1 ADDENDUM NO. 01 PROJECT Colby Glass E.S. Window Upgrades and ADA Work PROJECT NO DATE February 07, 2018 TO: All Prime Contract Bidders and all others to whom Drawings and Specifications have been issued by the Architect/Engineer. This Addendum forms a part of the Contract Documents. This addendum modifies and supplements the Contract Documents as follows for the above-mentioned project and includes two (2) pages, three (3) attachments, and no revised drawing sheets. All other provisions of the Documents remain the same. CLARIFICATIONS None CHANGES TO THE SPECIFICATIONS ITEM NO. 1. ITEM NO. 2. ITEM NO. 3. ITEM NO. 4. ITEM NO. 5. ITEM NO. 6. ITEM NO. 7. TABLE OF CONTENTS: A. Remove Table of Contents and insert new attached Table of Contents. Add new SECTION NO , ALLOWANCES to the Specifications. SECTION NO , UNIT PRICES: A. At subparagraph 1.8.A.1, add allow for brick toothing. to the end of the description. SECTION NO , TEMPORARY PROJECT SIGNAGE: A. Added attached edited drawing SECTION NO , ARCHITECTURAL WOOD CASEWORK: A. At Paragraphs B. 1 and 2, revise wood species to read Select White Birch or Select White Maple. B. At Paragraph C.: Delete paragraph in its entirety. All cabinets are to be wood veneer. C. At Paragraph A, revise to read Plastic Laminate Countertops: ¾ inch plywood substrate covered with HPDL, conventionally fabricated, post formed and self-edge banded. SECTION NO , DOOR HARDWARE: A. Hardware Schedule: 1) Eliminate HWS #101 and add Door E105B to Hardware Set #104. 2) Hardware Set #103: Revise label from Privacy to Passage. SECTION No , TOILET, BATH, AND LAUNDRY ACCESSORIES: A. Add subparagraph B.1: Product: Kimberly-Clark In-Sight Lev-R-Matic II Roll Paper Towel Dispenser #KIM09736.

2 ADDENDUM NO February 07, 2018 Page 2 of 2 CHANGES TO THE DRAWINGS ITEM NO. 8. DRAWING SHEET NO. A201, SCHEDULES & DETAILS: A. TOILET ACCESSORY SCHEDULE, Change TA-3 to read Kimberly-Clark In-Sight Lev-R-Matic II Roll Paper Towel Dispenser #KIM ITEM NO. 9. DRAWING SHEET NO. A402, ENLARGED PLANS & ELEV.: A. C3/A402 Provide one TA-8 Sanitary Napkin Disposal Unit. Install top at 2-0 a.f.f. o 0 o T:\16043\15-0_Bidding\Addenda\Addendum No. 1.docx

3 T NISD Colby Glass ES Window Upgrades and ADA Work (slew512) TOC - 1 of 3 TABLE OF CONTENTS DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS PROCUREMENT AND CONTRACTING REQUIREMENTS PROVIDED BY THE OWNER (See Table of Contents for included documents) AVAILABLE PROJECT INFORMATION STC Asbestos Survey Report Dated January 26, ADDITIONAL SUPPLEMENTARY CONDITIONS DIVISION 01 GENERAL REQUIREMENTS PROVISIONS FOR ACCESSIBILITY SUMMARY Roof Membrane Guarantee No. TXSADF by U.S. Ply, Inc. Roof Membrane Guarantee No by Siplast, Inc. (for areas A,E, and F) PRICE AND PAYMENT PROCEDURES ALLOWANCES (Addendum No. 1) UNIT PRICES ALTERNATES ADMINISTRATIVE REQUIREMENTS Substitution Request form (Pre-Bid) Substitution Request form (Post-Bid & after execution of Contract) Release of Liability and Indemnification for Use of Electronic Files Notice to Comply (NTC) Form RFI Form AIA Document G CONSTRUCTION PROGRESS SCHEDULE QUALITY REQUIREMENTS REGULATORY REQUIREMENTS TEMPORARY FACILITIES AND CONTROLS TEMPORARY PROJECT SIGNAGE S1 Temporary Project Sign PRODUCT REQUIREMENTS VOLATILE ORGANIC COMPOUND (VOC) CONTENT RESTRICTIONS EXECUTION AND CLOSEOUT REQUIREMENTS CLOSEOUT SUBMITTALS DIVISION 02 EXISTING CONDITIONS DEMOLITION LEAD-BASED PAINT REMOVAL AND DISPOSAL DIVISION 03 CONCRETE - NOT USED T:\16043\13-0_Specs\XXX No Input\Cover & TOC\TOC-MF2004-FULL--RED.doc TABLE OF CONTENTS TOC - 1

4 T NISD Colby Glass ES Window Upgrades and ADA Work (slew512) TOC - 2 of 3 DIVISION 04 MASONRY UNIT MASONRY CAST STONE MASONRY DIVISION 05 METALS COLD-FORMED METAL FRAMING METAL FABRICATIONS PIPE AND TUBE RAILINGS DIVISION 06 WOOD, PLASTIC, & COMPOSITES ROUGH CARPENTRY ROOF CARPENTRY (RC) ARCHITECTURAL WOOD CASEWORK DIVISION 07 THERMAL AND MOISTURE PROTECTION THERMAL INSULATION MEMBRANE FLASHING FLUID-APPLIED AIR BARRIER ASSEMBLY ROOF INSTALLER S WARRANTY (RC) ROOF SYSTEM REPAIRS (RC) JOINT SEALANTS EXPANSION JOINT COVER ASSEMBLIES DIVISION 08 OPENINGS HOLLOW METAL FRAMES FLUSH WOOD DOORS ALUMINUM-FRAMED STOREFRONTS DOOR HARDWARE GLAZING METAL COMPOSITE WINDOW INFILL PANELS DIVISION 09 FINISHES GYPSUM BOARD ASSEMBLIES CEMENT PLASTERING TILING ACOUSTICAL CEILINGS RESILIENT FLOORING EXTERIOR PAINTING INTERIOR PAINTING DIVISION 10 Through 20 NOT USED DIVISION 21 FIRE SUPPRESSION T:\16043\13-0_Specs\XXX No Input\Cover & TOC\TOC-MF2004-FULL--RED.doc TABLE OF CONTENTS TOC - 2

5 T NISD Colby Glass ES Window Upgrades and ADA Work (slew512) TOC - 3 of 3 DIVISION 22 PLUMBING (15410) PLUMBING PIPING (15440) PLUMBING FIXTURES DIVISION 23 HEATING, VENTILATING, & AIR CONDITIONING - MEP (15010) GENERAL REQUIREMENT FOR MECHANICAL AND ELECTRICAL (15050) BASIC MECHANICAL MATERIALS AND METHODS (15890) AIR DISTRIBUTION DIVISION 24 and 25 NOT USED DIVISION 26 ELECTRICAL (16010) BASIC ELECTRICAL REQUIREMENTS (16950) TESTING (16050) BASIC ELECTRICAL MATERIALS AND METHODS (16500) LIGHTING DIVISION 27 - COMMUNICATIONS ATTACHMENTS CONSULTANT KEY. Key Discipline Company Telephone MEP Mechanical, Electrical and Wallis Engineering Group (210) Plumbing Engineers 8031 Broadway San Antonio, TX RC Roofing Consultant Hollon + Cannon (512) Research Blvd. Austin, TX SE Structural Engineer RSCR 1950 La Manda Blvd. San Antonio, TX (210) END OF TABLE OF CONTENTS (TOC) T:\16043\13-0_Specs\XXX No Input\Cover & TOC\TOC-MF2004-FULL--RED.doc TABLE OF CONTENTS TOC - 3

6

7 T NISD Colby Glass ES - Window Upgrades & ADA Work (slew512) of 2 PART 1 GENERAL SECTION ALLOWANCES 1.1 SECTION INCLUDES A. Cash allowances. B. Contingency allowance. C. Payment and modification procedures relating to allowances. 1.2 RELATED REQUIREMENTS A. Section Price and Payment Procedures: Additional payment and modification procedures. 1.3 CASH ALLOWANCES A. Costs Included in Cash Allowances: Cost of product for purchase, delivery, and installation to Contractor or subcontractor, less applicable trade discounts. B. Architect Responsibilities: 1. Consult with Contractor for consideration and selection of products, suppliers, and installers. 2. Select products in consultation with Owner and transmit decision to Contractor. 3. Prepare Change Order. C. Contractor Responsibilities: 1. Assist Architect in selection of products, suppliers, and installers. 2. Obtain proposals from suppliers and installers and offer recommendations. 3. On notification of which products have been selected, execute purchase agreement with designated supplier and installer. 4. Arrange for and process shop drawings, product data, and samples. Arrange for delivery. 5. Promptly inspect products upon delivery for completeness, damage, and defects. Submit claims for transportation damage. D. Differences in costs will be adjusted by Change Order. 1.4 CONTINGENCY ALLOWANCE A. Contractor's costs for products, delivery, installation, labor, insurance, payroll, taxes, bonding, equipment rental, overhead and profit will be included in Change Orders authorizing expenditure of funds from this Contingency Allowance. B. Funds will be drawn from the Contingency Allowance only by Change Order. C. At closeout of Contract, funds remaining in Contingency Allowance will be credited to Owner by Change Order. 1.5 ALLOWANCES SCHEDULE A. Section Unit Masonry: Include a stipulated sum for purchase, delivery, and installation of 500 sf of brick veneer at the Unit Price determined in Section Unit Prices. B. Contingency Allowance: Include the stipulated sum/price of $25,000 for use upon Owner's instructions. PART 2 PRODUCTS - NOT USED PART 3 EXECUTION - NOT USED END OF SECTION Addendum No. 01 ALLOWANCES

8 T NISD Colby Glass ES - Window Upgrades & ADA Work (slew512) of 2 Addendum No. 01 ALLOWANCES