $ % 2 VASTCO, INC. $ $ % 3 GRANITE CONSTRUCTION COMPANY $ $ % TON ASPHALTIC CONCRETE (MISCELLANEOUS STRUCTURAL) Bid Rank Department Estimate 1, $ $288, FNF CONSTRUCTION, INC. $ $394, % 2 VASTCO, INC. $ $313, % 3 GRANITE CONSTRUCTION COMPANY $ $500, % TON ASPHALTIC CONCRETE FRICTION COURSE (MISC.) Bid Rank Department Estimate $ $38, FNF CONSTRUCTION, INC. $ $45, % 2 VASTCO, INC. $ $43, % 3 GRANITE CONSTRUCTION COMPANY $ $49, %

6 Printed: 1/23/2019 Page 5 of 18 Measure Description Quantity Unit Price Extended Amount L.FT. PIPE, CORRUGATED METAL, 28" X 20" Bid Rank Department Estimate $ $39, FNF CONSTRUCTION, INC. $ $59, % 2 VASTCO, INC. $ $59, % 3 GRANITE CONSTRUCTION COMPANY $ $76, % L.FT. PIPE, REINFORCED CONCRETE, CLASS II, 24" Bid Rank Department Estimate $ $13, FNF CONSTRUCTION, INC. $ $34, % 2 VASTCO, INC. $ $29, % 3 GRANITE CONSTRUCTION COMPANY $ $30, % L.FT. PIPE, REINFORCED CONCRETE, CLASS III, 24" Bid Rank Department Estimate $ $3, FNF CONSTRUCTION, INC. $ $8, % 2 VASTCO, INC. $ $14, % 3 GRANITE CONSTRUCTION COMPANY $ $7, % L.FT. PIPE, REINFORCED CONCRETE, CLASS IV, 24" Bid Rank Department Estimate $ $5, FNF CONSTRUCTION, INC. $ $11, % 2 VASTCO, INC. $ $10, % 3 GRANITE CONSTRUCTION COMPANY $ $11, % EACH FLARED END SECTION, 48" (C-13.25) Bid Rank Department Estimate $2, $8, FNF CONSTRUCTION, INC. $6, $24, % 2 VASTCO, INC. $2, $9, % 3 GRANITE CONSTRUCTION COMPANY $3, $12, % EACH METAL SAFETY END SECTION (28" X 20") Bid Rank Department Estimate $1, $21, FNF CONSTRUCTION, INC. $1, $14, % 2 VASTCO, INC. $2, $41, % 3 GRANITE CONSTRUCTION COMPANY $4, $56, % L.FT. PIPE (LINER) (EXISTING 48" CMP) Bid Rank Department Estimate $ $18, FNF CONSTRUCTION, INC. $ $63, % 2 VASTCO, INC. $ $68, % 3 GRANITE CONSTRUCTION COMPANY $ $71, % EACH CONCRETE CATCH BASIN (MEDIAN) (C-15.80) Bid Rank Department Estimate $4, $13, FNF CONSTRUCTION, INC. $8, $24, %

7 Printed: 1/23/2019 Page 6 of 18 Measure Description Quantity Unit Price Extended Amount EACH CONCRETE CATCH BASIN (MEDIAN) (C-15.80) Bid Rank Department Estimate $4, $13, VASTCO, INC. $8, $26, % 3 GRANITE CONSTRUCTION COMPANY $12, $36, % CU.YD. STRUCTURAL CONCRETE (CLASS S) (F'C = 3,000) Bid Rank Department Estimate $ $69, FNF CONSTRUCTION, INC. $ $96, % 2 VASTCO, INC. $1, $154, % 3 GRANITE CONSTRUCTION COMPANY $ $100, % SQ.YD. CONCRETE SLAB (PROTECTIVE) Bid Rank Department Estimate $ $7, FNF CONSTRUCTION, INC. $ $11, % 2 VASTCO, INC. $ $11, % 3 GRANITE CONSTRUCTION COMPANY $ $13, % LB. REINFORCING STEEL Bid Rank Department Estimate 12, $1.500 $18, FNF CONSTRUCTION, INC. $3.000 $37, % 2 VASTCO, INC. $1.950 $24, % 3 GRANITE CONSTRUCTION COMPANY $2.250 $27, % LB. REINFORCING STEEL (EPOXY COATED) Bid Rank Department Estimate $ $ FNF CONSTRUCTION, INC. $4.000 $ % 2 VASTCO, INC. $1.270 $ % 3 GRANITE CONSTRUCTION COMPANY $3.000 $ % EACH PLACE DOWELS Bid Rank Department Estimate $ $2, FNF CONSTRUCTION, INC. $ $1, % 2 VASTCO, INC. $ $3, % 3 GRANITE CONSTRUCTION COMPANY $ $1, % EACH SLIP BASE (P2) Bid Rank Department Estimate $ $3, FNF CONSTRUCTION, INC. $ $3, % 2 VASTCO, INC. $ $ % 3 GRANITE CONSTRUCTION COMPANY $ $3, % L.FT. SIGN POST (PERFORATED) (2 S) Bid Rank Department Estimate $ $ FNF CONSTRUCTION, INC. $ $1, % 2 VASTCO, INC. $ $1, %

8 Printed: 1/23/2019 Page 7 of 18 Measure Description Quantity Unit Price Extended Amount L.FT. SIGN POST (PERFORATED) (2 S) Bid Rank Department Estimate $ $ GRANITE CONSTRUCTION COMPANY $ $1, % L.FT. SIGN POST (PERFORATED) (2 1/2 S) Bid Rank Department Estimate $ $1, FNF CONSTRUCTION, INC. $ $1, % 2 VASTCO, INC. $ $1, % 3 GRANITE CONSTRUCTION COMPANY $ $1, % EACH FOUNDATION FOR SIGN POST (CONCRETE) Bid Rank Department Estimate $ $3, FNF CONSTRUCTION, INC. $ $3, % 2 VASTCO, INC. $ $3, % 3 GRANITE CONSTRUCTION COMPANY $ $3, % SQ.FT. WARNING, MARKER, OR REGULATORY SIGN PANEL Bid Rank Department Estimate $ $ FNF CONSTRUCTION, INC. $ $1, % 2 VASTCO, INC. $ $1, % 3 GRANITE CONSTRUCTION COMPANY $ $1, % SQ.FT. FLAT SHEET ALUMINUM SIGN PANEL Bid Rank Department Estimate $ $ FNF CONSTRUCTION, INC. $ $ % 2 VASTCO, INC. $ $ % 3 GRANITE CONSTRUCTION COMPANY $ $ % L.FT. TEMPORARY PREFORMED MARKING (TYPE II, TAPE LINE) Bid Rank Department Estimate 6, $3.000 $19, FNF CONSTRUCTION, INC. $2.000 $13, % 2 VASTCO, INC. $3.500 $23, % 3 GRANITE CONSTRUCTION COMPANY $1.850 $12, % L.FT. TEMPORARY PAINTED MARKING (STRIPE) Bid Rank Department Estimate 12, $0.200 $2, FNF CONSTRUCTION, INC. $0.200 $2, % 2 VASTCO, INC. $0.340 $4, % 3 GRANITE CONSTRUCTION COMPANY $0.200 $2, % EACH-DAY BARRICADE (TYPE II, VERT.PANEL, TUBULAR MARKER) Bid Rank Department Estimate 9, $0.300 $2, FNF CONSTRUCTION, INC. $0.300 $2, % 2 VASTCO, INC. $0.420 $4, % 3 GRANITE CONSTRUCTION COMPANY $0.260 $2, %

9 Printed: 1/23/2019 Page 8 of 18 Measure Description Quantity Unit Price Extended Amount EACH-DAY BARRICADE (TYPE III, HIGH LEVEL FLAG TREES) Bid Rank Department Estimate $0.700 $ FNF CONSTRUCTION, INC. $1.000 $ % 2 VASTCO, INC. $1.050 $ % 3 GRANITE CONSTRUCTION COMPANY $0.630 $ % EACH-DAY PORTABLE SIGN STANDS (SPRING TYPE) Bid Rank Department Estimate $0.800 $ FNF CONSTRUCTION, INC. $1.000 $ % 2 VASTCO, INC. $1.150 $ % 3 GRANITE CONSTRUCTION COMPANY $0.700 $ % EACH-DAY WARNING LIGHTS (TYPE A) Bid Rank Department Estimate 4, $0.250 $1, FNF CONSTRUCTION, INC. $0.500 $2, % 2 VASTCO, INC. $0.310 $1, % 3 GRANITE CONSTRUCTION COMPANY $0.200 $ % EACH-DAY WARNING LIGHTS (TYPE C) Bid Rank Department Estimate 9, $0.300 $2, FNF CONSTRUCTION, INC. $0.500 $4, % 2 VASTCO, INC. $0.310 $3, % 3 GRANITE CONSTRUCTION COMPANY $0.200 $1, % EACH-DAY EMBEDDED SIGN POST Bid Rank Department Estimate 8, $0.200 $1, FNF CONSTRUCTION, INC. $0.500 $4, % 2 VASTCO, INC. $0.520 $4, % 3 GRANITE CONSTRUCTION COMPANY $0.350 $2, % EACH-DAY TEMPORARY SIGN (LESS THAN 10 S.F.) Bid Rank Department Estimate $0.600 $ FNF CONSTRUCTION, INC. $1.000 $ % 2 VASTCO, INC. $0.730 $ % 3 GRANITE CONSTRUCTION COMPANY $0.450 $ % EACH-DAY TEMPORARY SIGN (10 S.F. OR MORE) Bid Rank Department Estimate 4, $0.700 $3, FNF CONSTRUCTION, INC. $1.000 $4, % 2 VASTCO, INC. $0.940 $4, % 3 GRANITE CONSTRUCTION COMPANY $0.600 $2, % EACH-DAY FLASHING ARROW PANEL Bid Rank Department Estimate $ $ FNF CONSTRUCTION, INC. $ $ %

10 Printed: 1/23/2019 Page 9 of 18 Measure Description Quantity Unit Price Extended Amount EACH-DAY FLASHING ARROW PANEL Bid Rank Department Estimate $ $ VASTCO, INC. $ $ % 3 GRANITE CONSTRUCTION COMPANY $ $ % EACH-DAY CHANGEABLE MESSAGE BOARD (CONTRACTOR FURNISHED) Bid Rank Department Estimate $ $5, FNF CONSTRUCTION, INC. $ $9, % 2 VASTCO, INC. $ $13, % 3 GRANITE CONSTRUCTION COMPANY $ $8, % HOUR FLAGGING SERVICES (CIVILIAN) Bid Rank Department Estimate 4, $ $155, FNF CONSTRUCTION, INC. $ $133, % 2 VASTCO, INC. $ $159, % 3 GRANITE CONSTRUCTION COMPANY $ $76, % HOUR FLAGGING SERVICES (DPS) Bid Rank Department Estimate 1, $ $114, FNF CONSTRUCTION, INC. $ $114, % 2 VASTCO, INC. $ $114, % 3 GRANITE CONSTRUCTION COMPANY $ $114, % EACH RESET MILEPOST MARKER Bid Rank Department Estimate $ $ FNF CONSTRUCTION, INC. $ $1, % 2 VASTCO, INC. $ $ % 3 GRANITE CONSTRUCTION COMPANY $ $1, % EACH OBJECT MARKER (M-23) (TYPE 3(1)) Bid Rank Department Estimate $ $1, FNF CONSTRUCTION, INC. $ $1, % 2 VASTCO, INC. $ $1, % 3 GRANITE CONSTRUCTION COMPANY $ $2, % EACH PAVEMENT MARKER, RECESSED, TYPE D Bid Rank Department Estimate $ $ FNF CONSTRUCTION, INC. $ $1, % 2 VASTCO, INC. $ $2, % 3 GRANITE CONSTRUCTION COMPANY $ $1, % L.FT. PERMANENT PAVEMENT MARKING (PAINTED) (WHITE) Bid Rank Department Estimate 6, $0.300 $1, FNF CONSTRUCTION, INC. $0.200 $1, % 2 VASTCO, INC. $0.340 $2, %

11 Printed: 1/23/2019 Page 10 of 18 Measure Description Quantity Unit Price Extended Amount L.FT. PERMANENT PAVEMENT MARKING (PAINTED) (WHITE) Bid Rank Department Estimate 6, $0.300 $1, GRANITE CONSTRUCTION COMPANY $0.200 $1, % L.FT. PERMANENT PAVEMENT MARKING (PAINTED) (YELLOW) Bid Rank Department Estimate 6, $0.300 $1, FNF CONSTRUCTION, INC. $0.200 $1, % 2 VASTCO, INC. $0.340 $2, % 3 GRANITE CONSTRUCTION COMPANY $0.200 $1, % L.FT. DUAL COMPONENT PAVEMENT MARKING (WHITE EPOXY) Bid Rank Department Estimate 9, $0.500 $4, FNF CONSTRUCTION, INC. $0.400 $3, % 2 VASTCO, INC. $0.790 $7, % 3 GRANITE CONSTRUCTION COMPANY $0.450 $4, % L.FT. DUAL COMPONENT PAVEMENT MARKING (YELLOW EPOXY) Bid Rank Department Estimate 9, $0.500 $4, FNF CONSTRUCTION, INC. $0.400 $3, % 2 VASTCO, INC. $0.790 $7, % 3 GRANITE CONSTRUCTION COMPANY $0.450 $4, % ACRE SEEDING (CLASS II) Bid Rank Department Estimate $3, $35, FNF CONSTRUCTION, INC. $5, $50, % 2 VASTCO, INC. $5, $50, % 3 GRANITE CONSTRUCTION COMPANY $3, $35, % CU.YD. EROSION CONTROL (RIPRAP) (GRADATION A) Bid Rank Department Estimate $ $11, FNF CONSTRUCTION, INC. $ $17, % 2 VASTCO, INC. $ $19, % 3 GRANITE CONSTRUCTION COMPANY $ $8, % L.FT. EROSION CONTROL (SILT FENCE ) Bid Rank Department Estimate 1, $8.000 $9, FNF CONSTRUCTION, INC. $5.000 $5, % 2 VASTCO, INC. $4.870 $5, % 3 GRANITE CONSTRUCTION COMPANY $7.000 $8, % L.FT. EROSION CONTROL (WATTLES) (20") Bid Rank Department Estimate $8.000 $2, FNF CONSTRUCTION, INC. $6.000 $2, % 2 VASTCO, INC. $4.110 $1, % 3 GRANITE CONSTRUCTION COMPANY $4.750 $1, %

12 Printed: 1/23/2019 Page 11 of 18 Measure Description Quantity Unit Price Extended Amount SQ.YD. EROSION CONTROL (STABILIZED CONSTRUCTION ENTRANCE/EXIT GRAVEL PAD) Bid Rank Department Estimate 1, $ $25, FNF CONSTRUCTION, INC. $ $10, % 2 VASTCO, INC. $ $42, % 3 GRANITE CONSTRUCTION COMPANY $ $30, % L.FT. EROSION CONTROL (WATTLES) (9") Bid Rank Department Estimate 4, $4.000 $16, FNF CONSTRUCTION, INC. $2.500 $10, % 2 VASTCO, INC. $2.230 $9, % 3 GRANITE CONSTRUCTION COMPANY $1.800 $7, % L.FT. EROSION CONTROL (WATTLES) (12") Bid Rank Department Estimate $6.000 $ FNF CONSTRUCTION, INC. $5.000 $ % 2 VASTCO, INC. $3.160 $ % 3 GRANITE CONSTRUCTION COMPANY $3.500 $ % CU.YD. EROSION CONTROL (ROCK MULCH) (GRADATION C) Bid Rank Department Estimate $ $6, FNF CONSTRUCTION, INC. $ $9, % 2 VASTCO, INC. $ $10, % 3 GRANITE CONSTRUCTION COMPANY $ $6, % L.SUM MOBILIZATION Bid Rank Department Estimate $700, $700, FNF CONSTRUCTION, INC. $947, $947, % 2 VASTCO, INC. $950, $950, % 3 GRANITE CONSTRUCTION COMPANY $1,005, $1,005, % L.FT. CHAIN LINK FENCE, TYPE 1 (60") Bid Rank Department Estimate $ $2, FNF CONSTRUCTION, INC. $ $2, % 2 VASTCO, INC. $ $2, % 3 GRANITE CONSTRUCTION COMPANY $ $2, % L.FT. CHAIN LINK FENCE (FOR STRUCTURE) Bid Rank Department Estimate $ $7, FNF CONSTRUCTION, INC. $ $7, % 2 VASTCO, INC. $ $7, % 3 GRANITE CONSTRUCTION COMPANY $ $7, % L.FT. BARBED WIRE FENCE, TYPE 2 Bid Rank Department Estimate 3, $ $50, FNF CONSTRUCTION, INC. $2.500 $8, %

13 Printed: 1/23/2019 Page 12 of 18 Measure Description Quantity Unit Price Extended Amount L.FT. BARBED WIRE FENCE, TYPE 2 Bid Rank Department Estimate 3, $ $50, VASTCO, INC. $2.400 $8, % 3 GRANITE CONSTRUCTION COMPANY $2.250 $7, % EACH FENCE GATE, TYPE 1, SINGLE Bid Rank Department Estimate $1, $1, FNF CONSTRUCTION, INC. $ $ % 2 VASTCO, INC. $ $ % 3 GRANITE CONSTRUCTION COMPANY $ $ % L.FT. RECONSTRUCT BARBED WIRE FENCE, TYPE 2 Bid Rank Department Estimate $5.000 $1, FNF CONSTRUCTION, INC. $2.200 $ % 2 VASTCO, INC. $2.150 $ % 3 GRANITE CONSTRUCTION COMPANY $2.000 $ % L.FT. GUARD RAIL, W-BEAM, SINGLE FACE (MASH) Bid Rank Department Estimate 1, $ $28, FNF CONSTRUCTION, INC. $ $25, % 2 VASTCO, INC. $ $28, % 3 GRANITE CONSTRUCTION COMPANY $ $26, % EACH GUARD RAIL TERMINAL (MASH) Bid Rank Department Estimate $3, $14, FNF CONSTRUCTION, INC. $4, $18, % 2 VASTCO, INC. $4, $19, % 3 GRANITE CONSTRUCTION COMPANY $4, $18, % EACH GUARD RAIL TRANSITION (C-10.30) Bid Rank Department Estimate $2, $5, FNF CONSTRUCTION, INC. $4, $9, % 2 VASTCO, INC. $4, $8, % 3 GRANITE CONSTRUCTION COMPANY $4, $8, % EACH GUARD RAIL TRANSITION (C-10.31) Bid Rank Department Estimate $2, $5, FNF CONSTRUCTION, INC. $5, $10, % 2 VASTCO, INC. $5, $10, % 3 GRANITE CONSTRUCTION COMPANY $5, $10, % EACH CATTLE GUARD (2 UNIT) Bid Rank Department Estimate $12, $12, FNF CONSTRUCTION, INC. $17, $17, % 2 VASTCO, INC. $34, $34, %

14 Printed: 1/23/2019 Page 13 of 18 Measure Description Quantity Unit Price Extended Amount EACH CATTLE GUARD (2 UNIT) Bid Rank Department Estimate $12, $12, GRANITE CONSTRUCTION COMPANY $17, $17, % EACH CATTLE GUARD (3 UNIT) Bid Rank Department Estimate $18, $18, FNF CONSTRUCTION, INC. $25, $25, % 2 VASTCO, INC. $44, $44, % 3 GRANITE CONSTRUCTION COMPANY $21, $21, % EACH CATTLE GUARD (4 UNIT) Bid Rank Department Estimate $24, $24, FNF CONSTRUCTION, INC. $30, $30, % 2 VASTCO, INC. $54, $54, % 3 GRANITE CONSTRUCTION COMPANY $31, $31, % EACH CATTLE GUARD (5 UNIT) Bid Rank Department Estimate $30, $30, FNF CONSTRUCTION, INC. $36, $36, % 2 VASTCO, INC. $63, $63, % 3 GRANITE CONSTRUCTION COMPANY $40, $40, % CU.YD. RIPRAP (DUMPED) Bid Rank Department Estimate $ $3, FNF CONSTRUCTION, INC. $ $4, % 2 VASTCO, INC. $ $3, % 3 GRANITE CONSTRUCTION COMPANY $ $6, % CU.YD. RIPRAP (WIRE-TIED) Bid Rank Department Estimate $ $8, FNF CONSTRUCTION, INC. $ $13, % 2 VASTCO, INC. $ $9, % 3 GRANITE CONSTRUCTION COMPANY $ $32, % CU.YD. RIPRAP (GABIONS) Bid Rank Department Estimate $ $99, FNF CONSTRUCTION, INC. $ $139, % 2 VASTCO, INC. $ $205, % 3 GRANITE CONSTRUCTION COMPANY $ $328, % CU.YD. RIPRAP (GROUTED) (GABIONS) Bid Rank Department Estimate $ $39, FNF CONSTRUCTION, INC. $ $74, % 2 VASTCO, INC. $ $96, % 3 GRANITE CONSTRUCTION COMPANY $ $181, %

15 Printed: 1/23/2019 Page 14 of 18 Measure Description Quantity Unit Price Extended Amount SQ.FT. RETAINING WALL (REINFORCED CONCRETE) Bid Rank Department Estimate 1, $ $77, FNF CONSTRUCTION, INC. $ $124, % 2 VASTCO, INC. $ $177, % 3 GRANITE CONSTRUCTION COMPANY $ $124, % L.FT. EMBANKMENT CURB Bid Rank Department Estimate $ $1, FNF CONSTRUCTION, INC. $ $1, % 2 VASTCO, INC. $ $1, % 3 GRANITE CONSTRUCTION COMPANY $ $3, % L.FT. EMBANKMENT SPILLWAY (C-4.10) Bid Rank Department Estimate $ $4, FNF CONSTRUCTION, INC. $ $4, % 2 VASTCO, INC. $ $6, % 3 GRANITE CONSTRUCTION COMPANY $ $2, % EACH INLET (C-4.10) (SINGLE) Bid Rank Department Estimate $3, $6, FNF CONSTRUCTION, INC. $2, $5, % 2 VASTCO, INC. $1, $2, % 3 GRANITE CONSTRUCTION COMPANY $3, $7, % EACH OUTLET (C-4.10) Bid Rank Department Estimate $2, $2, FNF CONSTRUCTION, INC. $3, $3, % 2 VASTCO, INC. $4, $4, % 3 GRANITE CONSTRUCTION COMPANY $2, $2, % L.SUM FORCE ACCOUNT WORK (BIOLOGIST) Bid Rank Department Estimate $15, $15, FNF CONSTRUCTION, INC. $15, $15, % 2 VASTCO, INC. $15, $15, % 3 GRANITE CONSTRUCTION COMPANY $15, $15, % L.SUM FORCE ACCOUNT WORK (DEWATERING) Bid Rank Department Estimate $100, $100, FNF CONSTRUCTION, INC. $100, $100, % 2 VASTCO, INC. $100, $100, % 3 GRANITE CONSTRUCTION COMPANY $100, $100, % L.FT. MISCELLANEOUS WORK (CONCRETE LINED DITCH, DETAIL B) Bid Rank Department Estimate $ $24, FNF CONSTRUCTION, INC. $ $36, %

16 Printed: 1/23/2019 Page 15 of 18 Measure Description Quantity Unit Price Extended Amount L.FT. MISCELLANEOUS WORK (CONCRETE LINED DITCH, DETAIL B) Bid Rank Department Estimate $ $24, VASTCO, INC. $ $104, % 3 GRANITE CONSTRUCTION COMPANY $ $28, % L.SUM CONTRACTOR QUALITY CONTROL Bid Rank Department Estimate $75, $75, FNF CONSTRUCTION, INC. $120, $120, % 2 VASTCO, INC. $56, $56, % 3 GRANITE CONSTRUCTION COMPANY $75, $75, % SQ.YD. MISCELLANEOUS WORK (CONTROL OF NOXIOUS PLANTS) (MANUAL / MECHANICAL METHODS) Bid Rank Department Estimate 21, $0.600 $13, FNF CONSTRUCTION, INC. $0.600 $13, % 2 VASTCO, INC. $0.640 $13, % 3 GRANITE CONSTRUCTION COMPANY $0.500 $10, % SQ.YD. MISCELLANEOUS WORK (CONTROL OF NOXIOUS PLANTS) (HERBICIDE) Bid Rank Department Estimate 26, $0.300 $7, FNF CONSTRUCTION, INC. $0.200 $5, % 2 VASTCO, INC. $0.240 $6, % 3 GRANITE CONSTRUCTION COMPANY $0.500 $13, % L.SUM CONSTRUCTION SURVEYING AND LAYOUT Bid Rank Department Estimate $100, $100, FNF CONSTRUCTION, INC. $120, $120, % 2 VASTCO, INC. $126, $126, % 3 GRANITE CONSTRUCTION COMPANY $175, $175, % L.FT. GROUND-IN RUMBLE STRIP (6 INCH) Bid Rank Department Estimate 4, $0.500 $2, FNF CONSTRUCTION, INC. $1.000 $4, % 2 VASTCO, INC. $0.320 $1, % 3 GRANITE CONSTRUCTION COMPANY $1.000 $4, % A L.SUM REMOVE BRIDGE Bid Rank Department Estimate $250, $250, FNF CONSTRUCTION, INC. $189, $189, % 2 VASTCO, INC. $337, $337, % 3 GRANITE CONSTRUCTION COMPANY $340, $340, % A CU.YD. STRUCTURAL EXCAVATION Bid Rank Department Estimate $ $7, FNF CONSTRUCTION, INC. $ $48, % 2 VASTCO, INC. $1, $151, %

17 Printed: 1/23/2019 Page 16 of 18 Measure Description Quantity Unit Price Extended Amount A CU.YD. STRUCTURAL EXCAVATION Bid Rank Department Estimate $ $7, GRANITE CONSTRUCTION COMPANY $ $22, % A CU.YD. STRUCTURE BACKFILL Bid Rank Department Estimate $ $18, FNF CONSTRUCTION, INC. $ $39, % 2 VASTCO, INC. $ $30, % 3 GRANITE CONSTRUCTION COMPANY $ $45, % A CU.YD. STRUCTURAL CONCRETE (CLASS S) (F'C = 3,500) Bid Rank Department Estimate $ $404, FNF CONSTRUCTION, INC. $1, $808, % 2 VASTCO, INC. $1, $857, % 3 GRANITE CONSTRUCTION COMPANY $1, $622, % A CU.YD. STRUCTURAL CONCRETE (CLASS S) (F'C = 4,500) Bid Rank Department Estimate $ $481, FNF CONSTRUCTION, INC. $1, $706, % 2 VASTCO, INC. $1, $745, % 3 GRANITE CONSTRUCTION COMPANY $1, $770, % A SQ.YD. BRIDGE REPAIR (PENETRATING CRACK SEAL) Bid Rank Department Estimate 2, $ $51, FNF CONSTRUCTION, INC. $ $24, % 2 VASTCO, INC. $ $54, % 3 GRANITE CONSTRUCTION COMPANY $ $67, % A SQ.YD. GROOVE BRIDGE DECK Bid Rank Department Estimate 1, $ $23, FNF CONSTRUCTION, INC. $7.000 $13, % 2 VASTCO, INC. $8.650 $16, % 3 GRANITE CONSTRUCTION COMPANY $6.000 $11, % A L.FT. F-SHAPE BRIDGE CONCRETE BARRIER AND TRANSITION (34") Bid Rank Department Estimate 1, $ $146, FNF CONSTRUCTION, INC. $ $134, % 2 VASTCO, INC. $ $112, % 3 GRANITE CONSTRUCTION COMPANY $ $144, % A L.FT. DECK JOINT ASSEMBLY (STRIP SEAL JOINT) Bid Rank Department Estimate $ $20, FNF CONSTRUCTION, INC. $ $17, % 2 VASTCO, INC. $ $23, % 3 GRANITE CONSTRUCTION COMPANY $ $24, %

18 Printed: 1/23/2019 Page 17 of 18 Measure Description Quantity Unit Price Extended Amount A SQ.FT. APPROACH SLAB (SD 2.01) Bid Rank Department Estimate 1, $ $38, FNF CONSTRUCTION, INC. $ $38, % 2 VASTCO, INC. $ $50, % 3 GRANITE CONSTRUCTION COMPANY $ $47, % A L.FT. PRECAST, P/S MEMBER (AASHTO TYPE 6 MOD. GR.) Bid Rank Department Estimate 2, $ $812, FNF CONSTRUCTION, INC. $ $1,330, % 2 VASTCO, INC. $ $1,359, % 3 GRANITE CONSTRUCTION COMPANY $ $1,600, % A EACH RESTRAINERS, VERTICAL EARTHQUAKE (FIXED) Bid Rank Department Estimate $ $4, FNF CONSTRUCTION, INC. $ $3, % 2 VASTCO, INC. $ $6, % 3 GRANITE CONSTRUCTION COMPANY $ $4, % A EACH RESTRAINERS, VERTICAL EARTHQUAKE (EXPANSION) Bid Rank Department Estimate $ $4, FNF CONSTRUCTION, INC. $ $4, % 2 VASTCO, INC. $ $5, % 3 GRANITE CONSTRUCTION COMPANY $ $6, % A LB. REINFORCING STEEL Bid Rank Department Estimate 122, $1.300 $158, FNF CONSTRUCTION, INC. $2.000 $244, % 2 VASTCO, INC. $1.410 $172, % 3 GRANITE CONSTRUCTION COMPANY $1.700 $207, % A LB. REINFORCING STEEL (EPOXY COATED) Bid Rank Department Estimate 163, $1.500 $245, FNF CONSTRUCTION, INC. $2.000 $327, % 2 VASTCO, INC. $1.620 $265, % 3 GRANITE CONSTRUCTION COMPANY $1.930 $316, % B L.FT. DRILLED SHAFT FOUNDATION (60") Bid Rank Department Estimate $1, $451, FNF CONSTRUCTION, INC. $2, $527, % 2 VASTCO, INC. $1, $425, % 3 GRANITE CONSTRUCTION COMPANY $1, $407, % B L.FT. DRILLED SHAFT FOUNDATION (108") Bid Rank Department Estimate $4, $252, FNF CONSTRUCTION, INC. $6, $378, %

19 Printed: 1/23/2019 Page 18 of 18 Measure Description Quantity Unit Price Extended Amount B L.FT. DRILLED SHAFT FOUNDATION (108") Bid Rank Department Estimate $4, $252, VASTCO, INC. $4, $314, % 3 GRANITE CONSTRUCTION COMPANY $4, $291, % B L.FT. DRILLED SHAFT FOR FOUNDATION (ROCK) (54") Bid Rank Department Estimate $2, $80, FNF CONSTRUCTION, INC. $4, $160, % 2 VASTCO, INC. $1, $60, % 3 GRANITE CONSTRUCTION COMPANY $1, $59, % B L.FT. DRILLED SHAFTS (ROCK) (102") Bid Rank Department Estimate $7, $574, FNF CONSTRUCTION, INC. $5, $410, % 2 VASTCO, INC. $5, $431, % 3 GRANITE CONSTRUCTION COMPANY $5, $414, %