1 School District: Coast Mountains Asset: STEWART ELEMENTARY Facility: STEWART ELEMENTARY Asset Number: Assets are ordered by Asset Name Currency: CAD Statistics FCI Cost: 2,543,413 FCI: 0.59 RI Cost: 2,788,489 RI: 0.64 Total Requirement Cost: 2,543,415 Size: 2,609 SM Current Replacement Value: 4,340,772 Address 1 BOX 280 Address 2 12TH ST City STEWART State/Province/Region British Columbia Copyright 2016 VFA, Inc. All rights reserved. 1-Feb-16 5:41:29 PM Page 1 of 19

2 Photo STEWART ELEMENTARY Auditor Touch Photo System Description System Name A - Substructure-Concrete Column Footings A - Substructure-Foundation Wall and Footings - Crawlspace B10 - Superstructure-Flat Roof Description Interior concrete column footings. Basic perimeter foundation for building with crawlspace. System cost includes strip footing, 1.8 meter high foundation wall, damp proofing and underdrain and is based on average height of crawlspace at 600mm. Roof superstructure consists of steel columns and steel joist roof structure. Exterior walls are covered under a separate System. Copyright 2016 VFA, Inc. All rights reserved. 1-Feb-16 5:41:29 PM Page 2 of 19

3 System Name Description Assembly - Metal Deck Steel Framing #3 B10 - Superstructure-Flat Roof Assembly - Metal Deck Steel Framing #4,5 B10 - Superstructure-Flat Roof Assembly - Wood Deck Steel Framing #2 B10 - Superstructure-Floor Assembly - Wood Joists and Subfloor B10 - Superstructure-Sloped Roof Assembly - Wood Rafters and Decking #1 B Ramps-Accessible Ramp - Exterior Wood B Exterior Stairs and Fire Escapes-Exterior Stairs - Concrete B Exterior Stairs and Fire Escapes-Exterior Stairs - Wood B Exterior Walls-Metal Siding on Framing B Exterior Walls-Painted Finish (Exterior Walls) B Exterior Windows-Steel Windows B Exterior Windows- Windows - Aluminum Newer Roof superstructure consists of steel columns and steel joist roof structure. Exterior walls are covered under a separate System. Roof superstructure consists of steel joist roof structure supporting wood roof decking. Exterior walls are covered under a separate System. Floor assembly includes wood floor joists and wood subfloor. The building superstructure has a conventionally framed sloped roof using wood rafters covered with roof decking. Assumes ceiling insulation. Wooden exterior ramp including railings. the ramp is in poor condition Ramp width is 1200mm. Exterior concrete stairs (1800mm wide x 5 risers) with railing. Each flight. Wooden exterior stairs including railings. Each flight. The exterior wall has prefinished metal panel siding on framing with GWB finish on the interior. The exterior foundation perimeter walls and the roof soffits have a painted finish. The building includes steel framed exterior window units with insulating glass. The building includes aluminum framed exterior units with insulating glass. Copyright 2016 VFA, Inc. All rights reserved. 1-Feb-16 5:41:29 PM Page 3 of 19

4 System Name B Exterior Windows- Windows - Aluminum Older B Exterior Doors-Door Assembly - Double 1972 B Exterior Doors-Door Assembly - Double 1997 B Exterior Doors-Door Assembly - Single B Exterior Doors-Door Assembly - Storefront Double 1997 B30 - Roofing-SBS Modified Bitumen Membrane #1 B30 - Roofing-SBS Modified Bitumen Membrane #2 B30 - Roofing-SBS Modified Bitumen Membrane #3 B30 - Roofing-SBS Modified Bitumen Membrane #4 B30 - Roofing-SBS Modified Bitumen Membrane #5 C Partitions-Glazed Partitions C Partitions-Plywood on Stud C Interior Doors-Swinging Doors Wood and Metal 1972 C Interior Doors-Swinging Description The building includes aluminum framed exterior units with insulating glass. Exterior doors include double-leaf doors and frames with standard hardware. Exterior doors include double-leaf doors and frames with standard hardware. Exterior doors include single-leaf door and frames with standard hardware. The door has some deterioration at the lower portion. Replacement is recommended for reliability and appearance. The exterior doors include double swinging, glazed, aluminum storefronts with aluminum frame and standard hardware. The building's insulated roof is finished with an SBS Granulated Bitumen Membrane type. The cost estimate includes rigid insulation. The building's insulated roof is finished with an SBS Granulated Bitumen Membrane type. The cost estimate includes rigid insulation. The building's insulated roof is finished with an SBS Granulated Bitumen Membrane type. The cost estimate includes rigid insulation. The building's insulated roof is finished with an SBS Granulated Bitumen Membrane type. The cost estimate includes rigid insulation. The building's insulated roof is finished with an SBS Granulated Bitumen Membrane type. The cost estimate includes rigid insulation. Building interior includes windows and storefront partitions. The building interior includes standard plywood on wood stud partitions with GWB or Plywood sheathing on each face. No insulation and no finish included in system cost. Interior doors include wood and metal doors and frames with standard hardware. System cost includes both single and double doors. Interior doors include wood and metal doors and frames with standard hardware. System cost includes both single and double doors. Copyright 2016 VFA, Inc. All rights reserved. 1-Feb-16 5:41:29 PM Page 4 of 19

5 System Name Description Doors Wood and Metal 1990 C Fittings-Metal Partitions Washrooms C Fittings-Washroom Accessories C Identifying Devices- Signage (Room Numbering and Identification) C20 - Stairs-Stairs Typical C Wall Finishes-Ceramic Wall Tile C Wall Finishes-Hardboard Paneling C Wall Finishes-Painted Finish - Average (1 Coat Prime - 2 Coats Finish) C Floor Finishes-Carpeting - Broadloom C Floor Finishes-Ceramic Floor Tile C Floor Finishes-Concrete - Painted or Sealed C Floor Finishes-Vinyl Composite Tile Premium C Floor Finishes-Vinyl Sheet Goods C Floor Finishes-Wood Strip Flooring Washrooms and change rooms are equipped with standard quality ceiling, and or floor mounted toilet partitions. The washroom accessories typically include mirror, grab bars, paper towel dispenser and disposal, toilet paper holder and soap dispenser. The building has way finding signage which typically includes door numbers, names and graphics. The interior stairs include two, 12-riser flights per story with hand and guard rails. Building wall coverings include 100 x 100mm thin set ceramic decorator tiles at medium price. Interior wall finishes include hardboard paneling. The system is in fair to good condition. The observed years remaining are extended. Interior wall finishes include standard paint finish.the system is in fair condition. The observed years remaining are extended. Floor finishes include medium priced carpeting and base. Floor finishes include ceramic tile and base.the system is in fair to good condition. The observed years remaining are extended. The building includes a typical painted concrete floor finish. Floor finishes include areas of premium VCT flooring and related base. Examples include Tarkett or equivalent brands. Floor finishes in the building include resilient sheet vinyl and rubber base. Floor finishes include finished maple strip flooring. Includes finished wood base. Copyright 2016 VFA, Inc. All rights reserved. 1-Feb-16 5:41:29 PM Page 5 of 19

6 System Name C Ceiling Finishes- Concealed Spline ACT C Ceiling Finishes-GWB Taped and Finished C Ceiling Finishes- Suspended ACT D Plumbing Fixtures- Classroom Sinks D Plumbing Fixtures- Custodial Sink D Plumbing Fixtures- Drinking Fountains D Plumbing Fixtures- Restroom Fixtures Wing D Plumbing Fixtures- Restroom Fixtures D Domestic Water Distribution-Water Dist Complete D Domestic Water Distribution-Water Heater - Electric D Domestic Water Distribution-Water Heater - Electric D Sanitary Waste-Sanitary Waste - Gravity Disch D Rain Water Drainage- Roof Drainage - Gravity Description Concealed spline 300 x 300 x 19mm ACT ceiling system, stapled or glued onto wood-strapping attached to the building superstructure. System includes GWB ceiling at 2400mm or more above the floor level; typically taped, finished and painted with primer and 2 finish coats. Ceiling supported by a suspension system or fastened to metal or wood furring. 600 x 600mm or 600 x 1200mm x 19mm standard acoustic ceiling tiles (ACT) in 14mm tee grid suspension system. The plumbing fixtures include stainless steel sinks in the classrooms, staff lounge, kitchen, medical room, and library. The plumbing fixtures includes a floor mounted custodial sink in custodian rooms. Plumbing fixtures include wall mounted drinking fountains. The restroom fixtures on the original 1967 wing include vitreous china urinals, water closets and lavatories. The restroom fixtures include vitreous china urinals, water closets and lavatories. The building domestic water distribution system includes a main water supply line located in the chalk brush/storage room and associated distribution piping. The domestic hot water is provided by two small 10 Gal electric water heaters in the 1972 wing. The domestic hot water is provided by a 184 litre electric water heater in the custodian room. The building includes sanitary waste piping system with gravity discharge to the municipal main. Rain water is removed from the roof via drains equipped with strainers and connected to rainwater leaders, which discharge to a municipal main. Copyright 2016 VFA, Inc. All rights reserved. 1-Feb-16 5:41:29 PM Page 6 of 19

7 System Name D Other Plumbing Systems- Propane Supply for Bldg D Heat Generating Systems- Boilers HW - Propane Fired MBTUH D Distribution Systems-Air Handling Units D Distribution Systems- Distribution Ductwork D Distribution Systems- Exhaust System D Distribution Systems-Hot Water Pipe Distribution System D Distribution Systems- Perimeter Heat - Electric Baseboard D Distribution Systems- Perimeter Heat System - Hydronic Fin Tube D Controls and Instrumentation-DDC System D Controls and Instrumentation-Electric Controls D40 - Fire Protection-Fire Extinguishers D Low Tension Service and Dist.-Main Electrical Service - 600A 120/208V Description The building includes propane tanks and propane distribution system. Heat for the facility is provided by two gas fired hot water boilers, each rated at 400 MBTUH located in the boiler room. The HVAC system includes two air handling units: one located in the gymnasium and the other located in the boiler room. Includes hot water coils. The HVAC system includes distribution ductwork and diffusers. The HVAC ventilation system includes multiple rooftop exhaust fans. HVAC distribution system includes heating hot water piping and the associated valves, expansion tank, insulation and circulation pumps. The heating system includes electric baseboard heaters in the hallways, washrooms, service rooms and some selected classrooms. HVAC distribution includes a two-pipe system of heating hot water, with perimeter units in east wing classrooms. HVAC controls include a DDC system for system optimization, basic pc control, moderate sensor types and quantities. The system is in good condition. The building has electric wall-mounted thermostats and a basic local HVAC control system. Handheld type fire extinguishers are located throughout the building, as required. The building includes a typical electrical service, which includes incoming feeders, pull section, 600A main breaker section, CT section, and metering. Copyright 2016 VFA, Inc. All rights reserved. 1-Feb-16 5:41:29 PM Page 7 of 19

8 System Name D Low Tension Service and Dist.-Panelboards, Feeders, and Disconnects - 120/208V D Branch Wiring Devices- Branch Wiring - Equipment & Devices D Lighting Equipment- Lighting - Exterior D Lighting Equipment- Lighting - Interior D Lighting Equipment-Stage Lighting - Dated Gym Stage D Public Address and Music Systems-Public Address System D Telephone Systems- Telephone System D Clock and Program Systems-Bell System D Fire Alarm Systems-Fire Alarm System D Security and Detection Systems-Security System - Intrusion Alarm D Local Area Networks-LAN System D Emergency Light and Power Systems-Emergency Description The electrical distribution system includes 120/208V switchboards, local 100A and 200A panelboards, disconnects, and associated equipment. Branch wiring for this building includes interior and exterior branch wiring, devices, and utilization equipment. Exterior lighting consists of HID wall pack units. Lighting system includes fluorescent fixtures throughout the facility. Gymnasium is equipped with metal halide fixtures controlled by low-voltage switches. Hallways are lighted with surface mounted 1'x4' fixtures in the east wing and recessed 2'x4' fixtures in the west wing. Classrooms are lighted with recessed 2'x4, surface mounted 1'x4', and pendent 1'x4' fluorescent fixtures. Lighting fixtures have been upgraded with T8 lamps and electronic ballasts. Stage lights are provided on the stage in the gymnasium. The system is aged and inefficient and should be replaced. The public address system includes master console, speakers, conduit and shielded wiring. The telephone system includes Cat3 Wiring, RJ-11 Terminations, and BX panel. Centralized, automatic timed bell system for an average sized building. Bell system includes head end equipment, conduit, wire, electrician and helper time, and fittings. The building is provided with a zoned type Edwards 2280 Fire Detection and Alarm system consisting of a control panel in electrical room, annunciator near the entrance, manual pull stations, smoke detectors, heat detectors, and audible bell and visual alarms. An intrusion alarm system, utilizing motion detectors, provides surveillance for the building. The system has reached beyond BOMA life expectancy of 10 years and replacement should be planned. The building includes local area network wiring Cat5/Cat5e and RJ-45 Terminations. Ethernet equipment such as routers and switches is considered owner equipment, hence, is excluded here. LAN equipment (aside from cabling) has been removed and internet is no longer operational in the school. The emergency lighting system includes self-contained battery packs and lights with both remote and unit mounted heads. Copyright 2016 VFA, Inc. All rights reserved. 1-Feb-16 5:41:29 PM Page 8 of 19

9 System Name Description Lighting D Emergency Light and Power Systems-Exit Signs E - Equipment and Furnishings- Architectural Millwork - Typical 1972 E - Equipment and Furnishings- Casework - Elementary School Newer E - Equipment and Furnishings- Casework - Elementary School Older E - Equipment and Furnishings- Gym Equipment (Elementary School) E - Equipment and Furnishings- Gymnasium Stage Curtain E Fixed Casework-Fixed Lockers - Single Tier The school has LED exit signs to indicate the direction to the means of egress. The building includes typically found architectural millwork such as wood trim and wood paneling. The building includes typical classroom, library, kitchen, administration and office casework for an elementary school. The building includes typical classroom, library, kitchen, administration and office casework for an elementary school. Building includes equipment such as basketball hoops and climbing walls. Building includes gymnasium stage curtain.the system is in fair to good condition. The observed years remaining are extended. Student lockers, steel, baked enamel, single tier box, 450 x 375 x 1800mm. Copyright 2016 VFA, Inc. All rights reserved. 1-Feb-16 5:41:29 PM Page 9 of 19

10 Replacement Value Based on System Costs with Overheads Uniformat System Name Lifetime (Years) % Renew Year Installed Next Renewal Year Renewal Cost Replacement Cost A - Substructure Concrete Column Footings ,016 64,263 A - Substructure Foundation Wall and Footings - Crawlspace , ,043 B10 - Superstructure B10 - Superstructure B10 - Superstructure Flat Roof Assembly - Metal Deck Steel Framing #4,5 Sloped Roof Assembly - Wood Rafters and Decking #1 Flat Roof Assembly - Wood Deck Steel Framing # , , , ,871 93,938 B10 - Superstructure Floor Assembly - Wood Joists and Subfloor ,038 96,609 B10 - Superstructure Flat Roof Assembly - Metal Deck Steel Framing # ,916 94,659 B Ramps Accessible Ramp - Exterior Wood ,669 4,535 B Exterior Stairs and Fire Escapes Exterior Stairs - Concrete ,534 5,227 B Exterior Stairs and Fire Escapes Exterior Stairs - Wood ,716 16,710 B Exterior Walls Metal Siding on Framing , ,821 B Exterior Walls Painted Finish (Exterior Walls) ,771 8,617 B Exterior Windows Windows - Aluminum Newer ,496 13,197 B Exterior Windows Steel Windows ,272 3,418 B Exterior Windows Windows - Aluminum Older ,914 47,131 Copyright 2016 VFA, Inc. All rights reserved. 1-Feb-16 5:41:29 PM Page 10 of 19

11 Uniformat System Name Lifetime (Years) % Renew Year Installed Next Renewal Year Renewal Cost Replacement Cost B Exterior Doors Door Assembly - Single ,126 1,701 B Exterior Doors Door Assembly - Storefront Double ,046 5,637 B Exterior Doors Door Assembly - Double ,319 9,855 B Exterior Doors Door Assembly - Double ,319 9,855 B30 - Roofing SBS Modified Bitumen Membrane # , ,382 B30 - Roofing SBS Modified Bitumen Membrane # ,461 12,369 B30 - Roofing SBS Modified Bitumen Membrane # ,461 12,369 B30 - Roofing SBS Modified Bitumen Membrane # , ,484 B30 - Roofing SBS Modified Bitumen Membrane # ,023 71,218 C Partitions Plywood on Stud , ,966 C Partitions Glazed Partitions ,214 8,971 C Interior Doors Swinging Doors Wood and Metal , ,567 C Interior Doors Swinging Doors Wood and Metal ,491 22,793 C Fittings Washroom Accessories ,567 29,253 C Fittings Metal Partitions Washrooms ,172 22,538 C Identifying Devices Signage (Room Numbering and Identification) ,279 11,423 C20 - Stairs Stairs Typical ,083 24,220 C Wall Finishes Hardboard Paneling ,455 84,252 C Wall Finishes Ceramic Wall Tile ,077 28,861 Copyright 2016 VFA, Inc. All rights reserved. 1-Feb-16 5:41:29 PM Page 11 of 19

12 Uniformat System Name Lifetime (Years) % Renew Year Installed Next Renewal Year Renewal Cost Replacement Cost C Wall Finishes Painted Finish - Average (1 Coat Prime - 2 Coats Finish) ,827 60,661 C Floor Finishes Vinyl Composite Tile Premium ,618 26,894 C Floor Finishes Vinyl Sheet Goods ,021 32,017 C Floor Finishes Carpeting - Broadloom , ,436 C Floor Finishes Ceramic Floor Tile ,802 54,241 C Floor Finishes Concrete - Painted or Sealed , C Floor Finishes Wood Strip Flooring ,841 71,073 C Ceiling Finishes Concealed Spline ACT ,230 46,584 C Ceiling Finishes GWB Taped and Finished ,709 10,167 C Ceiling Finishes Suspended ACT ,730 85,384 D Plumbing Fixtures Restroom Fixtures Wing ,244 32,195 D Plumbing Fixtures Classroom Sinks ,746 18,197 D Plumbing Fixtures Custodial Sink ,150 20,920 D Plumbing Fixtures Drinking Fountains ,184 5,747 D Plumbing Fixtures Restroom Fixtures ,198 32,158 D Domestic Water Distribution Water Heater - Electric ,246 8,255 D Domestic Water Distribution Water Dist Complete ,604 82,314 D Domestic Water Distribution Water Heater - Electric ,705 6,880 D Sanitary Waste Sanitary Waste - Gravity Disch ,888 62,311 Copyright 2016 VFA, Inc. All rights reserved. 1-Feb-16 5:41:29 PM Page 12 of 19

13 Uniformat System Name Lifetime (Years) % Renew Year Installed Next Renewal Year Renewal Cost Replacement Cost D Rain Water Drainage Roof Drainage - Gravity ,118 86,494 D Other Plumbing Systems Propane Supply for Bldg ,523 53,219 D Heat Generating Systems Boilers HW - Propane Fired MBTUH ,150 43,320 D Distribution Systems Hot Water Pipe Distribution System ,079 82,463 D Distribution Systems Distribution Ductwork , ,832 D Distribution Systems Air Handling Units ,532 86,825 D Distribution Systems Exhaust System ,225 23,380 D Distribution Systems Perimeter Heat System - Hydronic Fin Tube ,365 73,213 D Distribution Systems Perimeter Heat - Electric Baseboard ,993 24,994 D Controls and Instrumentation Electric Controls ,592 21,273 D Controls and Instrumentation DDC System ,076 36,061 D40 - Fire Protection Fire Extinguishers ,154 3,003 D Low Tension Service and Dist. Panelboards, Feeders, and Disconnects - 120/208V ,173 69,738 D Low Tension Service and Dist. Main Electrical Service - 600A 120/208V ,034 43,227 D Branch Wiring Devices Branch Wiring - Equipment & Devices ,852 25,482 D Lighting Equipment Lighting - Interior ,311 79,449 D Lighting Equipment Lighting - Exterior ,113 2,490 D Lighting Equipment Stage Lighting - Dated Gym Stage ,319 29,855 D Public Address and Music Systems Public Address System ,123 27,298 Copyright 2016 VFA, Inc. All rights reserved. 1-Feb-16 5:41:29 PM Page 13 of 19

14 Uniformat System Name Lifetime (Years) % Renew Year Installed Next Renewal Year Renewal Cost Replacement Cost D Telephone Systems Telephone System ,900 26,258 D Clock and Program Systems Bell System ,281 16,225 D Fire Alarm Systems Fire Alarm System ,704 50,964 D Security and Detection Systems Security System - Intrusion Alarm ,171 20,137 D Local Area Networks LAN System ,806 31,818 D Emergency Light and Power Systems D Emergency Light and Power Systems Emergency Lighting ,661 16,529 Exit Signs ,404 14,723 E - Equipment and Furnishings Gym Equipment (Elementary School) ,637 33,310 E - Equipment and Furnishings Architectural Millwork - Typical ,700 52,560 E - Equipment and Furnishings Casework - Elementary School Newer ,157 52,125 E - Equipment and Furnishings Casework - Elementary School Older ,383 71,507 E - Equipment and Furnishings Gymnasium Stage Curtain ,874 16,700 E Fixed Casework Fixed Lockers - Single Tier ,712 18,169 Subtotal 4,340,772 Overhead: 0 Total Replacement Value Based on System Costs with Overheads 4,340,772 Copyright 2016 VFA, Inc. All rights reserved. 1-Feb-16 5:41:29 PM Page 14 of 19

15 Subtotal 0 Total Replacement Value Based on System Costs with Overheads 4,340,772 Requirements including Renewals Copyright 2016 VFA, Inc. All rights reserved. 1-Feb-16 5:41:29 PM Page 15 of 19

16 1,200,000 Costs by Requirement Type 1,000,000 Cost CAD 800, , , , Non-Renewal Requirements Renewal Requirement Name Renewal Prime System Category Priority Action Date Estimated Cost Accessible Ramp - Exterior Wood Renewal Yes B Ramps Beyond Useful Life 1- Immediate 29-Jul-14 5,669 Air Handling Units Renewal Yes D Distribution Systems Beyond Useful Life 3- Long Term 29-Jul ,532 Architectural Millwork - Typical 1972 Renewal Yes E - Equipment and Furnishings Beyond Useful Life 1- Immediate 29-Jul-14 65,700 Bell System Renewal Yes D Clock and Program Systems Beyond Useful Life 3- Long Term 29-Jul-17 20,281 Branch Wiring - Equipment & Devices Renewal Yes D Branch Wiring Devices Beyond Useful Life 3- Long Term 29-Jul-17 31,852 Carpeting - Broadloom Renewal Yes C Floor Finishes Beyond Useful Life 1- Immediate 29-Jul ,294 Casework - Elementary School Older Renewal Yes E - Equipment and Furnishings Beyond Useful Life 1- Immediate 29-Jul-14 89,383 Copyright 2016 VFA, Inc. All rights reserved. 1-Feb-16 5:41:29 PM Page 16 of 19

17 Requirement Name Renewal Prime System Category Priority Action Date Estimated Cost Classroom Sinks Renewal Yes D Plumbing Fixtures Beyond Useful Life 3- Long Term 29-Jul-20 22,746 Concealed Spline ACT Renewal Yes C Ceiling Finishes Beyond Useful Life 3- Long Term 29-Jul-17 58,230 Concrete - Painted or Sealed Renewal Yes C Floor Finishes Beyond Useful Life 1- Immediate 29-Jul-14 1,164 Custodial Sink Renewal Yes D Plumbing Fixtures Beyond Useful Life 3- Long Term 29-Jul-20 26,150 Distribution Ductwork Renewal Yes D Distribution Systems Beyond Useful Life 3- Long Term 29-Jul ,040 Distribution Systems - Fire Stopping Not Installed No D Distribution Systems Building Code 2- Short Term 29-Jul-16 1,197 Door Assembly - Double 1972 Renewal Yes B Exterior Doors Beyond Useful Life 1- Immediate 29-Jul-14 12,319 Door Assembly - Single Renewal Yes B Exterior Doors Beyond Useful Life 1- Immediate 29-Jul-14 2,126 Drinking Fountains Renewal Yes D Plumbing Fixtures Beyond Useful Life 3- Long Term 29-Jul-20 7,184 Electric Controls Renewal Yes D Controls and Instrumentation Beyond Useful Life 3- Long Term 29-Jul-17 26,592 Emergency Lighting Renewal Yes D Emergency Light and Power Systems Beyond Useful Life 1- Immediate 29-Jul-15 20,661 Exhaust System Renewal Yes D Distribution Systems Beyond Useful Life 3- Long Term 29-Jul-17 29,225 Exit Signs Renewal Yes D Emergency Light and Power Systems Beyond Useful Life 3- Long Term 29-Jul-19 18,404 Exterior Doors x 2100 Cracked Glazing No B Exterior Doors Reliability 2- Short Term 29-Jul Exterior Stairs - Wood Renewal Yes B Exterior Stairs and Fire Escapes Beyond Useful Life 3- Long Term 29-Jul-17 18,716 Fire Alarm System Renewal Yes D Fire Alarm Systems Beyond Useful Life 3- Long Term 29-Jul-17 63,704 Fire Sealant Required in Boiler Room No C Ceiling Finishes Life Safety 1- Immediate 29-Jul Gymnasium Stage Curtain Renewal Yes E - Equipment and Furnishings Beyond Useful Life 3- Long Term 29-Jul-19 20,875 Hot Water Pipe Distribution System Renewal Yes D Distribution Systems Beyond Useful Life 3- Long Term 29-Jul ,079 LAN System Renewal Yes D Local Area Networks Beyond Useful Life 3- Long Term 29-Jul-17 33,806 Lighting - Exterior Renewal Yes D Lighting Equipment Beyond Useful Life 3- Long Term 29-Jul-17 3,113 Main Electrical Service - 600A 120/208V Renewal Yes D Low Tension Service and Dist. Beyond Useful Life 3- Long Term 29-Jul-20 54,034 Copyright 2016 VFA, Inc. All rights reserved. 1-Feb-16 5:41:29 PM Page 17 of 19

18 Requirement Name Renewal Prime System Category Priority Action Date Estimated Cost Painted Finish (Exterior Walls) Renewal Yes B Exterior Walls Beyond Useful Life 1- Immediate 29-Jul-14 10,771 Painted Finish - Average (1 Coat Prime - 2 Coats Finish) Renewal Yes C Wall Finishes Beyond Useful Life 3- Long Term 29-Jul-19 75,827 Panelboards, Feeders, and Disconnects - 120/208V Renewal Yes D Low Tension Service and Dist. Beyond Useful Life 3- Long Term 29-Jul-20 87,173 Perimeter Heat - Electric Baseboard Renewal Yes D Distribution Systems Beyond Useful Life 3- Long Term 29-Jul-17 27,993 Perimeter Heat System - Hydronic Fin Tube Renewal Yes D Distribution Systems Beyond Useful Life 3- Long Term 29-Jul-17 82,365 Propane Supply for Bldg Renewal Yes D Other Plumbing Systems Beyond Useful Life 3- Long Term 29-Jul-20 66,523 Public Address System Renewal Yes D Public Address and Music Systems Beyond Useful Life 3- Long Term 29-Jul-17 34,123 Restroom Fixtures Wing Renewal Yes D Plumbing Fixtures Beyond Useful Life 3- Long Term 29-Jul-17 40,244 Restroom Fixtures Renewal Yes D Plumbing Fixtures Beyond Useful Life 3- Long Term 29-Jul-17 40,198 SBS Modified Bitumen Membrane #1 Renewal Yes B30 - Roofing Beyond Useful Life 3- Long Term 29-Jul ,478 SBS Modified Bitumen Membrane #2 Renewal Yes B30 - Roofing Beyond Useful Life 2- Short Term 29-Jul-16 89,023 SBS Modified Bitumen Membrane #3 Renewal Yes B30 - Roofing Beyond Useful Life 3- Long Term 29-Jul ,605 SBS Modified Bitumen Membrane #4 Renewal Yes B30 - Roofing Beyond Useful Life 3- Long Term 29-Jul-17 15,461 SBS Modified Bitumen Membrane #5 Renewal Yes B30 - Roofing Beyond Useful Life 3- Long Term 29-Jul-17 15,461 Security System - Intrusion Alarm Renewal Yes D Security and Detection Systems Beyond Useful Life 3- Long Term 29-Jul-17 25,171 Signage (Room Numbering and Identification) Renewal Yes C Identifying Devices Beyond Useful Life 1- Immediate 29-Jul-14 14,279 Stage Lighting - Dated Gym Stage Renewal Yes D Lighting Equipment Beyond Useful Life 3- Long Term 29-Jul-17 37,319 Steel Windows Renewal Yes B Exterior Windows Beyond Useful Life 1- Immediate 29-Jul-14 4,272 Suspended ACT Renewal Yes C Ceiling Finishes Beyond Useful Life 3- Long Term 29-Jul ,730 Telephone System Renewal Yes D Telephone Systems Beyond Useful Life 3- Long Term 29-Jul-17 27,900 Vinyl Composite Tile Premium Renewal Yes C Floor Finishes Beyond Useful Life 1- Immediate 29-Jul-14 33,618 Vinyl Sheet Goods Renewal Yes C Floor Finishes Beyond Useful Life 3- Long Term 29-Jul-17 40,021 Copyright 2016 VFA, Inc. All rights reserved. 1-Feb-16 5:41:29 PM Page 18 of 19

19 Requirement Name Renewal Prime System Category Priority Action Date Estimated Cost Water Dist Complete Renewal Yes D Domestic Water Distribution Beyond Useful Life 3- Long Term 29-Jul-17 92,604 Water Heater - Electric Renewal Yes D Domestic Water Distribution Beyond Useful Life 3- Long Term 29-Jul-17 9,246 Water Ingress at the Crawl Space No A - Substructure Reliability 2- Short Term 29-Jul-16 6,241 Windows - Aluminum Older Renewal Yes B Exterior Windows Beyond Useful Life 1- Immediate 29-Jul-14 58,914 Total 2,543,415 Copyright 2016 VFA, Inc. All rights reserved. 1-Feb-16 5:41:29 PM Page 19 of 19