REVISION INFORMATION SHEET ONTARIO PROVINCIAL STANDARDS FOR ROADS AND PUBLIC WORKS

Size: px
Start display at page:

Download "REVISION INFORMATION SHEET ONTARIO PROVINCIAL STANDARDS FOR ROADS AND PUBLIC WORKS"

Transcription

1 Ontario Provincial Standards 301 St. Paul St., 2 nd Floor North St. Catharines, ON L2R 7R4 Telephone: Fax: REVISION INFORMATION SHEET ONTARIO PROVINCIAL STANDARDS FOR ROADS AND PUBLIC WORKS VOLUME 1 GENERAL CONDITIONS OF CONTRACT AND SPECIFICATIONS FOR CONSTRUCTION MANUAL REVISION #75 NOVEMBER 2005 Each Owner is responsible for determining implementation dates and directions for use of Ontario Provincial Standards; therefore, manual holders are cautioned about immediately discarding superseded and cancelled standards. NEW METHOD FOR PUBLISHING ONTARIO PROVINCIAL STANDARDS With this publication of the Ontario Provincial Standards comes a new method of publishing the standards, both specifications and drawings. Now the Ontario Provincial Standards are available online with free access on the Ontario Ministry of Transportation (MTO) Library site at: < At this URL, you will find the latest versions of the published standards, archives of the previously published standards, Revision Information Sheets for currently and previously published standards, indexes for each OPS volume, and OPS User Notes. Hard-copy paper versions of the standards are available through Publications Ontario and may be ordered online for a nominal fee at: < At this URL, you can type Ontario Provincial Standards in the search box, and all related products for the Ontario Provincial Standards will be listed, click on the item you wish to purchase, add the item to your cart, then follow the instructions to complete your order. Hard-copy versions of OPS Volumes 1 to 3 are sold as an item, and OPS Volume 4 is sold separately. Planned for December release will be OPS Volumes 1 to 4 in PDF format on CD and OPS Volumes 3 and 4 in AutoCAD format on a separate CD. Most revisions to the Ontario Provincial Standards are published at the end of November each year. There may also be a limited publishing at the end of April each year for issuing OPSS 127, Schedule Of Rental Rates For Construction Equipment, Including Model And Specification Reference; correcting errors in recently published standards; and issuing time-sensitive revised standards. The Ontario Provincial Standards for Roads and Public Works organization is working with Publications Ontario to develop a system of notifying OPS users, regardless of the source from which they purchased their hard-copy standard volumes. Every effort is being made to ensure a smooth transition from one publisher to the next so OPS users are made aware of revisions to the standards as they are published. It is our intention to keep OPS users informed of available updates to the standards. Rev. Info Sheet - OPS Volume 1: Rev. Number 75 (Date: 11/2005) Page 1

2 WAITING TO HEAR FROM YOU If you have a suggestion to revise a standard or you have a standard that works in your ministry, municipality, or area, send it to the Head, OPS Administration, for possible inclusion into the Ontario Provincial Standards. This manual is revised as follows: Index Pages Volume 1 Please remove the entire index and replace with the attached revised index. Standard Specifications Volume 1 Superseded/Cancelled (Remove) Revised/New (Insert) Remarks OPSS Dated OPSS Dated 180 January November 2005 GENERAL SPECIFICATION FOR THE MANAGEMENT OF EXCESS MATERIAL 316 April November 2005 CONSTRUCTION SPECIFICATION FOR EXTRUDED EXPANDED POLYSTYRENE FROST HEAVE TREATMENT November 2005 New Specification CONSTRUCTION SPECIFICATION FOR COLD IN-PLACE RECYCLING WITH EXPANDED ASPHALT 336 November November 2005 CONSTRUCTION SPECIFICATION FOR MICRO-SURFACING 351 September November 2005 CONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK 361 November November 2005 CONSTRUCTION SPECIFICATION FOR RUBBLIZING CONCRETE PAVEMENT AND CONCRETE BASE Subsection , Actual Measurement, reformatted. 405 February November 2005 CONSTRUCTION SPECIFICATION FOR PIPE SUBDRAINS 409 April November 2005 CONSTRUCTION SPECIFICATION FOR CLOSED-CIRCUIT TELEVISION INSPECTION OF PIPELINES November 2005 New Specification CONSTRUCTION SPECIFICATION FOR CEMENT MORTAR LINING OF WATERMAINS Page 2 Rev. Info Sheet - OPS Volume 1: Rev. Number 75 (Date: 11/2005)

3 Superseded/Cancelled (Remove) Revised/New (Insert) Remarks OPSS Dated OPSS Dated 501 February November 2005 CONSTRUCTION SPECIFICATION FOR COMPACTING 503 April November 2005 CONSTRUCTION SPECIFICATION FOR SITE PREPARATION FOR PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES 504 April November 2005 CONSTRUCTION SPECIFICATION FOR PRESERVATION, PROTECTION, AND RECONSTRUCTION OF EXISTING FACILITIES 506 November November 2005 CONSTRUCTION SPECIFICATION FOR DUST SUPPRESSANTS 507 April November 2005 CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOLLOWING INSTALLATION OF PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES 514 April November 2005 CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING 515 April November 2005 CONSTRUCTION SPECIFICATION FOR ROCK EXCAVATION FOR PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES IN OPEN CUT 516 April November 2005 CONSTRUCTION SPECIFICATION FOR EXCAVATING, BACKFILLING, AND COMPACTING FOR MAINTENANCE HOLES, CATCH BASINS, DITCH INLETS, AND VALVE CHAMBERS 517 April November 2005 CONSTRUCTION SPECIFICATION FOR DEWATERING OF PIPELINE, UTILITY, AND ASSOCIATED STRUCTURE EXCAVATION 538 April November 2005 CONSTRUCTION SPECIFICATION FOR SUPPORT SYSTEMS 541 December November 2005 CONSTRUCTION SPECIFICATION FOR CHAIN-LINK FENCE Rev. Info Sheet - OPS Volume 1: Rev. Number 75 (Date: 11/2005) Page 3

4 Superseded/Cancelled (Remove) Revised/New (Insert) Remarks OPSS Dated OPSS Dated November 2005 New Specification CONSTRUCTION SPECIFICATION FOR QUADGUARD SYSTEM November 2005 New Specification CONSTRUCTION SPECIFICATION FOR TRACC SYSTEM November 2005 New Specification CONSTRUCTION SPECIFICATION FOR TAU II SYSTEM 617 September November 2005 CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ROADWAY LUMINAIRES 630 April November 2005 CONSTRUCTION SPECIFICATION FOR INSTALLATION OF SECTIONAL STEEL HIGH MAST LIGHTING POLES Reference OPSS 601 deleted. OPSS 2476 title revised in Reference section. 910 November November 2005 CONSTRUCTION SPECIFICATION FOR STRESSING SYSTEMS FOR POST-TENSIONING 915 December November 2005 CONSTRUCTION SPECIFICATION FOR SIGN SUPPORT STRUCTURES 920 April November 2005 CONSTRUCTION SPECIFICATION FOR DECK JOINT ASSEMBLIES, PREFORMED SEALS, JOINT FILLERS, JOINT SEALS, JOINT SEALING COMPOUNDS, AND WATERSTOPS - STRUCTURES Revised drawing number and title referenced in Commentary. Page 4 Rev. Info Sheet - OPS Volume 1: Rev. Number 75 (Date: 11/2005)

5 SUMMARY OF REVISIONS TO OPSS 180 November 2005 GENERAL SPECIFICATION FOR THE MANAGEMENT OF EXCESS MATERIAL Title revised. Section , Scope, revised. Section , Definitions, revised definitions for Concrete and Waste. Definitions reordered. Section , Submission And Design Requirements, subsections revised for Notification of Site Selection and Property Owner Release, Verification of Management by Disposal as Non-Hazardous Solid Industrial or Commercial Waste, and Notification of Forest Resource Licensees. Section , Construction, revised subsections for Conditions on Management of Excess Material - General, Conditions on Management as Disposable Fill, Conditions on Management by Open Burning, Conditions on Management by Disposal as Non-Hazardous Solid Industrial or Commercial Waste, and Conditions on Management by Stockpiling. Section , Basis Of Payment, revised. Table 1 revised. Ontario Provincial Standards Forms (OPSF) 180-1, 180-2, 180-3, 180-4, and renumbered. OPSF 180-1, 180-2, and revised. SUMMARY OF REVISIONS TO OPSS 316 November 2005 CONSTRUCTION SPECIFICATION FOR EXTRUDED EXPANDED POLYSTYRENE FROST HEAVE TREATMENT Section , Scope, has been rewritten. References have been updated. Reference to OPSS 502 has been deleted. Subsection , Extruded Expanded Polystyrene, has been rewritten. Existing subsection , SS-1 Emulsion, title has been revised to Emulsified Asphalt and the subsection has been rewritten. Subsection , Tack Coat, has been added. Other subsections have been reordered. Section , Construction, has been rewritten. Subsection , Plan Quantity Measurement, and clause have been added. Tack Coat item added to subsection Rev. Info Sheet - OPS Volume 1: Rev. Number 75 (Date: 11/2005) Page 5

6 SUMMARY OF REVISIONS TO OPSS 336 November 2005 CONSTRUCTION SPECIFICATION FOR MICRO-SURFACING Requirements for Micro-Surfacing Type III Modified have been added throughout the specification. References have been updated. Reference to OPSS 180 has been deleted. Reference to OPSS 532 has been added. References to ASTM D 2170 and ASTM D 2419 have been deleted. References to the following Ministry of Transportation Publications have been added: LS-200, LS-216, LS-609, LS-625, Ontario Traffic Manual, Book 7 - Temporary Conditions, and SP-024. Reference to CAN/CSA A3001 has been added. Section , Definitions, has been added. First paragraph of subsection , Polymer Modified Emulsified Asphalt, has been rewritten. Subsection , Mineral Filler, has been rewritten. Subsection , Tack Coat, has been added. Subsections , Pilot Vehicle; , Operational Constraints; , Documentation, and , Surface Preparation, have been rewritten. Clause , paragraph 2 has been rewritten. Existing subsection , Traffic Convoy, has been rewritten and renamed Traffic Control With Moving Vehicles. Subsection , Repairs, has been added and other subsections reordered. Subsection , Sampling, has been rewritten. Subsection , Warranty Requirements, has been added. Section , Basis of Payment, has been rewritten to delete the item for Traffic Convoy. Table 5, Micro-Surfacing Repair and Replacement Methods, added. Page 6 Rev. Info Sheet - OPS Volume 1: Rev. Number 75 (Date: 11/2005)

7 SUMMARY OF REVISIONS TO OPSS 351 November 2005 CONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK References have been updated. Reference to OPSS 350 has been deleted. Subsection , General, and , Concrete Curing, have been rewritten. Subsection , Management of Excess Material, has been added. Subsection , Plan Quantity Measurement, has been rewritten. SUMMARY OF REVISIONS TO OPSS 405 November 2005 CONSTRUCTION SPECIFICATION FOR PIPE SUBDRAINS References have been updated. References to OPSS 206 and CGSB 41-GP-29 have been deleted. References to OPSS 1004, OPSS 1010, OPSS 1841, and BNQ have been added. Sections , Definitions, , Materials, , Construction, , Measurement for Payment, and , Basis of Payment, have been rewritten. Section , Submission and Design Requirements, has been added. SUMMARY OF REVISIONS TO OPSS 409 November 2005 CONSTRUCTION SPECIFICATION FOR CLOSED-CIRCUIT TELEVISION INSPECTION OF PIPELINES The reference in section , References, has been updated. In section , Definitions, definitions for Business Day, CD, DVD, MPEG, and VRC have been added. Existing section , Submission and Design Requirements, has been rewritten. Existing section , Materials, has been rewritten. Existing section , Equipment, has been rewritten. Existing section , Construction, has been rewritten. Existing section , Quality Assurance, has been added. Existing section , Basis of Payment, has been rewritten. Rev. Info Sheet - OPS Volume 1: Rev. Number 75 (Date: 11/2005) Page 7

8 SUMMARY OF REVISIONS TO OPSS 501 November 2005 CONSTRUCTION SPECIFICATION FOR COMPACTING References have been updated. Reference to OPSS 102 and OPSS 1001 have been deleted. Reference to Ministry of Transportation Publication Report EM-54 deleted. Reference to MTO Laboratory Testing Manual test LS-623 added. Section , Definitions, has been added. Subsection , Earth, has been deleted. Subsection , Water, has been rewritten. Clause has been rewritten. Existing clause has been deleted. Subsection , Hand Operated Vibratory Equipment, has been renumbered Existing subsection , Water, has been renumbered and has been rewritten. Subsection , Nuclear Moisture and Density Gauge, has been added. Subsection , Restricted Zones, has been added. Existing subsection , Water for Compaction, has been renumbered and rewritten. Subsection , Compacting, has been deleted. Subsection , Quality Control, has been added. Sections , Quality Assurance; , Measurement for Payment; and , Basis of Payment, have been rewritten. An Appendix has been added for the Field Compaction Report. Page 8 Rev. Info Sheet - OPS Volume 1: Rev. Number 75 (Date: 11/2005)

9 SUMMARY OF REVISIONS TO OPSS 503 November 2005 CONSTRUCTION SPECIFICATION FOR SITE PREPARATION FOR PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES References have been updated. OPSS 180 reference has been deleted. OPSS 577 reference has been added. Existing subsection , Shrub and Tree Relocation, has been rewritten. Existing subsection , Tree Pruning, has been renamed and rewritten. Existing subsection , Stripping and Stockpiling Topsoil, has been rewritten. Existing subsection , Management and Disposal of Excess Material, has been renamed and rewritten. SUMMARY OF REVISIONS TO OPSS 504 November 2005 CONSTRUCTION SPECIFICATION FOR PRESERVATION, PROTECTION, AND RECONSTRUCTION OF EXISTING FACILITIES References have been updated. OPSS 180 reference has been deleted. Existing subsection , Notification, has been rewritten. Existing subsection , Management and Disposal of Excess Material, has been renamed and rewritten. Existing section , Basis of Payment, has been rewritten. SUMMARY OF REVISIONS TO OPSS 506 November 2005 CONSTRUCTION SPECIFICATION FOR DUST SUPPRESSANTS Reference to OPSS 102 has been deleted. Reference to OPSS 2503 has been added. Reference to and requirement for Ministry of Environment Letter of Agreement deleted throughout specification. Subsection , Dust Suppressants, has been rewritten. Subsection , Magnesium Chloride Flake and Magnesium Chloride Solution, has been added. Subsection , Mixing Tanks, has been deleted. Other subsections have been reordered. Subsection , General, has been rewritten. Rev. Info Sheet - OPS Volume 1: Rev. Number 75 (Date: 11/2005) Page 9

10 Clause has been rewritten. Clause and subsection , Management of Excess Material, have been added. Sections , Measurement and Payment, and , Basis of Payment, have been rewritten. SUMMARY OF REVISIONS TO OPSS 507 November 2005 CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOLLOWING INSTALLATION OF PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES The references in section , References, have been updated. OPSS 1541 reference has been added. OPSS 180 reference has been deleted. Existing subsection , Chain-Link Fence, has been rewritten. Existing subsection , Gates, has been rewritten. Existing subsection , Grading, has been rewritten. Existing subsection , Fences and Guide Rails, has been rewritten. Existing subsection , Shrub and Tree Replanting, has been rewritten. Existing subsection , Management and Disposal of Excess Material, has been renamed and rewritten. SUMMARY OF REVISIONS TO OPSS 514 November 2005 CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING The references in section , References, have been updated. OPSS 180 reference has been deleted. The definition for Maximum Dry Density in section , Definitions, has been deleted. Existing subsection , Temporary Protection Systems, has been renamed and rewritten. Clause has been rewritten. Clause has been rewritten. Existing subsection , Management and Disposal of Excess Material, has been renamed and rewritten. Page 10 Rev. Info Sheet - OPS Volume 1: Rev. Number 75 (Date: 11/2005)

11 SUMMARY OF REVISIONS TO OPSS 515 November 2005 CONSTRUCTION SPECIFICATION FOR ROCK EXCAVATION FOR PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES IN OPEN CUT The references in section , References, have been updated. OPSS 120 and 180 references have been deleted. Existing subsection , Use of Explosives, has been rewritten. Existing subsection , Management and Disposal of Excess Material, has been renamed and rewritten. In clause , the width measurement has been rewritten. SUMMARY OF REVISIONS TO OPSS 516 November 2005 CONSTRUCTION SPECIFICATION FOR EXCAVATING, BACKFILLING, AND COMPACTING FOR MAINTENANCE HOLES, CATCH BASINS, DITCH INLETS, AND VALVE CHAMBERS The references in section , References, have been updated. OPSS 180 reference has been deleted. The definition for Maximum Dry Density in section , Definitions, has been deleted. Existing subsection , General, has been rewritten. Existing subsection , Excavation, has been rewritten. Existing subsection , Additional Excavating, Backfilling, and Compacting, has been rewritten. Existing subsection , Management and Disposal of Excess Material, has been renamed and rewritten. SUMMARY OF REVISIONS TO OPSS 517 November 2005 CONSTRUCTION SPECIFICATION FOR DEWATERING OF PIPELINE, UTILITY, AND ASSOCIATED STRUCTURE EXCAVATION The references in section , References, have been updated. Section , Submission and Design Requirements, has been added. Subsection , Dewatering, has been rewritten. Rev. Info Sheet - OPS Volume 1: Rev. Number 75 (Date: 11/2005) Page 11

12 SUMMARY OF REVISIONS TO OPSS 538 November 2005 CONSTRUCTION SPECIFICATION FOR SUPPORT SYSTEMS Section , Submission and Design Requirements, has been added. Subsection , Installation, has been rewritten. Subsection , Management of Excess Material, has been added. SUMMARY OF REVISIONS TO OPSS 541 November 2005 CONSTRUCTION SPECIFICATION FOR CHAIN-LINK FENCE Section , References, OPSS 1350, FF-T-791b, CAN , CAN , CAN , CSA G162.1, and CSA-G164 have been deleted. OPSS 1541 and ASTM A 780 have been added. CSA W59 has been updated. Section , Definitions, definitions have been reordered. Definitions for Barbed, Corner Post, Non-Shrink Cement Grout, and Straining Post have been deleted. Definitions for Barbed Wire Arm, Twisted, and Selvage have been added. Definitions for Bottom Wire, End Post, Gate Post, Line Post, Terminal Post, Top Rail, and Top Wire have been rewritten. Section , Materials, material requirements have been moved to new OPSS Existing subsection , Chain Link Fence, has been deleted. Existing clause has been renumbered to and rewritten. Clause has been added to replace existing clauses and Existing clause has been renumbered to , renamed to Posts on Concrete Barrier, and 1 st paragraph has been rewritten. Clause has been renumbered to and 2 nd and 3 rd paragraphs have been deleted. Clause has been added to replace existing clauses and Existing clause has been renumbered to and rewritten. Existing clause has been renumbered to Existing clause has been renumbered to and rewritten. Existing clause has been renumbered to and rewritten. Existing subsection , Terminal Posts, has been deleted. Clause has been rewritten. Existing clause has been deleted. Subsection , Gates, has been rewritten. Page 12 Rev. Info Sheet - OPS Volume 1: Rev. Number 75 (Date: 11/2005)

13 Clause , 1 st paragraph has been rewritten. Subsection , Management of Excess Material, has been added. Section , Quality Assurance, has been added. Existing clause has been rewritten. Existing clause has been deleted. Other clause reordered. Subsection , item Terminal Posts has been deleted. Subsection , Removals and Replacements, has been added. SUMMARY OF REVISIONS TO OPSS 617 November 2005 CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ROADWAY LUMINAIRES Section , Scope, has been rewritten. Section , References, has been updated. OPSS 601, OPSS 2426, OPSS 2428, CSA C22.2 No. 59, CSA C22.2 No. 97, CSA C22.2 No. 136, CSA G164, CSA W59, ANSI A53, and IES Lighting Handbook references deleted. CSA C22.2 No. 9.0, CSA C22.2 No , and CSA C22.2 No references added. Section , Definitions, has been added. Existing subsection , Luminaires, Roadway Lighting Type, has been rewritten, renamed, and renumbered to Clause has been added and other clauses reordered. Existing subsection , Luminaires, Floodlighting Type, has been rewritten, renamed, and renumbered to Existing subsection , Lamps, has been rewritten and renumbered to and Table 1 has been moved to the back of the specification. Existing subsections , Brackets, Roadway Lighting Type and , Brackets, Floodlighting Type, have been rewritten and combined into subsection , Brackets. Existing subsection , Conduit and Fittings, has been rewritten and renumbered to Existing subsection , Fuse Holders and Fuses, has been rewritten and renumbered to Existing subsection , General, has been rewritten, 1 st paragraph has been rewritten, renamed, and renumbered to , Lamp Installation, and 2 nd paragraph has been rewritten, renamed, and renumber to , General. Clause , 2 nd, 3 rd, and 4 th paragraphs have been added. Subsection , Removals, has been added. Rev. Info Sheet - OPS Volume 1: Rev. Number 75 (Date: 11/2005) Page 13

14 Existing subsection , Brackets, Roadway Lighting Type, has been rewritten, renamed, and renumbered to Existing subsection , Brackets, Floodlighting Type, has been rewritten, renamed, and renumbered to Existing subsection , Luminaires, Roadway Lighting Type, 1 st paragraph has been rewritten, renamed, and renumbered to Existing subsection , Luminaires, Floodlighting Type, 1 st and 3 rd paragraphs have been rewritten, renamed, and renumbered to Clause has been added. Existing subsection , Wiring and Connections, 4 th paragraph has been rewritten and renumbered to Other subsections reordered. Existing subsection , Quality Control, has been split into two clauses, rewritten, and renumbered to and Section , Measurement for Payment, has been rewritten. Section , Basic of Payment, has been rewritten. Appendix 617-B has been added. SUMMARY OF REVISIONS TO OPSS 910 November 2005 CONSTRUCTION SPECIFICATION FOR STRESSING SYSTEMS FOR POST-TENSIONING Title revised. Section , Scope, revised. Section , References, added references OPSS 1304; Structural Manual, Division 1; CSA A283 and S6; ASTM A 53/A 53M, A 416/A 416M, D 2239, D 3350, and D 4285; and ISO/IEC Guide Deleted references OPSS 904, 919, 1301, 1303, 1350, and 1442; and Ontario Highway Bridge Design Code. Existing references updated. Section , Definitions, added definitions for Cementing Materials, Coupler, Deviator, Engineer, Primary Tendon Anchorages, Splice - Prestressing Tendon, Sublot, and Vent. Revised definitions for Calibration, Grout, and Proposal. Section , Submission and Design Requirements, rewritten. Section , Material, revised section entirely. Section , Equipment, added subsections for Air Compressor - Air Blasting, Grout Testing Equipment, and Malfunction of Gauges. Revised and reordered existing subsections. Section , Construction, revised section entirely. Page 14 Rev. Info Sheet - OPS Volume 1: Rev. Number 75 (Date: 11/2005)

15 Section , Quality Assurance, added subsections for Testing of Prestressing Steel; Anchorages, Spirals, and Couplers; Anchorage Outlet Sampling of Grout; and Material, Stressing Records and Test Results. Deleted subsection for Friction Test. Existing subsection revised and reordered. Section , Measurement for Payment, section deleted. Section , Basis of Payment, added subsection for Stressing System Payment Adjustment. Deleted subsection for Concrete. Existing subsection revised. SUMMARY OF REVISIONS TO OPSS 915 November 2005 CONSTRUCTION SPECIFICATION FOR SIGN SUPPORT STRUCTURES Section , Scope, revised. Section , References, added references OPSS 501, 603, 609, 902, 903, 904, 905, 906, 907, 911, 919, 1010, 1350, 1440, and 1601; Structural Manual, Division 1; CSA G40.21, S6, W47.2, W59, W59.2M, W178.1, and W178.2; ASTM A 307, A 314, A 325, A 325M, A 449, A 500, B 209M, and B 221M; CGSB ; SAE J403; and ISO/IEC Guide Deleted references CSA HA Series-M, S157, and S244. Section , Definitions, added definitions for Cantilever Sign Support, Column, Column Sign Support, Engineer, Leg, Monotube Overhead Sign Support, Overhead Sign Support Structure, Proposal, Sweep, and Sign. Section , Submission And Design Requirements, completely revised with subsection added for Submissions, and one for Design. Deleted existing subsection Shop Drawings for Steel Monotube Type Overhead Sign Supports, and subsection for Drawings of Erection Operation for Sign Support Structures. Section , Material, added subsections for General, Clamps, Concrete, Reinforcing Steel, Wood, Anchorage Assembly, Primer and Locking Compound, Electrical, Granular Backfill, and Coatings. Existing subsections revised. Section , Construction, completely revised with subsections added for Fabrication - Sign Support Structures, Footings - Overhead Sign Support Structures, Installation of Sign Support Structures, Steel and Wood Column Sign Supports, Site Trimming Around Footings, Bridge Mounted Sign Support Structures - Aluminum, Attachment of Signs, Quality Control, Submission of Certificate of Conformance, Repair of New and Existing Structures, and As Built Drawings. Existing subsections deleted with information incorporated into added subsections. Section , Quality Assurance, added. Section , Measurement For Payment, added subsections for Actual Measurement, and Plan Quantity Measurement. Deleted subsections for Sign Support Structures, and Sign Support Structure Footings. Section , Basis of Payment, added subsection to include items for sign support footings and sign support structures payment. Deleted subsections, Sign Support Structures, and Concrete Sign Support Structure Footings. Existing information revised and included in the added item subsection. Rev. Info Sheet - OPS Volume 1: Rev. Number 75 (Date: 11/2005) Page 15